Rational Focal Point for Project Managementand RTC - 1.0 Beta 1 Check Point
Erich Gamma/Dirk Bäumer
Planning relevant C/ALM Linking
Mats Gothe & Dirk Bäumer
IBM Software Group | Rational software
IBM Confidential
IBM Software Group
IBM Confidential
Project Area Links
To support CALM PPM scenarios we propose to add the following links between project areas:
– Contributes to: if a project Area C contributes to a project area P
– And the reverse link between P and C: comprises (or comprised of)
Project Area B Project Area C
Project Area A
Contributes To Contributes To
IBM Software Group
IBM Confidential
Plan linking
Due to the fact that in RTC a project area can be used to deliver more than one release pure project area linking is not enough. So we have to introduce links between plans and corresponding RRC and RQM artifacts as well:
Plan P2
Plan P1
Contributes To
Test PlanRequirement Setimplements Tested by
IBM Software Group
IBM Confidential
Work item links across Project Areas
Contributes To links between project areas and plans can spawn repository boundaries. This implies that links between work items on these plans must be able to spawn repository boundaries as well. Since a parent / child relationship implies semantic (for example last child closes parent) which we might not be able to provide across repository / project area boundaries we propose to add a special work item link here as well.
Work Item W2
Work Item W1
Contributes To