Jobs, Innovation, Growth, Stability www.ies.ncsu.edu
Planning Tools for Mass DepopEvents
David Cornejo
Ph.D. Candidate in Operations Research
Problem Statement
• Engineering solutions can be tested and evaluated on a small scale
• Implementation effectiveness requires taking into account system interaction.
• Simulation can estimate the resources required to scale-up process to disaster response proportions.
2
Goals
• Strategic(Before)
• Develop basic estimates of resource requirements before disaster.
• Tactical(During)
• Assist in identifying resource savings/need during event.
•Delivery via Web application
3
System Overview
•4 Distinct Stages
• Moving pigs from house to loading chute
• Loading pigs onto available farm truck
• Preparing trucks and gasification
• Disposal of carcasses
•METRIC: Time to complete process.
4
Moving Pigs from house to truck
• Influenced by following user inputs
• Pigs: Number, Weight class
• Houses: Number, Size, Loading Slot length
• Workers: Number available
• Variables affect Travel Time of run.
• Calculated travel time parameterized travel time distribution(stochastic travel time).
5
Load Truck
• Pigs Loaded onto truck
• Capacity of trucks from pig weight class
• Details
• One or more loading chutes available
6
Class Name Space Requirement(sq. ft./pig)Nursing (<50lbs) 1.09
Weaning (50-100lbs) 2.635
Finishing (100+lbs) 3.48
Breeding Boar/Sows 5.55
Preparing Trucks for Gas
•Before each application of gas some preparation (check tarp, attach hose etc.)
•Assumed to take between 5 and 10 mins
• May physically take place at gas location.
7
Administer Gas
•Correct Flow rate(20-30% of volume of container/min) applied for minimum of 5 minutes.
•Applying gas consumes available stock.
• Process halted when no more gas
• Gas can be delivered on intervals.
• Sublimation a way to extend gas stock
8
Dispose of Carcasses
• “Dwell Time” of 10 minutes accounted for in minimum travel time to Disposal Site.
• Ability to travel immediately after gas
• Trucks take time to return to loading slot
9
Computer Animation of process
10
Computer Animation(2)
11
Parameters and Control Variables
• Farm Parameters• Size of House• Size of Pin• Number/Length of Load Slots
• Truck Controls• Truck Size• Number of Trucks
• Handler Controls• Number of Handler• Handler Efficiency
• Special Process Parameters• Dry Ice recovery process option
12
Jobs, Innovation, Growth, Stability www.ies.ncsu.edu
Planning Tools using Simulation
13
Web App Solution
• Best resource solution form a large array of scenarios batch run in simulation model.
• Results stored in database.
• Web application exposes relevant controls to decsionmaker and calculates resource requirements based on stored simulation results.
• Web app runs fast (seconds) and requires no specialized software.
14
Web App Screen Shot
15
Web App (1)
16
Web App(2)
17
Web App Output Page
18
Jobs, Innovation, Growth, Stability www.ies.ncsu.edu
Questions?
.
19