PlantPlant‐‐Wide Odour Control StrategyWide Odour Control StrategyPresented to Humber Treatment PlantPresented to Humber Treatment Plant
Neighbourhood Liaison CommitteeNeighbourhood Liaison Committee
February 16, 2011February 16, 2011
![Page 2: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/2.jpg)
AgendaAgenda
•Project Overview•Odour Sampling
•Air Model Baseline Results
•Identified Odour Sources•Treatment Strategies
•Phase I•Phase II
•Air Model Results Summary
![Page 3: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/3.jpg)
Project OverviewProject Overview•Located on 130 Queensway
•Constructed in 1950’s
•Several Upgrades/phased expansions since then
•Process Upgrades made to reduce odour
•Stantec conducting Process and Odour Upgrade Contract
![Page 4: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/4.jpg)
Odour SamplingOdour Sampling
•3 Rounds of odour sampling completed
•September 22‐25, 2008
•January 16, 2009
•September 2‐3, 2009
•Sampled 6 process areas of concern
1. Inlet Sewer 4. North Primary Clarifiers
2. Headworks Facility 5. South Primary Clarifiers
3. North Grit Building 6. Aeration
Aeration Sampling Location
![Page 5: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/5.jpg)
Air Model Air Model –– Baseline ResultsBaseline Results
![Page 6: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/6.jpg)
![Page 7: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/7.jpg)
Air Model Air Model –– Baseline ResultsBaseline ResultsOdour distribution at most sensitive receptorOdour distribution at most sensitive receptor
![Page 8: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/8.jpg)
Identified Odour Sources Identified Odour Sources –– Phase IPhase I
![Page 9: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/9.jpg)
Identified Odour Sources Identified Odour Sources –– Phase IIPhase II
![Page 10: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/10.jpg)
Treatment Strategy Treatment Strategy –– Phase IPhase I•Underground Biofilter to treat:
•Headworks Facility (screens, grit chambers, channels, and proposed truck bay)
•North Grit Building (grit tanks and channels)
•North Primary Clarifiers (influent and effluent channels)
•Above Ground Biofilter to treat:
•South Primary Clarifiers (influent and effluent channels)
•Carbon Adsorber located adjacent to Headworks Facility to treat:
•Screen Room in Headworks Facility
![Page 11: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/11.jpg)
Treatment Strategy Treatment Strategy –– Phase IPhase I
![Page 12: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/12.jpg)
Treatment Strategy Treatment Strategy –– Phase IPhase I
BiofilterCarbon Unit
![Page 13: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/13.jpg)
Treatment Strategy Treatment Strategy –– Phase IIPhase II•Cover Phase I biofilter and exhaust with strobic fan
•Contain air from North and South Primary Clarifiers with a new building and covers and treat air with new biofilter
•Treat Aeration with new biofilter
•Cover both new biofilters and exhaust with strobic fan
•Treat Digester Buildings withnew carbon unit
![Page 14: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/14.jpg)
Treatment Strategy Treatment Strategy –– Phase IIPhase II
![Page 15: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/15.jpg)
Air Model Air Model –– Summary of ResultsSummary of ResultsAt Most Sensitive ReceptorAt Most Sensitive Receptor
Odour Concentration (OU)
Baseline Phase I Phase II
75 3.8 2.1
Phase I Phase I ‐‐ $9M, as part of a $55M project$9M, as part of a $55M projectPhase II Phase II ‐‐ $59M$59M
![Page 16: Plant Wide Odour Control Strategy · Microsoft PowerPoint - Ppt0000004.ppt [Read-Only] Author: NMARTIN Created Date: 2/17/2011 4:31:44 PM ...](https://reader033.fdocuments.in/reader033/viewer/2022042809/5f92a70c81a9d83bab12b41b/html5/thumbnails/16.jpg)
Questions??Questions??