Planned Maintenance Programme 2011-12 What’s in it for you?

description

Planned Maintenance 2011-12 leaflet

Transcript of Planned Maintenance 2011-12

Planned Maintenance Programme

2011-12

What’s in it for you?

2 Planned Maintenance Programme 2011/2012

Contents

What to expect 3

Kitchen and bathroom replacements 4

Heating replacements 5

Electrical upgrades 6

Lift maintenance / replacement 7

Fire prevention 8

District heating / communal heating 9 improvements

Overcladding 10

External works 11

Tower block improvements 12

Improvements to commercial properties 13

Drainage 13

The programme and you 14

Thinking ahead and reviewing 15the programme of work

At a glance – west area 2011/12 16

At a glance – east area 2011/12 18

3Planned Maintenance Programme 2011/2012

What to expect

Stockport Homes is committed to maintaining and investing in customers’ homes and communal areas. We aim to deliver improvements to properties and the environment of estates to meet the aspirations of current and future residents.

This leaflet contains information on the proposed capital works to be carried out in the 2011/2012 financial year from April 2011 to March 2012.

Stockport Homes has a lot of work planned to maintain and improve your home over the next twelve months. We want you to know what to expect, where and when.

By looking at the table at the back of this leaflet, you will be able to find out the work and the areas we intend to target over the next twelve months. Please note that this list may change to cater for any health and safety works required and priorities that we may receive over the course of the twelve months that we could not have planned for.

If you would like a full breakdown of the properties that are included within the programme of works, please contact:

Investment Team, Technical Services Operations Centre, Unit 9, Southside, Bredbury Park Industrial Estate, Bredbury, Stockport SK6 2SP

Tel: 0161 474 4407Email: [email protected]

4 Planned Maintenance Programme 2011/2012

Kitchen and bathroom replacements

The kitchen and bathroom replacement programme is now into its sixth year.

A survey of all the properties in this years programme will be undertaken to find out the condition of the existing kitchen and bathroom. Kitchens and bathrooms that already meet the Decent Homes standard will not be included in the replacement programme.

Customers will be contacted directly to arrange an appointment to see and choose from the kitchen and bathroom samples available. A choice event within Brinnington will also be arranged for customers who live in and around Brinnington.

These works will be carried out in the following areas:

Area Locations covered

East Bredbury, Brinnington, Hampshire Road, Hazel Grove, Marple, Mottram Street, Offerton, Romiley, Spring Gardens, Stockport, Victoria Park, Woodley

West Adswood, Brinksway, Cale Green, Cheadle, Cheadle Heath, Cheadle Hulme, Councillor Lane, East Street, Edgeley, Farley Way, Gatley, Heald Green, Heaton Chapel, Heaton Norris, Heaviley, North Reddish, Reddish, South Reddish, Swann Lane, Stockport

Area Locations covered

Cheadle Hulme Wimbourne Close

We will also be replacing the communal kitchen at the following location:

5Planned Maintenance Programme 2011/2012

Heating replacements

This year the programme for heating replacements contains those that have not been done in previous years and those where the heating system is near to the end of its lifecycle.

These works will be carried out in the following areas:

Area Locations coveredEast Brinnington, Offerton, Romiley, StockportWest Adswood, Councillor Lane, Heaton Chapel, South Reddish,

Stockport

6 Planned Maintenance Programme 2011/2012

Electrical upgrades

Electrical upgrades will be carried out across the Borough. A large proportion of this work will be undertaken in conjunction with the kitchen and bathroom replacements.

These works will be carried out in the following areas:

Area Locations coveredEast Bredbury, Hazel Grove, Marple Bridge, Offerton, Spring

Gardens, StockportWest Adswood, Brinksway, Cale Green, Cheadle Heath, Cheadle

Hulme, Heaton Chapel, Heaviley, Reddish, Stockport

7Planned Maintenance Programme 2011/2012

Lift maintenance and replacements

Stockport Homes has an on-going lift replacement programme. This programme has been drawn up following surveys by our consultant and is based on priority need. Due to the nature of such works, we do operate flexibility and should a lift on a scheme deteriorate or fall into failure, we take appropriate action and bring the works forward as required.

During 2011/2012 we will see the completion of lift replacements where work commenced in 2010/11. These are included in the areas below.

We will also see work commence on lifts that have been identified for replacement and considered those most at risk, within the 2011/2012 programme, which are also listed below:

Area Locations coveredEast Offerton:

Beaver House and Voewood HouseWest Heaton Norris, Lancashire Hill:

Heaton Towers, Norris Towers, Hanover Towers, Pendlebury Towers, Hollywood Towers, Stonemill Terrace

8 Planned Maintenance Programme 2011/2012

Fire prevention

The aim of fire prevention is to eliminate or reduce the risk from the spread of fire in multiple occupied properties. The fire risk assessment reports make recommendations on physical improvements needed in communal areas to bring properties up to the standards required under the Regulatory Reform (Fire Safety) Order 2005.

There is an on-going programme of fire prevention works. The areas that have been identified where fire prevention works are required to be completed within the 2011/2012 programme include:

Area Locations coveredEast Lincoln Towers, Mottram Towers, Millbrook Towers, Ratcliffe

Towers

9Planned Maintenance Programme 2011/2012

District Heating / Communal Heating replacements

Many properties are heated by a communal heating system. This programme covers the replacement and upgrade of those that are considered to be in priority need for replacement.

One area of work will be the completion of the Bio-mass boiler at Lancashire Hill. Biomass is a renewable energy source. Heat is produced from incinerating (for example, wood chips) and this is then used as fuel to source heat to communal heating within flats.

These works will be carried out in the following locations:

Area Locations coveredEast Mottram StreetWest Lancashire Hill

10 Planned Maintenance Programme 2011/2012

Overcladding

The overcladding to properties improves the aesthetics of the area as well as delivering a considerable saving on fuel bills. This highly efficient external wall insulation is fixed to the outside of the property then finished with a tough and long lasting finish.

These works will be carried out in the following locations:

Area Locations coveredVarious Location to be confirmed.

11Planned Maintenance Programme 2011/2012

External works (for example, roofing, windows and canopies)

We will also be carrying out roofing works to those properties in most need where the roofing is in disrepair. Where feasible, we will also be doing other external improvements at the same time, such as replacement windows, fascias and soffits, canopies and front / rear doors. The areas where it has been noted where this type of work is required includes:

Component Areas highlighted:Roofing Hazel Grove, Marple, WoodleyDoors BrinningtonCanopies Stockport

Component Areas highlighted:Roofing Edgeley, Heaton Chapel, GatleyDoors Adswood, Davenport, Heaton ChapelWindows Bramhall, Heaton ChapelCanopies Stockport

East

West

12 Planned Maintenance Programme 2011/2012

Tower block improvements

Part of the improvements to tower blocks includes improvements to bin stores. One of the improvements includes the replacement of the protective skirting to run around the chute to prevent any debris / refuse from coming out of the refuse bins.

This work will be carried out at the following location during 2011/2012:

Area Locations coveredEast Lincoln Towers, Norris Towers, Ratcliffe Towers

13Planned Maintenance Programme 2011/2012

Improvements to commercial properties

During 2011/2012, work will commence on improvements to shops. The improvements will focus on the condition of roofing, walkways, balcony’s and generally improving the flats above the shop area.

The priority for 2011/12 is listed below:

Area Locations coveredEast Romiley Precinct, Stockport

Drainage

To resolve the issues we have had with drainage throughout the Borough with clearage of blockages and overflowing drains, land drainage will be a priority on the 2011/2012 programme.

The type of work required will include removal of silt build up, excavations for the replacement of collapsed and broken or sunken drainage pipework and will focus within the following area considered as a priority:

Area Locations coveredEast and West Various

14 Planned Maintenance Programme 2011/2012

The programme and you

If your home is included within the Planned Maintenance Programme, Stockport Homes will contact you to confirm that your home has been included and discuss with you in more detail the exact scope of the works to be undertaken.

In addition to the main programme of works, additional miscellaneous projects will be carried out including:

• pre-painting, painting and repairs;• communal area painting;• maintenance work to garages, fences and gates;• work to improve housing, health and safety; and • improvements to door entry systems and concierge.

15Planned Maintenance Programme 2011/2012

Thinking ahead and reviewingthe programme of work

This is a rolling programme of works and we expect things are likely to change.

We must allow a degree of flexibility; therefore we will regularly review the programme to ensure that those properties most in need are improved first. With your feedback, you can influence what work is needed and where the works are carried out.

If you would like further information on how you can comment on the 2011/2012 Planned Maintenance Programme or if you have an idea for future programmes, please contact the Investment Team on:

Investment TeamTechnical Services Operations Centre, Unit 9Southside, Bredbury Park Industrial EstateBredbury, Stockport SK6 2SPTel: 0161 474 4407Email: [email protected]

16 Planned Maintenance Programme 2011/2012

At a glanceWest Area 2011/2012

External Works

Lift Maintenance / Replacement

Rewire

Heating Replacements

Communal KitchenReplacement

District Heating

Kitchen and Bathroom

Are

a

••

••

Ads

woo

d

•B

ram

hall

••

Brin

ksw

ay

••

Cal

e G

reen

•C

head

le

••

Che

adle

Hea

th

••

Che

adle

Hul

me

••

Cou

ncillo

r La

ne

•D

aven

port

Did

sbur

y R

oad

•E

ast S

tree

t

••

Edg

eley

17Planned Maintenance Programme 2011/2012

West Area 2011/2012

At a glance•

Farle

y W

ay

••

Gat

ley

•H

eald

Gre

en

••

••

Hea

ton

Cha

pel

•H

eato

n N

orris

••

•H

eavi

ley

•H

olly

woo

d To

wer

s

•La

ncas

hire

Hill

••

Nor

th R

eddi

sh

••

Red

dish

••

Sou

th R

eddi

sh

•S

wan

n La

ne

••

••

Sto

ckpo

rt

•S

tone

mill

Terr

ace

•W

imbo

rne

Clo

se

18 Planned Maintenance Programme 2011/2012

At a glanceEast Area 2011/2012

Housing Health and Safety Rating System HHSRS Works

Shops

Tower Block (Skirts)

Overcladding /Fenistration

Underground Drainage

External Works

Fire Prevention

Rewire

District Heating / Communal Heating

Heating Replacements

Presurised Water Mains

Kitchen and Bathroom

Are

a

•B

eave

r H

ouse

••

Bre

dbur

y

••

•B

rinni

ngto

n

•H

amps

hire

R

oad

••

•H

azel

Gro

ve

•H

illgat

e

••

Linc

oln

Tow

ers

•Lo

catio

n to

be

confi

rmed

••

Mar

ple

19Planned Maintenance Programme 2011/2012

East Area 2011/2012

At a glance•

Mar

ple

Brid

ge

•M

illbro

ok

Tow

ers

••

Mot

tram

Str

eet

•M

ottr

am

Tow

ers

•N

orris

Tow

ers

••

••

Offe

rton

••

Rat

cliff

e To

wer

s

••

•R

omile

y

••

Spr

ing

Gar

dens

••

••

Sto

ckpo

rt

•V

icto

ria P

ark

••

Woo

dley

Accessing our services

This leaflet gives you information on the Planned Maintenance Programme April 2011 to March 2012. If you would like a copy in large print, Braille, on audio tape or CD, please contact the Social Inclusion Team on 0161 474 2854 or email: [email protected]

Ref

: 791

/ M

arch

201

1

Accessing our services