December 23, 2019 1 Pittsburgh Parking Authority 9 th and Penn Avenue Replacement Garage Planning Commission Design Review Process New Construction December 23, 2019

Transcript of Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way...

Page 1: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019

1

Pittsburgh Parking Authority

9th and Penn Avenue

Replacement Garage

Planning Commission

Design Review Process

New Construction

December 23, 2019

Page 2: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019LOCATION MAP

2

Page 3: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019INTRODUCTION

• Location

• 136 9th Street, Pittsburgh, PA

• Zoning District: GT-C (Golden Triangle – C)

• Size

• Demolition of existing 586 space parking structure

• Build a 692 space facility

• Operations

• Functional and efficient for ease of operations

• Durable cast in place p/t structure with extended life

• Community

• Revitalization and building block for future development

• Architecturally sensitive, and aesthetically enhanced

• Safe pedestrian connections to destinations

• Creation of urban open space (10%)

• Public art requirement (1%)

• Feasibility of re-purposing- ground tier

Page 4: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019SITE PLAN – EXISTING PPAP OWNERSHIP

4

Page 5: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019EXISTING PPAP OWNERSHIP AND DEMOLITION

5

Page 6: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019CONDITIONS PRIOR TO DEMOLITION

Page 7: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019EXISTING PPAP OWNERSHIP AND DEMOLITION

7

Page 8: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019KEY DESIGN AND SITE CONSIDERATIONS

• User groups

• Daily Commuters

• Theatre District Patrons

• North Shore Stadium Events

• Architecture

• Open per code, and natural ventilated structure

• Horizontal lines and screening applications

• Recognition of proposed adjacent uses (hotel, condo)

• Traffic

• Traffic Study

• Primary entry/exits on 9th Street, overflow off of 8th Street

• Close coordination with the Cultural Trust

• Buildings owned by the Cultural Trust

• Maintaining the 3 buildings at corner of 9th and Penn Ave.

• Maintain the Goodyear building to the northwest of garage

• Coordination with demolition of the Duff’s building

• Property line consideration

• Sustainable

• ParkSmart Gold certified / Sustainable strategies

• Green Roof / City Park

Page 9: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019SURROUNDING CONTEXT

9

Intersection of 9th Street and Penn Avenue Benedum Center / Umbrella Sky Exhibit

Page 10: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019SURROUNDING CONTEXT

10

Page 11: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019PERSPECTIVE RENDERINGS / PPAP Existing Parking Structures

11

Page 12: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019RELATIONSHIP TO MASTER PLAN

12

PITTSBURGH CULTURAL TRUST MASTER PLAN

Page 13: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019RELATIONSHIP TO MASTER PLAN

13

Page 14: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Penn Avenue

14

Glass guardrail

pedestrian barrier

Cast-In-Place

Concrete

Perforated metal

panel; panels

project at varying

depth; multi-color

Curtainwall

Decorative /

Architectural

Fencing

Page 15: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019PERSPECTIVE RENDERINGS: 8th Street from Penn Avenue

15

Cast-In-Place

Concrete

Glass guardrail

pedestrian barrier

Perforated metal

panel; panels

project at same

depth; one color

Curtainwall

Page 16: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Fort Duquesne

16

Glass guardrail

pedestrian barrier

Cast-In-Place

Concrete

Perforated metal

panel; panels

project at varying

depth; multi-color

Curtainwall

Decorative /

Architectural

Fencing

Page 17: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Penn Avenue (night)

17

Glass guardrail

pedestrian barrier

Cast-In-Place

Concrete

Perforated metal

panel; panels

project at varying

depth; multi-color

Curtainwall

Decorative /

Architectural

Fencing

Page 18: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019AERIAL RENDERINGS: 9th Street from Fort Duquesne

18

Paver area;

temporary movie

area

Tall grasses

Children’s

playground; sport

turf

Artwork / sculpture

Dog park

Glass guardrail

pedestrian barrier

Page 19: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019WALL PANEL DETAIL

19

Perforated metal

panels in 6 shades

of grey, projecting

from the face of the

garage at varying

distance

Page 20: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019SITE PLAN

20

Page 21: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019SITE PLAN

21

Page 22: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019GROUND TIER PLAN

22

Page 23: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019GROUND TIER PLAN

23

Page 24: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019SECOND TIER PLAN

24

Page 25: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019TYPICAL TIER PLAN

25

Page 26: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

December 23, 2019ROOF LEVEL PLAN – GREEN ROOF

26

Page 27: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020  · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will

PEN

N A

VEN

UE

→)

UB

UP

SPEED RAMPUP

PL PL PL PL

PL PL

P L

PL PL PL PL PL

PL

PROPOSED PARKINGGARAGE

URBAN OPEN SPACE ANDPEDESTRIAN ACCESS

EASEMENT #2

ACCESS DRIVEEASEMENT #1

SIT

E D

EV

ELO

PM

EN

T P

LAN

LD-5

NOTES:

1. SOIL CLASSIFICATION;

URBAN LAND (UB) - 0 TO 3 PERCENT SLOPES, PAVEMENT, BUILDINGS AND OTHER ARTIFICIALLY COVERED AREAS.

NOTE: FOR LEGEND OF EXISTING FEATURES SEE SHEET LD-2; NOTES, LEGEND AND ABBREVIATIONS

PIT

TS

BU

RG

H P

AR

KIN

G A

UT

HO

RIT

Y9T

H A

ND

PE

NN

PA

RK

ING

GA

RA

GE

CIT

Y O

F P

ITT

SB

UR

GH

ALL

EG

HE

NY

CO

UN

TY

P

A

N WC

ON

SU

LT

ING

EN

GIN

EE

RS

, IN

C.

151

REN

O A

VEN

UE

NEW

CU

MBE

RLAN

D, P

A 17

070

(717

) 441

-221

6

FA

X (7

17) 6

95-7

449

ww

w.n

avar

row

right

.com

NA

VA

RR

O &W

RIG

HT

DRAFTGoodyear Service Center

- No Access

Cultural Trust TempParking - Access neededfor easement construction

9th & Penn Garage FootprintOccupied Buildings- No Access

Sidewalk Closure forduration of project

9th Street

8th Street

Penn A

venue

Ft D

uquesne Blvd.

TemporaryConstructionFence

Site accessGate for twoway traffic

Tower CraneReach zone -Approx 150ft radius

Limited Delivery Zone Will need coordinated for lane closure

Site accessGate for twoway traffic

ConstructionTrailers

ConstructionAccess Zone

Temporary EasementDumpsterLocation

Main Delivery Zone Crane Hoisting Area

DRAFT - Site Logistics Plan

Developed by Massaro12/02/2019