Other Industries
Mike Coldiron , P.E.Air Permits Division
Texas Commission on Environmental QualityAdvanced Air Permitting Seminar 2012
![Page 2: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/2.jpg)
What Are Planned MSS Emissions?
• Planned MSS emissions include air emissions resulting from the maintenance, startup, or shutdown of equipment or facilities at a site
![Page 3: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/3.jpg)
What Are Planned MSS Emissions?
• Part of normal or routine facility operations other than production operations
• Predictable to timing
• Do not have to be scheduled for a specific date or time
![Page 4: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/4.jpg)
What Are Planned MSS Emissions?
• Do not include unplanned MSS, upsets, or emission events– TCEQ does not permit unplanned MSS,
upsets, or emission events– Emission events are covered under 30
TAC §101.201
![Page 5: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/5.jpg)
MSS Permitting – Other Industries
• Diversity very different from previous industry groups
• Different industry demographics - small businesses and minor sources (sites)
![Page 6: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/6.jpg)
MSS Permitting Goals – Other Industries
• Reduce the amount of effort for staff and regulated community
• Reduce processing times
• Efficiently review MSS from the large number of permitted sources anticipated for the 2013 submittal
![Page 7: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/7.jpg)
MSS Permitting – Previously Permitted Industries
Number of Applications Received by DateRefineries 26 January 5, 2007
Chemical plants 400 January 5, 2008
Carbon black 6 January 5, 2010
Power plants 103 January 5, 2011
![Page 8: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/8.jpg)
MSS Permitting – Coatings Industry
Foam Manufacturing 35
Printing 55
Fiber Reinforced Plastics/Cultured Marble 91
Paint, Coatings, Ink, and Adhesive Mfg. 43
Degreasing 18
Semiconductors and Electronics 32
Enclosed Painting 297
Non-enclosed Painting 43
Abrasive Blasting 23
Miscellaneous 56
![Page 9: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/9.jpg)
MSS Permitting – Mech/Ag/Construction Industry
Cotton Gins 267Grain Elevators 693Concrete Batch Plants 1015Hot Mix Asphalt Plants 284Rock Crushers 488Feed Mills 81
Total number of Mechanical Section applications is expected to exceed 3000
![Page 10: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/10.jpg)
MSS Permitting – Chemical Process Industry
Bulk and Marine Terminals 199Cleaning Facilities (i.e., railcar cleaning)
86
Refuse and Offsite Treatment 38Chemicals and Allied Services 37
![Page 11: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/11.jpg)
MSS Permitting – Planned MSS Groupings
• Evaluated possible MSS activities for each industry type
• Created groupings of similar industry types with similar MSS activities
• Discussed options for authorizing those activities
![Page 12: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/12.jpg)
Activity Categories for MSS
• Process MSS
• General facility MSS– Included in other industry submissions– Impacts issues are difficult to deal with
![Page 13: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/13.jpg)
Approach for Process MSS Activities
• Identified specific facility types
• Identified for each facility type– What is MSS– What is not MSS (normal process)
• MSS activities may be common to different facilities
• Authorization options
![Page 14: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/14.jpg)
Process MSS Authorization Options
• Already authorized in current permit explicitly or implicitly
• PBR – 30 TAC Chapter 106– No registration in most cases– Simple (or no) recordkeeping– No BACT review or public notice– Limited (or no) impacts review
![Page 15: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/15.jpg)
Process MSS Authorization Options
• De minimis – 30 TAC §116.119– No registration– Simple (or no) recordkeeping– No BACT review or public notice– Limited impacts review
![Page 16: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/16.jpg)
Examples of Process MSS Using PBR §106.263
• Temporary control devices for degassing
• Thermal control device startup and shutdown
• Process piping replacement or repair
![Page 17: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/17.jpg)
Approach for General Facility MSS
• Identify common activities• Approach to authorization
– De minimis under 30 TAC §116.119– PBR
![Page 18: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/18.jpg)
General Facility MSS Authorization Options
• De minimis – 30 TAC §116.119– No registration– Simple (or no) recordkeeping– No BACT review or public notice– Limited impacts review
![Page 19: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/19.jpg)
General Facility MSS Authorization Options
• PBR – 30 TAC Chapter 106– No registration in most cases– Simple (or no) recordkeeping– No BACT review or public notice– Limited (or no) impacts review
![Page 20: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/20.jpg)
Examples of General Facility MSSDe Minimis - §116.119
• Glove box blasting cabinets
• Aerosol cans (< 64 ounces/day)
• Vehicle/equipment washing
![Page 21: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/21.jpg)
Examples of General Facility MSSDe Minimis - §116.119
• Instrument calibration/leak checking
• Non-aerosol lubricants
• Aqueous detergents
![Page 22: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/22.jpg)
Examples of General Facility MSS Using PBRs
• Facility painting/blasting: §106.263
• Parts cleaners: §106.454
• Welding: §106.227
• Hand-held equipment: §106.265
![Page 23: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/23.jpg)
MSS Authorization Requirements - Amendments
• Identify planned MSS activities • Quantify emissions
• BACT required– May include restrictions on activities– May be work practices
![Page 24: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/24.jpg)
MSS Authorization Requirements - Amendments
• Impacts analysis required – Use MERA– Air dispersion modeling may be required
• Public notice may be required – New air contaminants – Increased emissions > PN Triggers
![Page 25: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/25.jpg)
Implementation Tools – Coatings Sources
• Form PI-MSS for surface coating sources
• Example application based on Form PI-MSS
• Updated MSS BACT Tables
• Frequently Asked Questions
![Page 26: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/26.jpg)
Implementation Tools – Mech/Ag/Construction
Industry• Survey to gather information
• Outreach to industry
• Early MSS review
![Page 27: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/27.jpg)
Implementation Tools – Chemical Sources
• Chemical Section Toolbox on Air Permits page of TCEQ Web site will include the following:– Guidance documents– Instructions– Calculation spreadsheets– BACT tables– FAQs
![Page 28: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/28.jpg)
Summary• Applications for “other sources” are due
by 01/05/13
• Timely applications will preserve the affirmative defense
• BACT and an impacts analysis will be required for permit amendments
![Page 29: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/29.jpg)
Summary• Use PBR or de minimis for general
facility MSS activities
• Use the implementation tools developed by APD
• Work with APD during application development
![Page 30: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/30.jpg)
Phone Numbers
APIRT: (512) 239-3075 APD: (512) 239-1240 or
1250
![Page 31: Planned Maintenance, Startup, and Shutdown – Other Industries](https://reader034.fdocuments.in/reader034/viewer/2022050723/56815f76550346895dce7c40/html5/thumbnails/31.jpg)
Contact Information
Contact information for the Coatings MSS Team is located on the announcements page of the TCEQ Web site.