Piping Material Management
Piping Material Management Software
3D model
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Classes
Step 1: Process produces the Fluids list with
• Fluid(s) services,
• Service conditions (range of temprature and pressure)
• Basic material,
• Corrosion allowance,
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Classes
Step 2: Process groups the Fluids in Piping classes of same material and range of service conditions
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Classes
Step 3: Piping produces the Piping Classes Summary with
• Definition of type of valve (gate, globe , check, ball , butterfly, …),
• Definition of trims of valves,
• Definition of kind of gasket,
• Definition of bolting quality,
• The others requirements (corrosion, heat treatments,…),
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Classes
Step 4: Piping produces the specification for each Piping Class
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material class specification
Each item is defined by a Material Standard and a Dimensional standard
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material class specification
Each item is defined by a Material Standard and a Dimensional standard
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material class specification
The wall thickness of pipes, elbows and tees must be calculated as per the applicable design code, for oil & gas facilities, ASME B31.3
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping wall thickness calculation
ASME B 31.3
)(
PY 2SWE
D * Pt
Calculation spreadsheet: https://drive.google.com/open?id=0BxBpbhTfKqRBY3pGaEYxVDVtQlk
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material class specification
Flanges shall be selected for the design P, T limit of the material
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material class specification Design & construction code, types and materials of seat/seal, trim, are specified for valves
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material class specification
12
Once the Piping Material Classes are defined, they are entered into the Piping Material Management Software
Piping Material Management Software
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material class specification
Each component is codified « smartly » with Commodity Code
Commodity code: FWN1C54X12L201
Example: Commodity Code (welding neck flange)
Table Name: Table Detail Digits Code
Group: Flanges 1 F
A-Dimensional Std: ASME B 16-5 1 1
B-Material: ASTM A105 4 C54X
D-Ends: R.F. 2 12
F-Rating: 150 lbs 2 L2
X-Alias: Ra=3.2 to 6.3µm 2 01
Part: Welding neck flange 2 WN
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material class specification
The piping classes are loaded from the Piping Materials Management software into the 3D model
Piping Material Management Software 3D model
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
Now let’s see what are the time requirements to order Piping materials.
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
Let’s consider a lareg 3-year Project. Piping material is usually required at Site on month 18. When shall it be ordered latest?
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
Piping material is required at Site on month 18. When shall it be ordered latest? Required On Site (ROS) date - procurement cycle - transport duration = required Engineering requisition issue date
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
Piping material is required at Site on month 18. When shall it be ordered latest? Required On Site (ROS) date - procurement cycle - transport duration = required Engineering requisition issue date
Inquiry to PO 4 months PO to ex-works Pipes 6-8 months Fittings & flanges 8 months Transport, incl. Custom clearance 2 months ======================================================== POs to be placed month 18 – 2 – 8 = month 8 of the 3 year Project! Inquiries to be placed month 18 – 2 – 8 – 4 = month 4
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
MANUFACTURING INQUIRY
4 8 18
PROJECT MONTH
TRANSPORT
Inquiries issued
Purchase orders placed
Material Site delivery
Isometric drawings
Piping fab.
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
The Piping MTO is issued 3 times as a minimum: 1st MTO: issued for Inquiry, to get the Unit prices 2nd MTO: issued for Order 3rd and subsequent MTOs: to top-up
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO prepared?
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
The Piping MTO is issued 3 times as a minimum: 1st MTO: issued for Inquiry, to get the Unit prices 2nd MTO: issued for Order 3rd and subsequent MTOs: to top-up
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO prepared? 1st MTO:
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
The Piping MTO is issued 3 times as a minimum: 1st MTO: issued for Inquiry, to get the Unit prices 2nd MTO: issued for Order 3rd and subsequent MTOs: to top-up
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO prepared? 1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
The Piping MTO is issued 3 times as a minimum: 1st MTO: issued for Inquiry, to get the Unit prices 2nd MTO: issued for Order 3rd and subsequent MTOs: to top-up
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO prepared? 1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available) 2nd MTO
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
The Piping MTO is issued 3 times as a minimum: 1st MTO: issued for Inquiry, to get the Unit prices 2nd MTO: issued for Order 3rd and subsequent MTOs: to top-up
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO prepared? 1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available) 2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part)
How are Quantities to purchase (BOM) obtained from the MTO quantities?
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Material Take-Off’s
Piping installation
Piping material
MTO
Material Requisition P&IDs
Piping routing /
layout
Bill of Materials
+ Estimates of what is not taken-off
+ Allowances for cut & losses
MTO quantities
- Uncertain items
+ Allowances for design development
Piping specifications
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Material Take-Off’s
0
10
20
30
40
50
60
70
80
90
100
MTO 01 MTO 02
qu
an
titi
es
(%
)
Estimation
Validity factor
Manual take-off
Model 3D
1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available) 2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part)
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
The Piping MTO is issued 3 times as a minimum: 1st MTO: issued for Inquiry, to get the Unit prices 2nd MTO: issued for Order 3rd and subsequent MTOs: to top-up
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO prepared? 1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available) 2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part) 3rd and subsequent MTOs
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
The Piping MTO is issued 3 times as a minimum: 1st MTO: issued for Inquiry, to get the Unit prices 2nd MTO: issued for Order 3rd and subsequent MTOs: to top-up
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO prepared? 1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available) 2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part) 3rd and subsequent MTOs: (IFC P&IDs) + isometrics (3D model)
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Management
Above ground Piping
2nd MTO (for order)
1st MTO
(for inquiry)
3rd MTO (top-up’s)
Piping Material Take-Off’s
IFR IFD IFC P&ID
Piping routing drawings
Piping layout drawings/3D model
Piping isometric drawings
Drawing
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Management
Isometric
3D
Once the isometric is issued the final list of material is known.
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Management
Isometric
3D
These quantities are fed into the Piping Material Management software.
Piping Material Management Software
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Management
Isometric
3D
They replace the previous quantities (that of MTO 2).
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Management
Isometric
3D
The difference is made and balance quantities are ordered.
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping material requisition
34
0
10
20
30
40
50
60
70
80
90
100
qu
an
titi
es (
%)
MTO 01 MTO 02 MTO 03
Model 3D IFC
Estimation
Validity factor
Manual take-off
Model 3D
1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available) 2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part) 3rd and subsequent MTOs: (IFC P&IDs) + isometrics (3D model)
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
What is Piping Material matching?
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
What is Piping Material matching? A check to know if all materials required to fabricate a piping iso/spool are available at Site. In the positive the spool is called a « Yes » spool .
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
Material match?
Bill of materials
Shop isometric
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
Material match?
« Yes » spool
« No » spool
Bill of materials
Shop isometric
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
Material match?
« Yes » spool
« No » spool
50%
75%
˜ 33%
Shop isometric
Bill of materials
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
What is Piping Material matching? A check to know if all materials required to fabricate a piping iso/spool are available at Site. In the positive the iso/spool is called a « Yes » iso/spool. It enables you to assess the workfront.
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
What is Piping Material matching? A check to know if all materials required to fabricate a piping iso/spool are available at Site. In the positive the iso/spool is called a « Yes » iso/spool. It enables you to assess the workfront. To do the material matching you must allocate the BOM of the iso/spool to the materials in the Piping Material Management System. This is done by feeding the BOM with the iso/spool reference in the Piping Materials Management system.
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Materials Procurement
Piping Design
3D model
Material requisition
Design/shop iso Activity Document
Legend
Piping Materials Management software
Piping Material Management System
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
What is Piping Material matching? The Piping Material Management System is fed with the materials deliveries.
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Materials Procurement
Piping Design
3D model
Material requisition
Design/shop iso Activity Document
Legend
Piping Materials Management software
Piping Material Management System Site Materials receipt
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Piping Material Matching
What is Piping Material matching? This enables the Material Matching!
HERVE
BARON
© 2
01
6 – H
ervé
Baro
n
Material match?
« Yes » spool
Piping Materials Procurement
Piping Design
Site Materials receipt
3D model
Material requisition
Design/shop iso Activity Document
Legend
Piping Materials Management software
Piping Material Management System