Placing boom B4Z 36/32 Pumping unit HP1606H HP1608EC ... · placement in narrow areas •...

2
6200 6140 4500 4000 max 11300 1450 7250 91° 180° 250° 250° 7,8 7,6 7,6 8,6 35,6 23,8 -25 35 30 25 20 15 10 5 0 -5 -10 -15 -20 m m 31,4 40 35 30 25 20 15 10 5 0 -5 -10 -15 -20 m K36 Dimensions varying according to truck assembly Dimensions Placing boom Pumping unit Driven by Chassis B4Z 36/32 HP1606H HP1608EC PTO 3 - 4 axles TRUCK-MOUNTED CONCRETE BOOM PUMP

Transcript of Placing boom B4Z 36/32 Pumping unit HP1606H HP1608EC ... · placement in narrow areas •...

Page 1: Placing boom B4Z 36/32 Pumping unit HP1606H HP1608EC ... · placement in narrow areas • Proportional boom control • The “BFC” Best-Flex Cifa supporting system allowing just

6200

6140

4500

4000

max

11300

1450

7250

91°

180°

250°

250°

7,8 7,6 7,6 8,6

35,6

23,8

-2535 30 25 20 15 10 5 0 -5 -10 -15 -20m m

31,4

40

35

30

25

20

15

10

5

0

-5

-10

-15

-20

m

K36

Dimensions varying according to truck assembly

Dimensions

Placing boomPumping unit

Driven byChassis

B4Z 36/32HP1606HHP1608ECPTO3 - 4 axles

TRUCK-MOUNTED CONCRETE BOOM PUMP

Page 2: Placing boom B4Z 36/32 Pumping unit HP1606H HP1608EC ... · placement in narrow areas • Proportional boom control • The “BFC” Best-Flex Cifa supporting system allowing just

CIFA S.p.A.via Stati Uniti d’America,2620030 Senago (Milano) - Italiatel.: +39.02.990131 - fax: +39.02.9981157www.cifa.com

K36

K36_

ENG

_011

5

Technical data and characteristics subject to modifications without notice

Model HP1606H HP1608EC

Max. theorical output m3/h 160 160

Max. pressureon concrete bar 53 80

Max. numbers ofcycles per min. nr. 30 31

Conc. cylinders(diam. x stroke) mm 230x2100 230x2100

Concrete hopper capacity l 550 550

Hydraulic circuit open closed

Main features• Advantageous assembling on standard 3 - 4 axle chassis• Self-supporting frame - torsion free FEM designed• Placing boom B4Z 36/32, 4 sections, 125 mm pipeline diameter,

“Z” folding system• Fully hydraulic outrigger controls on both sides of the truck• Front outriggers “X” style for a quick set-up and easy pump

placement in narrow areas• Proportional boom control• The “BFC” Best-Flex Cifa supporting system allowing just one man

to change delivery pipeline easily, quickly and safely• Concrete flow rate regulator• HP EC pumping unit with closed circuit and reversal flow: superb

performances, high pressures and output, high reliability and easy and reduced maintenance; 9 inches S valve

alternatively: pumping system with open circuit: smooth, continuous and easy pumping, combined with high reliability• Safety device on opening inspection hatch

Standard equipment• 2 Proportional radio control with two boom movement speed,

synthesiser for automatic frequency search, 8 position joy stick and concrete flow rate regulator. 20 mt cable

• Emergency control pad for pumping unit• Remote controlled electric vibrator placed on the concrete hopper grid • Centralized lubrification system for pumping unit• Additional manual lubrification system for pumping unit• Hard plastic outrigger support plates with relative housing• Rear light on hopper• Level readers for stabilization control• Accessories for cleaning and pipes washing• Double thickness concrete pipes, in high resistant steel - CIFA Long

Life Pipes• Fiberglass hopper covering

Optionals••• High pressure water pump for cleaning• Air compressor for pipeline cleaning• Centralized lubrification system for placing boom• Air pipeline for placing boom• Separated emergency engine kit for independent control

of the hopper mixer, concrete pumping unit, boom and water pump• Continuous boom rotation kit

Model B4Z 36/32

Pipeline diameter mm 125

Max. vertical reach m 35,6

Max. horizontal distance m 31,4

Min. unfolding height m 8,6

Section numbers 4

1st section opening angle 90°

2nd section opening angle 180°

3rd section opening angle 250°

4th section opening angle 250°

Rotating angle 370°

End hose length m 4

Placing boom technical data

Pumping unit technical data

B4Z 36/32HP1606HHP1608ECPTO3 - 4 axles

Placing boomPumping unit

Driven byChassis

TRUCK-MOUNTED CONCRETE BOOM PUMP