PLANT · 2020. 5. 3. · bahaya, mendiagnosa kondisi operasi yang abnormal dan melakukan...

4
PERATOR RAINING IMULATOR O T S PLANT Training Provider Training Engineering Design Construction Commissioning PT.BANGUN ENERGI B E Drive Operational Effectiveness Drive Operational Effectiveness Learn in real control room environment Understanding the "why" not just the "how" the plant performs SIMGenics Representative Indonesia development | TRAINING | Consulting

Transcript of PLANT · 2020. 5. 3. · bahaya, mendiagnosa kondisi operasi yang abnormal dan melakukan...

Page 1: PLANT · 2020. 5. 3. · bahaya, mendiagnosa kondisi operasi yang abnormal dan melakukan troubleshooting. Hal ini sangatlah penting untuk memastikan power plant operation yang aman

PERATOR RAININGIMULATOR

OTS

PLANT

Training Provider

TrainingEngineering Design ConstructionCommissioning

P T. B A N G U N E N E R G IBEDriv e Operat ional Ef f e c t iv eness

Drive Operational Effectiveness

Learn in real control room environment

Understanding the "why" not just the "how" the plant performs

SIMGenics Representative Indonesia

development | TRAINING | Consulting

Page 2: PLANT · 2020. 5. 3. · bahaya, mendiagnosa kondisi operasi yang abnormal dan melakukan troubleshooting. Hal ini sangatlah penting untuk memastikan power plant operation yang aman

SIMGENICSoperator training simulator (OTS)

High fidelity-simulation software menggunakan basis

“Data Modeling” dari proses nyata dengan tujuan untuk melatih trainee (engineer/operator) dalam mengkontrol proses pembangkit baik dalam kondisi normal ataupun darurat tanpa mempengaruhi operasi pembangkit.

OTS-Manfaat dan Kegunaan“Operator Training”, OTS menyediakan fasilitas bagi para trainee untuk melakukan familiarisasi dengan prosedur operasi power plant, sebelum terjun mengoperasikan power plant tersebut secara langsung di lapangan. Sehingga, OTS ini bisa dipergunakan untuk mencetak engineer dan operator, mulai dari fresh graduate sampai menjadi engineer atau operator yang berkompetensi dan berkualitas.

OTS meningkatkan kompetensi operator sehingga para operator mampu untuk menghindari situasi yang berpotensi menimbulkan bahaya, mendiagnosa kondisi operasi yang abnormal dan melakukan troubleshooting. Hal ini sangatlah penting untuk memastikan power plant operation yang aman dan reliable.

OTS wajib diikuti oleh mahasiswa, program vokasi (politeknik), operator pembangkit, konsultan, dan tenaga pendidik yang ingin mendalami kompetensi dibidang pembangkit listrik.

Page 3: PLANT · 2020. 5. 3. · bahaya, mendiagnosa kondisi operasi yang abnormal dan melakukan troubleshooting. Hal ini sangatlah penting untuk memastikan power plant operation yang aman

CONSULTING (Simgenics OTS DESIGN)

Simgenics OTS TURNKEY PROJECT

Perancangan Model Simulator yg diperlukan sesuai dengan kondisi riil (tailor made)

Penyiapan OTS mulai dari Engineering, Procurement, Construction, and Commissioning

Kantor Administrasi : Jl. Muara Takus Raya No. A6/7 PHARMINDO – CIJERAH, BANDUNG

B. Advance TrainingPower Plant Optimization and Troubleshooting

PT.DATC

Nugroho, M.Sc.General Manager OTS

0857-8192-2287

[email protected]

www.ots-simgenics.com

MODULAR Training :Paket A : Steam boilerPaket B : Boiler Air and Flue GasPaket C : Turbine & Auxiliaries Paket D : Generator & Auxiliaries

INTEGRATED Package:Paket E : Integrated Start-upPaket F : Integrated ShutdownPaket G : Complete Power Plant

training package

2 Hari2 Hari2 Hari2 Hari

5 Hari3 Hari

8 Hari

TRAINING

A. BAsic Training

Penyelenggaraan Training Simulator dapat

dilakukan secara INHOUSE sesuai kebutuhan

I n f o r m a s i

DUDI Chandra , S.Ds.Customer Support

0819-1017-1661

[email protected]@gmail.com

[email protected]

Kantor Operasional : Jl. Pahlawan No. 55, BANDUNG

Page 4: PLANT · 2020. 5. 3. · bahaya, mendiagnosa kondisi operasi yang abnormal dan melakukan troubleshooting. Hal ini sangatlah penting untuk memastikan power plant operation yang aman

PARTNERSSIMGenics

· NRG

· Westar Energy

· Black Hills Power Corp.

· Pierpont Community and Technical College

· Portland General Electric

· NV Energy

· Aus�n Energy

· EPRI

· Sta�onary Engineers

· NIPSCO (Michigan City Genera�ng Sta�on,

R.M. Schahfer Genera�ng Sta�on, Bailly

Genera�ng Sta�on, Dean H. Mitchell Sta�on,

and Corporate Training Center)

· NPPD (Gerald Gentlemen Sta�on units 1 and

2, Canaday Sta�on, and Sheldon Sta�on)

· Oklahoma Gas & Electric Company

· Pacificorp (Naughton Power Plant, Dave

Johnston Power Plant and Wyodak Power

Plant)

· Duke Energy (Cayuga Genera�ng Sta�on,

Zimmer Genera�ng Sta�on, Beckjord

Genera�ng Sta�on, Gibson Genera�ng

Sta�on, Gallagher Sta�on, and East Bend

Genera�ng Sta�on)

· Entergy (Corporate Headquarters, White Bluff

Plant, Sabine Plant, Willow Glen Plant,

Michoud Plant, Independence Plant, Li�le

Gypsy Plant, Nine Mile Plant, Waterford Plant,

Lewis Creek Plant, and Nelson Plant)

· Basin Electric Power Coopera�ve (Laramie

River Sta�on)

· Associated Electric Power Coopera�ve Inc.

(New Madrid Plant, Thomas Hill Plant)

· Santee Cooper Electric (Cross Plant, Winyah

Plant, Grainger Plant, Jeffries Plant)

· Vectren Energy (A.B. Brown Plant, Culley

Plant)

· Portland General Electric (Boardman Plant)

· MidAmerican Energy

· Texas Municipal Power Agency (Gibbons

Creek Steam Electric Sta�on)

· General Chemical Corpora�on (Mul�-boiler,

mul�-turbine, coal fired cogenera�on plant

located in Green River, Wyoming)

· Nova Sco�a Community College (Ackersley

and Strait Campus)

· Casper Community College

· St. Lawrence College

· California Public U�li�es Commission

· Eskom

· Intergraph PP&M

· PTT Phenol

· 3D Verifier

· Canadian Na�onal Resources Limited (CNRL)

· Alghanim Interna�onal

· ABB

· Siemens

· Fluor

WORLD WIDE CUSTOMERSIMGenics