Piping Formulae
-
Upload
shaikhimranuddin -
Category
Documents
-
view
238 -
download
0
Transcript of Piping Formulae
-
8/10/2019 Piping Formulae
1/13
TOTAL
37.59 Sch. 90 45 90 45 90 45 EQ. CO/EC
1Os 10 20 30 40 80 10S 40 80 10S 40 80 10S 40 80
m m m m m m pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs
"
''
1''1''
2'' 0.2
2''
3'' 0.4 2 1.0 3.0
4''
5''
6''
8''
10''
12''
14''
16''18''
20''
22''
24''
26''
28''
30''
32''
34''
36''
38''
40''42''
44''
46''
48''
10S 600#40 80 150# 300#
CRISTIANELBOW TEE Reducer CAP WN FLANPIPE
-
8/10/2019 Piping Formulae
2/13
Main DIAMETER Branch Diameter
2xR 2xr
1219.2 609.6
1219.2 609.6
Suplimentary length to be cut out.
x VALUE 527.93w VALUE 557.30
R -x = 81.6709
Thickness
Quoted Length 845
Branch Length 318.07Branch Length 287.70
r
Rx
Main pipe = 20"45 branch = 8"
Main pipe = 22"90 branch = 20"
I
48'' 24''
-
8/10/2019 Piping Formulae
3/13
mm
mm
ANGLE 90
ANGLE 45
ENTER DATA
uhas Cristian Bonny -Island 2001
-
8/10/2019 Piping Formulae
4/13
Elbow 90 Trunion
x = 40.82
H = 57.44
ADITIONAL LENGTH
QUOTED LENGTH
CUTTING LENGTH
130.82
90
Drawing : Irimia AntonProgram: Cristian Iuhas
Bonny Island 2001
Particular case: 14" ELBOW 900with 10" TRUNION
2'' 1"
-
8/10/2019 Piping Formulae
5/13
R = 30" Head pipeB = 18" Branch
D1 = 1290 mm
E = 229 mmVENT HOLE
Pad material sh
Reinforcement
with a longitudin
on each half.
Branch attache
with ANSI B31.3
For sizes not sh
1
2
3
4
NOTE :
BRA
NO
BRA
NI
SHELL STANDARD FOR
Reinforcing pad thickenessshall not be less than thethicknes of the header. Thereinforcing pad material shallbe the same nominal materialas the header and equal orhigher stress value.
1. The reinforcing pad width 'L' shall not be2. The pad shall be positioned so that the t
equal distance from outside surface of t
WI
Iuhas Cristian Bonny -
-
8/10/2019 Piping Formulae
6/13
817.20 mm
1006.58 mm
all be the same as the main pipe.
ads may be divided into halves
al welded seam, and venthole
ent welds shall be in accordance
wn, consult withsttress analyst.
NCH 90
INAL SIZE
NCH 45
ERIA LNG PROJECT
EFINERY COMPLEX.
less than that specified .p of the pad extends ane branch on either its side.
DTH ' L' [mm]
Island 2001
18''
180
-
8/10/2019 Piping Formulae
7/13
190 mm ADD EXTR. ADD EXTRACT RESULT
62 mm
SS86 mm 2"-20"
140 mm 24"30"
273.00
136.50 CS&ITC12.70 2"- 16"
>18"
104.78
165.00
RAPID CALCULATOR
SCH
SIZE
RED.
TEE
FLANGE
O.D.
THK
OD
WELDOLET
Iuhas
ELBOW
VALVE
DELETE1''
300#
3''
6''
10''
80
14''
CLEAR
5''
90LR
WN
BALL150#
1''
-
8/10/2019 Piping Formulae
8/13
6m - 8m 6 m
12m | 6m6m
S11m-13m 12m
ristian Bonny -Island 2001
-
8/10/2019 Piping Formulae
9/13
-
8/10/2019 Piping Formulae
10/13
-
8/10/2019 Piping Formulae
11/13
-
8/10/2019 Piping Formulae
12/13
150 300 600
" 3.42
1" 4.09 4.79 5.49
1" 7.72
" 1.92
1" 2.99
1" 4.42 Kg
CS 3" 4" 24"
11954 12053 1183512055 12042 11825
11957 12045 11830
SS 6" 10" 20" 24"
6020 6560 6020 6015
6295 6042 6020
6710 6045 6025
6785
ITCS 2" 6" 8" 18"
12045 13043 13500 9225
13138
12972
RANDOMS SIZE
SIZEWEIGHT [Kg]
NIPOFLANGE
NIPOLET
-
8/10/2019 Piping Formulae
13/13