Planning and Siting of Explosive Facilities
MA01 Slide 1
Background
Assessment, planning, siting and construction:
• Ensure safe, economic, efficient operation• Ensure an acceptable level of protection to the public• Keep the risks from explosive sites at least (ALARP)• Minimise the loss of stocks due to an unplanned event• Keep stocks in a fully serviceable condition• Ensure licences of existing sites are not compromised• Room for future expansion
MA01 Slide 2
Quantity Distances
Quantity Distances• Most hazardous – towards centre• Least hazardous – towards outer• Ensure minimum IQDs to limit required OQDs• Consider CGs
Consider earth traverses for ESHs
Construction / Land Cost v Cost of Stock
MA01 Slide 3
Isolation
Maintain OQDs Avoid infrastructure (eg power cables/gas
pipes) Avoid low flying aircraft Avoid RadHaz
But – requires access to a workforce
MA01 Slide 4
Accessibility
Accessible to user units Accessible to sources of supply Good road links Rail link (into depot, or good road to railhead) Roads in facility to be appropriate:
• Gradients• Turning circles• One-way system
MA01 Slide 5
Climate and Terrain
Dry storage conditions:• Well drained areas• Avoid areas with high incidence of electrical storms• Avoid areas of flooding
Avoid roads which are easily blocked by snow Seek firm and stable subsoil Avoid thickly wooded sites Seek dry, gently undulating country if possible
MA01 Slide 6
General Considerations - Example
MA01 Slide 7
The Systems Approach
Explosive Storehouse (ESH) Ammunition Process Building (APB) Demolition Area Admin buildings/other ‘non-explosive’ facilities Temporary storage of loaded vehicles
MA01 Slide 8
System Components
MA01 Slide 9
Siting Boards
For new sites For changes to existing sites Engage all stakeholders early Key skills (as a minimum):
• Project manager • Ammunition technical personnel• Civil engineers• Specialist technical advisors
MA01 Slide 10
Siting Boards – New facilities
Maps NEQ and HD for each PES A description of the purpose of each site The site perimeter, boundaries and borders The IQD and OQD outer distances Leased real estate Construction drawings Any special sites or buildings
MA01 Slide 11
Changes to Existing Facilities
Change a non-explosive facility to a PES Change of use of an existing PES or ES Major PES structural alterations/refurbishment
Any change of materials or alterations
MA01 Slide 12
Quick Confirmatory Test
Questions
MA01 Slide 14