PLANNING & DESIGN · Classrooms & Informal Learning . Mat-Su Career & Technical High School ......
Transcript of PLANNING & DESIGN · Classrooms & Informal Learning . Mat-Su Career & Technical High School ......
Mat-Su Career & Technical High School
PLANNING & DESIGN Mat Su Career & Technical High School
Matanuska Susitna Borough
Mat Su School District
McCool Carlson Green Architects
Mat-Su Career & Technical High School
AGENDA
• Planning Process Overview
• Planning History & Current Operations
• Budget Review
• Space Needs
• Addition Concepts
• Next Steps
Mat-Su Career & Technical High School
Building Design Committee (BDC) Role
• Educational Vision
• Knowledge of existing building/operations
• New Program Information
• Design Ideas
• Critique
• Outreach
• Support
• Lines of communication
Mat-Su Career & Technical High School
BDC Schedule
• July 17: Kickoff
• August 12-14: Workshop
• August 27: Concept Refinement
• August 29: Focus Groups
• September 17: Schematic Design
• October: School Board/Assembly Approvals
• March 2014: Bidding
• July 2015: Occupancy
Mat-Su Career & Technical High School
Aspirations
• What are the most important goals for this
project?
Mat-Su Career & Technical High School
PROJECT HISTORY
Learning Plan
Visioning
Planning
Concept Design
Mat-Su Career & Technical High School
LEARNING NETWORK
• Links high school to postsecondary education and careers
• Broad clusters of related occupations in terms of knowledge and skills
• Respond to state and local labor market
• Related occupations represent variety of educational and income levels
Mat-Su Career & Technical High School
STAKEHOLDER ORGANIZATION
• Steering Committee Key school, community, and industry leaders
• Design Committee Students
Parents and families
Teachers and guidance counselors
Administrators
Board members
Business and industry
Organized labor
Government
Community
Higher education
Mat-Su Career & Technical High School
LEARNING BEFORE FACILITIES
Learning Plan
Facility Plan
Mat-Su Career & Technical High School
ED SPEC SUMMARY
• Learner Population: 500 FTE
• Building Area: 76,550 sf CTHS = 153 sf/student
DEED HS Standard = 165 sf/student
• Full time high school plus part time students
• Career Pathways
Pathway #1: IT/Business/Electronics
Pathway #2: Arch/Engineering/Construction
Pathway #3: Culinary Arts/Hospitality
Pathway #4: Health Sciences/Nursing
Pathway #5: P.E./Sports Science
Mat-Su Career & Technical High School
EDUCATIONAL TRANSFORMATION
CONCEPTS
• Business & Industry Relationships
• New Teaching and Learning Strategies
• Integrating Academic and CTE
• Learning Signature
• Career Pathways
• Expansion Capability
• Flexibility & Adaptability
Mat-Su Career & Technical High School
LEARNING ORGANIZATION
Mat-Su Career & Technical High School
SITE CONTEXT
Mat-Su Career & Technical High School
EXPANSION & GROWTH
Mat-Su Career & Technical High School
SITE
PLAN
Future
Expansion Future
Expansion
Future
Expansion
Mat-Su Career & Technical High School
ORGANIZATIONAL PRINCIPLES
• Strong identity for career pathways • Distribute services and administration • Flexibility & adaptability to changes • Personalizable environments • Small learning communities • Integrated & interdisciplinary • Team / project based learning • Part-time and full-time student • Serving others via distance learning • Multiple use: school, employers, labor, etc.
Mat-Su Career & Technical High School
RELATIONSHIP TO BUISINESS & INDUSTRY
Mat-Su Career & Technical High School
FLEXIBILITY & ADAPTABILITY
Mat-Su Career & Technical High School
FLEXIBLE INSTRUCTION PROTOTYPE
• Individual Work Areas
• Small Group Work/Conference room
• Large Group Work Area/Classroom
• Teaching Team Office
• Storage
• Technical Reference Library
• 2,600 sf per Pathway
Mat-Su Career & Technical High School
PATHWAY PROTOTYPES
Mat-Su Career & Technical High School
1st Floor
Mat-Su Career & Technical High School
2nd Floor
Mat-Su Career & Technical High School
ADAPTABLE CORE
Overhead Door
provides access for
large equipment and
displays
Operable Walls
create multiple
configuration
opportunities
Each Pathway has a
Portal facing the
MPR/Partners Room
Auxiliary dining area
for Culinary Arts
training
Large
Assembly
Fitness &
Large
Seminar
Fitness,
Classrooms &
Informal Learning
Mat-Su Career & Technical High School
PATHWAY ANATOMY
Mat-Su Career & Technical High School
LEARNING SIGNATURE
“The Career Center is, above all, a hub of learning for the community, providing a safe and inviting learning setting for all ages with strong ties to business and industry. To do this, the center must be connected to industry and business and be willing to adapt to the changing needs over time. It will, and must be, as changing and dynamic as the meandering Matanuska River.”
changing, adapting, connecting / inviting, welcoming, responding
Mat-Su Career & Technical High School
LEARNING SIGNATURE
changing, adapting, connecting inviting, welcoming, responding
Mat-Su Career & Technical High School
Discussion – Teaching & Learning
• Teaching & Learning at CTHS
Mat-Su Career & Technical High School
Discussion – Future Trends
• Technology
• Mobile devices • Distance Learning • Information vs. understanding • Teachers as coaches
• Diversity
• Personalization • Languages • Teaching teams
• Global Economy
• Literacy • Creativity • Collaboration • Integrated learning / inquiry based
• Brain Research
• Learning Pyramid • Multi sensory learning • Active Learners • Learning styles
Mat-Su Career & Technical High School
Discussion – Existing Operations
• Integrating academic and tech
• Lack of classrooms space
• Configuring Flex areas for classroom use
• More kitchen serving lines needed
• Sound isolation at classrooms
• Need Gym for ball sports
• Space for itinerants
• 2nd floor cross circulation
• More restrooms
• Media center / Library
• Loading dock access
Mat-Su Career & Technical High School
Preliminary Budget Summary
Unit Cost Area Cost
Minor Remodeling 30$ 4,000 120,000$ allowance for minor adjustments to existing building
Food Service Mods 400$ 1,000 400,000$ allowance for adding a serving line
Addition Interface 500$ 250 125,000$ tie-in between existing building and new addition
Building Addition Budget (1) 350$ 33,060 11,571,000$ based on recent Valley Pathways low bid
Total Project Budget Estimate 12,216,000$
Budget 12,485,000$
Variance (269,000)$ over budget (under budget) amounts
(1) Total Building Area identified in RFP of 33,060 GSF translates to approximately 23,614 SF net program space
Mat-Su Career & Technical High School
Discussion – New Program Needs
• Transportation Pathway
• Therapeutic Services Pathway Expansion
• Natural Resources Pathway
• Human Services Pathway
• Media / Testing Center
• 10 General Classrooms
• 2 Science Classrooms
Mat-Su Career & Technical High School
Preliminary Space Program
Quantity Size Totals Dept Totals Path Totals
Natural Resources Pathway
Classroom 1 800 800
Vet nary Lab 1 1,200 1,200
2,000
Flexible Instructional Space
Large Group Instruction/Classroom 1 800 800
Flex Area 1 1,674 1,674
Individual Work Areas
Small Group Work Areas/Conference
Teacher Team Office
Technical Library
Student Lockers
Storage
2,474
Natural Resources Pathway Total 4,474
Mat-Su Career & Technical High School
Preliminary Space Program
Quantity Size Totals Dept Totals Path Totals
Transportation Pathway
Aviation Lab 1 2,100 2,100
Process Technology Lab 1 1,000 1,000
Diesel Power Generation Lab 1 1,000 1,000
Storage 3 300 900
5,000
Flexible Instructional Space
Large Group Instruction/Classroom 1 800 800
Flex Area 1 1,674 1,674
Individual Work Areas
Small Group Work Areas/Conference
Teacher Team Office
Technical Library
Student Lockers
Storage
2,474
Transportation Pathway Total 7,474
Mat-Su Career & Technical High School
Preliminary Space Program
Quantity Size Totals Dept Totals Path Totals
Human Services Pathway
Law Enforcement Classroom 1 1,000 1,000
Education Classroom 1 1,000 1,000
2,000
Flexible Instructional Space
Large Group Instruction/Classroom 1 800 800
Flex Area 1 1,674 1,674
Individual Work Areas
Small Group Work Areas/Conference
Teacher Team Office
Technical Library
Student Lockers
Storage
2,474
Human Services Pathway 4,474
Mat-Su Career & Technical High School
Preliminary Space Program
Quantity Size Totals Dept Totals Path Totals
Therapeutic Services Pathway Addition
Gymnasium 1 4,600 4,600
Gym Storage 1 400 400
5,000
Therapeutic Services Pathway Addition Total 5,000
Media / Testing Center -
Library 1 3,650 3,650
Testing Center 1 800 800
Library Office/Workroom 1 250 250
Library Storage 1 300 300
5,000
Media / Testing Center Total 5,000
Mat-Su Career & Technical High School
Preliminary Space Program
Quantity Size Totals Dept Totals Path Totals
General Academic
Classrooms (6 distributed to Flex) 4 800 3,200
Science Labs 2 1,200 2,400
Science Prep 1 400 400
- 6,000
Administration Subtotal 6,000
Targets Variance
Net Program Area 32,422 23,614 8,808
Service, Mechanical, Structural, Circulation & Toilets (SMSCT) 40% 12,969 9,446
Total Gross Program Area 45,391 33,060 12,331
Mat-Su Career & Technical High School
Educational Specifications
• Program Information
• DEED Approval
Mat-Su Career & Technical High School
Expansion Concept Option
Mat-Su Career & Technical High School
Homework
• Program Prioritization/Budget
Reconciliation
• Program detail information
– Teaching & Learning strategies
– Space sizes & functions
– Major equipment
– Student population
– Critical spatial relationships
Mat-Su Career & Technical High School
Wrap Up
• Questions/Comments?