piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008...

39
piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 maah kI p`NaalaI p`caalana irpaoT- POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL LOAD DESPATCH CENTRE F-3,MIDC,MAROL,ANDHERI(E),MUMBAI-400093 Paavar iga`D karpaoroSana Aa^f [MiDyaa ilaimaToD piScama xaoi~ya Baar p`oYaNa kond` ef -3 ema.Aaya.iD.saI., maraola, AMQaorI( pUva- ) mau mba[- -400093

Transcript of piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008...

Page 1: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 maah kI p`NaalaI p`caalana

irpaoT-

POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL LOAD DESPATCH CENTRE

F-3,MIDC,MAROL,ANDHERI(E),MUMBAI-400093

Paavar iga`D karpaoroSana Aa^f [MiDyaa ilaimaToD piScama xaoi~ya Baar p`oYaNa kond`

ef -3 ema.Aaya.iD.saI., maraola, AMQaorI( pUva- ) maumba[--400093

Page 2: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga

WRLDC,O/S

1

maah Agast 08 ka saaraMSa p`itvaodna Summary Report for Aug 2008

mah%vapUNa- GaTnaae^M Important events:-Nil

isaBaI GaTkao ka saoMT/la sao@Tr maoM SaODyaUla / D/avala Central sector schedule versus drawal of all constituents.

saBaI AaMkDo mao.yau. maoM (All Figures in MUs)

Anauk`maaMk Sl. No.

sToT/ yau.TI/ isasTma State/U.T/

System

AnausaUcaI (maogaa yauinaT) Schedule

(Mus)

vaastva AahrNa(maogaa yauinaT)

Actual Drawal (Mus)

kula jyaada/ kma AahrNa

(maogaa yauinaT) Total Over (+)/Under (-)drawal

(MUs)

jyaada/ kma AahrNa jaba

AavaR<aI<49hT-sa (maogaa yauinaT)

Overdrawal at Freq.

<49Hz (MUs)

kma AahrNa jaba AavaR<aI>50.5hT-sa

((maogaa yauinaT) Underdrawal

at Freq. >50.5Hz (MUs)

1. gaujarat Gujarat 1304.49 1204.24 (-)100.24 2.865 0.014

2. Ci<asagaZ Chhattisgarh

240.87 171.41 (-)69.46 2.413 0.076

3. maQya p`doSa Madhya Pradesh

754.37 728.29 (-)26.08 1.802 0.029

4. maharaYT/Maharashtra 2015.99 2353.36 337.37 8.340 0.057 5. gaaovaaGoa 157.79 147.75 (-)10.05 0.179 0.017 6. dmana AaOr dIvaD&D 101.90 123.71 21.81 0.909 0.001 7. dadra nagar hvaolaI

DNH 204.09 261.21 57.13 2.617 0.000

8. Pavariga`D hcavaIDIsaI PG(HVDC)

2.226 0.90

9 kula TOTAL

4779 4989.97

Page 3: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga

WRLDC,O/S

2

1.0 maah Agast08 maoM AMtr xao~ sao piScama xao~ kao ivaVut ivainamaya Inter-Regional Exchange of Power from / to Western Region during Aug 2008

Line Import(MUs) [- Aar enaTIpIsaI sao ijayauivaenaela From ER(NTPC) to GUVNL 19.917

[- Aar enaTIpIsaI sao map`ivaparokMila From ER(NTPC ) to MPPTCL 23.703

[- Aar enaTIpIsaI sao emaesa[-TisaIela From ER(NTPC ) to MSETCL 68.851

[- Aar enaTIpIsaI sao Ci<asagaD rajya ivaVut baaoD- From ER(NTPC ) to CSEB 12.501

[- Aar enaTIpIsaI sao gaaovaa From ER(NTPC ) to GOA 0.738

[- Aar enaTIpIsaI sao dmana dIva From ER(NTPC ) to DD- AC link 4.362

[- Aar enaTIpIsaI sao dadra nagar hvaolaI From ER(NTPC ) to DNH- AC link 4.506

[- Aar enaTIpIsaI dadrI sao emaesa[-TisaIela From NTPC DADRI to MSETCL(NVVNL ) 5.199

vaosT baMgaala rajya sao baosT ivaVut baaoD- sao emaesa[-TIsaIela

From WBSEB to BESTMSETCL (PTC ) 4.125

iDvaIsaI sao map`ivaparokMila From DVC to MPPTCL (Long Term Open Access ) 30.862

ihmaacala sao epIpIsaIsaI From HIMACHAL to MSETCL TPTCL) 5.893

ihmaacala sao TIpIsaI emaesa[-TIsaIela From HIMACHAL to TPC MSETCL TPTCL) 10.254

ija[-ela sao iba[-esaTI emaesa[-TIsaIela From GEL to BEST MSETCL (GEL ) 1.673

ihrakuD sao Ci<asagaD rajya ivaVut baaoD- From Hirakud to CSEB 1.299

jaoko sao TIena[-baI From JK to TNEB (NVVNL ) 7.125

jaoko sao TIena[-baI From JK to TNEB (NVVNL ) 7.499

enaDIpIela sao epIpIsaIsaI From NDPL(DTL) to APPCC(KPDCL) 0.428

enaDIpIela sao epIpIsaIsaI From NDPL(DTL) to APPCC(KPDCL) 0.406

enaDIpIela sao iba[-esaTI emaesa[-TIsaIela From NDPL(DTL) to BEST MSETCL (KDPL ) 0.238

jaopIela sao epIpIsaIsaI From JPL to APPCC(LANCO) 11.695

jaopIela sao epIpIsaIsaI From JPL to APPCC( TPTCL ) 1.235

jaopIela sao epIpIsaIsaI From JPL to HPGCL(JSWPTL ) 5.256

jaopIela sao epIpIsaIsaI From JPL to HPGCL(JSWPTL ) 13.040

isae[-DIsaIela eesa[-baI sao emaesa[-TIsaIela From CAEDCL ASEB to MSETCL (TPTCL) 14.342

irhaMD sao map`ivaparokMila From Jindal SR to MPPTCL(Long Term Open Access ) 4.276

maaTaqaIlaa sao map`ivaparokMila From Matathilla to MPPTCL(Long Term Open Access ) 5.312

enaDIpIela sao map`ivaparokMila From NDPLto TPC MSETCL(TPC) 0.628

epIena[-Aar sao iba[-esaTI emaesa[-TIsaIela From APNER to BEST MSETCL ( TPTCL ) 0.593

epIena[-Aar sao iba[-esaTI emaesa[-TIsaIela From APNER to BEST MSETCL ( TPCL ) 34.230

epIena[-Aar sao map`ivaparokMila From APNER to MPPTCL ( MPPTCL ) 15.570

enaibaivaela sao TIpIsaI emaesa[-TIsaIela From NBVLto TPC MSETCL (TPTCL ) 0.768

enaibaivaela sao ibaesa[esa DITIela From NBVLto BSEL(DTL)(RETL) 6.218

enaibaivaela sao ibaesa[esa DITIela From NBVLto BSEL(DTL)(RETL) 11.684

enaibaivaela sao ibaesa[esa DITIela From NBVLto BSEL(DTL)(RETL) 18.858

[- Aar sao Aayaat net import from ER 239.159

ena Aar sao Aayaat net import from NR 252.094

esa Aar sao Aayaat net import from SR 7.487

Page 4: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga

WRLDC,O/S

3

Line Line inayaa-t Exports

map`ivaparokMila sao yaupIsaIela From CSEB to BEST MSETCL ( PTC ) 5.225

map`ivaparokMila sao yaupIsaIela From CSEB to UPCL ( UPCL ) 22.077

map`ivaparokMila sao yaupIsaIela From CSEB to UPCL ( PTC ) 9.660

map`ivaparokMila sao yaupIsaIela From CSEB to BEST MSETCL ( PTC ) 7.350

map`ivaparokMila sao iba[-esaTI emaesa[-TIsaIela From MPPTCL to BEST MSETCL ( TPCL ) 0.507

map`ivaparokMila sao iba[-esaTI emaesa[-TIsaIela From MPPTCL to BEST MSETCL ( TPC ) 0.270

map`ivaparokMila sao iba[-esaTI emaesa[-TIsaIela From MPPTCL to BEST MSETCL ( TPCL ) 12.213

map`ivaparokMila sao iba[-esaTI emaesa[-TIsaIela From MPPTCL to BEST MSETCL ( LANCO ) 38.100

map`ivaparokMila sao ijayauivaenaela From MPPTCL to GUVNL(AEL) 60.000

map`ivaparokMila sao epIpIsaIsaI From MPPTCL to APPCC (LANCO ) 27.109

map`ivaparokMila sao pIesa[-baI From MPPTCL to PSEB(LANCO) 22.156

map`ivaparokMila sao pIesa[-baI From MPPTCL to PSEB(LANCO) 96.108

map`ivaparokMila sao pIesa[-baI From MPPTCL to PSEB(LANCO) 9.559

map`ivaparokMila sao pIesa[-baI From MPPTCL to PSEB(NVVNL) 40.020

map`ivaparokMila sao pIesa[-baI From MPPTCL to PSEB(NVVNL) 20.872

map`ivaparokMila sao pIesa[-baI From MPPTCL to PSEB(NVVNL) 4.758

emasaIpIela map`ivaparokMila sao enapIsaIela From MCPL MPPTCL to NPCL(AEL) 5.368

emaesa[-TisaIela sao enaDIpIela From MSETCL ) NDPL(DTL)(AEL) 40.250

emaesa[-TisaIela sao enaDIpIela From MSETCL ) NDPL(DTL)(AEL) 26.720

emaesa[-TisaIela sao pIesa[-baI From MSETCL) PSEB(NVVNL) 4.758

emaesa[-TisaIela sao pIesa[-baI From MSETCL) PSEB(NVVNL) 6.190

ijayauivaenaela sao yaupIsaIela From GUVNL to UPCL ( UPCL ) 2.066

ijayauivaenaela sao epIpIsaIsaI From GUVNL to APPCC (AEL) 58.933

esa Aar kao inayaa-t Net export to SR 336.960

ena Aar kao inayaa-t Net export to NR 63.104

[- Aar kao inayaa-t Net export to ER 23.450

Page 5: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga

WRLDC,O/S

4

A) AavaRi<a $proKa Frequency Profile

AiQaktma AaavaRi<a (ekIkRt ) Maximum frequency(Inst) : 50.73Hz nyaUnatma AaavaRi<a (ekIkRt ) Minimum frequency(Inst) : 48.60Hz AaOsat AaavaRi<a Average frequency : 49.55Hz

AaavaRi<a ivatrNa p`itSat maoM Frequency distribution in %

hT-sa Hz

48.0sao kma <48.0

48.0 sao 49.0 tk 48.0-49.0

49.0 sao 49.50 tk49.0-49.5

49.5 sao 50.5 tk 49.5-50.5

50.5 sao 51.0 tk 50.5-51.0

51 sao ]pr >51.0

% 0 7.53 39.47 52.85 0.15 0

5.Agast 08 maah maoM ivaVut puit- isqatI Power supply position during Aug 2008

Ap`itbaMiQat carma maaMga Unrestricted peak demand : 33361 maogaa vaa^T MW on.29.08.2008

}jaa- kI AavaSyakta Energy Requirement : 18680maogaa yauinaT MUs

carma maaMga maoT Peak Demand met : 27346 maogaa vaa^T MW on 30.08.2008

}jaa- kI ]plabQata Energy Availability :16569 maogaa yauinaT MUs

p.07

Page 6: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga WRLDC,O/S

B) ivastRt p`itvaodna Detailed Report

31 Agast 2008 tk kI sqaaipt evaM p`BaavaI xamata Installed/Effective Capacity as on 31.08..2008

sqaipt }jaa- INSTALLED CAPACITY(MW) P`aBaavaI }jaa- EFFECTIVE CAPACITY(MW)

saMGaTk Constituent

tapIya Thermal jailaya Hydro

naaiBakIyaNuclear

Pavana Wind

iDJaola Diesel

kula Total

tapIya Thermal jailaya Hydro

naaiBakIyaNuclear

Pavana Wind

iDJaola Diesel

kula Total

kaoyalaa Coal

ga^sa Gas

kula Total

kaoyalaaCoal

ga^sa Gas

kula Total

ijayauivaenaela GUVNL

5129 2345.72 7474.72 779 0 306.88 17.48 8578.08 5069 2121.72 7190.72 779 0 306.88 17.48 8294.08

emapIpITIisaela MPPTCL

2657.5 0 2657.5 3310.75 0 51.19 0 6019.44 2647.5 0 2647.5 3310.75 0 51.19 0 6009.44

isaesa[-baI CSEB

2530 0 2530 125 0 34.01 0 2689.01 2490 0 2490 125 0 34.01 0 2649.01

emaesa[-TIisaela MSETCL

8575 2572 11147 3242.41 0 706.68 0 15096.09 8546 2572 11118 3284.41 0 706.68 0 15109.09

gaaovaa Goa

0 48 48 0 0 0 0 48 0 48 48 0 0 0 0 48

saoMT/la sao@Tr Central Sector

5860 1313.59 7173.59 0 1840 0 0 9013.59 5860 1313.59 7173.59 0 1840 0 0 9013.59

piScama xao~ Western Region

24751.5 6279.31 31030.81 7457.16 1840 1098.76 17.48 41444.21 24612.5 6055.31 30667.81 7499.16 1840 1098.76 17.48 41123.21

Page 7: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga WRLDC,O/S

I) Agast 2008 maah ko daOrana piScama xao~Iya iga`D kI p`mauK ivaSaoYataeM . Salient Features Of Western Regional Grid For The Month Of August.2008

1. sqaaipt xamata (maogaa vaa^T) Installed Capacity (MW)

gaujarat Gujarat

maQya p`doSa M.P

Ci<asagaZ CSEB

maharaYT/ Mah.

Gaaovaa Goa

saoMT/la sao@Tr Central Sector

piScama xao~ Western Region

Agast Aug'07 8578 5544 1439 14404 48 8514 38527 Agast Aug'08 8578 6019 2689.01 15096 48 9013.59 41444

vaRiQd p`itSatmaoM % increase 0.00 8.57 86.81 4.80 0.00 5.87 7.57

2. ]jaa- Energy (Gross) gaujarat Gujarat

maQya p`doSa M.P

Ci<asagaZ CSEB

maharaYT/ Mah.

gaaovaa Goa

idva dmaNa DD

dadra nagar hvaolaI DNH

piScama xao~ Western Region

Aisaimat AavaSyakta (maogaa yaunaIT) Unrestricted requirement (MUs)

Agast Aug'07 4499 2724 1275 8485 221 137 286 17628 Agast Aug'08 4763 2739 1388 9041 174 123 260 18680

Aisaimat AavaSyakta(maogaa yaunaIT/ idnamaoM)

Unrestricted Requirement MUs/day

Agast Aug'07 149.97 90.80 42.50 282.83 7.37 4.57 9.53 587.60 Agast Aug'08 158.77 91.30 46.27 301.37 5.80 4.10 8.67 622.67

}jaa- ]plabQata (maogaa yaunaIT) Energy availability (MUs)

Agast Aug'07 4186 2667 1226 7657 217 135 282 16372 Agast Aug'08 4526 2507 1377 7653 171 123 260 16569

}jaa- ]plabQata (maogaa yaunaIT) Energy availability MUs/day

Agast Aug'07 139.53 88.90 40.87 255.23 7.23 4.50 9.40 545.73 Agast Aug'08 150.87 83.57 45.90 255.10 5.70 4.10 8.67 552.30

3. maaMga Demand gaujarat Gujarat

maQya p`doSa M.P

Ci<asagaZ CSEB

maharaYT/ Mah.

gaaovaa Goa

idva dmaNa DD

dadra nagar hvaolaI DNH

piScama xao~ Western Region

AbaiQat maaMga(maogaa vaa^T) Unrestricted demand (MW)

Agast Aug'07 9019 4518 2298 16169 452 225 442 31036 Agast Aug'08 9163 5896 2610 17052 386 205 383 33361

p`itSat in% 1.60 30.50 13.58 5.46 -14.60

-8.89 -13.35 7.49

carma maaMga(maogaa vaa^T) Peak Demand met (MW)

Agast Aug'07 8169 4276 1999 12069 400 205 407 24989 Agast Aug'08 8224 5035 2406 12415 361 205 383 27346

p`itSat in% 0.67 17.75 20.36 2.87 -9.75 0.00 -5.90 9.43 . **Regional Demand met is the simultaneous demand met and is not the sum of demand met of constituent states

Page 8: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga WRLDC,O/S

maaMga AaOr ]jaa- maoM kmaI p`itSat maoM Shortage in demand and energy (%)

xamatamaoM kmaI Capacity shortage

piScama xao~ Western Region

AiQaSaoYa (-)/ surplus (+) (MW)

gaujarat Gujarat

maQya p`doSa M.P

Ci<asagaZ CSEB

maharaYT/ Mah.

gaaovaa Goa idva dmaNa DD

dadra nagar hvaolaI DNH

Agast Aug'07 -850 -242 -299 -4100 -52.00 -20.00 -35.00 -6047

p`itSat in% -9.42 -5.36 -13.01 -25.36 -11.50 -8.89 -7.92 -19.48 Agast Aug'08 -939 -861 -204 -4637 -25.00 0.00 0.00 -6015

p`itSat in% -10.25 -14.60 -7.82 -27.19 -6.48 0.00 0.00 -18.03

}jaa- maoM kmaI Energy shortage(-)/ AiQaSaoYa Surplus (+) (MUs)

gaujarat Gujarat

maQya p`doSa M.P

Ci<asagaZ CSEB

maharaYT/ Mah.

gaaovaa Goa idva dmaNa DD

dadra nagar hvaolaI

DNH

p xao Western

Agast Aug'07 -313.00 -57.00 -49.00 -828.00 -4.00 -2.00 -4.00 -1256.00 p`itSat in% -6.96 -2.09 -3.84 -9.76 -1.81 -1.46 -1.40 -7.13

Agast Aug'08 -237.00 -232.00 -11.00 -1388.00 -3.00 0.00 0.00 -2111.00

p`itSat in% -4.98 -8.47 -0.79 -15.35 -1.72 0.00 0.00 -11.30

Page 9: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga WRLDC,O/S

III) AavaRi<a $proKa Frequency Profile

A line diagram showing hourly average frequency over the month, monthly average frequency of each day are shown .

Frequency Profile of August 2008

49.00

49.20

49.40

49.60

49.80

1 2 3 4 5 6 7 8 9 10 11 1213 14 1516 17 18 1920 21 2223 24

Hrs

Monthly Average Hourly Average

AavaRi<a $proKa

maaisak AaOsat GaNTovaar AaOsat

hT-sa Hz

GaNTo

Page 10: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

PaxaoBaap`okond` p`caalana saovaae^M ivaBaaga WRLDC,O/S

IV)ivaVutdaba $proKa 400kV Voltage Profile saba sToSanaka naama

Sub- Station Name

AMiktmaulya ivaVutdaba Nominal

Voltage(kV)

ivaVutdaba kI isqatI (p`itSat samaya) Percentage of time when voltage was

AiQaktma ivaVutdaba

Max. Voltage(kV)

nyaunatma ivaVutdaba

Min. Voltage(kV)

saMixaPt spYTIkrNa Brief

Explanation

Below 0.97p.u.

0.97-1.03 p.u

Above 1.03 p.u.

Qaulao Dhule 400 0 6 94 440 394

Asaaoja Asoj 400 0 25.34 74.66 429 400

kraD Karad 400 0 36.16 63.84 428 390

kasaoar Kasor 400 0 13.33 86.67 426 404

[ndaOr Indore 400 0 80.8 19.2 423 383

[TarsaI Itarsi 400 0 19 81 432 391

jaotpur Jetpur 400 0 79 21 422 377

iBalaa[- Bhilai 400 0 56.06 43.94 424 385

baInaa Bina 400 0 37.37 62.63 433 386

gbaalaIer Gwalior

400 0 78.83 21.17 427 389

Page 11: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

10

9

Installed Capacity/Derated Capacity of

Stations/Units in Western Region As on 31.08.08

ivaVut Power yauinaT Units sqaaipt xamata Installed iDroToD/ Apga`ToD xamata Derated/UpgradedsToSana/ yauinaT Station/Unit (No.x MW) Capacity Capacity

(MW) (MW)gaujarat GUJARAT

jailaya H ydro]k[- Ukai(H) 4x75 300 300

]k[- elabaIsaIeca Ukai LBCH 2x2.5 5 5

kDanaa Kadana 4x60 240 240

pnaama k^naala Panam canal 2x1 2 2sardar saraovar Sardar sarower (16%of 1450) 232 232kula jailaya Total (Hydro) 779.00 779.00tapIya Thermale[-kMpnaI A.E.Co. 4x15+2x30+3x110 450 390

QauvarNa Dhuvarana 4x63.5+2x140 534 534

]k[- Ukai 2x120+2x200+210 850 850

gaaMiQanagar Gandhi Nagar 2x120+3x210 870 870

vaanakbaaorI Wanakbori 7x210 1470 1470

isa@ka Sikka 2x120 240 240

kcC ilaganaa[-T Kutch Lignite 2x70+1x75 215 215

saurt ilaganaa[-T Surat Lignite 2x125 250 250

Aik`maaoTa Akrimota 2x125 250 250kula kaola Total (coal) 5129.00 5069.00ga^sa Gase[-kMpnaI A.E.CO. Gas 2x32.5+1x35 100 100

QauvarNa Dhuvaran Gas 27+67.85+38.77(ST) 133.62 133.62

]trNa Utran 3x33+1x45 144 135ijaAayapIsaIela GIPCL 3x32+1x49+106+54 305 305[-ssaar Essar 3x110+1x185(ST) 515 300ijapok GPEC 3X138+241(ST) 655 655ijasaok GSEG Hazira 2X52+1X52.1(ST) 156.1 156.1

AarpIela RPL 8x30 240 240

ijaesaIela GACL 2x33+31(ST) 97 97kula ga^sa Total (Gas) 2345.72 2121.72pvana Wind+RES 306.88 306.88iDJaola Diesel 17.48 17.48

Total(Hy+Coal+Gas+Wind+Die 8578.08 8294.08

piScama xao~ kI 31 Agast 08 tk kI sToSana AaOr yainaT kI sqaaipt AaOr iDroToD xamata

pxaoBaap`okond` p`caalana saovaae^M ivaBaaga

WRLDC,OS

Page 12: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

ivaVut Power yauinaT Units saqaaipt xamata Installed iDroToD/ Apga`ToD xamata Derated/UpgradedsToSana/ yauinaT Station/Unit (No.x MW) Capacity(MW) Capacity(MW)

maQya p`doSa MADHYA PRADESHjailaya HydrogaaMiQasaagar Gandhi Sagar 5x23(50%) 57.5 57.5AarpI saagar R.P.Sagar 4x43(50%) 86 86jao saagar J. Sagar 3x33(50%) 49.5 49.5poMca SaoAr Pench share 2x80(66.67%) 107 107baagaI- Bargi 2x50 100 100Tnsa Tons 3x105+2x15+3x20 405 405banasaagar Bansagar 31 31 31

ibarsaIMgapur Birsinghpur 1x20 20 20

rajaGaaT Rajghat 3x15 45 45

[Midra saagar Indira Sagar 8x125 1000 1000

imanaI maayak`ao jailaya Mini-Micro hydro 3.25 3.25 3.25

maodIKoDa Madhikeda HEP 3x20 60 60

AaoMkaroSvar Ommkareswar Hydro 8x65 520 520

sardar saraovar Sardar sarower 57% of 1450 826.5 826.5kula jailaya Total (Hydro) 3310.75 3310.75tapIya Thermal AmarkMTk Amarkantak 2x30+2x120 300 290

saatpura Satpura -I 5x62.5(60%) 187.5 187.5

saatpura Satpura -I I 1x200+1x210 410 410

saatpura Satpura -III 2x210 420 420

saMjaya gaaMiQa TIpIesa S.Gandhi TPS 4x210 840 840

saMjaya gaaMiQa TIpIesa S.Gandhi TPS 1x500 500 500kula tapIya Total (Thermal) 2657.50 2647.50pvana Wind 51.19 51.19

iDJaola Diesel 0 0 Total (Hy+Th+Wind+Diesel) 6019.44 6009.44

Cai<asagaZ CHHATISGARHjailaya Hydrohcadova ba^ngaao Hasdeo Bango 3x40 120.00 120.00ga^MgarIla Gangrel 1x5 5.00 5.00kula jailaya Total (Hydro) 125.00 125.00tapIya Thermalkaorbaa pUva- Korba (E) 4x50+2x120 440 400kaorbaa piScama Korba(W) 4x210 840 840kaorbaa Korba(EB)ext-1&2 2*250 500 500ijaMdala Jindal 3*250 750 750kula tapIya Total (Thermal) 2530.00 2490.00pvana Wind + RES 34.01 34.01iDJaola Diesel 0 0

Total (Hy+Th) 2689.01 2649.01

pxaoBaap`okond` p`caalana saovaae^M ivaBaaga

WRLDC,OS

Page 13: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

ivaVut Power yauinaT Units saqaaipt xamata Installed iDroToD/ Apga`ToD xamata Derated/UpgradedsToSana/ yauinaT Station/Unit (No.x MW) Capacity Capacity

(MW) (MW)maharaYT/ MAHARASHTRA kaoyanaa Koyna I & II (4x(65+5)+4x(75+5)) 560 600.00kaoyanaa Koyna III 4x80 320 320.00kaoyanaa Koyna DPH 2x20 40 40.00kaoyanaa Koyna IV 4x250 1000 1000.00TaTa jalaIya Tata HydroKaopaolaI Khopoli 3x24iBavapurI Bhivpuri 3x24+2x1.5 447.00 447.00iBara Bhira 6x25iBara pIesaesa Bhira PSS 1x150vaOtrNaa Vaitarna+Vaitarna DTPH 1x60+1x1.5 61.5 61.50elaDrI Eldari 3x7.5 22.5 22.50vaIr AaOr BaaTGar Vir & Bhatgar 2x4.5+1x16 25 25.00pOzNa Paithan 1x12 12 12.00i<allaarI Tillari 1x60 60 60.00raQaanagarI Radhanagri 4x1.2 4.8 4.80iBara Tolarosa Bhira T/R 2x40 80 80

BaMDardra Bhandardhara 1x10+34 44 44

duQagaMgaa Dudhganga 2x12 24 24

poMca D/avala Pench Drawal 2x80 (33.33%) 53.33 53.33

pvanaa Pawana 1x10 10 10

Baatasaa Bhatsa 1x15 15 17

Zaoma Dhom 2x1 2 2

knhar Kanhar 1x4 4 4

maaiNakDaoh Manikdoh 1x6 6 6

]jjanaI Ujjani 1x12 12 12

iDMbh Dimbhe 1x5 5 5

sauyaa- Surya 1x0.75+1x6 6.75 6.75

panasaot Panshet 1x8 8 8

varsagaava Varasgaon 1x8 8 8

vaarNaa Warna 2x8 16 16

yaovatoSvar Yeoteshwar 1x0.08 0.08 0.08

trvaanamaoZo Terwanmedhe 1x0.2 0.2 0.2

krMjavaana Karanjwane 1x3 3 3

maaMjalagaava Majalgaon 1x0.75 0.75 0.75

sardar saraovar Sardar sarower 27% of 1450 391.5 391.5kula jailaya Total (Hydro) 3242.41 3284.41

pxaoBaap`okond` p`caalana saovaae^M ivaBaaga

WRLDC,OS

Page 14: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

ivaVut Power yauinaT Units saqaaipt xamata Installed iDroToD/ Apga`ToD xamata Derated/UpgradedsToSana/ yauinaT Station/Unit (No.x MW) Capacity Capacity

(MW) (MW)tapIya ThermalcaMd`pur Chandrapur 4x210+3x500 2340 2340T/ambao Trombay 1x150+2x500 1150 1150kaoraDI Koradi 4x120+1x200+2x210 1100 1080naaiSak Nasik 2x140+3x210 910 910

KaprKoDa Khaperkheda 4x210 840 840plaI- Parli 2x30+3x210 690 690Bausaavala Bhusawal 1x62.5+2x210 482.5 478DhaNauREL Dahanu 2x250 500 500parsa Paras 1x62.5 62.5 58parsa Paras 1x250 250 250na[-plaI New Parli 1x250 250 250kula tapIya Total (Thermal) 8575.00 8546.00ga^sa GasT/ambao Trombay-7A&7B 120+60 180 180]rNa ga^sa Uran(G) 4x60+4x108 672 672]rNa DblauecaAar Uran- W.H.R-1&2 2x120 240 240

daBaaola Dabhol 2x240+1x260 740 740

daBaaola Dabhol Block-III(740) 2x240+1x260 740 740 Total (Gas) 2572.00 2572.00

pvana Wind+RES 706.68 706.68iDJaola Diesel 0 0

Total(Hy+Th+Gas ) 15096.09 15109.09gaaovaa Goaga^sa Gasirlaayansa saalagaanasar Reliance,Salgaoncar 1x39.82+1x8.2 48.00 48.00saonT/la sao@Tr Central Sector enapIsaI N P C T^Psa TAPS 2x160+2x540 1400.00 1400.00k^Psa KAPS 2x220 440.00 440.00kula ena pI saI Total NPC 1840.00 1840.00enaTIpIsaI N T P CtapIya ThermalkoesaTIpIesa K S T P S 3x200+3x500 2100.00 2100.00ivaesaTIpIesa V S T P S 6x210+4x500 3260.00 3260.00isapt Sipat STPS-II 500.00 500.00kula tapIya Total (Thermal) 5860.00 5860.00kavaasa Kawas 4x106+2x116.1 656.20 656.20gaanQaar Gandhar GPP 3x144.3+1x224.49 657.39 657.39kula ga^sa Total (Gas) 1313.59 1313.59kula ena TI pI saI Total NTPC 7173.59 7173.59piScama xao~ Western Regionkula jailaya Total (Hydro) 7457.16 7499.16kula tapIya Total (Thermal) 24751.50 24612.50kula ga^sa Total (Gas) 6279.31 6055.31kula tapIya + ga^sa Total (Th+Gas) 31030.81 30667.81kula naaiBakIya Total Nuclear 1840.00 1840.00kula pvana Wind+RES 1098.76 1098.76kula iDJaola Total Diesel 17.48 17.48sava- yaaoga Grand Total 41444 41123.21

pxaoBaap`okond` p`caalana saovaae^M ivaBaaga

WRLDC,OS

Page 15: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

maah Agast 2008 ko daOrana ]%padna kond`ao vdara ]%paidt ]jaa- evaM AiQaktma maaMga Energy generated & Maximum demand of Generating

Stations/Units in Western Region duringAug.08}jaa- Power sqaaipt xamata iDroToD xamata AiQaktma ]%padna

sToSana / yauinaT Station/Unit Installed Derated MaximumCapacity Capacity Output Agast 08 Ap`ola 08 saoAgast08

(MW) (MW) (MW) Aug.08 April'08 to Aug.08gaujara t GujaratjalaIya H ydro

]k[- Ukai(H)(4x75) 300.00 300.00 211 7.53 203.79]k[- Ukai LBCH(2x2.5) 5.00 5.00 4 1.22 6.65kDanaa Kadana(4x60) 240.00 240.00 0 0.00 40.11pnaama ca^nala Panam canal 2.00 2.00 1 0.33 1.67sardar saraovar Sardar Sarovar(16% of 1450) 232.00 232.00

kula jalaIya Total ( H ) 779.00 779.00 9.08 252.21tapIya Thermal

e[-kMpnaI A.E.Co.ABC(4x15+2x30) 120.00 60.00 62 44.94 224.07e[-kMpnaI A.E.Co. D 110.00 110.00 123 85.63 439.40e[-kMpnaI A.E.Co. E 110.00 110.00 113 83.23 409.04e[-kMpnaI A.E.CO.F 110.00 110.00 113 83.40 404.09e[-kMpnaI ga^sa A.E.CO. Gas(2x32.5+1x35) 100.00 100.00 106 71.56 321.29QauvarNa Dhuvaran(4x63.5+2x140) 534.00 534.00 190 88.95 541.57QauvarNa Dhuvaran Gas(27+67.85+38.77+40) 133.62 133.62 195 103.41 569.40]k[- Ukai-1 120.00 120.00 108 22.22 84.85]k[- Ukai-2 120.00 120.00 70.00 16.56 199.59]k[- Ukai-3 200.00 200.00 200.00 132.62 274.43]k[- Ukai-4 200.00 200.00 200.00 138.23 559.07]k[- Ukai-5 210.00 210.00 210.00 146.95 735.76gaaMQaInagar Gandhi Nagar-1 120.00 120.00 87.00 57.50 285.54gaaMQaInagar Gandhi Nagar-2 120.00 120.00 103.00 68.96 351.91gaaMQaInagar Gandhi Nagar-3 210.00 210.00 210.00 139.44 693.89gaaMQaInagar Gandhi Nagar-4 210.00 210.00 175.00 7.31 508.93gaaMQaInagar Gandhi Nagar-5 210.00 210.00 215.00 151.78 678.60vaanakbaaorI Wanakbori-1 210.00 210.00 200.00 142.91 692.77vaanakbaaorI Wanakbori-2 210.00 210.00 0.00 0.00 520.40vaanakbaaorI Wanakbori-3 210.00 210.00 210 115.33 566.15vaanakbaaorI Wanakbori-4 210.00 210.00 212 149.78 573.01vaanakbaaorI Wanakbori-5 210.00 210.00 212 146.34 646.66vaanakbaaorI Wanakbori-6 210.00 210.00 212 81.94 676.05vaanakbaaorI Wanakbori-7 210.00 210.00 213 52.75 671.77]trNa Utran(3x33+1x45) 144.00 135.00 245 81.51 422.12isa@ka Sikka(2x120) 240.00 240.00 209 77.67 572.33kcC ilaganaa[-T Kutch Lignite(2x70+1x75) 215.00 215.00 218 94.31 554.27Aik`maaoTa Akrimota(2x125) 250.00 250.00 240 63.67 403.42

}jaa- ]%padna Energy Generation

Mus

pxaoBaap`okond` p`caalana saovaae ivaBaaga WRLDC,OS

Page 16: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

}jaa- Power sqaaipt xamata iDroToD xamata AiQaktma ]%padnasToSana / yauinaT Station/Unit Installed Derated Maximum

Capacity Capacity Output Agast 08 Ap`ola 08 saoAgast08(MW) (MW) (MW) Aug.08 April'08 to Aug.08

svatM~ ibajalaI piryaaojanaae^M IPPs 0.00ijaAayapIsaIla GIPCL((3x32+1x49+106+54) 305.00 305.00 309 177.58 912.89saurt ilaganaa[-T Surat Lignite (2x125) 250.00 250.00 258 98.21 694.43[-saar Essar(3x110+1x185) 515.00 300.00 403 49.76 1209.72ijapok GPEC(3X138+241) 655.00 655.00 620 236.03 1415.96

ijasaoga GSEG(2x52+52.1ST) 156.10 156.10 74 44.63 400.04ijaeisaela GACL(2x33+31ST) 97.00 97.00 0.00 0.00AarpIela RPL(8x30) 240.00 240.00 100 37.39 221.44 kula tapIya Total ( Thermal) 7474.72 7190.72 3092.50 18434.86pvana Wind 306.88 306.88

iDJaola Diesel 17.48 17.48

kula jalaIya + tapIya Total(H + T+W+D ) 8578 8294 3101.58 18687.07

maQya p`doSa Madhya PradeshjalaIya H ydrogaaMQaIsaagar G.Sagar (50%)of 5x23) 57.50 57.50Aar pI saagar R.P.Sagar (50%of 4x43) 86.00 86.00 157 7.22 92.81jao saagar J. Sagar (50%of 3x33) 49.50 49.50poMca SaoAr Pench share(66.67%)2x80 107.00 107.00 152 2.88 47.63baagaI- Bargi(2x50) 100.00 100.00 90 53.82 145.97Tnsa Tons(3x105)+(2X15)+(3x20) 405.00 405.00 0 0.00 388.54ibarisaMgapur Birsinghpur 20.00 20.00 20 13.42 30.83[Midra saagar Indira Sagar(8x125) 1000.00 1000.00 975 143.23 600.49imanaI maayak`ao Mini-Micro hydro 3.25 3.25sardar saraovar Sardar Sarovar(57% of 1450) 826.50 826.50banasaagar Bansagar(Deolondh) 10.00 10.00 0 0.00 0.00banasaagar Bansagar(Silpara) 10.00 10.00 19 7.03 31.98banasaagar Bansagar(Zinaha) 11.00 11.00 0 4.40 6.87rajaGaaT Rajghat( 3x15) 45.00 45.00 23 14.85 27.97maoQaIKoDa Madhikeda HEP(3x20) 60.00 60.00 40 41.09 75.02AaoMkaroSvar Omkareswar(8x65) 520.00 520.00 405 77.77 337.48kula jalaIya Total(H) 3310.75 3310.75 362.83 1737.95tapIya Thermal AmarkMTk Amarkantak -I-1&2(2x30) 60.00 50.00 16 2.31 27.74AmarkMTk Amarkantak -II-1 120.00 120.00 75 46.69 215.20AmarkMTk Amarkantak -II-2 120.00 120.00 65 15.83 170.53saatpura 'Satpura 1-5 (5x62.5(60%)) 187.50 187.50 157 90.76 477.04saatpura Satpura-6 200.00 200.00 198 120.36 600.20saatpura Satpura-7 210.00 210.00 185 116.59 592.40saatpura Satpura-8 210.00 210.00 195 117.73 449.10saatpura Satpura-9 210.00 210.00 180 104.16 465.40saMjaya gaaMQaI TIpIesa S.Gandhi TPS-1 210.00 210.00 158 101.55 516.33saMjaya gaaMQaI TIpIesa S.Gandhi TPS-2 210.00 210.00 169 68.85 382.08saMjaya gaaMQaI TIpIesa S.Gandhi TPS-3 210.00 210.00 177 105.24 552.90saMjaya gaaMQaI TIpIesa S.Gandhi TPS-4 210.00 210.00 187 124.50 612.92saMjaya gaaMQaI TIpIesa S.Gandhi TPS-Ext-i 500.00 500.00 388 144.56 979.47kula tapIya Total Thermal(coal): 2657.50 2647.50 1159.13 6041.31pvana Wind+RES 51.19 51.19iDJaola Diesel 0.00 0.00kula Total ( H + T+W+D ) 6019 6009 1521.96 7779.26

}jaa- ]%padna Energy Generation MUs

pxaoBaap`okond` p`caalana saovaae ivaBaaga WRLDC,OS

Page 17: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

}jaa- Power+B144 sqaaipt xamata iDroToD xamata AiQaktma ]%padnasToSana / yauinaT Station/Unit Installed Derated Maximum

Capacity Capacity Output Agast 08 Ap`ola 08 saoAgast08(MW) (MW) (MW) Aug.08 April'08 to Aug.08

Ci<asagaZ CHHATISGARHjalaIya Hydrohsadova ba^Mgaao Hasdeo Bango(3x40) 120.00 120.00 115 31.54 68.44ga^MgarIla Gangrel 5 5.00 8 5.75 13.42imanaI maayak`ao Mini-Micro KWB 6 1.54 2.03tapIya Thermalkaorbaa Korba (E)- 1 to 4(4x50) 200.00 160.00 198 91.64 534.11korbaa pUva- K(E) -5 120.00 120.00 123 66.41 314.96korbaa pUva- K(E) -6 120.00 120.00 116 63.42 306.19kaorbaa piScama Korba(W)-1 210.00 210.00 210 148.34 748.01kaorbaa piScama Korba(W)-2 210.00 210.00 210 82.41 606.65kaorbaa piScama Korba(W)-3 210.00 210.00 193 134.17 678.39kaorbaa piScama Korba(W)-4 210.00 210.00 192 68.33 621.69kaorbaa piScama Korba(EB)Extn-1&2 500.00 500.00 486 337.69 1400.25baalakao sao isaesa[-baI BALCO to CSEB 171 2.75 38.85ijaMdala sao isaesa[-baI Jindal to CSEB 750.00 750.00 440 196.92 808.09kula taapIya Total Thermal(coal): 2530.00 2490.00 1192.08 6057.19pvana Wind+RES 34.01 34.01iDJaola Diesel 0.00 0.00kula Total(H+T+W+D) 2689.01 2649.01 1230.91 6141.08

maharaYT/ MAHARASHTRA jalaIya H ydro kaoyanaa Koyna I & II (4x(65+5)+4x(75+5) 560.00 600.00 555 62.10 376.85kaoyanaa Koyna III (4x80) 320.00 320.00 320 58.45 310.72kaoyanaa Koyna DPH (2x20) 40.00 40.00 35 10.85 55.54kaoyanaa Koyna IV(4x250) 1000.00 1000.00 1124 114.68 891.02TaTa jalaIya Tata HydroKaopaolaI Khopoli (3x24)iBavapurI Bhivpuri (3x24+2x1.5) 447.00 447.00 453 55.15 444.72iBara Bhira (6x25) 0.00iBara Bhira PSS (1x150) 0.00vaOtrNaa Vaitharna+VaitharnaDTPH(1x60+1x1.5) 61.50 61.50 60 12.43 61.83elaDarI Eldari(3x7.5) 22.50 22.50 0 0.00 2.19ivar AaOr BaaTGar Vir & Bhatgar(2x4.5+1x16) 25.00 25.00 40 4.54 21.79pOzNa Paithan 12.00 12.00 10 0.75 4.14itllaarI Tillari 60.00 60.00 61 23.66 64.99iBara Tola ra[ja Bhira T/R(2x40) 80.00 80.00 81 7.44 31.79sardar saraovar Sardar Sarovar(27% of 1450) 391.50 391.50 0poMca D/avala Pench Drawal(33.33%) 53.33 53.33 0smaala jalaIya Small Hydro (Others) 169.58 171.58 0 58.06 134.04kula Total(H): 3242.41 3284.41 408.11 2399.63tapIya Thermal 0.00naaiSak Nasik-1&2 280.00 280.00 214 129.20 486.82naaiSak Nasik-3 210.00 210.00 210 104.67 563.97naaiSak Nasik-4 210.00 210.00 202 77.93 621.61naaiSak Nasik-5 210.00 210.00 206 91.41 629.23T/ambao Trombay-4 150.00 150.00 145 68.58 357.33T/ambao Trombay-5 500.00 500.00 505 359.88 1793.28T/ambao Trombay-6 500.00 500.00 510 339.90 1671.00T/ambao Trombay-7A&7B(120+60) 180.00 180.00 0 0.00 452.95

MUs}jaa- ]%padna Energy Generation

pxaoBaap`okond` p`caalana saovaae ivaBaaga WRLDC,OS

Page 18: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

}jaa- Power sqaaipt xamata iDroToD xamata AiQaktma ]%padnasToSana / yauinaT Station/Unit Installed Derated Maximum

Capacity Capacity Output Agast 08 Ap`ola 08 saoAgast08(MW) (MW) (MW) Aug.08 April'08 to Aug.08

kaoraDI Koradi 1-4(4x120) 480.00 460.00 367 138.11 674.87kaoraDI Koradi-5 200.00 200.00 202 91.68 471.73kaoraDI Koradi-6 210.00 210.00 184 117.46 620.81kaoraDI Koradi-7 210.00 210.00 205 118.91 551.99Bausaavala Bhusawal-1 62.50 58.00 55 27.50 157.74Bausaavala Bhusawal-2 210.00 210.00 200 93.30 579.79Bausaavala Bhusawal-3 210.00 210.00 210 25.91 482.47plaI- Parli-1&2(2x30) 60.00 60.00 57 34.61 186.42plaI- Parli-3 210.00 210.00 150 71.70 295.32plaI- Parli-4 210.00 210.00 214 95.38 578.42plaI- Parli-5 210.00 210.00 195 126.81 646.17parsa Paras 62.50 58.00 55 29.57 169.14parsa Paras 250.00 250.00 127 29.91 316.89]rNa Uran(G)(4x60+4x108) 672.00 672.00 396 199.98 1197.96]rNa Uran- W.H.R-1&2(2x120) 240.00 240.00 238 112.72 675.76caMd`pur Chandrapur-1 210.00 210.00 180 85.04 424.03caMd`pur Chandrapur-2 210.00 210.00 180 75.61 553.37caMd`pur Chandrapur-3 210.00 210.00 210 19.31 570.91caMd`pur Chandrapur-4 210.00 210.00 210 88.18 649.83caMd`pur Chandrapur-5 500.00 500.00 465 72.92 1175.98caMd`pur Chandrapur-6 500.00 500.00 435 135.49 1012.54caMd`pur Chandrapur-7 500.00 500.00 465 237.56 1472.90KaprKoDa K'Kheda - II-1 210.00 210.00 211 122.97 687.91KaprKoDa K'Kheda - II-2 210.00 210.00 212 142.46 685.77KaprKoDa K'Kheda - II-3 210.00 210.00 214 142.76 728.74KaprKoDa K'Kheda - II-4 210.00 210.00 210 135.71 703.56DhaNau Dahanu-1&2(2x250) 500.00 500.00 534 375.11 1890.18nyau plaI- New Parli 250.00 250.00 0 0.00 495.49AayapIpI IPPdaBaaola Dabhol PH - I(3x235+35+740) 1480.00 1480.00 656 378.85 2265.71kula tapIya Total Thermal (coal) 8575.00 8546.00 3805.54 22906.19kula ga^sa Total Gas 2572.00 2572.00 691.55 4592.39tapIya Thermal 11147.00 11118.00 4497.09 27498.57pvana Wind+RES 706.68 706.68 65.11 325.55iDJaola Diesel 0.00 0.00kula Total(H+T+W+D) 15096 15109 4970.31 30223.75gaaovaa Goairlaayansa pavar Reliance power,Salgoancar 48.00 48.00 19 12.47 54.69Shared Hydro Projectssardar saraovar AarbaIpIeca Sardar SarovarRBPH-1 200.00 200.00 200 20.53 112.35sardar saraovar AarbaIpIeca Sardar SarovarRBPH-2 200.00 200.00 200 34.74 154.69sardar saraovar AarbaIpIeca Sardar SarovarRBPH-3 200.00 200.00 200 25.91 178.47sardar saraovar AarbaIpIeca Sardar SarovarRBPH-4 200.00 200.00 200 38.13 178.93sardar saraovar AarbaIpIeca Sardar SarovarRBPH-5 200.00 200.00 200 39.64 142.49sardar saraovar AarbaIpIeca Sardar SarovarRBPH-6 200.00 200.00 200 42.06 202.49sardar saraovar isaeca pIeca Sardar Sarovar CHPH-1 50.00 50.00 38 1.03 14.06sardar saraovar isaeca pIeca Sardar Sarovar CHPH-2 50.00 50.00 37 2.99 14.53sardar saraovar isaeca pIeca Sardar Sarovar CHPH-3 50.00 50.00 38 3.54 17.89sardar saraovar isaeca pIeca Sardar Sarovar CHPH-4 50.00 50.00 39 5.09 11.14sardar saraovar isaeca pIeca Sardar Sarovar CHPH-5 50.00 50.00 37 1.68 11.98kula sardar saraovar Total Sardar Sarovar 1389 215.34 1039.01poMca Pench 160.00 160.00 152 2.88 47.63kula SaoAr Total (Shared) 1541.00 218.22 1086.64

}jaa- ]%padna Energy Generation MUs

pxaoBaap`okond` p`caalana saovaae ivaBaaga WRLDC,OS

Page 19: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

}jaa- Power sqaaipt xamata iDroToD xamata AiQaktma ]%padnasToSana / yauinaT Station/Unit Installed Derated Maximum

Capacity Capacity Output Agast 08 Ap`ola 08 saoAgast08(MW) (MW) (MW) Aug.08 April'08 to Aug.08

koMd`Iya sao@Tr Central Sector enapIsaI N P Ctarapur prmaaNau paavar sToSana TAPS - I 160.00 160.00 160 107.96 529.00tarapur prmaaNau paavar sToSana TAPS - II 160.00 160.00 160 121.93 586.97tarapur prmaaNau paavar sToSana TAPS - III 540.00 540.00 260 190.88 633.70tarapur prmaaNau paavar sToSana TAPS - IV 540.00 540.00 260 190.48 808.58kakrapar Kakrapar - I 220.00 220.00 260 0.00 259.00kakrapar Kakrapar - II 220.00 220.00 260 95.81 452.47kula enapIsaI Total NPC 1840.00 1840.00 707.06 3269.71enaTIpIsaI N T P C koesaTIpIesa K S T P S-1 200.00 200.00 204 148.70 733.63koesaTIpIesa K S T P S-2 200.00 200.00 203 150.20 650.33koesaTIpIesa K S T P S-3 200.00 200.00 205 156.70 752.75koesaTIpIesa K S T P S-4 500.00 500.00 505 357.20 1784.61koesaTIpIesa K S T P S-5 500.00 500.00 505 379.20 1549.57koesaTIpIesa K S T P S-6 500.00 500.00 503 91.20 1513.18kula K S T P S 2100.00 2100.00 1283.20 6984.07ivhesaTIpIesa V S T P S-1 210.00 210.00 214 159.72 542.35ivhesaTIpIesa V S T P S-2 210.00 210.00 215 158.19 751.15ivhesaTIpIesa V S T P S-3 210.00 210.00 213 159.14 757.91ivhesaTIpIesa V S T P S-4 210.00 210.00 213 153.12 752.09ivhesaTIpIesa V S T P S-5 210.00 210.00 216 158.25 763.36ivhesaTIpIesa V S T P S-6 210.00 210.00 217 158.50 770.30ivhesaTIpIesa V S T P S-7 500.00 500.00 505 379.85 1835.00ivhesaTIpIesa V S T P S-8 500.00 500.00 0 0.00 1332.56ivhesaTIpIesa V S T P S-9 500.00 500.00 506 377.04 1414.19ivhesaTIpIesa V S T P S-10 500.00 500.00 508 377.60 1770.34kula V S T P S 3260.00 3260.00 2081.41 10689.25kavaasa Kawas-GT-1A 106.00 106.00 100 56.16 248.93kavaasa Kawas-GT-1B 106.00 106.00 104 47.71 226.33kavaasa Kawas- ST-1C 116.10 116.10 113 58.79 273.45kavaasa Kawas-GT-2A 106.00 106.00 99 13.98 194.47kavaasa Kawas-GT- 2B 106.00 106.00 104 20.83 187.59kavaasa Kawas-ST-2C 116.10 116.10 111 19.23 215.04kula kavaasa Total Kawas 656.20 656.20 216.70 1345.81gaaMQaar Gandhar - GT-1 144.30 144.30 133 86.40 390.49gaaMQaar Gandhar - GT-2 144.30 144.30 135 84.31 380.99gaaMQaar Gandhar - GT-3 144.30 144.30 133 53.40 296.95gaaMQaar Gandhar - ST-4 224.49 224.49 210 122.54 572.89kula gaaQaar Total Gandhar 657.39 657.39 346.65 1641.32isapt Sipat STPS-II 500.00 500.00 505 366.71 994.54enaTIpIsaI kaola NTPC(coal) 5360.00 5360.00 3364.61 17673.32

enaTIpIsaI ga^sa NTPC(Gas) 1313.59 1313.59 563.35 2987.13kula ena TI pI saI Total NTPC 6674 6674 3927.96 20660.45 piScama xao~ Western Region

jalaIya H ydro 7457 7499 1037 5560.32tapIya Thermal 30531 30168 13881 78747.07

naiBakIya Nuclear 1840 1840 707 3269.71pvana Wind+RES 1099 1099

iDJaola Diesel 17 17 kula yaaoga Grand Total 41444 41123 16125.36 89414.25

Note: A.E.Co.C derated to 60 MW, 215 MW of Essar generation is consumed by captive power units

MUs}jaa- ]%padna Energy Generation

pxaoBaap`okond` p`caalana saovaae ivaBaaga WRLDC,OS

Page 20: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

ivaVut sToSana Power Station p`BaavaI xamata }jaa- ]%padna Energy Generation

Effective Capacity(MW) Agast 08 Ap`ola 08 saoAgast08 Agast 08 Ap`ola 08 saoAgast08

gaujarat Gujarat Aug.08 April'08 to Aug.08 Aug.08 April'08 to Aug.08e[-kMpnaI A.E.Co. 510.00 368.76 1797.89 97.19 96.00QauvarNa Dhuvaran 628.85 192.36 1110.97 41.11 48.11]k[- Ukai 850.00 456.58 1853.70 72.20 59.39gaaMQaIngar Gandhi Nagar 870.00 424.99 2518.87 65.66 78.85vaanakbaaorI Wanakbori 1470.00 689.05 4346.82 63.00 80.53]trNa Utran 174.00 81.51 422.12 62.96 66.07isa@ka Sikka 240.00 77.67 572.33 43.50 64.94kcC ilaganaa[-T Kutch Lignite 215.00 94.31 554.27 58.96 70.21ijaAayapIsaIe la GIPCL 305.00 177.58 912.89 78.26 81.51jaIpok GPEC 655.00 236.03 1415.96 48.43 58.87[saar Essar 515.00 49.76 1209.72 12.99 63.97saurt ilaganaa[-T Surat Lignite 250.00 98.21 694.43 52.80 75.65maQya p`doSa Madhya Pradesh AmarkMTk Amarkantak 290.00 64.83 413.47 30.05 38.83saatpura Satpura - I (60%) 187.50 90.76 477.04 65.06 69.29saatpura Satpura - II & III 830.00 458.84 2107.10 74.30 69.14esajaITIpIesa SGTPS 840.00 544.70 3043.70 87.16 98.68Ci<asagaD Chhatisgarhkaorbaa pUva- Korba ( E ) 400.00 221.47 1155.26 74.42 78.65kaorbaa piScama Korba ( W ) 840.00 433.25 2654.74 69.32 86.07

ijaMdala sao isaesa[-baI Jindal to CSEB 750.0 196.92 808.09 35.29 29.34maharaYT/ MaharashtranaaiSak Nasik 910.00 342.59 2172.14 50.60 65.00T/ambao Trombay 1330.00 699.78 3917.23 70.72 80.21kaoraDI Koradi 1080.00 355.55 1802.27 44.25 45.45Bausaavala Bhusawal 478.00 153.82 1248.68 43.25 71.14plaI- Parli 690.00 323.46 1689.04 63.01 66.66parsa Paras 58.00 229.89 1514.85 532.74 711.28]rNa Uran 912.00 197.76 1099.79 29.15 32.84caMd`pur Chandrapur 2340.00 752.04 6123.44 43.20 71.27KaprKoDa Kaperkheda 840.00 543.90 2805.97 87.03 90.97DhaNau Dahanu 500.00 0.00 495.49 0.00 26.99koMd`Iya sao@Tr Central SectorenapIsI NPCtarapur prmaaNau pavar sToSana TAPS(1,2) 320.00 312.81 1220.67 131.39 103.88tarapur prmaaNau pavar sToSana TAPS-3 540.00 190.48 808.58 47.41 40.78tarapur prmaaNau pavar sToSana TAPS-4 540.00 0.00 259.00 0.00 13.06k^Psa KAPS 440.00 95.81 711.47 29.27 44.04enaTIpIsaI NTPC

koesaTIpIesa KSTPS(1,2&3) 600.00 455.60 2136.71 102.06 96.98koesaTIpIesa KSTPS(4,5&6) 1500.00 827.60 4847.36 74.16 88.01ivhesaTIpIesa VSTPS 1-6 1260.00 946.92 4337.16 101.01 93.74ivhesaTIpIesa VSTPS 7-10 2000.00 1134.49 6352.09 76.24 86.49kavaasa Kawas(1A,1B,2A&2B) 424.00 138.68 857.31 43.96 55.06kavaasa Kawas(ST 1C&2C) 232.0 78.02 488.49 45.20 57.34gaaMQaar Gandhar GT 1,2&3) 432.90 224.11 1068.44 69.58 67.21gaaMQaar Gandhar ST -4 224.49 122.54 572.89 73.37 69.50

isapt Sipat STPS-II 500.00 366.71 994.54 98.58 54.17

saMya~ Baar xanata Plant Load Factor(%)

MUsMUs

Plant load factors of Thermal Generating Stations in the Western Region during Aug.08

pxaoBaap`okond` p`caalana saovaae ivaBaaga WRLDC,OS

Page 21: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

Power Supply Position and Peak Demand / Met In Western Region a. ivaVut puit- kI isqatI Power Supply Position Jul-08 Apr -08 to Jul -08 Requirement

(MUs) Availability

(MUs) Shortage

(%) Requirement

(MUs) Availability

(MUs) Shortage

(%)

Gujarat 5271 4903 6.98 24079 20264 14.35

CSEB 1637 1610 1.65 5790 5645 2.5

MPSEB 2757 2412 12.49 12490 10554 15.5

Maharashtra 10062 7553 24.94 41119 33124 19.44

Goa 232 227 2.24 964 938 2.67

D&D 142 140 1.84 560 547 2.30

DNH 308 303 1.61 1225 1200 2.03

Western Region

20411 17149 15.98 86231 72637 15.76

b.Peak Demand / Demand Met(MW) Jul-08 Apr -08 to Jul-08 Requirement

(MW) Availability

(MW) Shortage

(%) Requirement

(MW) Availability

(MW) Shortage

(%)

Gujarat * 10089 8544 15.31 12284 9152 25.50

CSEB 2447 2308 5.68 2759 2378 13.81

MPSEB 4904 4198.5 14.39 6606 5574 15.62

Maharashtra 17869 12021 32.73 18168 13196 27.37

Goa 448 402 10.27 460 413 10.22

D&D 222 197 11.26 224 199 11.16

DNH 460 430 6.52 462 430 6.93

Western **Region

34227 25851 24.47 38644 29274 24.25

**Regional demand met is the simultaneous demand met and is not the sum of demand met of constituent states. * Gujarat demand includes demand of D&D and DNH

Page 22: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

Name of transmission line Length inCkt. Km

Total Locations(Nos)

Commiss-ioning Schedule

Remarks

8 LILO of Damoh-Bijawar D/C 2x15.5 55 2008-09 9 Betul-Gudgaun 61.4 155 2008-09 10 Tikamgarh-Jatara 37 123 2008-09 11 Mahgaon-Porss-Ambah 56 175 2008-09 12 Malanpur-Morar 30 105 2008-09 13 Khilchipur –Jeerapur 22.557 76 2008-09 14 Meghnagar-Jhabua-Raigarh 54 224 2008-09 15 Guna-Raghogarh for Bhonre D/C 2x25 88 2008-09 16 Bansagar IV-Amarpatni 67.5 227 2008-09 17 LILO of Nagda-Ratlam for Khachrod 2x0.278 4 2008-09 18 D/C Birsingpur-Jabalpur 250 2008-09 Line charged on 20/05/0719 D/C LILO of both circuits of Bhopal-Itarsi at Itarsi 4 2008-09 20 LILO of Birsingpur-Rewa at Amarkantak 42 2008-09 21 LILO of Birsingpur-Rewa for Sidhi 92 2008-09 22 Seoni 400 kV(PG)-Seoni (MP)-D/C 20 2008-09 23 D/C Amarkantak-Jabalpur 470 2008-09 24 Seoni 400 kV S/S(PG)-Seoni 220 kV S/S-D/C 6 2008-09 25 Interconnector(400kV PGCIL-220kV Seoni S/S) 8.4 19 2008-09 26 LILO of 1st ckt of 220kV DCDS Gwalior-Malanpur 16.9 32 2008-09 27 LILO of 1st Ckt. Of 220 kV Indore-Dewas for 200

kV Indore S/S 0.39 2 2008-09

28 Second ckt.of Pithampura-Raigarh 68.7 2008-09 29 LILO of one ckt. Damoh-Bina for 400kV Damoh 4 6 2008-09 30 LILO of Damoh-Tikamgarh for 400kV Damoh 4 6 2008-09 31 LILO of both ckt.of Birsinghpur TPS Nowrozabad 21.6 46 2008-09 Line charged on

30.06.07 32 LILO of one ckt.of Itarsi-Bhopal for 200kV

Mandideep 12 21 2008-09

33 LILO of Birsingpur-Satna one ckt at ATPS 87.4 147 2008-09 34 LILO of both ckt of 220kV Burwaha-Nepanagar-2

nos DCDC for Omkareshwer FEP 120 97 2007-08

35 Satna-Chhatarpur 140 492 2008-09 36 Extension of 400kV Birsingpur-Katni-Damoh for

PGCL Damoh 26.036 37 2008-09

37 Diversion of 400kV Birsingpur-Katni-Damoh at Katni

4 5 2008-09

38 Intconnector at 400kV Birsingpur-Katni-Damoh at Birsingpur

1.2 2 2008-09

39 220kV Chhindwara-400kV PGCIL Seoni D/C 140 258 2008-09 40 LILO of both ckt 220kV Pithapura-Rajgarh for

400kV PGCIL Rajgarh 23.53 40 2008-09

41 LILO of one ckt 220kV Jabalpur-Itarsi at Piparia S/S 7.20 13 2008-09 42 LILO of second ckt 220kV Jabalpur-Itarsi at

Narsingpur

43 220kV Bhopal-Ashta for Ashta S/S 194 340 2008-09 C Ci<asa gaZ Chhatisgarh I) 400kV Lines 1 LILO of 400 kV Korba(west)- Bhilai to Raipur

DCDS 50.00 2008-09

2 400 kV Korba(West) – Khedamara DCDS 220.00 2008-09 II) 220kV Lines 1 Korba-Darri-Bishrampur D/C 300 2008-09 2 K(E)-Batapara D/C 270 2008-09 3 LILO of Korba-Amarkantak at Pendra D/C 29 2008-09 4 Bhatapara(Suhela)-Bemetara D/C 120 2008-09 Ckt-I&II charged on

01.09.07 & 03.09.07 respectively

Page 23: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

Name of transmission line Length inCkt. Km

Total Locations(Nos)

Commiss-ioning Schedule

Remarks

5 K(E)-K(W) Interconnection 18 2007-08 6 Kumhari(PGCIL)-Mandirhasod 40 2007-08 7 LILO of Korba(E)-Bhatpara 2nd ckt at Champa 30 2007-08 Ckt I and Ckt II charged

on 18.11.07 &21.11.078 Bhatapara 400kV(PGCIL)S/S-Bhatapara S/S 5 2007-08 9 LILO of K(E)-Bhatapara at Bhatapara

400kV(PGCIL)S/S D/C 8 2007-08

10 Raigarh 400kV(PGCIL)S/S-Raigarh 220kV S/S 28 2007-08 11 LILO of K(E)-Budipadar 2nd ckt at Raigarh

400kV(PGCIL)S/SD/C 15 2007-08

13 220kV DCDS Suhela-PGCIL 30 2007-08 14 220kV Bhatapara-Kumhari LILO at PGCIL 12 2007-08 15 Budhipadar-Korba ckt-2 LILO at PGCIL Raigarh 24 Jun’07 16 220kV Raigarh-Ms Jindal Power Ltd 104 2008-09 17 220kV D/C of exsisting Bhatapara-Suhela 30 2008-09

18 LILO of Bhilai-Barsoor-II Ckt to Gurur S/S 14 447 2007-08 Line charged on 25.07.07

19

Korba(E)-Suhela(Bhatapara) 270 445 2007-08 Ckt I and Ckt II charged on 18.11.07 &21.11.07

D maharaYT/ Maharashtra I) 400kV Lines

1 Dabhol-Nagothane ckt-II 134.445 338 Jan’-08 Work in progress 2 LILO of Bhusawal-Koradi Ckt-I at Akola S/S 80 101 2007-08 Work in progress II) 220kV Lines

1 Power evacuation from Khaparkheda & row Kanhan

10 47 2007-08 Commissioned on 25.05.07

2 LILO B'shwer Aurangabad for Bhenda S/S 37.095 117 2008-09 Tower material required 3 Evacuation of power from Parli ext.project 5.112 20 2008-09

4 LILO of Nasik-Kalwa for Ghatghar S/S 99 84 2008-09 5 220kV line from PGCIL to 220kV Wada S/S - 195 2008-09 6 Padegaon-Sawangi D/C 29.436 52 31.03.07 Line being

commissioned soon 7 Theur-Jejuri(Holkarwadi)D/C 38 61 Mar’07 Line commissioned on

25.05.07 8 LILO on Malharpeth-Wankuswade for

SataraMIDC 60 98 31.03.07

9 Interconaction between Kolhapur-II-Kolhapur-III S/S

18.4 36 2008-09

10 LILO on Apta -Chinchwad for URSE S/S 22 37 2008-09 Work order placed 11 Kanhan-Umred S/C on D/C at Umred 50.106 164 2008-09 Foundation, Erection

etc. in progress 12 LILO of Tarapur-Borivali for Boisar-II S/S 14 9 2008-09 13 LILo of Dhule-Dondaicha at Amalner D/C 80 2008-09 14 Boisar(PGCIL 400/220kV)-Wada 55 2008-09 15 Kolhapur—III-Mundhaltitta 40 2008-09 16 LILO of Jejuri-Pandharpur at Temburni D/C 6 2008-09 17 Kanhan-Umred S/C on D/C line 50.1 158 2008-09 Foundation Erection

etc. in progress 18 Dhule-Dondaicha D/C at Amalner S/S 44 98 2008-09 Complete stringing

material required 19 LILO of Tarapur-Borivali for Boisar-II S/S 8 15 2008-09 20 220kV line from PGCIL to 220kV Wada S/S 57 199 2008-09 D gaaovaa GOA

Xeldem-Cuncolin D/C 20 2008-09

Page 24: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

Name of transmission line Length inCkt. Km

Total Locations(Nos)

Commiss-ioning Schedule

Remarks

Sl.No pavariga`D POWERGRID

765 kV 1 Sipat-Seoni-I-(S/C) 351 954 Sep’07 In commercial operation

w.e.f 1.11.07 2 Sipat-Seoni-II-(S/C) 354 958 2007-08 Under commercial

operation w.e.f 01.05.08.

3 Seoni-Wardha(to be operated at 400kV) 269 2008-09 Tendering under progress

4 Seoni-Bina(to be initially charged at 400kV) 292 2008-09 400kV Lines

A) Sipat Trans system stage- II 702 1244 2008-09 1 400kV D/C Khandwa-Rajgarh 440 588 Feb’08 Test charged on

31.03.08 and synchronized on 01.04.08

B) Western Region System Strengthening-I 2008-09 1 400kV D/C Sipat-Raipur 296 41 2008-09 Under commercial

operation w.e.f 01.08.08C) Sipat-II Suplimentry Trans system 1173 - 2008-09 1 D/C Wardha-Akola 368 2008-09 2 D/C Akola-Aurangabad 530 2008-09 3 Korba(NTPC)-Birsingpur(MPGENCO) D/C 454 July’10 4 Birsingpur(MPGENCO)-Damoh(PGCIL) 508 July’10 5 Birsingpur-Damoh-Bhopal 220 kV Line 1 220kV Vapi(PG)-Magarwada(DD) line & 7 Kms.

Multi-Ckt portion 50 Mar’08 Under commercial

operation w.e.f01.05.082 220kV Vapi(PG)-Kharadpada(DNH)D/C line. 36 Mar’08 Commissioned on

07.06.08

Page 25: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

piScama xao~ maoM inamaa-NaaiQana ]%padna yaaojanaaAaoM kI p`gatI

PROGRESS OF GENERATION SCHEMES UNDER CONSTRUCTION Sr.No. Name of the Power Projects Capacity(MW) Schedule Date of CommissioningA gaujarat GUJARAT

taipya piryaaojanaa Thermal Project 1 koelaTIpIesa - pona^naDrao KLTPS-Panandhro-4 75 Oct 2008

2 ippavaava isaisapIpI Pipvav CCPP –GPCL & GSPC joint venture Unit-1 & Unit-II

350 350

Mar,2010 Jun,2010

3 isa@ka TIpIesa Sikka TPS-3&4 500(2x250) (1st unit-Feb’10,2nd unit-Jun’10)

4 hjarIyaa isaisapIpI e@sapanasana ijaesa[-ijIa Hazira CCPP Ext.-GSEG

350 Feb’2010

5 ]trNa jaIpIpI Utran GPP

360 Jul -2009

6 saujana TIpIjaIisaela isaisapIpI saurt ga^sa Block-1 Sugen CCPP, Torrent power Block-2 Block-3

365 365 365

Oct-2008 Jan-2009 Apr-2009

7 saurt ilaganaa[-T TipIpI e@sapanasana jaIAayapIisaela Block-1 Surat Lignite TPP Extn.-GIPCL Block-2

125 125

Nov-2008 Mar-2009

8 Dhuvran CCPP GSECL Stage – III 360 Mar,2010 9 Baavanagar ilaganaa[-T inarmaa ga`up

Bhavanagar Lignite TPS(Nirma Group)-Joint venture 500 Apr-2011

10 isasaana enaelasaI Sesan-NLC 1000 Project clearance/inputs are being arranged

11 saa]qa gaujarat ilaganaa[T pavar p`aojao@T Stag-1 GSEG Ext South Gujarat Lignite Power project Stage-2

1500 500

2011-12 2012-13

12 ]k[- TipIesa e@sapansana Ukai TPS Extn 490 Nov 2010

Page 26: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

Sr.No. Name of the Power Projects Capacity(MW) Schedule Date of Commissioning

maQya p`doSa MADHYA PRADESH

taipya piryaaojanaa Thermal Project 1 AmarkMTk TIpIesa e@sapansana Amarkantak TPS Ext.-Unit-5 1x210 Commissioned on 15.06.08 2 maalavaa pITIpIesa Malwa TPP 1x500

1x500 Dec,2010 Apr,2011

3 Satpura TPS Extn. Unit-10 Unit - 11

250 250

Mar’2011 Sept,2011

4 Sahpura TPP Unit - 1 Unit - 2 Unit – 3

500 500 500

Dec 2012 Mar,2013 Jun,2013

5 caMMdorI isaisajaITIjaovaI Chanderi CCGT JV 1000 Project clearance/inputs are being arranged

jailaya piryaaojanaa Hydro Project 6 mahoSvar Maheshwar 10x40 2010-11 7 knhana hop Kanhan HEP-5 2x45 2011-12 8 saaonaI hop Sone HEP 5x20 2011-12 C C%tIsa gaZ CHHATTISGARH

taipya piryaaojanaa Thermal Project 1 Bhaiyathan TPP phase – I unit-1 & 2 2x500 April,2011

Oct,2011 2 kaorbaa piScama e@sapansana Korba South TPP(1&2) 2x500 Apr’2011

Oct’2011 3 maarvaa TipIpI Block-1

Marwa TPP Block-2 500 500

Nov’2010 Feb’2011

4 rayagaZ TIpIpI foja-I ijaMdaala esaTIpIesa Raigarh TPP ph-I &II Jindal STPS unit-4

250

2008-09

5 paqaDI TIpIesa 1 Pathadi TPS (LANCO) 2

300 300

Sep 2008 July 2009

6 iQa$ pavarjanaroSana p`ayavaoT ilaimatoD 1 Powergen Pvt.Ltd 2

250 250

Dec 2009 Mar 2010

7 Aarkoema pavarjanaroSana p`ayavaoT ilaimatoD 1 RKM Powergen Pvt.Ltd 2 3 4

300 300 300 300

Dec 2009 Mar 2010 Aug 2010 Mar 2011

8 e[-esa 1 M/s AES 2 3 4

300 300 300 300

Apr2011 Jul 2011 Oct 2011 Jan 2012

9 Aaryana kaola baoinaifkoSana p`ayavaoT ilaimaToD 2x125 M/s Aryan coal Benefication Pvt Ltd.

250 Aug-2009

26

Page 27: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

Sr.No. Name of the Power Projects Capacity(MW) Schedule Date of Commissioning

10 esavaI pavar ilaimaToD 2x150 M/s SV Power Ltd.

300 Oct-2008

11 maa$tI i@lana kaola AaOr pavar ilaimatoD 1 Maruti Clean coal & Power Ltd 2

135 135

Apr 2009 Oct 2009

jailaya piryaaojanaa HYDRO PROJECT 12 Sikasar Hep 7 13 BaaoDGaaT piryaaojanaa-1

Bodhghat project-1 500 March-2012

14 maatnar piryaaojanaa-1x30 Matnar project-1 x30

60 March-2012

D maharaYT/ MAHARASTRA

taipya piryaaojanaa Thermal Project 1 PalaI- TipIesa e@sapansana Parli TPS New unit-2 250 Feb’09 2 Paarsa TIpIesa e@sapansana Paras TPS Ext.-2 250 Apr-2009 3 KaprKoDa TIpIesa Khaparkheda TPS Ext –1

Ext.-2 500 500

Mar-2010 June-2010

4 Bausaavala TIpIesa Bhusawal TPS 1&2 2x500 Jan-2010,Oct2010 5 kaoraDI- TIpIesa e@sapansanaKoradi TPS Expansion 1&2 2x500 2009-2010 6 caMd`pur TIpIesa e@sapansanaChandrapur TPS Expansion 1x500 Apr.2012 7 Qaaopavao TIpIesa Dhopawe TPS(Imported coal) 1 800 Nov.2011 8 Qaaopavao TIpIesa Dhopawe TPS(Imported coal) 2 800 May.2012 9 ]rNa ga^sa pavar sToSana e@sapansanaUran Gas Power Station

Exponsion 1&2 2x520 Apr-2008,Jul-2008

10 tlaogaava isaisapIpI Talegaon CCPP 1&2 1400 Project clearance/inputs are being arranged

11 naagaaozNao Nagothane Ph-1,Ph-II&Ph-III 4050 Project clearance/inputs are being arranged

12 ivalaI TipIpI Ville TPP(Pvt)-I&II 2x500 1 3 Tombay TPP-TPC unit -1 250 Oct’08 March-2012

jailaya piryaaojanaa Hydro Project 14 GaaTGar pmp sTaoroja iskma Ghatghar Pump Storage Scheme 2x125 Commissioned on 09.04.08

Commissioned on 23.06.08 15 smaala jailaya Small Hydro 90 16 Daolavaahla hop Dolwahal HEP 2x1 2008-09

17 vaana hop Wan HEP 1x1.5 2008-09

Page 28: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

GENERATING STATIONS TO BE COMMISSIONED IN ER HAVING ALLCATIONS TO STATES OF WR

Sr.No. Name of the Power Projects Capacity (MW) Schedule Date of Commissioning

1 khlagaava Kahalgaon-II-Ph-I khlagaava Kahalgaon-II-Ph-II ($ Allocation to WR States)

2x500 Unit-5 Unit-6 1x500 Unit-7

Apr-2007 May-2007 Apr-2007

2 naaqa- krnapura North Karanpura ($ $Allocation to WR States)

3x660 Unit-1 Unit-2

Unit-3

Feb-2010 Dec-2010 Oct-2011

3 bah- Barh ($ $ $Allocation to WR States

3x660 Unit-1 Unit-2

Unit-3

Mar-2009 Jan-2010 Oct-2011

$ Allocation from Kahalgaon-II(Ph I & II) Gujarat-92 MW.Maharashtra-100MW,MP-107MW, DD-5MW &DNH-5MW(309MW) $$ Allocation from North Karanpura-Gujarat-231MW, Maharashtra-100MW,MP-199MW, DD-7MW &DNH-8MW(545MW) $$$ Allocation from Barh-Gujarat-260MW, Maharashtra-100MW,MP-224MW, DD-5MW (589MW)

Sr.No. Name of the Power Projects Capacity (MW)

Schedule Date of Commissioning

E kond`Iya inakaya CENTRAL SECTOR

taipya piryaaojanaa Thermal Project

1 isapt Sipat-II(2x500MW)- Unit-5 500

Nov,2008

2 isapt Sipat-I(3x660MW) 1980 Apr 2008 Feb2009,Mar 2009

3 gaanQaar isaisapIpI Gandhar CCPP-II(2x650MW) 1300 2009-10 2009-10

4 kavaasa isaisapIpI Kawas CCPP-II(2x650MW) 1300 2009-10 2009-10

5 iBalaa[- jaa[-MT vaoMcar Bhilai Joint Venture SAIL unit 1 250 Synchronised on 20.04.08 6 iBalaa[- jaa[-MT vaoMcar Bhilai Joint Venture SAIL unit 2 250 2008-09

jailaya piryaaojanaa Hydro Project 7 kaorbaaa esaTIpIpI Korba-STPS-III -7 500 Feb’10 8 maa}Da esaTIpIpI Mauda-TPP -I

II 500 500

2011 2012

Page 29: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

6000

6100

6200

6300

6400

6500

6600

6700

6800

6900

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

maogaav

a^T M

W

maah Agast 08 maoM gaujarat ka GaNTovaar k^TD- maaMgaHourly average Gujarat catered demand forAug.2008

49.10

49.20

49.30

49.40

49.50

49.60

49.70

49.80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

hT-sa

Hz

maah Agast 08 maoM GaNTovaar AaOsat AavaRi<a Hourly average Frequency Aug. 2008

WRLDC MUMBAI piScama xaoi~ya Baar p`oYaNa kond` mauMba[-OPERATION SERVICES p`caalana saovaae^M

Page 30: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

27002800290030003100320033003400350036003700380039004000410042004300

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

maogaav

a^T M

W

maah Agast 08 maoM maQya p`doSa ka GaNTovaar k^TD- maaMga Hourly average Madhya Predesh Catered demand forAugl 2007

49.10

49.20

49.30

49.40

49.50

49.60

49.70

49.80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

hT-sa

Hz

maah Agast 08 maoM GaNTovaar AaOsat AavaRi<a Hourly average Frequency Aug. 2008

WRLDC MUMBAI piScama xaoi~ya Baar p`oYaNa kond` mauMba[-OPERATION SERVICES p`caalana saovaae^M

Page 31: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

1650

1750

1850

1950

2050

2150

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

maogaav

a^T M

W

maah Agast 08 maoM Ci<asagaD ka GaNTovaar AaOsat AavaRi<a Hourly average CSEB Catered demand forAug 2008

49.10

49.20

49.30

49.40

49.50

49.60

49.70

49.80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

hT-sa

Hz

maah Agast 08 maoM GaNTovaar AaOsat AavaRi<a Hourly average Frequency Aug. 2008

WRLDC MUMBAI piScama xaoi~ya Baar p`oYaNa kond` mauMba[-OPERATION SERVICES p`caalana saovaae^M

Page 32: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

890091009300950097009900

1010010300105001070010900

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

maogaav

a^T M

W

maah Agast 08 maoM maharaYT/ ka GaNTovaar k^TD- maaMga Hourly average Maharashtra Catered demand for Aug 2008

49.10

49.20

49.30

49.40

49.50

49.60

49.70

49.80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

hT-sa

Hz

maah Agast 08 maoM GaNTovaar AaOsat AavaRi<a Hourly average Frequency Aug. 2008

WRLDC MUMBAI piScama xaoi~ya Baar p`oYaNa kond` mauMba[-OPERATION SERVICES p`caalana saovaae^M

Page 33: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

20800210002120021400216002180022000222002240022600228002300023200234002360023800240002420024400

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

maogaav

a^T M

W

maah Agast 08 maoM piScama xao~ ka GaNTovaar k^TD- maaMga Hourly average WR Catered demand forAug 2008

49.10

49.20

49.30

49.40

49.50

49.60

49.70

49.80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

GaNTo Hours

hT-sa

Hz

maah Agast 08 maoM GaNTovaar AaOsat AavaRi<a Hourly average Frequency Aug. 2008

WRLDC MUMBAI piScama xaoi~ya Baar p`oYaNa kond` mauMba[-OPERATION SERVICES p`caalana saovaae^M

Page 34: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

koesaTIpIesa ka 30.08.08 kao AnausaucaI banaama vaastivak [Mjao@Sana Schedule Vs Actual Injection of KSTPS for Date 30.08.08

2010

2060

21100:

001:

152:

303:

455:

006:

157:

308:

4510

:00

11:1

512

:30

13:4

515

:00

16:1

517

:30

18:4

520

:00

21:1

522

:30

23:4

5

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Actual Injection Final schedule 15 Minute Avg.Freq.

vhIesaTIpIesa ka 30.08.08 kao AnausaucaI banaama vaastivak [Mjao@Sana Schedule Vs Actual Injection of VSTPS for Date 30.08.08

2560

2610

2660

2710

2760

2810

0:00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

011

:15

12:3

013

:45

15:0

016

:15

17:3

018

:45

20:0

021

:15

22:3

023

:45

samaya Time

maogaa

vaT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual injection 15 Minute Avg.Freq.

AMitma AnausaucaI vaastivak [Mjao@Sana 15 imainaT kI AaOsat AavaRi<a

AMitma AnausaucaI vaastivak [Mjao@Sana 15 imainaT kI AaOsat AavaRi<a

p xao Baa p` kond` p`caalana saovaae^M maumba[- WRLDC O/S

Page 35: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

jaIjaIpIesa ka 30.08.08 kao AnausaucaI banaama vaastivak [Mjao@Sana Schedule Vs Actual Injection of GGPS for Date 30.08.08

560570580590600610620630640650660670680690

0:00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

011

:15

12:3

013

:45

15:0

016

:15

17:3

018

:45

20:0

021

:15

22:3

023

:45

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual injection 15 Minute Avg.Freq.

kavaasa ka 30.08.08 kao AnausaucaI banaama vaastivak [Mjao@Sana Schedule Vs Actual Injection of KAWAS for Date 30.08.08

550

560

570

580

590

600

610

620

630

640

650

0:00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

011

:15

12:3

013

:45

15:0

016

:15

17:3

018

:45

20:0

021

:15

22:3

023

:45

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual injection 15 Minute Avg.Freq.

AMitma AnausaucaI vaastivak [Mjao@Sana 15 imainaT kI AaOsat AavaRi<a

AMitma AnausaucaI vaastivak [Mjao@Sana 15 imainaT kI AaOsat AavaRi<a

p xao Baa p` kond` p`caalana saovaae^M maumba[- WRLDC O/S

Page 36: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

emapIesa[-baI ka 30.08.08 kao AnausaucaI banaama vaastivak AahrNa Schedule Vs Actual drawal of MPSEB for Date 30.08.08

520670820970

1120127014201570172018702020217023202470

0:00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

011

:15

12:3

013

:45

15:0

016

:15

17:3

018

:45

20:0

021

:15

22:3

023

:45

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual Drawal 15 Minute Avg.Freq.

jaI[-baI ka 30.08.08 kao AnausaucaI banaama vaastivak AahrNa Schedule Vs Actual drawal of GEB for Date 30.08.08

164017401840194020402140224023402440254026402740284029403040314032403340344035403640

0:00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

011

:15

12:3

013

:45

15:0

016

:15

17:3

018

:45

20:0

021

:15

22:3

023

:45

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual Drawal 15 Minute Avg.Freq.AMitma AnausaucaI vaastivak AahrNa 15 imainaT kI AaOsat AavaRi<a

AMitma AnausaucaI vaastivak AahrNa 15 imainaT kI AaOsat AavaRi<a

p xao Baa p` kond` p`caalana saovaae^M maumba[- WRLDC O/S

Page 37: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

emaesa[-baI ka 30.08.08 kao AnausaucaI banaama vaastivak AahrNa Schedule Vs Actual drawal of MSEB for Date 30.08.08

2450255026502750285029503050315032503350345035503650375038503950405041504250435044504550

0:00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

011

:15

12:3

013

:45

15:0

016

:15

17:3

018

:45

20:0

021

:15

22:3

023

:45

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual Drawal 15 Minute Avg.Freq.

isaesa[-baI ka 30.08.08 kao AnausaucaI banaama vaastivak AahrNa Schedule Vs Actual drawal of CSEB for Date 30.08.08

90

190

290

390

490

590

690

790

890

9900:

001:

152:

303:

455:

006:

157:

308:

4510

:00

11:1

512

:30

13:4

515

:00

16:1

517

:30

18:4

520

:00

21:1

522

:30

23:4

5

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual Drawal 15 Minute Avg.Freq.AMitma AnausaucaI vaastivak AahrNa 15 imainaT kI AaOsat AavaRi<a

AMitma AnausaucaI vaastivak AahrNa 15 imainaT kI AaOsat AavaRi<a

p xao Baa p` kond` p`caalana saovaae^M maumba[- WRLDC O/S

Page 38: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

gaaovaa ka 30.08.08 kao AnausaucaI banaama vaastivak AahrNa Schedule Vs Actual drawal of GOA for Date 30.08.08

100

200

300

4000:

00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

0

11:1

5

12:3

0

13:4

5

15:0

0

16:1

5

17:3

0

18:4

5

20:0

0

21:1

5

22:3

0

23:4

5

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual Drawal 15 Minute Avg.Freq.

dIva AaOr dmaNa ka 30.08.08 kao AnausaucaI banaama vaastivak AahrNa Schedule Vs Actual drawal of DD for Date 30.08.08

100

200

300

0:00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

0

11:1

5

12:3

0

13:4

5

15:0

0

16:1

5

17:3

0

18:4

5

20:0

0

21:1

5

22:3

0

23:4

5

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual Drawal 15 Minute Avg.Freq.

AMitma AnausaucaI vaastivak AahrNa 15 imainaT kI AaOsat AavaRi<a

AMitma AnausaucaI vaastivak AahrNa 15 imainaT kI AaOsat AavaRi<a

p xao Baa p` kond` p`caalana saovaae^M maumba[- WRLDC O/S

Page 39: piScama xao~Iya Baar p`oYaNa koMd` ik Agast 2008 …wrldc.org/Progresrep/PGR_Aug2008.pdfAgast 2008 maah kI p`NaalaI p`caalana irpaoT-POWERGRID CORPORATION OF INDIA LTD WESTERN REGIONAL

dadra nagar hvaolaI ka 30.08.08 kao AnausaucaI banaama vaastivak AahrNa Schedule Vs Actual drawal of DNH for Date 30.08.08

200

300

400

500

600

700

0:00

1:15

2:30

3:45

5:00

6:15

7:30

8:45

10:0

0

11:1

5

12:3

0

13:4

5

15:0

0

16:1

5

17:3

0

18:4

5

20:0

0

21:1

5

22:3

0

23:4

5

samaya Time

maogaav

aT̂ M

W

47.5

48

48.5

49

49.5

50

hT-sa

Hz

Final schedule Actual Drawal 15 Minute Avg.Freq.

Note:1 Western Region met Maximum demand on 30.08.08 in Aug 2008 Therefore,the schedule Vs Actual graphs are furnished for that day.

AMitma AnausaucaI vaastivak AahrNa 15 imainaT kI AaOsat AavaRi<a

p xao Baa p` kond` p`caalana saovaae^M maumba[- WRLDC O/S