NATIONAL ENGAGEMENT - PLANNING CONSIDERATIONS: EVACUATION AND SHELTER-IN-PLACE August 9, 2018 FEMA’s National Integration Center is seeking feedback on the draft document Planning Considerations: Evacuation and Shelter-in-Place, as part of the continued development of the document. Feedback and recommendations received help ensure the final version of the guide is an effective resource for emergency managers across the nation. Evacuation and shelter-in-place protective actions are prompted by a variety of threats and hazards. Incident-specific circumstances drive the relevant protective actions based on a community’s demographics, infrastructure, resources, authorities, and decision-making process. Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such as hurricanes Harvey, Irma, Katrina, and Maria, have highlighted the value of enacting a zone-phased approach to evacuation and shelter-in-place, enabling jurisdictions to move as few people as necessary. Sheltering-in-place populations that are not directly in harm's way, rather than having them evacuate, helps jurisdictions reduce costs, resource requirements, and the negative impacts of evacuations, while promoting improved response and quicker re-entry and recovery. As you review the document, consider: Identifying areas that may be confusing and need revision; Providing success stories or best practices associated with the critical considerations identified in the document; and Identifying additional job aides, training opportunities, or resources for inclusion in the document. The document will undergo subsequent technical editing to correct any issues related to formatting, grammatical, or punctuation issues. A comment matrix can be found at https://www.fema.gov/plan and can be used to capture any recommendations. Please provide any comments, input, or recommendations by COB on, August 31, 2018. Email feedback to [email protected].

Transcript of Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to...

Page 1: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

NATIONAL ENGAGEMENT - PLANNING CONSIDERATIONS:

EVACUATION AND SHELTER-IN-PLACE

August 9, 2018

FEMA’s National Integration Center is seeking feedback on the draft document Planning

Considerations: Evacuation and Shelter-in-Place, as part of the continued development of the

document. Feedback and recommendations received help ensure the final version of the guide is

an effective resource for emergency managers across the nation.

Evacuation and shelter-in-place protective actions are prompted by a variety of threats and

hazards. Incident-specific circumstances drive the relevant protective actions based on a

community’s demographics, infrastructure, resources, authorities, and decision-making process.

Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons

learned from disasters, such as hurricanes Harvey, Irma, Katrina, and Maria, have highlighted the

value of enacting a zone-phased approach to evacuation and shelter-in-place, enabling

jurisdictions to move as few people as necessary. Sheltering-in-place populations that are not

directly in harm's way, rather than having them evacuate, helps jurisdictions reduce costs,

resource requirements, and the negative impacts of evacuations, while promoting improved

response and quicker re-entry and recovery.

As you review the document, consider:

Identifying areas that may be confusing and need revision;

Providing success stories or best practices associated with the critical considerations

identified in the document; and

Identifying additional job aides, training opportunities, or resources for inclusion in

the document.

The document will undergo subsequent technical editing to correct any issues related to

formatting, grammatical, or punctuation issues.

A comment matrix can be found at https://www.fema.gov/plan and can be used to capture any

recommendations. Please provide any comments, input, or recommendations by COB on, August

31, 2018. Email feedback to [email protected].

Page 2: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

1

2

3 PLANNING CONSIDERATIONS:

4 EVACUATION AND 5

SHELTER-IN-PLACE

Pictures to be inserted prior to publication

Page 3: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT i

Table of Contents 6

Background ................................................................................................................................... 1 7

Purpose ...................................................................................................................................................... 1 8

Background ............................................................................................................................................... 1 9

Planning Principles ....................................................................................................................... 2 10

Roles and Responsibilities ........................................................................................................................ 4 11

Key Concepts ................................................................................................................................. 7 12

Zones ......................................................................................................................................................... 7 13

Evacuation Transportation Models ........................................................................................................... 8 14

Phases ........................................................................................................................................................ 9 15

Characteristics of Evacuation and Shelter-In-Place ................................................................................ 10 16

Critical Considerations ............................................................................................................... 13 17

Accessibility ............................................................................................................................................ 13 18

Contraflow Lane Reversal ...................................................................................................................... 13 19

Correctional Facilities ............................................................................................................................. 13 20

Domestic/Sexual Violence Shelters ........................................................................................................ 14 21

Evacuation Clearance Time .................................................................................................................... 14 22

Fuel Management .................................................................................................................................... 15 23

Homeless Populations ............................................................................................................................. 15 24

Household Pets and Service Animals ..................................................................................................... 16 25

Individuals with Access and Functional Needs ...................................................................................... 16 26

Legal Requirements and Authorities ....................................................................................................... 17 27

Mass Care Services ................................................................................................................................. 17 28

Population Assessment ........................................................................................................................... 18 29

Terminology Used in Public Messaging ................................................................................................. 18 30

Tourist Populations ................................................................................................................................. 18 31

Tracking .................................................................................................................................................. 18 32

Traffic Management ................................................................................................................................ 19 33

Zonal Approach/Methodology ................................................................................................................ 19 34

Using the Six-Step Planning Process ......................................................................................... 21 35

Step 1: Form a Planning Team ................................................................................................................ 21 36

Step 2: Understand the Situation ............................................................................................................. 22 37

Step 3: Determine Goals and Objectives ................................................................................................ 22 38

Step 4: Plan Development ....................................................................................................................... 23 39

Step 5: Plan Preparation, Review, and Approval .................................................................................... 23 40

Page 4: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT ii

Step 6: Plan Implementation and Maintenance ....................................................................................... 23 41

Appendix A – Acronym List ...................................................................................................... 24 42

Appendix B – Terminology ........................................................................................................ 26 43

Appendix C – Authorities ........................................................................................................... 30 44

Appendix D – Job Aids ............................................................................................................... 32 45

Command Job Aid .................................................................................................................................. 32 46

Essential Elements of Information .......................................................................................................... 34 47

Appendix E – Checklists ............................................................................................................. 40 48

Appendix F – Resources ............................................................................................................. 46 49

Training Resources ................................................................................................................................. 46 50

Other Resources ...................................................................................................................................... 46 51

Federal Evacuation Support Resources ................................................................................................... 46 52

53

Page 5: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 1

Background 54

Purpose 55

This document directly supports state, local, tribal, and territorial partners in planning for 56 evacuation and/or shelter-in-place protective actions.1 It summarizes the unique characteristics 57

that jurisdictions should consider when planning for evacuation and/or shelter-in-place 58 operations and builds on Comprehensive Preparedness Guide (CPG) 101: Developing and 59 Maintaining Emergency Operations Plans by providing planning considerations to help develop 60 evacuation and shelter-in-place plans.2 In addition, this document contains job aids and 61 checklists that jurisdictions can customize to meet their needs. 62

Background 63

An unprecedented eight million people came under evacuation orders due to various hazards 64 throughout the Nation in 2017, including: 65

In February 2017, flooding caused the Oroville Dam in California to fail, causing the 66 evacuation of over 180,000 people3; 67

Hurricane Harvey struck Texas in August 2017 and resulted in the evacuation of over 68 780,000 people4; 69

Hurricane Irma struck Florida in September 2017 and resulted in jurisdictions issuing 70 evacuation orders covering a record 6.8 million citizens; 71

From October 8–31, 2017, wildfires in California forced the evacuation of over 100,000 72 residents. 73

Lessons learned from these recent disasters have proven that evacuation and shelter-in-place 74

protective actions vary based on the threat or hazard. Protective actions also vary based on a 75 community’s demographics, infrastructure, resources, authorities, and decision-making process. 76 Consequently, determining the most appropriate protective actions depends on a variety of 77 factors, which this document discusses. 78

1 Note that this document does not address building/facility evacuations or shelter-in-place considerations typically covered in

occupant emergency plans. 2 FEMA, CPG 101: Developing and Maintaining Emergncy Operations Plans, Version 2.0, (Washington, DC, 2010), https://www.fema.gov/media-library/assets/documents/25975. 3 2018, FEMA DRAFT National Preparedness Report. 4 2018 FEMA, 2017 After Action Reports.

Page 6: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 2

Planning Principles 79

A shared understanding of evacuation and shelter-in-place planning principles is essential to 80 effective planning. These principles provide an underlying foundation for the planning process 81 and establish a common operating picture that is scalable and translatable across a multi-82 jurisdictional evacuation concept. The 12 principles below are the foundation for successful 83

evacuation and shelter-in-place plans. 84

1. Defined Authorities 85

Evacuation and shelter-in-place planning should be consistent with existing jurisdictional 86 authorities, roles, and responsibility, as defined in current statutes, regulations, delegations of 87

power, memoranda of understanding/agreement (MOUs/MOAs), policies, and other guidance 88 documents. 89

In some jurisdictions, the authorities to issue an evacuation order or shelter-in-place direction are 90 not clearly defined or lie with a vacant office (e.g., county justice, police chief) where the office 91

is not held at the time of an incident. These situations will require specific guidance on further 92 authority and coordination between levels of government to clarify processes before an event 93 occurs. 94

2. Shelter-In-Place – First/Default Option 95

An evacuation should move as few people as possible the shortest distance possible while 96

providing for their safety. Jurisdictions should always consider shelter-in-place as the 97 first/default option, when feasible. Generally, this helps support life-safety, lessens the resource 98

requirements and negative impacts of evacuations, and promotes improved response and quicker 99 re-entry and recovery. 100

Jurisdictions should look for opportunities to lessen the need for evacuation. This may mean 101

looking at risk more closely and when possible, advising populations to shelter-in-place. 102

3. Common Understanding 103

Establishing a common understanding of a plan’s goal and operational procedures is important to 104 overall coordination. Plans need to be viable for each locality, as well as locally supportable, and 105 integrate with the applicable region, state, and interstate plans. 106

Using common terms and strategies helps align planning concepts into one cohesive approach. 107

4. Zone-based Operational Strategies 108

Plans should articulate operational strategies, include jurisdictional priorities, and provide 109 decision support to promote phased, zone-based evacuation or shelter-in-place for notice and no-110

notice events. 111

Planners should analyze communities as zones; evacuation orders or shelter-in-place direction 112 should target specific populations within zones at risk. This practice is most beneficial in large 113

Page 7: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 3

population centers and during localized events. Larger events may necessitate full jurisdiction 114 evacuations but require careful consideration. 115

5. Unified Coordination Process 116

Jurisdictions within a geographic or political region should consider individual jurisdictional 117

plans that outline common language, formatting, and a unified coordination process. 118

Most jurisdictions identify the need for a common mechanism to coordinate across jurisdictional 119 boundaries. This may be a coordination group concept or an existing mechanism facilitated by 120 the state. 121

6. All Hazard Planning 122

Plans should include all-hazards planning to address a myriad of threats and indicate when 123

shelter-in-place or evacuation is appropriate. Jurisdictions should consider existing concepts, 124

plans, systems, resources, and practices (such as traffic management plans, hurricane or 125 nuclear/chemical plant evacuation plans and zones). These documents should identify the chain 126 of command early in the planning process to facilitate initial information gathering for plan 127 development. Planners should also account for considerations that can result from catastrophic 128

events such as threats from external nation states or catastrophic natural disasters (e.g., major 129 hurricanes or earthquakes). Such events may require increased resource commitments over 130

longer periods of time due to the source and severity of the incident and may constrain 131 availability of resources (e.g., National Guard). These incidents may result in a larger Federal 132 presence and jurisdictions should establish a common process for integrating this increased 133

presence into their protective actions plans. 134

7. Whole Community Approach 135

Local jurisdictions should include the whole community in developing evacuation and shelter-in-136 place plans, including private sector stakeholders. To provide perspective and solicit buy-in, 137

entities should engage early and throughout the entire planning process. 138

Whole community stakeholders will have diverse individual needs during an evacuation. 139

Accounting for the characteristics and needs of the actual community, as well as the resources 140 owned and operated by non-governmental entities, is vital to an effective evacuation (for 141

example in the case of many mass transit systems). 142

8. Flexibility and Scalability 143

Plans should be flexible and scalable to engage the appropriate protective action based on the 144 incident. Similarly, if the regional, inter-jurisdiction coordination mechanism (Evacuation 145

Coordination Group) becomes active, the state in addition with other jurisdictions should 146 coordinate the response efforts in a unified decision-making process as described above in 147 principle 5. 148

Vertical and horizontal integration is essential in large-scale evacuation efforts. This often means 149 local, state, and Federal entities work together to facilitate the movement of the displaced 150 population. 151

9. Critical Transportation Needs (CTN) 152

Page 8: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 4

Plans should account for CTN populations and registries, if they exist, that focus on individuals 153 with evacuation needs. A CTN population encompasses any evacuees with limited or no access 154 to transportation who require assistance to evacuate safely. 155

A large percentage of the jurisdictionally supplied evacuation support may directly support 156

individuals who require transportation assistance. Jurisdictions must consider these needs during 157 planning to account for any resource shortages. 158

10. Service and Assistance Animals, and Household Pets 159

Plans should make accommodations for individuals evacuating with animals and address the 160 specific needs of those with service and assistance animals. 161

Animals require their own resources and supportive services. Planners should account for needs 162 associated with household pets and service animals throughout the planning process. 163

11. Evacuee Tracking 164

Evacuee tracking can become a part of evacuation operations based on jurisdictional capacities, 165 capabilities, and resource needs. FEMA’s National Mass Evacuation Tracking System (NMETS) 166 is a software- and paper-based no-cost option available to jurisdictions. Electronic systems 167

should have redundant paper systems. A jurisdiction should include the tracking system that their 168 messaging uses so community members know what system to use to ensure timely reunification 169

with families. Additionally, jurisdictions should ensure citizens that the systems will protect 170 personally identifiable information while facilitating reunification and ensuring safety during an 171 evacuation. 172

Tracking allows jurisdictions to associate records of displaced persons with their personal 173

belongings, companions, and pets. Without tracking, situational awareness, accountability, and 174 reunification become challenging. 175

12. Mass Care 176

Jurisdictions should coordinate mass care efforts concurrently with sheltering/evacuation 177 planning so that populations evacuating from a disaster area have a safe location to seek refuge. 178

Understanding the destination of the evacuee is important, as is the establishment and operation 179 of shelter sites. If possible, the placement of displaced persons in shelters should occur during 180

embarkation. Public information strategies should account for sharing this information with the 181 displaced population. 182

Roles and Responsibilities 183

Individuals and Families 184

Individuals and families are survivors who primarily execute shelter-in-place and evacuation 185 protective actions. Emergency managers should conduct outreach through their community 186

engagement offices or programs to communicate expected individual and family roles and 187 responsibilities. Individuals and families should develop plans and ensure their readiness for both 188 protective actions. Being prepared for an evacuation includes identifying primary evacuation 189

routes from multiple locations (e.g., offices, homes, schools) as well as family reunification 190

Page 9: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 5

points in case an evacuation occurs while a family is scattered during the course of their normal 191 day-to-day life. Families should establish a communication plan that supports the family 192 evacuation plan and helps members communicate to implement evacuation, reunification, and re-193 entry. 194

Preparations for shelter-in-place include ensuring that the family or individual has a specified 195 shelter-in-place location. This location should contain enough non-perishable food, blankets, 196 communication equipment (such as radios), alternate power sources, first aid supplies, necessary 197 medications, and durable medical equipment (e.g., hearing aid batteries, catheters) to allow self-198 sustainment in that location for a minimum of 72 hours. For a detailed list of supplies 199

recommended for home emergency supply kits, consult www.ready.gov. 200

Private Sector 201

Private sector entities play an important role in safeguarding their employees. These entities 202 prepare, plan, and coordinate evacuation and shelter-in-place protective actions in case of threats 203 or hazards. Jurisdictions are encouraged to collaborate with the public and private sectors to 204 develop a shared understanding of protective actions and shelter-in-place concepts, plans, 205

terminology, and roles. Proper planning ensures the security of employees and reduces the 206 potential for life loss if an incident occurs during hours of operation. Private sector facilities 207

should have similar provisions as individuals and families for shelter-in-place; however, these 208 provisions will be on a larger scale and should accommodate goods and equipment (e.g., 209 signage). Private entities should also work with jurisdictions in the planning process to identify 210

evacuation routes and resources available to the private sector that could facilitate a large-scale 211 evacuation (e.g., buses or vans for transportation; stores as evacuation points). 212

State, Local, Tribal, and Territorial) Governments 213

Prior to an incident, jurisdictional governments should engage the whole community, including 214

public/private sectors, faith-based organizations, non-profits, and individuals and families to 215 conduct awareness briefings and preparedness training so that stakeholders are familiar with 216

what is expected of them during each type of protective action. Additionally, for each protective 217 action, jurisdictions should create clear and accessible messaging approved by leadership so 218

messages can easily and quickly be pushed to the public to advise them on necessary actions 219 (e.g., evacuation or shelter-in-place), including anything specific to the threat or hazard that is 220 impacting their community (e.g., anticipated flooding, hazardous material exposure, expected 221 loss of power). 222

For evacuations, the jurisdictional government issues evacuation orders, manages traffic flow, 223

identifies evacuation routes, and identifies shelters for citizens. Additionally, jurisdictions should 224

plan for disruptions to government operations and ensure they have a continuity of operations 225

plan (COOP) and continuity of government (COG) plan. These plans activate in the event of 226 government disruption and/or government relocation from an impacted area. For large-scale 227 events requiring Federal resources, communities should consult the Federal Evacuation 228 Supplemental Annex (FESA)5 for more information on coordinating efforts with Federal entities. 229

5 2018 FEMA DRAFT Federal Evacuation Supplemental Annex

Page 10: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 6

Jurisdictional Government Responsibilities 230

Set clear expectations for households and community partners by conducting training and information231 sessions232

Establish and publish clear evacuation routes and zones for the community233

Identify evacuation shelters in their community, as well as shelters where evacuees can go in other234 communities if needed235

Notify nearby jurisdictions and state partners of operations when appropriate236

Create pre-approved accessible messaging for rapid distribution regarding incident and shelter-in-237 place or evacuation instructions238

Have a continuity plan to help maintain response operations if interrupted239

Page 11: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 7

Key Concepts 240

The following key concepts often serve as the foundation for successful evacuation and shelter-241 in-place planning: Zones, use of various Transportation Models, Phases, and other 242 Characteristics. 243

Zones 244

Evacuation and shelter-in-place zones allow jurisdictions to target zone-based evacuation to the 245 most vulnerable areas, while also limiting the need for evacuating large areas that are not under 246 the threat of a hazard. Generally, considerations to select zone boundaries include U.S. Census 247

Blocks, neighborhood boundaries, fire/police districts, U.S. Army Corps of Engineers (USACE) 248 hurricane evacuation zones, zip codes, and existing preparedness plans and documentation (e.g., 249 existing evacuation plans). Zones need to be easily recognizable by both first responders and 250 citizens to ensure clear messaging on protective actions occurring because of the hazard. The 251 mechanism for assigning these zones will vary from jurisdiction to jurisdiction. 252

Hurricane Katrina and Hurricane Harvey highlighted the value of a zone-phased approach to 253 evacuation and shelter-in-place. Jurisdictions can benefit from considering shelter-in-place as the 254 first/default option, when feasible. 255

Shelter-in-place involves the use of a structure, to include homes, to temporarily separate 256 individuals from a hazard or threat. Shelter-in-place is appropriate when conditions require that 257 individuals seek protection in their homes, places of employment, or other locations when a 258 hazard or threat is imminent or occurring. When populations that are not directly in harm’s way 259

shelter in place, jurisdictions reduce costs, resource requirements, and negative impacts of 260 evacuations, while promoting improved response and quicker re-entry and recovery. 261

The goal of an evacuation is to move as few people as needed the shortest distance to safety. 262 Planning evacuation operations to meet this goal also helps reduce resource burdens, facilitates 263 more efficient re-entry, and more quickly moves a community towards recovery. 264

A zone-based approach requires emergency managers, authorities, and the whole community to 265 work together. It is important to establish a common understanding of evacuation and shelter-in-266 place actions across the community for overall coordination, as well as to make informed 267 decisions on the appropriate transportation models.6 These protective actions serve as tools in all-268

hazards planning, whether for hurricanes, wildfires, floods, chemical spills, civil unrest, or active 269 shooter scenarios. Situational awareness and flexibility of plans, along with an educated public, 270

allow each local, state, tribal, and territorial partner to customize its preparation and response 271 efforts. 272

6 The Evacuation Transportation Models section of this document presents details on the “hub and spoke” and “point-to-point”

transportation models.

Page 12: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 8

Evacuation Transportation Models 273

274 Transportation planning considerations should include staging, embarkation points,

275 transportation centers, and evacuee and shelter locations. Using these points in planning,

276 jurisdictions may choose to employ one of the transportation models below to facilitate the

277 movement of evacuees.

278

279

Figure 1: Hub and Spoke Evacuation Model 280

281 282 283

• Hub and Spoke (Figure 1): Moves and aggregates evacuees in short trips from numerous

pickup locations to centers, which in turn provide evacuation to mass care centers. Hub

and spoke maximizes routes and provides immediate movement of people from dangerous

locations to a safer location temporarily.284

285

Figure 2: Point-to-Point Evacuation Model 286

287 288 289 290

• Point-to-Point (Figure 2): Moves evacuees directly from the point of embarkation to a host

jurisdiction or shelter. Point-to-point is the fastest evacuation action to employ, most direct

and streamlined, and least resource-intensive in the immediate operational period. This

concept of operations has limited capacity for surges during large displacements and is not

ideal if the host location has not been determined.291

292

Page 13: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 9

Phases 293

Evacuation and shelter-in-place response operations occur in five phases—mobilization, 294 evacuation and shelter-in-place, impact, mass care, and re-entry. Phases, used in conjunction 295 with evacuation and shelter-in-place zones, provide a construct to move people to safety or have 296 them shelter-in-place. These phases help jurisdictions plan, organize, respond, and delegate 297 evacuation and shelter-in-place strategies, messages, tasks and decisions. Phases may differ 298 across zones that face unique hazards and considerations, may not occur at all, or may occur in 299 any order based on incident realities. 300

Mobilization Phase: The mobilization phase begins with the identification of a threat or301 hazard that could lead to an evacuation or shelter-in-place order. The first activity is initial302 notification of people, systems, and resources to establish incident command and303

management structures. Emergency management officials make coordinated decisions for304 protective actions and priorities, disseminating clear evacuation advisories and messaging to305 the public. Mobilization will likely happen concurrently with other phases for no-notice306 events and low-notice events307

Evacuation and Shelter-In-Place Phase: This phase begins when a threat requires308 evacuation or sheltering-in-place operations, either following or concurrent with mobilization309 phase activities depending on incident notice. This phase includes implementing the310 protective actions of evacuation and shelter-in-place orders. During this phase, shelter-in-311 place is the default primary protective action, if feasible. Evacuation and shelter-in-place312 actions will vary depending on the size and scope of the incident. This phase may be used in313 advance of the impact phase for notice events (e.g., hurricane) or after the impact phase for314 no-notice or low-notice events (e.g., earthquake, terrorist attack) to meet incident objectives315

and protect life and property.316

Impact Phase: During this phase, for notice events, jurisdictions work to secure facilities,317 people, and equipment and clear transportation system users upon impact of the hazard.318 Within the impact phase, the “zero hour” marks the time needed to ensure the safety of first319 responders as the hazard makes impact, and it is the designated point in time when it is no320 longer safe for responders to continue operations. For no-notice events the impact phase,321

mobilization phase, and evacuation and shelter-in-place phase may be compressed or occur322 simultaneously depending on incident specifics.323

Mass Care Phase: In case of an evacuation outside of the jurisdiction, evacuees will remain324 in the host jurisdiction until their community is safe. During this phase the evacuating325 jurisdictions should communicate with the host jurisdictions to coordinate shelters for326 evacuees, numbers of evacuees, types of evacuees, and potential length of evacuation. Not327

every evacuation necessitates mass care; mass care is most common in long-lasting events.328 During shelter-in-place, mass care may consist of commodity distribution, short-term care,329

and respite care.330

Re-entry Phase: This phase incorporates the coordinated movement of evacuees back into a331 community once the threat or hazard dissipates and the event causing the evacuation ends.332

Re-entry typically marks the transition to recovery activities. This phase may follow the re-333 entry of first responders if the threat or hazard was significant enough to require first334

Page 14: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 10

responders to evacuate or will begin once first responders have stabilized the area to a point 335 where residents can return to their communities. 336

Characteristics of Evacuation and Shelter-In-Place 337

Evacuations, like the incidents that trigger them, can affect multiple geographic regions and have 338 long-term social, political, and economic impacts. A whole community cooperative approach 339 supports and enables the safe and efficient movement of individuals and animals from an 340 impacted or potentially impacted community, as well as the return of evacuees back to the 341 community once it is safe. Evacuations may begin with the spontaneous movement of evacuees 342 or an official evacuation order and may occur before (pre-) or during and/or after (post-) an 343 incident. Similarly, shelter-in-place action can be pre- or post-incident, and pre-incident shelter-344 in-place action may still require a post-incident evacuation if the threat or hazard occurs with 345

little or no notice. 346

Duration of evacuation or shelter-in-place is incident dependent and varies on jurisdiction size, 347 location, and resources. The following are characteristics of each evacuation/shelter-in-place 348 type and types of evacuees. 349

Pre-incident evacuation and shelter-in-place occurs when warning is available before an350 incident, enabling the movement of the most vulnerable, threatened population away from a351 potential area of impact, and sheltering of populations in place when and where conditions352 support. One key advantage to pre-incident evacuation and shelter-in-place is that353 transportation resources and infrastructure are operating under normal conditions. Pre-354 incident evacuation decision making requires officials to balance potentially costly,355 hazardous, or unnecessary evacuations against the possibility of loss of life from an untimely356

evacuation. Calling for shelter-in-place in areas that are less impacted helps reduce the357 negative impacts of evacuation.358

Post-incident evacuation and shelter-in-place occurs during and/or after an incident. This359 may be the result of a no-notice event or unexpected impact of a notice event. Post-incident360 evacuation should only occur when it is unsafe for the affected population to remain in the361 incident area. In contrast to pre-incident evacuations, post-incident evacuations may occur362

simultaneously with life-saving response operations. Resource constraints will arise as363 resources otherwise employed to support evacuation operations fulfill other emergency364 response tasks instead.365

Types of Evacuees 366

Understanding the types of evacuees in the population affected by a potential threat or hazard 367

and their associated needs is critical to a jurisdiction’s evacuation and shelter-in- place planning 368 efforts. These types include: 369

General Population Evacuees: General population evacuees may possess the means to370

evacuate (i.e., self-evacuee) or may require assistance (i.e., critical transportation needs371 evacuee).372

– Self-Evacuees: Individuals who possess the capability or can obtain the resources to373 evacuate from a potentially dangerous area prior to, during, or after an incident.374

Page 15: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 11

– Critical Transportation Needs Evacuees: Individuals who require assistance to leave a 375 potentially dangerous or disaster-affected area (also referred to as Transportation-376 Dependent or Transportation-Disadvantaged Population). 377

Patient Evacuees: Individuals under the care of Emergency Medical Services (e.g.,378 prehospital emergency care, community para-medicine/mobile integrated healthcare),379 inpatient healthcare facilities (e.g., hospital, skilled nursing facility/nursing home, psychiatric380 facility), and outpatient healthcare services (e.g., home healthcare, dialysis, ambulatory381 surgery) prior to, during, or after a disaster. This type of evacuee requires specialized382 transportation (e.g., ambulances, ambulettes) as well as personnel and other support during383 and after an evacuation.384

Under most circumstances, patient evacuees can be sheltered with general population385 evacuees, but they may require close monitoring for medical assistance. However,386

jurisdictions should work with their health care partners to make accommodations for patient387 evacuees who may have compromised immune systems, require decontamination, or388 otherwise require round-the-clock medical care.389

Service Animal and Household Pet Evacuees: Animals, such as household pets, assistance390 animals, working dogs, agricultural animals/livestock, wildlife, exotic animals, zoo animals,391 research animals, and animals housed in shelters, rescue organizations, breeding facilities,392 and sanctuaries, may need evacuation support. Service animals evacuate with their owners as393 part of either the general population or patient population. Shelter-in-place of these types of394 evacuees depends on the incident, hazard or threat, and the safety of sheltering in place395 versus evacuating.396

Spontaneous Evacuees: Under some circumstances, citizens may self-evacuate based on an397 individual, family, or group decision in reaction to an incident or threat of an incident, rather398 than being motivated to take a protective action as a result of an evacuation order. These399 individuals and/or groups are considered spontaneous evacuees. Spontaneous evacuations400 can complicate operations and add confusion. Jurisdictions can lessen the likelihood and401 impact of spontaneous evacuations by conducting pre-event preparedness education402 campaigns; clearly defining zones; providing clear, unified, and unambiguous evacuation and403 shelter-in-place orders; and providing clear expected actions, and timely threat, hazard and404

risk information. Jurisdictions should carefully shape all communications to use appropriate405 and accessible language and forms of media to provide evacuation and shelter-in-place406 information to the community.407

Evacuation Facilities 408

A large-scale incident requires moving people across large areas and multiple jurisdictions. The 409

types of sites and resources identified by the planning team for such an incident depend on the 410 classification of the local jurisdiction. In addition, planners should be aware of the resources in 411

“pass-through” communities (between evacuating and host jurisdictions), because resources will 412 be stretched in these locations and their jurisdictions may be asked to establish and host 413 additional shelters if needed. 414

Based on the incident, the possible evacuation facilities may include: 415

Page 16: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 12

Evacuation Assembly Point: A temporary location exclusively for evacuation embarkation 416 and transportation coordination in a field setting. Basic life sustaining services are not 417 generally available. 418

Emergency Respite Site: A location along an evacuation route that is capable of supporting419 transportation-assisted evacuees and self-evacuees. Respite sites may include fuel stations,420 restroom facilities, and access to water.421

Regional Hub Reception Center (RHRC): A regional facility where evacuees can receive422 assistance in identifying the most appropriate shelter location for their needs. RHRCs are423 typically state-run and employed during significant multijurisdictional, multiregional events.424

Shelter (Mass Care): A facility where evacuees without a destination are evaluated and425 receive disaster services from government agencies and/or pre-established volunteer426

organizations. Meals and water should be available. Basic first aid, pet sheltering (if427 applicable), sleeping quarters, hygienic support, and basic disaster services (e.g., counseling,428 financial assistance and referral) should also be available.429

Page 17: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 13

Critical Considerations 430

Communities and emergency managers have many considerations to weigh as they integrate 431 evacuation and shelter-in-place protective actions into their emergency plans. Communities must 432 develop operational-level plans based on existing capabilities and revise those plans, and the 433 specific annexes for evacuation and shelter-in-place, as the strategic planning process continues 434 and capabilities change. 435

The following is an alphabetical list of some of the complex considerations that emergency 436 mangers and planning teams may encounter during planning, exercises, or actual execution of 437 their plans. 438

Accessibility 439

Accessible resources, or accommodations and modifications for accessibility, ensure that 440 evacuation and re-entry operations are inclusive of children and adults with access and functional 441 needs. This includes provisions for accessible dissemination of information, including evacuation 442 and shelter-in-place orders. These provisions include, but are not limited to, sign language 443 interpreters, alternative forms of communication, and language translation. 444

Contraflow Lane Reversal 445

Contraflow lane reversal alters the normal flow of traffic (typically one or more lanes in the 446 opposing direction on a controlled-access highway) to increase the flow of outbound vehicle 447 traffic in an evacuation. Contraflow operations may cause issues at jurisdictional borders if the 448

transition from contraflow lanes to normal lanes is uncoordinated, which can significantly slow 449 the evacuation. Properly executed, contraflow requires significant resources and is most 450 applicable when an expedited large-scale evacuation is necessary. 451

Correctional Facilities 452

The Correctional System in the U.S. is comprised of incarceration within correctional facilities 453

(e.g., jails, prisons) that detain individuals (inmates) involved in perpetrating crimes; community 454 supervision of individuals conditionally released from prison (parole); or individuals who are 455 under conditional liberty or provisional freedom (probation). 456

Jail: A containment area for suspected offenders awaiting trial or sentencing.457

Prison: A facility to confine convicted felons. Prisons have several security classifications458 (High, Medium, Low, and Minimum) that typically correspond to the seriousness of459

convicted offenders’ crimes, their demonstration of intent, and their capacity to harm others460 (such as inmates and correctional personnel) during incarceration.461

The custody and care of inmates falls under the correctional department of the local, state, or 462 Federal jurisdiction that oversees the facility. The evacuation of secure correctional facilities 463 requires a coordinated effort between local and state law enforcement and corrections officials, 464 publicly run and privately operated institutions (if applicable), and Federal agencies, (e.g., 465

Page 18: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 14

Department of Justice Federal Bureau of Prisons, Department of Homeland Security [DHS], 466 Bureau of Immigration and Customs Enforcement, U.S. Marshals Service). 467

Domestic/Sexual Violence Shelters 468

Domestic and sexual violence are acts that leave long-lasting impacts on their survivors. Shelter 469 managers and management teams should strive to provide additional protections for those who 470 have already survived domestic and sexual violence, as well as prevent these acts from occurring 471 during the operation of a shelter. There is a potential for an increase in domestic/sexual violence 472 following a disaster. Shelter managers should visibly post telephone numbers for local domestic 473 violence shelters and national providers such as the National Domestic Violence Hotline: 1-800-474 799-SAFE in emergency shelter areas.475

In addition to preventing domestic and sexual violence from occurring in a shelter, those who 476

currently live in community domestic or sexual violence shelters may be forced to evacuate to 477 emergency shelters due to the impacts of a threat or hazard. Often, these survivors require 478 additional precautions, particularly when handling their personally identifiable information. In 479 cases where emergency shelter management teams are not able to take on this additional task, 480 they should make alternate arrangements to maintain confidentiality for these survivors. Types of 481 safe and secure alternate housing accommodations include: 482

A physical shelter facility operated by a domestic violence program that serves victims of483 domestic/sexual violence;484

A safe home provided by a victim’s family member or friend; and485

Other accommodations, such as a time-limited motel or hotel placement or other direct486

placement programs providing safe housing. These accommodations should have a telephone487 and bathroom facilities, and all doors to the accommodations should have locks.488

To ease the burden on shelter managers, planning teams should include domestic violence 489 shelters in the planning process so that they can consider alternative safe and secure 490 arrangements ahead of time. 491

Evacuation Clearance Time 492

Evacuation clearance time is the amount of time needed to move a threatened population to 493

safety, given various factors such as the type of hazard or threat, level of notice of the incident, 494 population characteristics of the area at the time, and public behavior. Clearance time is 495 generally the time from the issuing of an evacuation order until the last evacuee exits a 496 jurisdiction. 497

Jurisdictional analysis of clearance times may include a calculation of at-risk populations, 498 shadow evacuees, and evacuees from other jurisdictions who may pass through. Clearance time 499 calculations should include the time required for evacuees to secure their homes and prepare to 500

leave, the time spent by all vehicles traveling along an evacuation route network, and the 501 additional time spent on the road caused by traffic and road congestion. 502

Page 19: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 15

Fuel Management 503

A large-scale evacuation places increased stress on a variety of resources. Fuel management is a 504 crucial challenge that jurisdictions should address, particularly in planning evacuation routes. 505 Jurisdictions should identify evacuation routes that have ample businesses in pass through 506 communities to provide fuel to evacuees. Jurisdictions should also make an effort to ensure that 507 secondary and tertiary evacuation routes are also well supplied with fuel resources. Jurisdictions 508 should work with their private sector partners to identify additional fuel supplies and coordinate 509 additional deliveries to providers along evacuation routes. Additionally, jurisdictions and their 510 partners should identify which fuel stations on the evacuations routes have, or would require, 511 generator power in the case of a loss of power, as a loss of power would leave fuel unable for 512 evacuees. 513

Failure to manage fuel supplies can lead to fuel shortages, which impact traffic patterns and slow 514 down evacuation operations. Jurisdictions should retain a supply of fuel dedicated to supporting 515 evacuation operations. 516

Homeless Populations 517

People who are homeless7 have limited resources to evacuate, stockpile food, store medications, 518 and shelter in place. Messages communicated through mainstream media sources may not reach 519 them, because many of these individuals have no access to radio, television, or the internet. 520 Some may be illiterate or non-English speaking, so that written communication may also be 521 ineffective with that subset of this population. The most common form of communication in this 522 population is word-of-mouth, leading to the spread of inaccurate rumors and misunderstandings 523 that may have serious consequences during an emergency. 524

Many homeless individuals may have difficulties interacting with a mainstream shelter 525 population, and the stressful and (relatively) intimate setting of a disaster shelter may amplify the 526 situation. Because of this potential discomfort, while homeless individuals may go to any shelter; 527 however, designated specific shelters staffed by specialists trained to assist homeless persons are 528 recommended. 529

To communicate disasters to people without homes, jurisdictions should include homeless 530

service providers in emergency notification systems. Service providers can quickly communicate 531 the emergency to homeless individuals concentrated near their facilities and deploy outreach 532 teams to notify other homeless people dispersed throughout the community. Outreach teams 533

making notifications can also transport people to shelters or designated pickup points for 534 evacuation. Outreach teams employed by homeless service providers are familiar with the 535

homeless community, have established trust and credibility, and are better able to negotiate with 536

people who might resist evacuation efforts. Jurisdictions should coordinate outreach teams, 537

drivers, and accessible vehicles in advance, and assign them to specific designations as soon as 538 possible to prevent delays during a potentially small window of time. 539

Communities are also encouraged to consider the housing needs of homeless individuals after a 540 disaster. Many areas inhabited by people without homes may not be suitable for living after a 541

7 Homeless person: An individual without permanent housing who may live on the streets; stay in a shelter, mission, single room

occupancy facility, abandoned building, or vehicle; or in any other unstable or non-permanent situation. (Pre-decisional FESA)

Page 20: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 16

disaster. Despite the transient nature of homelessness, many homeless people want to return to 542 their communities. 543

Further information is available through the National Health Care for the Homeless Council 544 http://www.nhchc.org. 545

Household Pets and Service Animals 546

During evacuation and re-entry operations, animals require tracking, embarkation, transportation, 547 debarkation, care, feeding, husbandry/waste removal, veterinary support, and sheltering support. 548 Trained personnel immediately assess the animal population requiring evacuation to determine 549 transportation, mass care, and additional support requirements. Sixty-five percent (65%) of 550 American households have pets, which includes a variety of animal species,8 and populations 551 who are evacuating will bring their animals with them. When feasible, animals should remain 552

with their owners during transport. By law, service animals—and, in some cases, assistance 553 animals—must always remain with the owner. 554

Regardless of disaster type, jurisdictions should have plans in place for the safe and effective 555 evacuation and sheltering of not just common pets, but all types of animals9 within the impacted 556 communities. The failure to have, and communicate, such plans creates preventable risks for 557 animals, animal owners and caretakers, the public, and first responders. Previous disasters have 558 demonstrated that co-evacuating (and co-sheltering, where possible) people with their animals, 559 including household pets and service and assistance animals, increases people’s compliance with 560 evacuation orders, increases survivor resilience, and decreases re-entry to unsafe areas motivated 561 by animal rescue. 562

Animals, including household pets and service and assistance animals that co-evacuate with 563

owners should be in good health and vaccinated. Otherwise, the animals could spread disease 564 among themselves, or to evacuees (e.g., from bites). During co-evacuation process, owners 565 should also ensure they have sufficient means to control their pets, service or assistance animals, 566 such as leashes, and crates. 567

Individuals with Access and Functional Needs 568

Individuals with access and functional needs may include, but are not limited to, individuals with 569

disabilities, older adults, and individuals with limited English proficiency, limited access to 570 transportation, and/or limited access to financial resources to prepare for, respond to, and recover 571 from an emergency. 572

Evacuating populations leaving an impact area and arriving in a host area will include some 573

people with health or medical needs that normally require home- and community-based services. 574 Conditions that may have been under control prior to evacuation may be exacerbated, and health 575 conditions may degrade during the evacuation process. Evacuees with such needs may require 576

ongoing health support while in host areas; when possible, it is the responsibility of the evacuee 577

8 http://americanpetproducts.org/press_industrytrends.asp. 9 Animals include household pets, service and assistance animals, working dogs, agricultural animals/livestock, exotic animals,

and animals housed in shelters or rescue organizations. (Pre-decisional FESA)

Page 21: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 17

to obtain additional medical support or request the assistance of shelter management in obtaining 578 these services. 579

Many of the relevant medical support and assessment procedures are the same, whether they take 580 place in the impact area prior to the transport of evacuees or when they arrive in host areas. 581 Assistance may be required to connect/reestablish evacuees with home- and community-based 582 service providers. During the evacuation process, monitoring these evacuees will help identify if 583 conditions worsen and if additional medical assistance and supplies are necessary. 584

Jurisdictions are encouraged to keep a opt-in registration database of those most at risk so that 585 first responders can assess their needs and conditions quickly after a threat or hazard has passed 586 and these individuals have been sheltered in place. 587

Legal Requirements and Authorities 588

Evacuation and shelter-in-place planning is a core element of all-hazards emergency 589 preparedness. One of the first steps for evacuation and shelter-in-place planning efforts is to 590 review and understand the extent of emergency powers granted to and within a jurisdiction. In 591 many cases, the authority to issue evacuation and shelter-in-place orders may exist in local, state, 592 tribal, or territorial laws, statutes, regulations, delegations or power, MOUs/MOAs, policies, and 593 other guidance documentation. Planners should review all legal requirements and authorities 594 during the planning sessions. Since these legal requirements vary by jurisdiction, they are not 595 included in this document. Check with your General Counsel to determine the legal requirements 596 in a specific jurisdiction, to confirm what authorities exist in your jurisdiction and the limitations 597 on these authorities. 598

Evacuation and shelter-in-place efforts for small-scale incidents are typically handled at the 599

lowest possible jurisdictional level. Local public safety officials (e.g., fire chief, police chief) 600 implement them and do not require the support of higher-level authorities, such as elected 601 officials at the local or state level (e.g., mayor, county executive, judge, governor). For 602 community-level or larger-scale events affecting multiple jurisdictions, higher-level authorities 603 are often necessary to issue orders to evacuation. State assistance may need to supplement local 604 resources and services to safely evacuate or shelter the population in place. Depending on the 605 incident and threat/hazard, the responsible authority will declare an evacuation and/or shelter-in-606

place. Federal authorities may assist local, state, tribal, and territorial governments when they 607 indicate that their resources have become, or will soon become, overwhelmed. 608

In addition to the authorities outlined in the National Response Framework,10 Appendix C – 609

Authorities includes additional authorities relevant to evacuation and shelter-in-place planning. 610

Mass Care Services 611

Initial evacuee support consists primarily of mass care. However, once immediate life safety 612

considerations have subsided, some evacuees may need shelter or accessible housing for a longer 613 duration. This may include transitional sheltering (e.g., hotels, motels) or interim housing (e.g., 614 apartments, mobile homes, detached homes). Many disaster survivors in less-impacted areas may 615

10 National Response Framework. https://www.fema.gov/media-library-data/1466014682982-

9bcf8245ba4c60c120aa915abe74e15d/National_Response_Framework3rd.pdf. 2016.

Page 22: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 18

be able to return to their homes quickly after the disaster, if not immediately. Disaster survivors 616 whose homes suffered minor damage may be able to stay in their homes as they undergo repairs 617 or utilize shelter-in-place options while their homes are under repair. However, evacuees using 618 their own resources to meet their emergency need for shelter (e.g., staying in a motel, with 619

friends or family) are often able to maintain their shelter for only a brief time before their 620 resources are exhausted, and they may then turn to other available congregate and/or non-621 congregate shelter options. 622

Population Assessment 623

Pre-incident population information may be incomplete, requiring an immediate assessment of 624 the evacuee population to identify specific individual or family group needs (e.g., health/medical, 625 mental, functional, social services, socio-economic, nutritional, language). Maintaining an 626

accurate population assessment can help a jurisdiction understand the needs of the community 627 and better estimate the resources needed to implement efficient protective action operations. 628

Terminology Used in Public Messaging 629

One of the most critical aspects in a threat or hazard involving shelter-in-place or evacuation 630 actions is a concise, accurate, accessible, and understandable message. The general public does 631

not use the same common parlance as emergency management professionals and may interpret 632 terms and instructions quite differently than intended (e.g., mandatory, voluntary, recommended, 633 forced, phased, and zoned). 634

Regardless of the term, individuals within an impacted or potentially impacted jurisdiction or 635 community are most likely to heed evacuation orders issued by a trusted authority (e.g., 636 governor, police chief), when their family, friends, and/or community members have chosen to 637

evacuate, or when jurisdictional plans provide for the evacuation of pets/animals. Therefore, it is 638

imperative that jurisdictions develop messages with clear plain terminology understandable by 639 all members of the community during a crisis. This will help ensure that citizens remain safe 640 during an incident and that jurisdictions can allocate resources appropriately to conduct an 641

efficient response to an incident. 642

Tourist Populations 643

In some jurisdictions, evacuation of the tourist population occurs prior to the general population. 644 If unable to evacuate these populations prior to an incident, impact-jurisdictions should work to 645 identify this population as non-resident, evacuate them, and advise host-jurisdictions to assist 646 them in coordinating their departure to their home destinations. 647

Tracking 648

Tracking government-assisted evacuees allows impact and host jurisdictions to follow the 649 movement of evacuees, as well as their animals (including household pets and service and 650 assistance animals), luggage, and durable medical equipment. Tracking also provides 651 information for family reunification purposes and supports recordkeeping efforts for Federal 652 reimbursement policies. Tracking should begin as soon as possible and may occur in the impact 653

Page 23: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 19

area prior to the point at which evacuees board transport, at Arrival Points, or at shelters in host 654 jurisdictions. 655

Traffic Management 656

To minimize traffic congestion and increase clearance times, mobile message boards and signage 657 along evacuation routes can inform self-evacuees of traffic hazards, the location of Welcome 658 Centers and Information Points, shelters, fueling exits, and hospitals. Effective traffic 659 management allows a jurisdiction to evacuate more people from a community in an efficient 660 manner, which reduces the burden on jurisdiction personnel and resources. Failure to organize 661 efficient traffic management efforts increases resource burdens, causes longer evacuation times, 662 and could leave evacuating citizens in vulnerable conditions during an incident. 663

Zonal Approach/Methodology 664

Evacuation and shelter-in-place zones promote phased, zone-based evacuation targeted to the 665 most vulnerable areas, while also limiting the need to evacuate large areas that are not under the 666 threat of a hazard. Zones: 667

Help jurisdictions understand transportation network throughput and capacity, critical668 transportation needs, resource needs, estimated evacuation clearance times, and shelter669 demand.670

Help planners develop planning factors and assumptions to inform goals and objectives.671

Help community members understand protective actions to take during an emergency.672

Help shelters limit traffic congestion and overcrowding.673

Evacuation and shelter-in-place zones work with evacuation phases, are interdependent with 674 evacuation routes and transportation modes, and rely on many of the same information sources 675 and assessments. 676

Zones should be easily recognizable by both first responders and community members. Public 677 messaging campaigns can help communicate zone assignments to the public, ideally before a 678 hazard strikes, through “know your zone” campaigns or other preparedness and outreach 679

initiatives. 680

The mechanism for identifying zones will vary from jurisdiction to jurisdiction. For example, a 681 jurisdiction may use well-known police districts to assign evacuation zones, whereas another 682 jurisdiction may use known neighborhoods. When possible, jurisdictions should consider 683 mapping zones using geographic information systems. Generally, considerations to select zone 684

boundaries include: 685

U.S. Census Blocks: https://www.census.gov/geo/maps-data/maps/block/2010/686

U.S. Census Tracts: https://www.census.gov/geo/maps-data/maps/2010tract.html687

UACE hurricane evacuation zones688

Neighborhood boundaries689

Page 24: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 20

School districts690

Fire/police districts691

Zip codes692

Existing preparedness plans and documentation (e.g., existing evacuation plans).693

Jurisdictions may need additional research studies to select zone boundaries. Additional 694 resources for conducting evacuation and shelter-in-place zone research may include: 695

Real Time Evacuation Planning Model: http://rtepm.vmasc.odu.edu/696

State Department of Transportation697

State and jurisdictional evacuation plans and other related plans698

Hurricane Evacuation Studies699

HAZUS-MH: https://www.fema.gov/hazus700

Hurricane Evacuation (HURREVAC): http://www.hurrevac.com/701

Sea, Lake, and Overland Surges from Hurricanes (SLOSH):702 http://www.nhc.noaa.gov/surge/slosh.php.703

Page 25: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 21

Using the Six-Step Planning Process 704

Evacuation and shelter-in-place plans should align with and support incident-specific plans 705 developed using the planning process described in CPG 101.11 The six steps of the CPG 101 706 planning process are detailed below. 707

Step 1: Form a Planning Team 708

The most realistic and complete plans result from a diverse planning team that includes 709 representatives from across the whole community. While jurisdictions can engage a large 710 number of partners to develop their Emergency Operations Plan (EOP), they should specifically 711

include partners with key roles in evacuation or shelter-in-place operations. These partners may 712 include: 713

Public Safety 714

Local, state, tribal, or territorial law enforcement715

Fire services716

Emergency medical services717

Public works718

Fusion centers719

Transportation sector (e.g., public transportation systems, local transportation departments)720

National Guard721

Public safety communications722

Hospitals and healthcare facilities723

Education 724

School administration725

Other Governments and Agencies 726

Elected officials727

Additional as Required 728

Coast Guard729

Private Sector 730

Critical infrastructure owners and operators (public and private)731

11FEMA, CPG 101: Developing and Maintaining Emergncy Operations Plans, Version 2.0, (Washington, DC, 2010),

fema.gov/pdf/about/divisions/npd/CPG_101_V2.pdf.

Page 26: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 22

Private utilities providers732

Private nonprofit organizations733

Volunteer organizations734

Faith-based organizations735

Advocacy organizations (e.g., organizations that address disability and access and functional736 needs issues, children’s issues, immigrant and racial/ethnic community concerns, animal737 welfare, or service animals)738

Disability services739

Media outlets (including social media).740

Step 2: Understand the Situation 741

This step has two aspects, both of which are needed for this planning process. Jurisdictions need 742 to understand how a new annex will coordinate with plans already in place, as well as 743 understanding potential events and their impacts on the community. 744

Prior to integrating evacuation or shelter-in place into a jurisdiction’s emergency plan or 745 developing relevant annexes, planners should understand their EOP and any existing supporting 746 plans and annexes, such as mass care. Annexes supplement the EOP and should be consistent 747 with the EOP and not duplicate or conflict with it. A jurisdiction’s base EOP or supporting plans 748 will address many responsibilities and actions taken when implementing evacuation or shelter-749 in-place, as these actions are frequently required regardless of the specific threat or hazard. An 750 evacuation/shelter-in-place annex should therefore address the unique characteristics and 751

requirements not already covered in the EOP or other annexes. 752

Once assembled, the planning team begins identifying potential consequences and impacts on the 753 community that would require an evacuation or shelter-in-place order and the estimated 754 resources necessary to implement these protective actions. 755

Step 3: Determine Goals and Objectives 756

The planning team develops a list of priorities, goals, and objectives that address capability gaps 757 related to the incident. Planners should consider goals and objectives related to evacuation and 758 shelter-in-place outcomes. 759

Operational Priorities: Specify what the responding organizations are to accomplish to achieve a760 desired end-state for the operation.761

Operational Goals: Are broad, general statements that indicate the intended solution to problems.762 They are what personnel and equipment resources are supposed to achieve.763

Operational Objectives: Specific and identifiable actions carried out during the operation that764 achieve response goals and determine the actions that participants in the operation must accomplish.765

As jurisdictions develop goals and objectives for their evacuation and shelter-in-place annex to 766 their EOP, those goals and objectives should align with the 12 planning principles in the second 767 chapter of this document. 768

Page 27: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 23

Step 4: Plan Development 769

Based on the information obtained during Step 3, the planning team can begin plan development. 770 Planners should refer to CPG 101 for writing and reviewing checklists, as well as format 771 considerations. Courses of Action should address the overarching evacuation and shelter-in-place 772 operation, to include resource allocation and prioritization efforts. 773

In addition to the planning considerations outlined above, planning for evacuation and shelter-in-774 place protective actions should aim to: 775

Reduce the number of people required to evacuate (e.g., create evacuation zones to target776 geographic areas susceptible to hazards)777

Shelter evacuees as close to the impact area as safely possible to reduce the economic burden778

and accelerate recovery operations779

Identify suitable shelter options that are not susceptible to incident threats/hazards780

Evacuate communities together to provide an internal support structure781

Disperse evacuee populations among various host communities to reduce the burden on782 individual jurisdictions and ensure accountability of all evacuated individuals783

Increase interoperability between tracking, reunification, and sheltering systems784

Coordinate evacuation resource allocation (multiple jurisdictions may depend on or compete785 over the same resources to support evacuation operations)786

Relocate evacuees who are unable to return to their permanent residence as close to the787 impact community as possible (preferably within the impact state) to reduce the burden on788

host jurisdictions and to facilitate recovery operations.789

Step 5: Plan Preparation, Review, and Approval 790

Jurisdictions will have different processes and procedures to prepare, review, and approve 791 evacuation and shelter-in-place plans. This step involves preparing the plan, reviewing it for 792

conformity to regulatory requirements of state and Federal agencies, and submitting it to the 793 appropriate elected officials for approval. During this step, jurisdictions may want to revisit and 794 update the incident analysis brief, update partners, and ensure buy-in from partners. 795

Step 6: Plan Implementation and Maintenance 796

Jurisdictions should implement the plan so stakeholders throughout the whole community know 797

their roles and responsibilities before, during, and after evacuation and shelter-in-place 798

operations. All organizations named in the plan and supporting partners should train, exercise, 799 and socialize the plan. Additionally, jurisdictions should routinely implement continuous 800

improvement measures for their evacuation and shelter-in place plans; this helps to maintain an 801 effective plan for protective actions. Jurisdictions can achieve this through tabletop or full-scale 802 exercises or through lessons learned from real-world events. 803

Page 28: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 24

Appendix A – Acronym List 804

AFN Access and Functional Needs 805

CERRA Crisis Event Response and Recovery Access 806

COG Continuity of Government 807

COOP Continuity of Operations 808

COP Common Operating Picture 809

CPG Comprehensive Preparedness Guide 810

CSEPP Chemical Stockpile Emergency Preparedness Program 811

CTN Critical Transportation Needs 812

DHS Department of Homeland Security 813

DoD Department of Defense 814

DOT Department of Transportation 815

EM Emergency Management 816

EMAC Emergency Management Assistance Compact 817

EMI Emergency Management Institute 818

EOC Emergency Operations Center 819

EOP Emergency Operations Plan 820

EPCRA Emergency Planning and Community Right-to-Know Act 821

ESF Emergency Support Function 822

FAA Federal Aviation Administration 823

FEMA Federal Emergency Management Agency 824

FESA Federal Evacuation Support Annex 825

FHWA Federal Highway Administration 826

FRA Federal Railroad Administration 827

FTA Federal Transit Administration 828

GATES Global Air Transportation Execution System 829

GEAR Geocentric Environment for Analysis and Reasoning 830

Page 29: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 25

HHS Health and Human Services 831

HIPAA Health Insurance Portability and Accountability Act of 1996 832

HURREVAC Hurricane Evacuation 833

JPATS Joint Patient Assessment and Tracking System 834

LEP Limited English Proficiency 835

MOA Memorandum of Agreement 836

MOU Memorandum of Understanding 837

NDMS National Disaster Medical System 838

NGA National Governors Association 839

NMETS National Mass Evacuation Tracking System 840

NOAA National Oceanic and Atmospheric Administration 841

NWS National Weather Service 842

PETS Pets Evacuation and Transportation Standards Act of 2006 843

REPP Radiological Emergency Preparedness Program 844

RHRC Regional Hub Reception Center 845

SEOC State Emergency Operations Center 846

SLOSH Sea, Lake, and Overland Surges from Hurricanes 847

TRAC2ES TRANSCOM Regulating and Command and Control Evacuation Systems 848

USACE U.S. Army Corps of Engineers 849

VMS Variable-Message Sign 850

Page 30: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 26

Appendix B – Terminology 851

Jurisdictions are encouraged to use the terms and definitions below. 852

Animal: Animals include household pets, service and assistance animals, working dogs, 853 agricultural animals/livestock, exotic animals, and animals housed in shelters, rescue 854 organizations, 855

Arrival Point: Any facility or point of entry into a host-state/jurisdiction that assists evacuees. 856 Arrival Points may include Transfer Points and Reception Processing Sites (for transportation- 857 assisted evacuees), Welcome Centers and Information Points (for self-evacuees), shelters, and 858 other congregate facilities. 859

Common Operating Picture (COP): A shared understanding among on-scene and off-scene 860 support personnel of an incident, including assumptions, facts, availability and location of 861 resources, personnel, and the status of requests for assistance. A COP is established and 862 maintained by gathering, collating, synthesizing, and disseminating incident information to all 863 appropriate parties involved in an incident. 864

Critical Transportation Needs (CTN) Population: Evacuees with limited or no access to 865 transportation who require government assistance to evacuate safely. CTN populations may 866 include, but are not limited to, homebound populations; individuals with access and functional 867 needs, including individuals who do not speak English; individuals with household pets; 868 unaccompanied minors; and individuals with no access to a vehicle or a ride with a friend/family. 869

Debarkation Point: A site designated to receive transportation-assisted evacuees. Evacuees may 870 be transported by air, rail, bus, or maritime, and therefore a jurisdiction may have multiple 871 debarkation points. 872

Embarkation Point: An intake, processing, and departure site designated for the movement of 873 government transportation-assisted evacuees, their animals (including household pets and service 874 and assistance animals), their luggage, and/or their durable medical equipment. Embarkation 875

modes of transportation include air, ground, and maritime. Government transportation-assisted 876 evacuees may be registered, tracked, assessed for issues or needs, and placed on transport for 877 evacuation to an Arrival Point. 878

Evacuation Clearance Time: The estimated time necessary to safely evacuate people from the 879 time an evacuation order is given until the time when the last evacuee can either leave the 880 evacuation zone or arrive at safe shelter. It is a cumulative estimate for designated areas (zones, 881

city, county), not the time for one person to evacuate a given location. Tools such as the Real 882

Time Evacuation Planning Model can aid in estimating evacuation clearances times. 883

Evacuation Coordination Group: A simple mechanism to exchange evacuation and shelter-in-884 place information across borders. The group’s coordination encourages real-time decision 885

making and establishes a clear and consistent message to the regional public regarding 886

recommended actions, consistent with the National Incident Management System and Incident 887 Command System. 888

Page 31: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 27

Evacuation Order: A jurisdictionally initiated action for an organized, phased, and supervised 889 withdrawal, dispersal, or removal of people from dangerous or potentially dangerous areas and 890 their reception and care in safe areas. 891

Evacuation Transportation Site (also called Evacuation Assembly Point or Pickup Point): A 892 temporary location exclusively for evacuation embarkation and transportation coordination in a 893 field setting. Basic life sustaining services are not generally available. 894

Evacuation Zone: A defined area to which residents may be directed to evacuate, depending 895 upon the impacts of the hazard (e.g., tides, storm intensity, path, hazardous material exposure). 896

Host Jurisdiction: Jurisdictions tasked as destination locations for evacuees with government- 897 coordinated or -sponsored evacuation sites. These jurisdictions “host” evacuees requiring shelter. 898

Individuals with Access and Functional Needs: Access and functional needs are met by 899 providing physical, programmatic, and effective communication access to the whole community 900 by accommodating individual requirements through universal accessibility and/or specific 901 actions or modifications. This includes assistance, accommodation, or modification for mobility, 902 communication, transportation, safety, health maintenance, etc.; need for assistance, 903 accommodation, or modification due to any situation (temporary or permanent) that limits an 904 individual’s ability to act in an emergency. Individuals having access and functional needs may 905 include, but are not limited to, people with disabilities, older adults, and populations having 906 limited English proficiency, limited access to transportation, and/or limited access to financial 907 resources to prepare for, respond to, and recover from the emergency. 908

Information Points (also called Welcome Centers): Located on or near main evacuation routes, 909 interstate highways, and state borders. These facilities are generally state-sponsored and located 910

at state points of entry (e.g., rest areas, tourist centers) and provide self-evacuees: 911

Information and/or directions to shelter facilities912

Access to restroom facilities913

A temporary rest during their evacuation914

A place to recharge mobile telephones or other electronic devices915

Limited access to food and water.916

No-Notice Event: An incident occurring with little or no warning and requiring rapid 917

assessment, decision making, communication, and implementation of protective action. 918

Notice Event: An incident where jurisdictions have warning of an impending hazard. The 919

officials have time to prepare in advance, assess, communicate, and implement protective action 920 measures. Typically, initial preparation discussions regarding the impending hazard occur as 921 soon as the jurisdiction receives first notice of impact. 922

Pass-Through Community: Communities that are not evacuating their populations but are 923 located on the evacuation routes of evacuating populations. Evacuees “pass through” these 924

communities en route to their final destinations. These communities may assist in facilitating 925 evacuation operations. 926

Page 32: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 28

Reception Center: A facility where displaced individuals receive assistance in identifying 927 available shelter locations. Reception Centers are short-term centers for meeting evacuees’ 928 immediate needs while they await assignment to a shelter. 929

Reception Processing Site (also called Community Reception Center): An interim site along 930

an evacuation route that provides mass care and other emergency services to evacuees arriving in 931 a host location via government transportation. A Reception Processing Site may be located 932 within an impact jurisdiction (although outside the impact area) or in a host jurisdiction. These 933 locations provide life-sustaining services, such as food, water, basic medical support, and 934 assignment and transportation to a shelter. Additional services may include disaster and local 935

weather information, reunification, and crisis counseling. Temporary sleeping space may also be 936 provided while evacuee needs are evaluated or if they arrive late at night. Jurisdictions should 937 arrange separate areas for unaccompanied minors, people without identification, and individuals 938

subject to judicial and/or administrative orders restricting their freedom of movement. These 939 sites may also process evacuees returning to the impact jurisdiction. Typically, Reception 940 Processing Sites do not process self-evacuees and should direct them to an Information Point at a 941

separate location. 942

Re-Entry: The coordinated movement of first responders, recovery resources, and the general 943

public back into a community once a threat or hazard dissipates and the event causing the 944 evacuation ends. 945

Refuge of Last Resort: A facility or location that may provide temporary or limited relief from 946

the hazard. 947

Self-Evacuees: The evacuees with the means and capability to evacuate the impacted area 948

without government-provided transportation assistance. The primary modes of transportation 949

during an evacuation are foot, bike, car, train, and bus. 950

Sending Community: Communities that are directly impacted by a hazard or impending hazard. 951 Officials these jurisdictions have determined the need to evacuate all or a portion of the 952

population and are “sending” these evacuees outside of the impacted area. 953

Shadow Evacuees: Evacuees who will evacuate regardless of directives by public officials due 954

to perceived risk of danger. 955

Shelter (Mass Care): A facility where government agencies and/or pre-established voluntary 956 organizations process, evaluate, and provide disaster services to evacuees without an endpoint 957 destination. Meals and water should be available, as well as basic first aid, pet sheltering (if 958 applicable), sleeping quarters, hygienic support, and basic disaster services (e.g., counseling, 959

financial assistance and referral). 960

Shelter Demand: The estimated percentage or number of people in a population who will 961

require mass care services in public shelters. A general rule of thumb is to plan for 962 approximately 10 percent of the population, but this can vary widely based on socio-economic, 963 hazard specifics, and other variables. 964

Shelter-in-Place: The use of a structure to temporarily separate individuals from a hazard or 965 threat. Sheltering in place is the primary protective action in many cases. Often it is safer for 966

Page 33: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 29

individuals to shelter-in-place than to try to evacuate. Sheltering in place is appropriate when 967 conditions necessitate that individuals seek protection in their home, place of employment or 968 other location when disaster strikes. 969

Spontaneous Evacuation: When individuals in threatened areas observe an incident or receive 970

unofficial notice of an actual or perceived threat and, without receiving instructions to do so, 971 elect to evacuate the area. Their movement, means, and direction of travel are unorganized and 972 unsupervised. 973

Transfer Point (also called Assembly and Transfer Center): If applicable, locations where 974 transportation-assisted evacuees move from their initial evacuation modes of transportation onto 975

other transportation to a Reception Processing Site or a shelter. Depending on drive times and/or 976 distances, relief drivers and/or vehicles may be needed to comply with state and/or Federal safety 977 regulations. 978

Zero Hour: The time needed to clear transportation system users and to secure facilities, people, 979 and equipment after the evacuation is completed but before the hazard arrives. Zero-hour actions 980 are part of the Impact Phase and end prior to the incident impact, when all evacuation operations 981

have or should have ceased (at the end of an operational period) to ensure the safety of first 982 responders. 983

Page 34: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 30

Appendix C – Authorities 984

In addition to the statutes, regulations, executive orders, and Presidential directives outlined in 985 the National Response Framework, this Appendix provides additional legal bases for evacuation 986 operations and activities. 987

The Air Carrier Access Act, as amended, requires carriers to permit service animals to988 accompany passengers with a disability (with some caveats for “unusual or exotic” service989 animals), addresses emotional support and psychiatric service animal transport in aircraft990 cabins, and provides guidance on carrying service animals.991

The Animal Welfare Act, as amended, and associated regulations, requires that federally992

established standards of care and treatment be provided for certain warm-blooded animals993 bred for commercial sale, used in research, transported commercially, or exhibited to the994 public.995

Emergency Management Assistance Compact (Pub. Law 104-321) is a national interstate996 mutual aid agreement that enables states to share resources during times of disaster,997 providing timely and cost-effective relief to states requesting assistance from member states998 who understand the needs of jurisdictions struggling to preserve life, the economy, and the999 environment.1000

Executive Order 13166 – Limited English Proficiency improves access to federally1001 conducted and federally assisted programs and activities for persons who, because of national1002 origin, have limited English proficiency (LEP).1003

Executive Order 13347 — Individuals with Disabilities in Emergency Preparedness1004 strengthens emergency preparedness with respect to individuals with disabilities.1005

The Fair Housing Act, as amended, requires reasonable accommodations and modifications1006 to housing policies (e.g., no pet fees, pet deposits, pet rent) for animals that serve individuals1007 with disabilities, including in the aftermath of disasters.1008

Health Insurance Portability and Accountability Act of 1996 (HIPAA) considers legal1009 and/or logistical constraints in the ability of host medical facilities to support evacuee1010 healthcare needs. It was enacted to amend the Internal Revenue Code of 1986 to improve the1011

portability and continuity of health insurance coverage in group and individual markets, to1012 combat waste, fraud, and abuse in health insurance and health care delivery, to promote the1013 use of medical savings accounts, to improve access to long-term care services and coverage,1014

to simplify the administration of health insurance, and for other purposes.1015

The Health Research Extension Act requires all Federal grantee institutions to have disaster1016 plans that address the well-being of both animals and personnel during unexpected events1017 that compromise ongoing animal care.1018

The Marine Mammal Protection Act, as amended, establishes procedures, practices, and1019

guidance for rescuing and rehabilitating stranded marine mammals. Contingency plans for1020 rehabilitation hospitals must include evacuation or sheltering in place for emergency events.1021

Page 35: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 31

Pet Evacuations and Transportation Standards (PETS) Act of 2006, as amended,1022 authorizes FEMA to provide rescue, care, shelter, and essential needs for individuals with1023 household pets and service animals, and to the household pets and animals themselves1024 following a major disaster or emergency.1025

Privacy Act of 1974 (U.S.C. §552a) addresses records management of individuals and the1026 sharing and disclosure of such information.1027

The following Federal laws and programs also impact evacuation planning. Check whether these 1028 impact your jurisdiction when planning evacuation and shelter-in-place actions. 1029

The Chemical Stockpile Emergency Preparedness Program (CSEPP) includes evacuation1030 and shelter-in-place planning for communities surrounding the Army’s chemical warfare1031 agent stockpiles.1032

The Emergency Planning and Community Right-to-Know Act (EPCRA) requires local1033 governments to prepare chemical emergency response plans (to include evacuation and1034 shelter-in-place).1035

The Radiological Emergency Preparedness Program (REPP) includes emergency1036 protective action (evacuation and shelter-in-place) planning requirements for incidents1037 involving commercial nuclear power plants.1038

Additional state, local, tribal, and territorial laws and authorities may also exist. 1039

Page 36: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 32

Appendix D – Job Aids 1040

Command Job Aid 1041

A Command Job Aid is a quick-reference tool for key decision makers and elected and appointed 1042 officials on evacuation concept implementation. They are often critical to the success of a plan, 1043 as seen in recent events. In addition, education of key officials is vital to issuance of orders. 1044

This tool guides coordination considerations for threats that could initiate a large-scale shelter-in-1045 place and/or evacuation operation. Some points outline specific roles and responsibilities, and 1046 many are reminders of other operations that should be taking place during the activation of the 1047 Evacuation Plan. 1048

Additionally, this tool guides coordination between the Emergency Manager and the elected 1049 official(s), to help them effectively make executive decisions and take executive actions 1050 necessary throughout the operational process. 1051

Tailor the sample job aid below to the relevant jurisdiction(s). 1052

Sample Command Job Aid 1053

Phase Time Questions for [Jurisdiction Authority] Consideration

Mobilization Phase

Potential Impacts within 120 Hours

What are the potential impacts of the event?

Is sufficient information and monitoring of the forecastedthreat/hazard in place/available?

Is the [Jurisdiction Emergency Operations Center (EOC)]activated per an Emergency Operations Plan (EOP) or anotherplan?

Are any critical staffing, resource shortages, infrastructurechallenges, etc. likely to impact the ability to respond to theforecasted system? Have these been communicated topartners?

What special contracts are being considered forimplementation in support of the planned response? What arethe lead and lag times?

What threshold/conditions will trigger jurisdiction officials todeclare an emergency?

Is shelter-in-place a viable strategy for the threat?

Is evacuation required for impacted zones?

What is the capacity of the receiving zone to acceptevacuees?

What is the recommended time/condition for the [JurisdictionAuthority] to communicate the recommendation to theGovernor to declare a State of Emergency?

Other jurisdiction questions

Page 37: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 33

Phase Time Questions for [Jurisdiction Authority] Consideration

Mobilization Phase

Potential Impacts within 96 Hours

What is the current feedback on evacuation and shelter-in- place of functional and medical needs residents, hospitals, long-term care facilities, and the general public if needed?

What mass care resources does the jurisdiction have in place to receive evacuees? What are the projected resource requirements?

What public messaging efforts are underway at the local and state levels?

Are any forecasted or actual needs not being met? Have these been communicated to partners?

Other jurisdiction questions

Mobilization Phase

Potential Impacts within 72 Hours

Is contraflow potentially required? What preparatory actions are required?

What protective measures are being taken in the neighboring zones? What is the potential impact on [Jurisdiction]?

What actions are underway that will ensure retail fuel is available along evacuation routes?

What is the status of mass care shelters? What are the anticipated shelter requirements?

Are any forecasted or actual needs not being met? Have these been communicated to partners?

Other jurisdiction questions

Evacuation and Shelter- in-Place Phase

Potential Impacts within 48 Hours

What is the status of functional and medical needs, long-term care facilities, and hospital evacuations?

What is the status of general population shelters?

Have any voluntary evacuations been initiated by local jurisdictions? What is the status of evacuation considerations by local jurisdictions?

What is the plan for staging resources/teams?

What critical infrastructure is in the potentially affected area and what protective measures are underway?

Are any forecasted or actual needs not being met? Have these been communicated to partners?

Other jurisdiction questions

Evacuation and Shelter- in-Place Phase

Potential Impacts within 24 Hours

What is the status of traffic along the evacuation routes?

Is contraflow underway?

Are any life safety issues unresolved?

What conditions will require zero-hour sheltering of response personnel and cessation of field operations?

Have zero-hour conditions been communicated to response staff? To the public?

Are any forecasted or actual needs not being met? Have these been communicated to partners?

Other jurisdiction questions

Page 38: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 34

Phase Time Questions for [Jurisdiction Authority] Consideration

Impact Phase Arrival of Impact

Have field operations ceased for zero hour? Have responderssought refuge?

Has the public been advised to seek a refuge of last resort?

What is the status of infrastructure?

Are any forecasted or actual needs not being met? Have thesebeen communicated to partners?

Other jurisdiction questions

Mass Care Phase

Pre-/Post-Impact

What is the status of mass care for government-assistedevacuees? For self-evacuees?

How long until re-entry can begin? What conditions must bemet to begin re-entry?

Are the communication and traffic flow resources in placeand/or staged to support re-entry when needed?

What infrastructure/systems assessments are underway?When will they be complete?

What is the status of public messaging?

Are any forecasted or actual needs not being met? Have thesebeen communicated to partners?

Other jurisdiction questions

Re-Entry Phase

Post Impact – Recovery

Other jurisdiction questions

1054

Essential Elements of Information 1055

The tables below provide a quick reference of the information needed to inform response and 1056 create a Common Operating Picture. 1057

Mobilization and Evacuation Phase 1058

Essential Element of Information

Timeline Responsible

Entity Specific Information

Methodology/ Source

Activation of EOC

Approximately 72 hours prior to event

Evacuating jurisdiction(s)

Forecast pre- evacuation andimplications forimpeding operations

Hazard onset andtiming

Zones impacted

Priorities of electedofficials/executives

NationalWeather Service(NWS)

Predictivemodeling

Existing maps

Census data

Council ofGovernments

Page 39: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 35

Essential Element of Information

Timeline Responsible

Entity Specific Information

Methodology/ Source

Local State of Emergency Declaration

Approximately 72 hours prior to event

Evacuating jurisdiction(s)

Forecast pre- evacuation and implications for impeding operations

Hazard onset and timing

Zones impacted

Priorities of elected officials/executives

NWS

Predictive modeling

Existing maps

Census data

Council of Governments

Evacuation Warning Order Timing

Contact made X hours prior to anticipated event/incident and updated twice per operational period

Evacuating jurisdiction(s)

Hazard onset and timing

Zones impacted

Time of day

Routes available

Estimated affected population, including estimates of those with access and functional needs and specific demographics (e.g., languages spoken)

Communication status

Priorities of elected officials/executives

Predictive modeling

Existing maps

Census data

Department of Transportation

Universities/ Colleges

Council of Governments

Boundaries of Potential or Actual Incident Area (storm surge area, plume, fires, flooding, terrorist threat)

Initial estimate following notification and updated every operational period

Modeling data as soon as available

Evacuating jurisdiction(s)

Geographic limits of damage and zone impacts

Description of the potential or actual severity of damage

Estimated percentage of population evacuated, in need of evacuation, or sheltering in place

Predictive modeling

Remote sensing

Forecast data

On-scene reports via rapid assessment teams

Media

Public (via 9-1-1 and jurisdictional hotlines)

Page 40: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 36

Essential Element of Information

Timeline Responsible

Entity Specific Information

Methodology/ Source

Hazard-specific information

Initial estimate no later than four hours after notification and updated every operational period

Evacuating, pass-through, and host jurisdictions

Number or estimate of affected structures

Potential or actual estimated impacts to roads and other critical infrastructures

Potential or actual impacts associated with the release of hazardous materials or radiological incidents

Personal safety issues

Public health concerns

Predictive modeling

NWS

State EOC

Department of Agriculture

Public Health Departments

Department of Health and Human Services – Centers for Disease Control

Weather As soon as possible prior to evacuation and ongoing as required

Evacuating, pass-through, and host jurisdictions

Forecast pre-evacuation and implications for impeding operations

NWS

Mass Care Information

Initial estimate following notification and updated every operational period

Evacuating, pass-through, and host jurisdictions

Estimated percentage of population evacuated, in need of evacuation, or sheltering in place

Number of shelters (and type) currently open, on standby, or closed/full

Local EOC

State EOC

Shelters

Government Services Closures

Initial estimate following notification and updated every operational period

Evacuating jurisdiction(s)

County government closures

County school closures

County government fuel availability

Emergency services suspense of services

Public safety communication outages

Local EOCs

State EOCs

Media

Public (via 9-1-1 and jurisdictional hotlines)

1059

Page 41: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 37

Re-Entry Phase 1060

Essential Element of Information

Timeline Responsible

Entity Specific Information

Methodology/ Source

Initial Needs and Damage Assessments

Initial estimate within 6 hours following incident (post-landfall) and updated every 12 hours

Evacuating, pass-through, and host jurisdictions

Rapid needs assessment and preliminary damage assessment teams’ reports

Damages reported by local, state, and Federal agency EOCs

Request for support to the state and Federal entities from local jurisdictions

Rapid needs assessment and preliminary damage assessment teams

Media

Social media accounts

Public (via 9-1-1 and jurisdictional hotlines)

SEOC and local EOC reports

Status of Declarations

As soon as information becomes available and updated every operational period.

Evacuating, pass-through, and host jurisdictions

Status of local emergency declarations

Status of state emergency declarations

Status of presidential disaster declarations

Jurisdictions included

Types of assistance authorized

Special cost-sharing provisions regarding direct Federal assistance

EOCs

State EOC/EM Coordination

FEMA declarations

The White House

Status of Key Personnel

Post-notification and updated every operational period

Evacuating, pass-through, and host jurisdictions

Incident Comment

Elected or appointed officials

Staffing needs for response operations

ESF #1 through ESF #xx

Page 42: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 38

Essential Element of Information

Timeline Responsible

Entity Specific Information

Methodology/ Source

Major Issues/ Shortfalls

Initial assessment following notification and updated every operational period

Evacuating, pass-through, and host jurisdictions

Actual or potential resource shortfalls

Anticipated requirements for mutual aid

Status of request for support under the Emergency Management Assistance Compact (EMAC)

ESF #1 through ESF #xx

Rapid needs assessment team reports

Access Points to Disaster Area

Post-evacuation/ incident and updated every operational period

Evacuating jurisdiction(s)

Location of access points

Credentials needed to enter

Best routes to approach the disaster area

Transportation

Public works

Military support

Law enforcement

Status of Infrastructure

Initial estimate following notification and updated every operational period

Evacuating, pass-through, and host jurisdictions

Status of life-safety infrastructure, including water mains, wastewater treatment, and other public utilities

Status of electrical generating facilities and distribution grid

Households without electric power

Households without natural gas

Status of natural gas transmission facilities and distribution pipelines

Status of refineries, gasoline, and oil distribution systems

Transportation

Public works

Energy

Private utilities and municipal utility districts

Status of residents

Initial estimate following notification and updated every operational period

Evacuating, pass-through, and host jurisdictions

Confirmed and unconfirmed casualties

Primary threats to life safety

Local EOCs

State EOCs

Media

Public (via 9-1-1 and jurisdictional hotlines)

Page 43: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 39

Essential Element of Information

Timeline Responsible

Entity Specific Information

Methodology/ Source

Government Services Closures

Initial estimate following notification and updated every operational period

Evacuating jurisdiction(s)

Government closures

School closures

Government fuel availability

Emergency services suspense of services

Public safety communication outages

Search and rescue operations

Local EOCs

State EOCs

Media

Public (via 9-1-1 and jurisdictional hotlines)

Status of Operations Outside of Region

Initial determination following notification and updated every operational period

State-level emergency management organization

State priorities

Priorities outside of the state

Major operations in support of affected jurisdictions

ESFs that have been activated

Status of request for support under the Emergency Management Assistance Compact (EMAC)

EM

Status of Re- entry Operations

Initial determination following notification and updated every operational period

Evacuating, pass-through, and host jurisdictions

Status of life-safety infrastructure and roadways

Best routes to approach the disaster area

Transportation

Public works

SEOC and local EOC reports

1061

Page 44: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 40

Appendix E – Checklists 1062

The Appendix offers sample execution checklists to use during planning and executing 1063 evacuation and shelter-in-place operations. 1064

The checklists provide actions and desirable outcomes for emergency managers and ESF 1065 agencies and sequential, time-phased references to guide decision makers, liaisons, field staff, 1066 and other stakeholders when facing a threat that could initiate large-scale evacuation and/or 1067 shelter-in-place operations. They are broken out by ESF and incident phase. 1068

Jurisdictions may incorporate these checklists by reference to other plans, and/or they may 1069 outline adjustments to existing execution checklists. 1070

ESF #1—Transportation (Evacuation and Shelter Phase) Checklist: 1071

ID Primary Agency

Support Agency

ESF #1—Transportation

Evacuation and Shelter-in-Place Phase Actions

Completed ()

Activate personnel and transportation partners to support the Evacuation and Shelter-in-Place Phase.

Implement contraflow operations if authorized, in close coordination with

ESF #5—Information and Planning

ESF #7—Logistics

ESF #13—Public Safety and Security

ESF #15—External Affairs.

Implement access controls to close transportation infrastructure, entrances, and/or exits determined unsafe, in conjunction with ESF #13—Public Safety and Security.

Adjust traffic signal timing and implement other systems to expedite outbound traffic flow and public transit, in conjunction with:

ESF #5—Information and Planning

ESF #13—Public Safety and Security.

Activate mobilized assets, including staging areas, roadway support and evacuation sites, in conjunction with:

ESF #5—Information and Planning

ESF #13—Public Safety and Security.

Activate VMS and other messaging capabilities, in conjunction with:

ESF #5—Information and Planning

ESF #13—Public Safety and Security

ESF #15—External Affairs.

Page 45: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 41

ID Primary Agency

Support Agency

ESF #1—Transportation

Evacuation and Shelter-in-Place Phase Actions

Completed ()

If necessary, continue to halt work zone activities on primary evacuation routes, in conjunction with ESF #13—Public Safety and Security.

Track resource requirements for those with critical transportation needs (CTN), persons with disabilities, and others with access and functional needs (AFN), evacuees, those with health and medical needs, and household pets and service animals.

Provide information to ESF #13—Public Safety and Security or ESF #8—Public Health and Medical Services, as needed.

Survey current resources and request for additional resources, as necessary.

Maintain streetlights, traffic signals, and other evacuation-related systems in conjunction with private-sector energy businesses.

Utilize alternate power sources as available.

Coordinate with ESF #13—Public Safety and Security to remove damaged/immobile vehicles from the primary evacuation routes.

Determine zero-hour criteria for halting operations and sheltering personnel (wind speed, flooding conditions, inaccessible locations, hazardous material exposure limits).

Communicate these criteria to workers, responders and the public, in close coordination with:

Relevant authorities

ESF #5—Information and Planning

ESF #15–External Affairs.

Develop transportation objectives and priorities for the Impact Phase.

Insert additional jurisdictional actions as needed.

1072

ESF #5—Information and Planning (Mobilization Phase) Checklist 1073

ID Primary Agency

Support Agency

ESF #5—Information and Planning

Mobilization Phase Actions

Completed ()

Activate the EOC (partial or full, depending on scale).

Page 46: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 42

ID Primary Agency

Support Agency

ESF #5—Information and Planning

Mobilization Phase Actions

Completed ()

Determine the need for contraflow.

Begin working with appropriate authorities to activate personnel, procedures, and resources and communicate the contraflow decision and timing to the public and other stakeholders:

ESF #1—Transportation

ESF #3—Public Works and Engineering

ESF #7—Logistics

ESF #13—Public Safety and Security

ESF #15–External Affairs.

Alert and activate personnel and partners to report (either in-person or virtually) to the EOC.

Provide personnel and relevant partners with hazard- and/or incident-specific information.

Inform the chief elected or appointed official of the situation; coordinate the emergency declaration process, if required.

Establish a regular briefing schedule.

Consider contacting the field/regional coordinators to initiate a conference call with area counties and the SOC.

Determine jurisdictional need for support from the state; request activation, if necessary.

Coordinate with the state and region regarding shelter vacancies.

Actively participate in state, National Weather Service, FEMA, and other agency briefings/calls, upon request.

Compare/contrast benefits to evacuation versus sheltering in place: what is the hazard, vulnerability, and anticipated exposure.

Determine the appropriate protective action (e.g., shelter-in-place, point-to-point evacuation, or hub and spoke evacuation).

Communicate strategy.

Determine zones affected (or likely impacted) by the incident.

Analyze demographics of impacted zones.

Page 47: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 43

ID Primary Agency

Support Agency

ESF #5—Information and Planning

Mobilization Phase Actions

Completed ()

Based on projections and demographics of impacted zones, determine type, scale, and resource needs for evacuation sites, to include evacuation transportation sites, RCs, and shelters.

Coordinate with the EOC to determine the transportation system to use (e.g., point-to-point, hub and spoke).

In coordination with ESF #7—Logistics, identify which sites to use as local forward staging areas.

In coordination with ESF #7—Logistics, identify mobilization gaps.

Determine the need to activate pre-event, standby contracts, and/or memoranda of understanding (MOU) to assist with filling identified gaps, as needed.

Participate in coordination calls; communicate situation updates with pass-through and host communities and other impacted jurisdictions.

Consider a pre-disaster declaration process, support for large evacuation events, and anticipated expenditures for Category B (Emergency Protective Measures) Public Assistance when the threat level exceeds the established threshold.

Collect any relevant plans, policies, procedures, and documents.

Documents may include a jurisdictional CTN, AFN, or health and medical needs registry, if available.

Identify primary motorist and pedestrian evacuation routes, in conjunction with ESF #1—Transportation and with assistance from ESF #3—Public Works and Engineering.

In coordination with ESF #13—Public Safety and Security, reassess risk to evacuation and shelter-in-place zones.

Identify a phased system for implementation using zonal demographic data.

Estimate an evacuation timeframe for zones, in conjunction with ESF #1—Transportation.

Mobilize staging areas with resources for the Evacuation and Shelter-in-Place Phase, in conjunction with:

ESF #1—Transportation

ESF #3—Public Works and Engineering

ESF #6—Mass Care, Emergency Assistance, Temporary Housing, and Human Services

ESF #13—Public Safety and Security.

Page 48: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 44

ID Primary Agency

Support Agency

ESF #5—Information and Planning

Mobilization Phase Actions

Completed ()

Communicate with facilities and systems that have individual standard operating procedures.

Provide mobilization assistance to health and medical facilities, incarceration facilities, and other facilities and systems, as resources are available and requested, in conjunction with

ESF #8—Public Health and Medical Services

ESF #13—Public Safety and Security.

If necessary, coordinate with ESF #1—Transportation and ESF #13—Public Safety and Security to halt work zone activities on evacuation routes.

Help mobilize VMS, HARs, and/or other message signs at pre-designated areas, in coordination with:

ESF #1—Transportation

ESF #13—Public Safety and Security.

Survey current resources and activate mutual aid/private sector agreements for additional resource needs.

Mobilize the selected evacuation strategy (e.g., point-to-point, hub and spoke).

Mobilize selected facilities with staff, infrastructure, and resources.

Initiate vehicle tow and breakdown support along routes, in conjunction with:

ESF #1—Transportation

ESF #13—Public Safety and Security.

Ensure assisting agencies are communicated the nearest evacuation transportation site facilities to relocate stranded motorists.

Coordinate the strategy and resources to support evacuation and/or shelter-in-place support for pets, service animals, livestock, and other animals, in close coordination with:

ESF #6—Mass Care, Emergency Assistance, Temporary Housing, and Human Services

ESF# 11—Agriculture and Natural Resources.

In conjunction with ESF #15—External Affairs (both local and state), determine messaging for the time-phased, zonal evacuation and sheltering in place.

Assess family reunification needs; assist with the program as needed.

Page 49: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 45

ID Primary Agency

Support Agency

ESF #5—Information and Planning

Mobilization Phase Actions

Completed ()

Determine operational objectives, priorities, and rotation shifts for personnel in the Evacuation and Shelter-in-Place Phase.

Inset additional jurisdictional actions as needed.

1074

ESF #6—Mass Care, Emergency Assistance, Temporary Housing, and Human 1075 Services (Mass Care Phase) Checklist: 1076

ID Primary Agency

Support Agency

ESF #6—Mass Care, Emergency Assistance, Temporary Housing, and Human Services

Mass Care Phase Actions

Completed ()

From the EOC, regularly provide updates to and receive updates from activated evacuation sites (e.g., evacuation transportation sites, RCs) and other facilities, in coordination with ESF #8—Public Health and Medical Services.

Communicate situation updates to and from the EOC, especially for pass-through and host communities and other impacted jurisdictions.

Working with the EOC and in conjunction with ESF #15—External Affairs, ensure signage is clear and well posted and evacuation information is regularly updated.

Ensure persons with disabilities, the AFN population, and pet populations have suitable accommodations.

Request resources as needed.

Develop objectives and priorities for Re-Entry Phase.

Insert additional jurisdictional actions as needed.

1077

Page 50: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 46

Appendix F – Resources 1078

Training Resources 1079

FEMA National Training and Education Division: Provides training to the emergency 1080 management community, other homeland security professionals, and our citizens to enhance 1081 their skills for preventing, protecting, responding to, and recovering from manmade and 1082 natural catastrophic events. The following evacuation related training courses can be found at 1083

firstrespondertraining.gov/. 1084

– MGT-412: Sport and Special Event Evacuation Training and Exercise 1085

FEMA Emergency Management Institute (EMI). EMI is the emergency management 1086 community’s flagship training institution and provides training to local, state, tribal, Federal, 1087

volunteer, public, and private sector officials to strengthen emergency management core 1088 competencies for professional, career-long training. The following evacuation-related 1089

training courses are at training.fema.gov/emi. 1090

– G0358: Evacuation and Re-Entry Planning Course 1091

Other Resources 1092

National Governors Association (NGA) Governors Guide to Mass Evacuation, 2014: 1093 https://www.nga.org/files/live/sites/NGA/files/pdf/GovGuideMassEvacuation.pdf. 1094

Crisis Event Response and Recovery Access (CERRA) Framework, March 2018: 1095 https://www.dhs.gov/sites/default/files/publications/Crisis%20Event%20Response%20and%1096 20Recovery%20Access%20%28CERRA%29%20Framework.pdf . 1097

Federal Evacuation Support Resources 1098

According to the Federal Evacuation Support Annex to the Federal Response and Recovery 1099

Interagency Operational Plans, Federal support to local and state evacuations may include: 1100

Transportation technical assistance and analysis for evacuation operations and evacuation 1101 route conditions. 1102

Information and coordination of mass care services for evacuations, including tracking the 1103 movement of evacuees, sheltering, feeding, reunification, temporary housing, and human and 1104 personal support services. 1105

Accommodations to ensure that evacuation assistance is inclusive of individuals with 1106 disabilities and others with access and functional needs. 1107

Supplemental assistance to local and state jurisdictions in identifying public health, health 1108 maintenance, and medical needs of survivors, including patient movement, as well as 1109

reunification of children or older adults with an appropriate adult or family member. 1110

Support of local and state public safety and security measures (e.g., crowd control, traffic 1111 management, control of contraflow lanes in evacuations). 1112

Page 51: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 47

Information and coordination evacuating animals, including household pets and service and 1113 assistance animals. 1114

Debris removal and clearance of evacuation routes. 1115

Goods and services to support evacuation efforts and transportation services. 1116

Military and/or commercial contract aircraft to support evacuation operations. 1117

Regulatory waivers and exemptions. 1118

Federal evacuation support resources are composed of tracking and manifesting systems, 1119 reunification systems, evacuation support contracts, decision support tools, and personnel. These 1120 additional resources may be available contingent with, or in anticipation of, a Presidentially 1121

declared disaster. For more information and coordination, jurisdictions should contact their 1122

FEMA regional offices. 1123

Tracking and Manifesting Systems 1124

Tracking and manifesting systems coordinate the movement of evacuees, animals, and their 1125

belongings throughout evacuation and re-entry operations. Most of the tracking systems listed 1126 below do not interface with state tracking and manifesting systems. 1127

National Mass Evacuation Tracking System (NMETS), FEMA: Tracks movement of 1128 evacuees, their household pets or service and assistance animals, luggage, durable medical 1129 equipment, and essential belongings, as well as assists in linking information of 1130

unaccompanied minors to the Unaccompanied Minor Registry hosted by the National Center 1131 for Missing and Exploited Children and the National Emergency Family Registry and 1132

Locator System. NMETS can operate independently, using paper-based and/or advanced 1133

technology, or used in combination to support local-level, state-managed, or multistate 1134

evacuation operations. Acquired information may be used to create transportation manifests, 1135 determine sheltering requirements, and inform operational decision-making regarding the 1136

allocation of emergency resources. The software and basic training is available at no cost to 1137 the states. 1138

Joint Patient Assessment and Tracking System (JPATS), HHS: Tracks patients moved by 1139 the National Disaster Medical System (NDMS) from the point of entry into the patient 1140

movement system, to the NDMS health facility, and back to their originating location or 1141 destination. NDMS and other HHS teams utilize JPATS for tracking; however, HHS can also 1142 provide this tool at no cost to states. 1143

Emergency Tracking and Accountability System, Department of Defense (DoD), National 1144 Guard: Captures the names and other available identification information of patients as they 1145

proceed through the triage process conducted by the Homeland Response Force and/or 1146 Chemical, Biological, Radiological, and Nuclear Response Enterprise. 1147

Global Air Transportation Execution System (GATES), DoD: The Air Mobility 1148 Command’s aerial port operations and management information system supports automated 1149 cargo; passenger processing when DoD military airframes or DoD-contracted commercial 1150 airlines transport evacuees; reporting of in-transit visibility data to the Global Transportation 1151 Network; and billing to Air Mobility Command’s Financial Management Directorate. 1152

Page 52: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 48

TRANSCOM Regulating and Command and Control Evacuation Systems (TRAC2ES), 1153 DoD: This automated information system combines transportation, logistics, and clinical 1154 decision elements into a seamless patient movement automated information system. It 1155 visualizes, assesses, and prioritizes patient movement requirements, assigns resources, and 1156 distributes relevant data to deliver patients efficiently. The system automates the processes of 1157 medical regulation—assignment of patients to suitable medical treatment facilities—and 1158

aeromedical evacuation during peace, war, and contingency operations. 1159

Reunification Systems 1160

A reunification system helps reunite adults, children, and animals and helps displaced survivors 1161 establish contact with family, friends, legal guardians, and colleagues. FEMA has the statutory 1162 requirement to reunify unaccompanied minors with their custodial parents/legal guardians, as 1163

well as to assist with the voluntary reunification of adults with their families, during declared 1164

emergencies or disasters. 1165

National Emergency Family Registry and Locator System, FEMA: This web-based 1166 system may be activated following a Presidentially declared disaster at the request of an 1167 affected state to help reunite families that have become separated because of the disaster. 1168 Individuals and families can register online (www.fema.gov or www.disasterassistance.gov) 1169

or by phone (1-800-588-9822) when the system is activated. 1170

“Safe and Well” Website, American Red Cross: This service is provided by the American 1171 Red Cross for use by those affected by disasters in the U.S.,and their loved ones. Registering 1172 is voluntary and information is modifiable at any time. The American Red Cross provides 1173

registration information, as needed, to other organizations to locate missing persons, help 1174 reunite loved ones, or provide other disaster relief services. 1175

Unaccompanied Minors Registry, National Center for Missing and Exploited Children: 1176 This service allows the public to report information related to children 18 and under who are 1177

separated from their parents, legal guardians, or other relatives because of a disaster. It 1178 provides a place for emergency management agencies, law enforcement, shelter staff, 1179 hospital employees, schools, childcare institutions, and other organizations to report minors 1180

in their care during disasters. With a Presidentially declared disaster, the National Center for 1181 Missing and Exploited Children can also activate their Call Center to help locate children and 1182 reunify families who were lost or separated during the disaster or subsequent evacuations. 1183

The National Mass Evacuation Tracking System (referenced above) includes some elements 1184 of the Unaccompanied Minors Registry, allowing the intake of information about children 1185 separated from their parents/legal guardians. 1186

National Evacuation Contracts 1187

FEMA maintains four evacuation-specific contractual agreements with private-sector vendors for 1188 transportation resources and operational planning support capabilities. Each evacuation contract 1189 provides varying degrees of support; however, transportation assets are only provided through 1190

Page 53: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 49

the National Medical Transport and Support Contract or the Air Transportation Support Services 1191 Contract.12 1192

National Medical Transport and Support Contract, FEMA: Activated to help patients and 1193 individuals who need assistance evacuating from an area at significant risk or to provide pre-1194 hospital care and patient transport services in a region that already affected by a disaster. 1195

Evacuation Planning and Operational Support for Motor Coaches Contract, FEMA: 1196 Provides evacuation planning and supports use of motor coaches to evacuate the general 1197 population in response to Presidentially declared emergencies and major disasters within the 1198

continental United States. This contract provides generalized non-medical evacuation 1199 planning for a large-scale motor coach evacuation operation and disaster-specific non-1200 medical evacuation planning and operational support to facilitate the motor coach evacuation 1201 of critical transportation needs general population evacuees. This contract does not provide 1202

Motor Coaches. This contract includes or may provide: 1203

– Activation of Central Dispatch Operations – Command & Control 1204

– Crisis Action Planning, if no state plans exist 1205

– Contractor evacuation liaison/subject matter expert support at all key motor coach 1206 operational sites 1207

– Fleet management coordination (deployment of management staff to motor coach 1208 operations sites). 1209

Air Transportation Support Services Contract, FEMA: This provides additional 1210 operational flexibility for the safe and efficient transportation of people, teams, equipment, 1211

and assets in response to declared or undeclared emergencies within the United States, its 1212

territories and possessions. This contract includes or may provide: 1213

– Aircraft/Aircrew 1214

– Surface movement of equipment/personnel 1215

– Operations – aircraft ground support services 1216

– Operations – passenger service support 1217

– All-inclusive turnkey operations for FEMA air transportation (fixed- and rotary-wing) 1218

– Executive jet aircraft, passenger aircraft (medium, large, or jumbo), cargo/freight aircraft, 1219 and helicopters 1220

– Ground support services, ground transportation services, and a cadre of aviation subject 1221 matter experts. 1222

Aviation Ground Support Contract, FEMA: Supports the ability to obtain aviation related 1223 ground support services at U.S. airports. Contract support includes passenger services for up 1224 to 20,000 non-medical critical transportation needs evacuees, including individuals with 1225

12 If necessary, FEMA can contract for additional resources. If commercial transportation is not available, FEMA can request

additional transportation assistance from DoD and other Federal agencies for general population and patient evacuation. DoD,

through the NDMS, may provide fixed-wing air transportation for patient aero-medical evacuation with available resources,

when approved by the Secretary of Defense.

Page 54: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 50

disabilities and others with access and functional needs for a large-scale air evacuation at 1226 airfields that have undergone the pre-planning component and/or crisis action or adaptive 1227 operational planning for airfields that do not have an evacuation plan. This contract includes 1228 or may provide: 1229

– Passenger manifesting/holding1230

– All aviation ground support equipment (e.g., tugs, baggage carts), services, and personnel1231

– Baggage loading1232

– Aviation expertise, liaison, and staff support1233

– Aviation SMEs with contingency and emergency airfield operations experience.1234

Decision Support Tools 1235

Various decision support tools can support evacuation planning and operations: 1236

Hurricane Evacuation (HURREVAC), FEMA, USACE, National Oceanic and1237 Atmospheric Administration (NOAA): This is a storm tracking and decision support tool of1238 the National Hurricane Program, administered by FEMA, USACE, and NOAA’s National1239 Hurricane Center. The program combines live feeds of tropical cyclone forecast information1240 with data from various state Hurricane Evacuation Studies to help local emergency managers1241 determine the most prudent evacuation decision time and the potential for significant storm1242 effects, such as wind and storm surge.1243

National Disaster Medical System Bed Availability Report: Over 1,800 civilian hospitals1244 in the U.S. are voluntary members of the NDMS Bed Availability Report, providing1245 approximately 100,000 hospital beds to support NDMS operations in an emergency. When a1246

civilian or military crisis activates the NDMS, participating hospitals communicate their1247 available bed types and numbers to the Global Patient Medical Regulating Center. Patients1248 can be distributed to a number of hospitals without overwhelming any one facility.1249 Participating hospitals report the current number of available beds (within four hours) and the1250 maximum number of beds, by category (burns, critical care, medical/surgical, negative1251 pressure isolation, pediatric intensive care, pediatrics, and psychiatric) that can be available1252

within 24 to 72 hours.1253

TRANSCOM Regulating, Command, and Control Evacuation Systems (TRAC2ES),1254 DoD: This automated information system combines transportation, logistics, and clinical1255

decision elements into a seamless patient movement automated information system. It1256 visualizes, assesses, and prioritizes DoD patient movement requirements, assigns resources,1257 and distributes relevant data to deliver patients evacuated by DoD efficiently. The system1258

automates the processes of medical regulation (assignment of patients to suitable medical1259 treatment facilities) and aeromedical evacuation during peace, war, and contingency1260 operations.1261

Transportation Analysis Simulation System, U.S. Department of Transportation,1262 Department of Energy, and Environmental Protection Agency: This system includes travel1263

modeling procedures to meet the needs of state departments of transportation and1264 metropolitan planning organizations for more accurate and more sensitive travel forecasts for1265

Page 55: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 51

transportation planning and emissions analysis. The system outputs detailed data on travel, 1266 congestion, and emissions, information that is increasingly important to investment decisions 1267 and policy setting. Since the system simulates and tracks travel by individuals, it can evaluate 1268 the benefits to and impacts on different geographies and travel markets as well. It can also 1269 evaluate highly congested scenarios and operational changes on highways and transit 1270 systems. 1271

Nuclear Evacuation Analysis Code, Department of Energy: Sandia National Laboratories 1272 developed this code to analyze shelter-evacuate strategies following an urban nuclear 1273 detonation. This tool can model a range of behaviors, including complex evacuation timing 1274 and path selection, as well as various sheltering or mixed evacuation and sheltering 1275 strategies. The calculations are based on externally generated, high-resolution fallout 1276 deposition and plume data. Scenario setup and calculation outputs make extensive use of 1277

graphics and interactive features. This software produces quantitative evaluations of nuclear 1278 detonation response options, but the outputs also help communicate technical insights 1279 concerning shelter-evacuate tradeoffs to urban planning or response personnel. 1280

Real Time Evacuation Planning Model, DHS, through the Virginia Modeling, Analysis, 1281 and Simulation Center at Old Dominion University: Originally developed for the DHS 1282 Science and Technology Directorate, this model is a free, hands-on evacuation-planning tool 1283 to help municipal and regional planners understand and prepare for emergencies. It estimates 1284 the time required for evacuating vehicles to clear a user-defined area for a variety of 1285 evacuation scenarios. The number and speed of evacuating vehicles are determined by user-1286 assigned or modified variables, such as the time of day when an evacuation starts, evacuation 1287 rate, the population’s participation rate, and the number of people per vehicle, using 1288 parameters provided within the model. 1289

Geocentric Environment for Analysis and Reasoning (GEAR™),13 USACE: This 1290 software suite simplifies the analysis/decision making process by bringing spatial data and 1291 decision analysis into one place. GEAR™ spatially and temporally enables decision analysis, 1292 allowing users to efficiently and intuitively assess, analyze, and compare alternative 1293 outcomes. Gears™ provides decision, planning, and real-time support for a broad spectrum 1294 of mission areas and specific user cases, to include humanitarian assistance and disaster 1295

response efforts, medical communities, tactical situational awareness, operational level 1296 planning, environmental analyses, socio-cultural influences, and resilience and vulnerability 1297 analyses. 1298

Personnel 1299

Evacuation Liaison Team, U.S. Department of Transportation: The Evacuation Liaison 1300 Team is a non-deployable team that supports regional hurricane response efforts by 1301 facilitating the rapid, efficient, and safe evacuation of threatened populations. 1302

Additional Federal Evacuation Support Resources 1303

Department of Transportation (DOT) maintains the ability to procure Mass Transit buses 1304 in support of evacuation operations. 1305

13 GEAR™ is a registered trademark of Reinventing Geospatial, Inc. provided under contract to USACE.

Page 56: Planning Considerations - Evacuation and Shelter-in-Place...Determining that evacuation needs to take place is not an all-or-nothing approach. Lessons learned from disasters, such

Draft Planning Considerations: Evacuation and Shelter-In-Place v201807

PRE-DECISIONAL DRAFT 52

Federal Aviation Administration (FAA) provides aviation expertise and operational1306 support through the U.S. DOT ESF #1 function at the local, regional and national levels. This1307 support includes:1308

– Establishing and managing temporary flight restrictions over disaster areas, enabling1309 evacuation and other relief aircraft to carry out their missions more safely, flexibly, and1310 rapidly.1311

– Revising aircrew rest requirements for operators conducting critical relief missions.1312

– Quickly restoring air navigation services, facilities, and systems damaged or otherwise1313 disrupted in the disaster area to ensure that services needed for evacuation flights and1314 other relief missions receive priority.1315

– Establishing operational cells at FAA facilities that directly support evacuation and other1316

operational disaster response.1317

Federal Highway Administration (FHWA): While FHWA does not have regulatory1318 authority to direct movement on highways, in a catastrophic event where Federal agencies1319 are working with state authorities, the FHWA may provide technical support to state officials1320 for highway evacuation operations.1321

Federal Transit Administration (FTA) regulates transit operations when needed for1322 national defense or in the event of a national or regional emergency, or to establish and1323 enforce a program to improve the safety of U.S. public transportation systems. FTA may not1324 regulate the rates, fares, tolls, rentals, or other charges prescribed by any provider of public1325 transportation.1326

Federal Railroad Administration (FRA) may stop or limit rail service, including freight1327 and passenger service and some commuter rail service, to abate unsafe conditions. This1328 authority applies to all railroad service connected to the general freight and passenger rail1329 system, but does not extend to rail rapid transit systems not part of the general railroad1330 system.1331

Non-Evacuation-Specific Resources 1332

During notice and no-notice incidents, jurisdictions may employ the following non-evacuation-1333

specific resources for evacuation purposes, if needed and available: 1334

National Disaster Medical System1335

Ground transportation (e.g., cars, ambulettes, accessible transport, buses)1336

Rail transportation (e.g., Amtrak, commuter trains, streetcars)1337

Air transportation (e.g., commercial and military air carriers)1338

Maritime transportation (e.g., cruise ships, ferries)1339

Ground transportation support services (e.g., fuel)1340