PILED FOUNDATION PILED FOUNDATION DESIGN & CONSTRUCTIONDESIGN & CONSTRUCTION
By Ir. Dr. Gue See Sewhttp://www.gnpgeo.com.my
![Page 2: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/2.jpg)
ContentsContents
Overview
Preliminary Study
Site Visit & SI Planning
Pile Design
Pile Installation Methods
Types of Piles
![Page 3: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/3.jpg)
Contents (ContContents (Cont’’d)d)Piling Supervision
Pile Damage
Piling Problems
Typical Design and Construction Issues
Myths in Piling
Case Histories
Conclusions
![Page 4: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/4.jpg)
Overview
![Page 5: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/5.jpg)
What is a Pile Foundation
It is a foundation system that transfers loads to a deeper and competent soil layer.
![Page 6: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/6.jpg)
When To Use Pile Foundations
• Inadequate Bearing Capacity of Shallow
Foundations
• To Prevent Uplift Forces
• To Reduce Excessive Settlement
![Page 7: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/7.jpg)
![Page 8: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/8.jpg)
PILE CLASSIFICATIONPILE CLASSIFICATION
Friction Pile– Load Bearing Resistance derived mainly
from skin friction
End Bearing Pile– Load Bearing Resistance derived mainly
from base
![Page 9: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/9.jpg)
Friction Pile
Overburden Soil Layer
![Page 10: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/10.jpg)
End Bearing Pile
Rock / Hard Layer
Overburden Soil
![Page 11: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/11.jpg)
Preliminary Study
![Page 12: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/12.jpg)
Preliminary StudyPreliminary Study
Type & Requirements of Superstructure
Proposed Platform Level (ie CUT or FILL)
Geology of Area
Previous Data or Case Histories
Subsurface Investigation Planning
Selection of Types & Size of Piles
![Page 13: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/13.jpg)
Previous Data & Case Previous Data & Case HistoriesHistories
Bedrock Profile
Existing Development
A
Existing Development
BProposed
Development
Only Need Minimal Number of Boreholes
![Page 14: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/14.jpg)
Challenge The Norm Thru Innovation To Excel
![Page 15: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/15.jpg)
SELECTION OF PILESSELECTION OF PILES
Factors Influencing Pile Selection– Types of Piles Available in Market (see Fig. 1)– Installation Method– Contractual Requirements– Ground Conditions (eg Limestone, etc)
– Site Conditions & Constraints (eg Accessibility)
– Type and Magnitude of Loading– Development Program & Cost– etc
![Page 16: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/16.jpg)
TYPE OF PILES
DISPLACEMENT PILES NON-DISPLACEMENT PILES
TOTALLY PREFORMED PILES(A ready-made pile is driven or jacked
into the ground)
DRIVEN CAST IN-PLACE PILES(a tube is driven into ground to
form void)
Bored piles Micro piles
HollowSmall displacement
Solid
Steel Pipe Concrete Spun Piles
Concrete Tube
Closed ended tube concreted with tube left in position
Closed ended tube
Steel Tube
Open ended tube extracted while concreting (Franki)
Concrete Steel H-piles(small displacement)
Bakau pilesTreated timber pile
Precast R.C. piles
Precast prestressed piles
FIG 1: CLASSIFICATION OF PILES
![Page 17: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/17.jpg)
BA
KA
U P
ILE
S
TIM
PE
R P
ILE
S
RC
PIL
ES
PS
C P
ILE
S
SP
UN
PIL
ES
STE
EL
H P
ILE
S
STE
EL
PIP
E P
ILE
S
JAC
KE
D P
ILE
S
<100 KN a a a ? ? ? ? a x ? a
100-300 a a a ? ? a a a x a a
300-600 ? a a a a a a a a a a
600-1100 x ? a a a a a ? a a ?
1100-2000 x ? a a a a a ? a a ?
2000-5000 x x a a a a a ? a a ?
5000-10000 x x a a a a a x a a x
>10000 x x ? a a a a x a ? x
<5m ? ? ? ? ? ? ? x a a ?
5-10m a a a a a a a ? a a a
10-20m ? ? a a a a a a a a a
20-30m x x a a a a a a a a a
30-60m x x a a a a a a a ? a
a a a a a ? a a a ? a
a a a a a a a a a ? a
? ? ? ? ? a a a ? a a
x x a a a a a ? a a ?x x ? ? ? a a ? a a ?x ? a a a a a a a a a
a a a a a a a a a ? a
a a a a a a a a a a a
? a a a a a a a a a a
x ? a a a a a a a a a
a a a a a a a a a a a
? a a a a a a a a a a
x ? a a a a a a a a a
V. DENSE SPT > 50 x x a a a a a ? a a ?
S < 100 mm x ? a a a a a a a a ?
100-1000mm x x ? ? ? a a ? a a x
1000-3000mm x x ? ? ? ? ? ? ? a x
>3000mm x x ? ? ? ? ? ? ? a x
a a a a a a a a a a a
x a a a a a a a a a a
a a ? ? ? ? ? a a a a
? ? ? ? ? ? ? a ? a a
1-2 0.5-2 1.5-3 1-2.5
AU
GE
RE
D P
ILE
S
COMPRESSIVE LOAD PER COLUMN
SC
ALE
OF
LOA
D
(STR
UC
TUR
AL)
1.0-3.5
PREVENTION OF EFFECTS ON ADJOINING STRUCTURES
(SUPPLY & INSTALL) RM/TON/M 0.5-2.5 0.3-2.0
LOOSE SPT < 10
UNIT COST
GROUND WATER
TYP
E O
F IN
TER
ME
DIA
TE L
AY
ER
GE
OTE
CH
NIC
AL TY
PE
OF
BE
AR
ING
LA
YE
RB
EA
RIN
G T
YP
E
ENVIRONMENT
MIC
RO
PIL
ES
BO
RE
D P
ILE
S
PREFORMED PILES
M. DENSE SPT = 10 - 30
MAINLY END -BEARING (D=Anticipated depth of bearing)
PARTLY FRICTION + PARTLY END BEARING
MAINLY FRICTION
LIMESTON FORMATION
M. STIFF SPT = 4 - 15
V. STIFF SPT = 15 - 32
HARD SPT > 32
DENSE / VERY DENSE SAND
SOFT SPT < 4
WEATHERED ROCK / SOFT ROCK
NOISE + VIBRATION; COUNTER MEASURES REQUIRED
BELOW PILE CAP
ROCK (RQD > 70%)
DENSE SPT = 30 - 50
COHESIVE SOIL
COHESIVELESS SOIL
SOIL WITH SOME BOULDERS / COBBLES (S=SIZE)
ABOVE PILE CAP
DESIGN CONSIDERATIONS
TYPE OF PILE
LEGEND :
8
x
?
INDICATES THAT THE PILE TYPE IS SUITABLEINDICATES THAT THE PILE TYPE IS NOT SUITABLE
INDICATES THAT THE USE OF PILE TYPE IS DOUBTFUL OR NOT COST EFFECTIVE UNLESS ADDITIONAL
MEASURES TAKEN
FIG 2 : PILE SELECTION CHART
![Page 18: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/18.jpg)
Pile Selection Based on Cost
RM 110.00 / m--Drilling in Soil
RM 240.00 / m--Drilling in Rock
RM 120.00 / m--API Pipe
RM 85.00 / m--Grouting
RM 150.00 / Nos--Pile Head
RM 4,297.50 / NosRM 1,066.00 / NosRM 967.00 / NosEst. Ave. Cost Per Point
RM 380,825.00RM 184,620.00RM 190,261.00Est. Foundation Cost
√
RM 200.00 / Nos--Movement
-RM 200.00 / NosRM 200.00 / NosCut Excess, Dispose + Starter Bars
-RM 32.00 / mRM 30.00 / mDrive
-RM 42.00 / mRM 33.00 / mSupply
RM 20,000.00RM 50,000.00RM 50,000.00Mob & Demob
Indicative Rates :
2.5m--Average Rock Socket Length
9m9m9mAverage Length
707083Total Points
Micropile300mm Spun Piles250mm Spun PilesDetails:
![Page 19: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/19.jpg)
Site Visit and SI Planning
![Page 20: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/20.jpg)
Site VisitSite VisitThings To Look For …
Accessibility & Constraints of Site
Adjacent Structures/Slopes, Rivers, Boulders, etc
Adjacent Activities (eg excavation)
Confirm Topography & Site Conditions
Any Other Observations that may affect Design and Construction of Foundation
![Page 21: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/21.jpg)
Subsurface Investigation (SI) Subsurface Investigation (SI) PlanningPlanning
Provide Sufficient Boreholes to get Subsoil Profile
Collect Rock Samples for Strength Tests (eg UCT)
In-Situ Tests to get consistency of ground (eg SPT)
Classification Tests to Determine Soil Type Profile
Soil Strength Tests (eg CIU)
Chemical Tests (eg Chlorine, Sulphate, etc)
![Page 22: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/22.jpg)
Typical CrossTypical Cross--Section at Hill Site Section at Hill Site
Ground Level
Bedrock LevelVery Hard Material Level
Hard Material Level
Groundwater Level
![Page 23: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/23.jpg)
EXISTING GROUND
LEVEL
Water Table
C’2, ø’2
Clayey Layer
C’3, ø’3
C’1, ø’1
BH
BH
BH Perched WT
Seepage
CROSS SECTION
![Page 24: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/24.jpg)
Placing Boreholes in Limestone Areas
Stage 1 : Preliminary S.I.- Carry out geophysical survey (for large areas)
Stage 2: Detailed S.I. - Boreholes at Critical Areas Interpreted from Stage 1
Stage 3: During Construction- Rock Probing at Selected Columns to supplement Stage 2
![Page 25: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/25.jpg)
Pile Design
![Page 26: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/26.jpg)
PILE DESIGNPILE DESIGN
Allowable Pile Capacity is the minimum of :
1) Allowable Structural Capacity
2) Allowable Geotechnical Capacitya. Negative Skin Frictionb. Settlement Control
![Page 27: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/27.jpg)
PILE DESIGNPILE DESIGNStructural consideration
• Not overstressed during handling, installation & in service for pile body, pile head, joint & shoe.
• Dimension & alignment tolerances (common defects?)
• Compute the allowable load in soft soil (<10kPa) over hard stratum
• Durability assessment
![Page 28: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/28.jpg)
Pile Capacity Design Pile Capacity Design Structural CapacityStructural Capacity
Concrete Pile
Steel Pile
Prestressed Concrete Pile
QQallall = 0.25 x = 0.25 x ffcucu x Ax Acc
QQallall = 0.3 x = 0.3 x ffyy x Ax Ass
QQallall = 0.25 (= 0.25 (ffcucu –– PrestressPrestress after loss) x Aafter loss) x Acc
Qall = Allowable pile
capacity
fcu = characteristic strength
of concrete
fs = yield strength of steel
Ac = cross sectional area of
concrete
As = cross sectional area of
steel
![Page 29: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/29.jpg)
SPT Blow Count per 300mm Penetration
Collection of SI DataCollection of SI Data
Pile Capacity Design Pile Capacity Design Geotechnical CapacityGeotechnical Capacity
4000 50 100 150 200 250 300 35026
24
22
20
18
16
14
12
10
8
6
4
2
0
12
10
8
6
4
2
0
0 50 100 150 200 250 300 350 400D
epth
(m)
Upper Bound
Lower Bound
Design Line (Moderately
Conservative)
Depth Vs SPT-N Blow Count
![Page 30: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/30.jpg)
0 50 100 150 200 250 300 350 400
26
24
22
20
18
16
14
12
10
8
6
4
2
0
12
10
8
6
4
2
0
0 50 100 150 200 250 300 350 400
0 50 100 150 200 250 300 350 400
26
24
22
20
18
16
14
12
10
8
6
4
2
0
12
10
8
6
4
2
0
0 50 100 150 200 250 300 350 400
Upper Bound
Lower Bound
Design Line Upper Bound
Lower Bound Design Line
Dep
th (m
)
Depth Vs SPT-N Blow Count
SPT Blow Count per 300mm Penetration
Dep
th (m
)
Depth Vs SPT-N Blow Count
SPT Blow Count per 300mm Penetration
Collection of SI DataCollection of SI Data
Pile Capacity Design Pile Capacity Design Geotechnical CapacityGeotechnical Capacity
![Page 31: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/31.jpg)
•• Piles installed in a group may fail:Piles installed in a group may fail:• Individually
• As a block
Pile Capacity Design Pile Capacity Design Geotechnical CapacityGeotechnical Capacity
![Page 32: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/32.jpg)
• Piles fail individually• When installed at large spacing
Pile Capacity Design Pile Capacity Design Geotechnical CapacityGeotechnical Capacity
![Page 33: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/33.jpg)
• Piles fail as a block• When installed at close spacing
Pile Capacity Design Pile Capacity Design Geotechnical CapacityGeotechnical Capacity
![Page 34: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/34.jpg)
Pile Capacity Design Pile Capacity Design Single Pile CapacitySingle Pile Capacity
![Page 35: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/35.jpg)
Pile Capacity DesignPile Capacity DesignFactor of Safety (FOS)Factor of Safety (FOS)
Factor of Safety (FOS) is required for
Natural variations in soil strength & variations in soil strength & compressibilitycompressibility
![Page 36: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/36.jpg)
Pile Capacity DesignPile Capacity DesignFactor of Safety (FOS)Factor of Safety (FOS)
Factor of Safety is (FOS) required for
Different degree of Different degree of mobilisationmobilisation for shaft for shaft & for tip& for tip Lo
adSettlement≈ 5mm
qsmob
qbmob
Load
Settlement≈ 5mm
qsmob
qbmob
![Page 37: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/37.jpg)
Pile Capacity Design Pile Capacity Design Factor of Safety (FOS)Factor of Safety (FOS)
PartialPartial factors of safety for shaft & base factors of safety for shaft & base capacities respectivelycapacities respectively
For shaft, use 1.5 (typical)For shaft, use 1.5 (typical)
For base, use 3.0 (typical)For base, use 3.0 (typical)ΣQsu + Qbu
1.5 3.0Qall =
![Page 38: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/38.jpg)
Pile Capacity DesignPile Capacity DesignFactor of Safety (FOS)Factor of Safety (FOS)
GlobalGlobal factor of safety for total ultimate factor of safety for total ultimate capacitycapacity
Use 2.0 (typical)Use 2.0 (typical)
ΣQsu + Qbu
2.0Qall =
![Page 39: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/39.jpg)
Pile Capacity Design Pile Capacity Design Factor of Safety (FOS)Factor of Safety (FOS)
Calculate using Calculate using BOTHBOTH approaches approaches (Partial & Global)(Partial & Global)
Choose the Choose the lower lower of the of the QQallall valuesvalues
![Page 40: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/40.jpg)
QQuu = Q= Qss + + QQbb
Overburden Soil Layer
Qs = skin friction
Qb = end bearing
Qu = ultimate bearing capacity
Pile Capacity Design Pile Capacity Design Single Pile CapacitySingle Pile Capacity
![Page 41: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/41.jpg)
Qu = α.sus.As + sub.Nc.Ab
Qsu Qbu
Qu = Ultimate bearing capacity of the pile a = adhesion factor (see next slide)sus = average undrained shear strength for shaftAs = surface area of shaft sub = undrained shear strength at pile baseNc = bearing capacity factor (taken as 9.0) Ab = cross sectional area of pile base
Pile Capacity Design Pile Capacity Design Single Pile Capacity : In Cohesive SoilSingle Pile Capacity : In Cohesive Soil
![Page 42: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/42.jpg)
Pile Capacity DesignPile Capacity DesignSingle Pile Capacity:Single Pile Capacity: In Cohesive SoilIn Cohesive SoilAdhesion factor (Adhesion factor (αα) ) –– Shear strength (SShear strength (Suu) )
(McClelland, 1974)(McClelland, 1974)
Adhesion Factor
Su (kN/m2)25 75 100 125 150 17550
0
0.6
0.2
0.4
0.8
1.0
Cα/Su
Preferred Design Line
![Page 43: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/43.jpg)
91.50.330510040
690.32307530
51.150.331555020
470.4117.537.515
41.60.52802510
29.750.742.512.55
12.5112.52.51
51500
fsu=α.su(kPa)α
su = (0.1+0.15N)*50
(kPa)
fsu=2.5N(kPa)SPT N
FukuokaMeyerhof
![Page 44: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/44.jpg)
Correlation Between SPT N and Correlation Between SPT N and ffsusufsu vs SPT N
0
10
20
30
40
50
60
70
80
90
100
110
0 5 10 15 20 25 30 35 40 45
SPT N
fsu
(kP
a)
Meyerhof Fukuoka
Pile Capacity DesignPile Capacity DesignSingle Pile Capacity:Single Pile Capacity: In Cohesive SoilIn Cohesive Soil
![Page 45: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/45.jpg)
Values of undrained shear strength, su can be obtained from the following:
Unconfined compressive test
Field vane shear test
Deduce based on Fukuoka’s Plot (minimum su )
Deduce from SPT-N values based on Meyerhof
Pile Capacity DesignPile Capacity DesignSingle Pile Capacity:Single Pile Capacity: In Cohesive SoilIn Cohesive Soil
NOTE: Use only direct field data for shaft friction prediction instead of Meyerhof
![Page 46: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/46.jpg)
Modified Meyerhof (1976):
Ult. Shaft friction = Qsu ≅ 2.5N (kPa)
Ult. Toe capacity = Qbu ≅ 250N (kPa)
or 9 su (kPa)
(Beware of base cleaning for bored piles –
ignore base capacity if doubtful)
Pile Capacity DesignPile Capacity DesignSingle Pile Capacity:Single Pile Capacity: In Cohesive SoilIn Cohesive Soil
![Page 47: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/47.jpg)
Modified Modified MeyerhofMeyerhof (1976):(1976):
UltUlt. Shaft Friction = . Shaft Friction = QQsusu ≅≅ 2.0N (2.0N (kPakPa))
UltUlt. Toe Capacity= . Toe Capacity= QQbubu ≅≅ 250N 250N –– 400N 400N
((kPakPa))
Pile Capacity DesignPile Capacity DesignSingle Pile Capacity:Single Pile Capacity: In In CohesionlessCohesionless SoilSoil
![Page 48: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/48.jpg)
0 200 400 600
20
16
12
8
4
0
Dep
th (m
)
0 100 200 300 400 500Load (kN)
20
16
12
8
4
0
Pile Capacity DesignPile Capacity Design
ΣQsu
Qbu
ΣQsu + Qbu
0 200 400 600
20
16
12
8
4
0
Dep
th (m
)
0 100 200 300 400 500Load (kN)
20
16
12
8
4
0
0 200 400 600
20
16
12
8
4
0
Dep
th (m
)
0 100 200 300 400 500Load (kN)
20
16
12
8
4
0
0 200 400 600
20
16
12
8
4
0
Dep
th (m
)
0 100 200 300 400 500Load (kN)
20
16
12
8
4
0
ΣQsu + Qbu2.0
0 200 400 600
20
16
12
8
4
0
Dep
th (m
)
0 100 200 300 400 500Load (kN)
20
16
12
8
4
0
ΣQsu + Qbu1.5 3.0
![Page 49: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/49.jpg)
Pile Capacity Design Pile Capacity Design Block CapacityBlock Capacity
![Page 50: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/50.jpg)
Qu = 2D(B+L) s + 1.3(sb.Nc.B.L)Where Qu= ultimate bearing capacity of pile groupD = depth of pile below pile cap levelB = width of pile groupL = length of pile groups = average cohesion of clay around groupsb = cohesion of clay beneath groupNc= bearing capacity factor = 9.0 (Refer to Text by Tomlinson, 1995)
Pile Capacity DesignPile Capacity DesignBlock Capacity:In Cohesive SoilBlock Capacity:In Cohesive Soil
![Page 51: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/51.jpg)
No risk of group failure
if FOS of individual pile is adequate
Pile Capacity DesignPile Capacity DesignBlock Capacity:Block Capacity: In In CohesionlessCohesionless SoilSoil
![Page 52: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/52.jpg)
No risk of block failure
if the piles are properly seated in the rock
formation
Pile Capacity DesignPile Capacity DesignBlock Capacity:Block Capacity: On RockOn Rock
![Page 53: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/53.jpg)
Pile Capacity Design Pile Capacity Design Negative Skin Friction (NSF)Negative Skin Friction (NSF)
![Page 54: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/54.jpg)
Compressible soil layer consolidates with time due to:
Surcharge of fillLowering of groundwater table
Pile Capacity DesignPile Capacity DesignNegative Skin FrictionNegative Skin Friction
![Page 55: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/55.jpg)
Clay
FillOGL
1 2 30
Hf
ρsMonth
Pile Capacity DesignPile Capacity DesignNegative Skin FrictionNegative Skin Friction
![Page 56: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/56.jpg)
Pile to length (floating pile)Pile settles with consolidating soil NO NSF
Pile Capacity DesignPile Capacity DesignNegative Skin FrictionNegative Skin Friction
![Page 57: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/57.jpg)
Pile to set at hard stratum (end-bearing pile)
Consolidation causes downdrag forces on piles as soil settles more than the pile
Pile Capacity DesignPile Capacity DesignNegative Skin FrictionNegative Skin Friction
![Page 58: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/58.jpg)
WARNING:No free fill by the contractor to avoid NSF
Pile Capacity DesignPile Capacity DesignNegative Skin FrictionNegative Skin Friction
![Page 59: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/59.jpg)
Effect of NSF Effect of NSF ……
Reduction of Pile Carrying Capacity
![Page 60: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/60.jpg)
Effect of NSF Effect of NSF ……
![Page 61: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/61.jpg)
NSF Preventive MeasuresNSF Preventive Measures
Avoid Filling
Carry Out Surcharging
Sleeve the Pile Shaft
Slip Coating
Reserve Structural Capacity for NSF
Allow for Larger Settlements
![Page 62: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/62.jpg)
Clay
Sand
OGL
Qba
Qneg
SandFL
Clay
Sand
OGL
Qba
Qsu
Qall = (Qsu/1.5 + Qbu/3.0) - Qneg
Qsu
Qall = (Qsu/1.5 + Qbu/3.0)
Pile Capacity DesignPile Capacity DesignNegative Skin FrictionNegative Skin Friction
![Page 63: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/63.jpg)
70 60 50 40 30 20 10 0
Settlement (mm)100 0 -100 -200-300-400-500-600 -700 -800 -900-1000
Axial Compression Force (kN)
Settlement Curves &Axial Compression Force
14 May 9815 May 9818 May 9821 May 9804 Jun 9809 Jun 9819 Jun 9802 Jul 9813 Jul 98
0 10 20 30 40 50SPT-N (Blows/300mm)
BoreholeBH-1BH-2
Datum = 36.300m
40
35
30
25
20
15
10
5
0D
epth
(m, b
gl)
Increased Pile Axial LoadIncreased Pile Axial Load
Check: maximum axial load < structural pile Check: maximum axial load < structural pile capacitycapacity
Pile Capacity Design Pile Capacity Design Negative Skin FrictionNegative Skin Friction
Maximum axial load
![Page 64: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/64.jpg)
Allowable working loadQult
FOS
Pile Capacity DesignPile Capacity DesignFactor of Safety (FOS)Factor of Safety (FOS)
Allowable working load
Qult
FOS(Qneg + etc)
Without Negative Skin Friction:
With Negative Skin Friction:
![Page 65: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/65.jpg)
Pile Capacity DesignPile Capacity DesignStatic Pile Load Test (Piles with NSF)Static Pile Load Test (Piles with NSF)
• Specified Working Load (SWL) = Specified foundationload at pile head
• Design Verification Load (DVL) = SWL + 2 Qneg
• Proof Load: will not normally exceed
DVL + SWL
![Page 66: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/66.jpg)
Pile Settlement DesignPile Settlement Design
![Page 67: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/67.jpg)
Pile Settlement DesignPile Settlement DesignIn Cohesive SoilIn Cohesive Soil
Design for Design for total settlement & settlement & differential settlement for design settlement for design tolerancetoleranceIn certain casesIn certain cases, total settlement not an settlement not an issueissueDifferential settlement can cause settlement can cause damage to structuresdamage to structures
![Page 68: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/68.jpg)
Pile Group Settlement in Clay
=
Immediate / Elastic Settlement + Consolidation
Settlement
Pile Settlement DesignPile Settlement DesignIn Cohesive SoilIn Cohesive Soil
![Page 69: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/69.jpg)
Where
pi = average immediate settlement
qn= pressure at base of equivalent raft
B = width of the equivalent raft
Eu= deformation modulus
μ1, μ0= influence factors for pile group width, B at depth D
below ground surface
by by JanbuJanbu, , BjerrumBjerrum and and KjaernsliKjaernsli (1956)(1956)
IMMEDIATE SETTLEMENTIMMEDIATE SETTLEMENT
Pile Settlement DesignPile Settlement DesignIn Cohesive SoilIn Cohesive Soil
u
ni E
Bqp 01μμ=
![Page 70: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/70.jpg)
μ1
μ0
Influence factors (after Janbu, Bjerrum and Kjaernsli, 1956)
IMMEDIATE SETTLEMENTIMMEDIATE SETTLEMENT
Pile Settlement DesignPile Settlement DesignIn Cohesive SoilIn Cohesive Soil
![Page 71: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/71.jpg)
As per footing (references given later)
CONSOLIDATION SETTLEMENTCONSOLIDATION SETTLEMENT
Pile Settlement DesignPile Settlement DesignIn Cohesive SoilIn Cohesive Soil
![Page 72: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/72.jpg)
No risk of excessive settlement
Pile Settlement DesignPile Settlement DesignOn RockOn Rock
![Page 73: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/73.jpg)
Pile Installation Methods
![Page 74: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/74.jpg)
PILE INSTALLATION PILE INSTALLATION METHODSMETHODS
•Diesel / Hydraulic / Drop HammerDriving
•Jacked-In
•Prebore Then Drive
•Prebore Then Jacked In
•Cast-In-Situ Pile
![Page 75: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/75.jpg)
Diesel Drop Hammer Driving
Diesel Drop Hammer Diesel Drop Hammer DrivingDriving
Hydraulic Hammer Driving
Hydraulic Hammer Hydraulic Hammer DrivingDriving
![Page 76: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/76.jpg)
JackedJacked--In In PilingPiling
![Page 77: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/77.jpg)
JackedJacked--In Piling (ContIn Piling (Cont’’d)d)
![Page 78: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/78.jpg)
Cast-In-Situ Piles
(Micropiles)
CastCast--InIn--Situ Situ Piles Piles
((MicropilesMicropiles))
![Page 79: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/79.jpg)
Types of Piles
![Page 80: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/80.jpg)
TYPES OF PILESTYPES OF PILES
•Treated Timber Piles
•Bakau Piles
•R.C. Square Piles
•Pre-Stressed Concrete SpunPiles
•Steel Piles
•Boredpiles
•Micropiles
•Caisson Piles
![Page 81: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/81.jpg)
R.C. Square PilesR.C. Square Piles
Size : 150mm to 400mmLengths : 3m, 6m, 9m and 12mStructural Capacity : 25Ton to 185TonMaterial : Grade 40MPa ConcreteJoints: WeldedInstallation Method :
–Drop Hammer–Jack-In
![Page 82: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/82.jpg)
RC RC Square Square PilesPiles
![Page 83: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/83.jpg)
Pile MarkingPile Marking
![Page 84: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/84.jpg)
Pile LiftingPile Lifting
![Page 85: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/85.jpg)
Pile Fitting to Piling MachinePile Fitting to Piling Machine
![Page 86: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/86.jpg)
Pile Pile PositioningPositioning
![Page 87: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/87.jpg)
Pile JoiningPile Joining
![Page 88: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/88.jpg)
Considerations in Using RC Considerations in Using RC Square Piles Square Piles ……
•Pile Quality
•Pile Handling Stresses
•Driving Stresses
•Tensile Stresses
•Lateral Loads
•Jointing
![Page 89: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/89.jpg)
PrePre--stressed Concrete Spun stressed Concrete Spun PilesPiles
Size : 250mm to 1000mmLengths : 6m, 9m and 12m (Typical)Structural Capacity : 45Ton to 520TonMaterial : Grade 60MPa & 80MPa ConcreteJoints: WeldedInstallation Method :
–Drop Hammer–Jack-In
![Page 90: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/90.jpg)
Spun PilesSpun Piles
![Page 91: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/91.jpg)
Spun Piles Spun Piles vsvs RC Square Piles RC Square Piles Spun Piles have …
•Better Bending Resistance
•Higher Axial Capacity
•Better Manufacturing Quality
•Able to Sustain Higher Driving Stresses
•Higher Tensile Capacity
•Easier to Check Integrity of Pile
•Similar cost as RC Square Piles
![Page 92: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/92.jpg)
Steel H PilesSteel H Piles
Size : 200mm to 400mLengths : 6m and 12mStructural Capacity : 40Ton to 1,000TonMaterial : 250N/mm2 to 410N/mm2 SteelJoints: WeldedInstallation Method :
–Hydraulic Hammer–Jack-In
![Page 93: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/93.jpg)
Steel H Steel H PilesPiles
![Page 94: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/94.jpg)
Steel H Piles (ContSteel H Piles (Cont’’d)d)
![Page 95: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/95.jpg)
Steel H Piles NotesSteel H Piles Notes……
•Corrosion Rate
•Fatigue
•OverDriving
![Page 96: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/96.jpg)
OverDrivingOverDrivingof Steel Pilesof Steel Piles
![Page 97: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/97.jpg)
Large Diameter CastLarge Diameter Cast--InIn--Situ Situ Piles (Bored Piles)Piles (Bored Piles)
Size : 450mm to 2mLengths : VariesStructural Capacity : 80Ton to 2,300TonsConcrete Grade : 20MPa to 30MPa (Tremie)Joints : NoneInstallation Method : Drill then Cast-In-Situ
![Page 98: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/98.jpg)
Overburden Soil Layer
Bedrock
Drilling BorepileBorepile ConstructionConstruction
![Page 99: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/99.jpg)
Overburden Soil Layer
Bedrock
Advance Drilling BorepileBorepile ConstructionConstruction
![Page 100: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/100.jpg)
Overburden Soil Layer
Bedrock
Drilling & Advance Casing
BorepileBorepile ConstructionConstruction
![Page 101: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/101.jpg)
Overburden Soil Layer
Bedrock
Drill to Bedrock BorepileBorepile ConstructionConstruction
![Page 102: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/102.jpg)
BorepileBorepile ConstructionConstruction
Overburden Soil Layer
Bedrock
Lower Reinforcement Cage
![Page 103: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/103.jpg)
Overburden Soil Layer
Bedrock
BorepileBorepile ConstructionConstructionLower TremieChute
![Page 104: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/104.jpg)
Overburden Soil Layer
Bedrock
Pour TremieConcrete
BorepileBorepile ConstructionConstruction
![Page 105: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/105.jpg)
BorepileBorepile ConstructionConstruction
Overburden Soil Layer
Bedrock
Completed Borepile
![Page 106: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/106.jpg)
BORED PILING MACHINEBORED PILING MACHINEBored Pile Construction
BG22
![Page 107: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/107.jpg)
Cleaning Bucket
Rock Reamer Rock Auger
![Page 108: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/108.jpg)
Harden Steel
Rock Chisel
![Page 109: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/109.jpg)
DRILLING EQUIPMENTDRILLING EQUIPMENTBored Pile Construction
Soil augerCoring bucketCleaning
bucket
![Page 110: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/110.jpg)
BENTONITE PLANTBENTONITE PLANTBored Pile Construction
MixerWater Tank Slurry
Tank
DesandingMachine
![Page 111: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/111.jpg)
DrillingDrilling
![Page 112: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/112.jpg)
Lower Lower ReinforcementReinforcement
![Page 113: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/113.jpg)
Place Place TremieTremie
ConcreteConcrete
![Page 114: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/114.jpg)
Completed Completed BoredpileBoredpile
![Page 115: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/115.jpg)
BorepileBorepile CosiderationsCosiderations……
•Borepile Base Difficult to Clean
•Bulging / Necking
•Collapse of Sidewall
•Dispute on Level of Weathered Rock
![Page 116: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/116.jpg)
MicropilesMicropiles
Size : 100mm to 350mm DiameterLengths : VariesStructural Capacity : 20Ton to 250TonMaterial : Grade 25MPa to 35MPa Grout
N80 API Pipe as ReinforcementJoints: NoneInstallation Method :
–Drill then Cast-In-Situ–Percussion Then Cast-In-Situ
![Page 117: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/117.jpg)
CastCast--InIn--Situ Situ PilesPiles
((MicropilesMicropiles))
![Page 118: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/118.jpg)
TYPES OF PILE SHOESTYPES OF PILE SHOES
•Flat Ended Shoe
•Oslo Point
•Cast-Iron Pointed Tip
•Cross Fin Shoe
•H-Section
![Page 119: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/119.jpg)
Cross Fin ShoeCross Fin Shoe
![Page 120: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/120.jpg)
Oslo Point ShoeOslo Point Shoe
![Page 121: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/121.jpg)
Cast Iron Tip ShoeCast Iron Tip Shoe
![Page 122: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/122.jpg)
HH--Section ShoeSection Shoe
![Page 123: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/123.jpg)
Piling Supervision
![Page 124: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/124.jpg)
Uniform Building By Uniform Building By Law (UBBL)1984Law (UBBL)1984
![Page 125: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/125.jpg)
PILING SUPERVISIONPILING SUPERVISION•Ensure That Piles Are Stacked Properly
•Ensure that Piles are Vertical During Driving
•Keep Proper Piling Records
•Ensure Correct Pile Types and Sizes are Used
•Ensure that Pile Joints are Properly Welded withNO GAPS
•Ensure Use of Correct Hammer Weights and DropHeights
![Page 126: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/126.jpg)
PILING SUPERVISION PILING SUPERVISION (Cont(Cont’’d)d)
•Ensure that Proper Types of Pile Shoes are Used.
•Check Pile Quality
•Ensure that the Piles are Driven to the RequiredLengths
•Monitor Pile Driving
![Page 127: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/127.jpg)
![Page 128: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/128.jpg)
![Page 129: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/129.jpg)
FAILURE OF PILING FAILURE OF PILING SUPERVISIONSUPERVISION
Failing to Provide Proper Supervision
WILL Result in
Higher Instances of Pile Damage
& Wastage
![Page 130: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/130.jpg)
Pile Damage
![Page 131: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/131.jpg)
Driven concrete piles are vulnerable Driven concrete piles are vulnerable to damages by overdriving. to damages by overdriving.
![Page 132: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/132.jpg)
Damage to Timber PileDamage to Timber Pile
![Page 133: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/133.jpg)
Weak Weak Timber Timber JointJoint
![Page 134: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/134.jpg)
Damage To RC Pile ToeDamage To RC Pile Toe
![Page 135: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/135.jpg)
Damage to Damage to RC Pile RC Pile HeadHead
![Page 136: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/136.jpg)
Damage to Damage to RC PilesRC Piles
![Page 137: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/137.jpg)
Damage to RC Piles Damage to RC Piles –– contcont’’d d
![Page 138: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/138.jpg)
Tilted RC Tilted RC PilesPiles
![Page 139: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/139.jpg)
Damage to Steel PilesDamage to Steel Piles
![Page 140: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/140.jpg)
Damaged Steel Pipe PilesDamaged Steel Pipe Piles
![Page 141: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/141.jpg)
![Page 142: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/142.jpg)
Detection of Pile Damage Detection of Pile Damage Through Piling RecordsThrough Piling Records
![Page 143: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/143.jpg)
Piling Problems
![Page 144: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/144.jpg)
Piling Problems – Soft Ground
![Page 145: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/145.jpg)
Ground heave due to pressure relief at base &
surcharge near excavation
Pile tilts & moves/walks
Piling Problems – Soft Ground
![Page 146: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/146.jpg)
Piling Problems – Soft Ground
![Page 147: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/147.jpg)
Piling in Kuala Lumpur LimestonePiling in Kuala Lumpur Limestone
Important Points to Note:• Highly Irregular Bedrock Profile
• Presence of Cavities & Solution Channels
• Very Soft Soil Immediately Above Limestone Bedrock
Results in …• High Rates of Pile Damage
• High Bending Stresses
![Page 148: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/148.jpg)
Piling Problems in Typical Limestone Piling Problems in Typical Limestone BedrockBedrock
![Page 149: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/149.jpg)
Piling Problems Piling Problems –– Undetected Undetected ProblemsProblems
![Page 150: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/150.jpg)
Piling Problems Piling Problems – Coastal Alluvium
![Page 151: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/151.jpg)
Piling Problems Piling Problems –– Defective PilesDefective Piles
Seriously damaged pile due to severe driving stress in soft ground (tension)
Defect due to poor workmanship of pile casting
![Page 152: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/152.jpg)
Defective pile shoe
Problems of defective pile head & overdriving!
Piling Problems Piling Problems –– Defective PilesDefective Piles
![Page 153: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/153.jpg)
Cracks& fractured
Non-chamfered corners
Piling Problems Piling Problems –– Defective PilesDefective Piles
![Page 154: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/154.jpg)
Pile head defect due to hard driving or and poor
workmanship
Piling Problems Piling Problems –– Defective PilesDefective Piles
![Page 155: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/155.jpg)
Piling Problem - Micropiles
Sinkholes caused by installation method-
dewatering?
![Page 156: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/156.jpg)
Piling in Fill GroundPiling in Fill GroundImportant Points to Note:
•High Consolidation Settlements If Original Ground is Soft•Uneven Settlement Due to Uneven Fill Thickness•Collapse Settlement of Fill Layer If Not Compacted
Properly
Results in …•Negative Skin Friction (NSF) & Crushing of Pile Due
to High Compressive Stresses•Uneven Settlements
![Page 157: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/157.jpg)
Typical Design and Typical Design and Construction Issues #1Construction Issues #1
Pile Toe Slippage Due to Steep Incline Bedrock
Use Oslo Point Shoe To Minimize Pile Damage
Issue #1
Solution #1
![Page 158: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/158.jpg)
Pile Breakage on Inclined Pile Breakage on Inclined Rock SurfaceRock Surface
No Proper Pile Shoe
![Page 159: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/159.jpg)
Extension PilePileJoint
![Page 160: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/160.jpg)
First Contact B/W Toe and Inclined Rock
![Page 161: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/161.jpg)
Toe “Kicked Off”on Driving
Pile Body Bends
Pile Joint Breaks
![Page 162: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/162.jpg)
Pile Breakage on Inclined Pile Breakage on Inclined Rock SurfaceRock Surface
Continue “Sliding” of
Toe
![Page 163: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/163.jpg)
Use Oslo Point Shoe to Minimize Use Oslo Point Shoe to Minimize DamageDamage
![Page 164: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/164.jpg)
Design and Construction Design and Construction Issues #2Issues #2
Presence of Cavity
Detect Cavities through Cavity Probing then perform Compaction Grouting
Issue #2
Solution #2
![Page 165: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/165.jpg)
Presence of CavityPresence of Cavity
Pile Sitting on Limestone with Cavity
![Page 166: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/166.jpg)
Application of Building Load
![Page 167: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/167.jpg)
Application of Building Load
Roof of Cavity starts to Crack …
![Page 168: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/168.jpg)
Collapse of Cavity Roof
Pile Plunges !
Building Collapse
![Page 169: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/169.jpg)
Design and Construction Design and Construction Issues #3Issues #3
Differential Settlement
Carry out analyses to check the settlement compatibility if different piling system is adopted
Issue #3
Solution #3
![Page 170: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/170.jpg)
Piling in Progress
Differential Settlement of Foundation
Original House on Piles
Hard LayerSPT>50
Cracks!!
No pile
SettlementSoft
Layer
Link House Construction
Renovation: Construct
Extensions
Piles transfer Load to
Hard Layer
No Settlement
SAFETY of Original Building
Not Compromised
![Page 171: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/171.jpg)
Piling in Progress
Eliminate Differential SettlementEliminate Differential Settlement
Hard LayerSPT>50
Soft Layer
Construct Extension with Suitable Piles
All Load transferred to Hard Layer – No Cracks!
![Page 172: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/172.jpg)
Piling in Progress
Problem of Short PilesProblem of Short Piles
Hard LayerSPT>50
Soft Layer
Load from Original House transferred to Hard Layer
Cracks!!
Soft!
Load transferred to
Soft Layer, Extension still Settles
Construct Extensions with Short
Piles
![Page 173: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/173.jpg)
Cracks at ExtensionCracks at Extension
![Page 174: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/174.jpg)
![Page 175: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/175.jpg)
![Page 176: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/176.jpg)
![Page 177: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/177.jpg)
Typical Design and Typical Design and Construction Issues #4Construction Issues #4
Costly conventional piling design – piled to set to deep layer in soft ground
-Strip footings / Raft
-Floating Piles
Issue #4
Solution #4
![Page 178: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/178.jpg)
![Page 179: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/179.jpg)
“Conventional” Foundation for Low Rise Buildings
![Page 180: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/180.jpg)
Foundation for Low Rise Buildings (Soil Settlement)
![Page 181: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/181.jpg)
Exposed Pile
Settlement
Settling Platform Detached from Building
![Page 182: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/182.jpg)
Conceptual Design of Conceptual Design of FOUNDATION SYSTEMFOUNDATION SYSTEM
1. Low Rise Buildings :-(Double-Storey Houses)= Strip Footings or Raft or Combination.
2. Medium Rise Buildings :-= Floating Piles System.
![Page 183: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/183.jpg)
Low Rise Buildings on Piled Raft/Strips
Strip / Raft System
Stiff Stratum
Hard Layer
Fill
25-30m
Soft Clay
![Page 184: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/184.jpg)
Comparison
Strip System
Stiff Stratum
Hard Layer
Fill
25-30m
Soft Clay
Building on Piles Building on Piled Strips
![Page 185: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/185.jpg)
Comparison (after settlement)Building on Piles Building on Piled Strips
Strip System
Stiff Stratum
Hard Layer
Fill
25-30m
Soft Clay
![Page 186: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/186.jpg)
Advantages of Advantages of Floating Piles SystemFloating Piles System
1. Cost Effective.
2. No Downdrag problems on the Piles.
3. Insignificant Differential Settlement between Buildings and Platform.
![Page 187: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/187.jpg)
Bandar Botanic
![Page 188: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/188.jpg)
Bandar Botanic at Night
![Page 189: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/189.jpg)
![Page 190: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/190.jpg)
Soft Ground Engineering
![Page 191: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/191.jpg)
Myths in Piling
![Page 192: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/192.jpg)
MYTHS IN PILING #1MYTHS IN PILING #1
Dynamic Formulae such as Hiley’s Formula Tells us the Capacity of the Pile
Pile Capacity can only be verified by using:
(i) Maintained (Static) Load Tests
(ii)Pile Dynamic Analyser (PDA) Tests
Myth:
Truth:
![Page 193: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/193.jpg)
MYTHS IN PILING #2MYTHS IN PILING #2
Pile Achieves Capacity When It is Set.
Myth:
Truth:
Pile May Only “Set” on Intermediate Hard Layer BUT May Still Not Achieve Required Capacity within Allowable Settlement.
![Page 194: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/194.jpg)
CASE HISTORIESCASE HISTORIESCase 1: Structural distortion & distresses
Case 2: Distresses at houses
![Page 195: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/195.jpg)
CASE HISTORY 1CASE HISTORY 1
Max. 20m Bouldery Fill on Undulating TerrainPlatform SettlementShort Piling ProblemsDowndrag on Piles
Distortion & Distresses on 40 Single/ 70 Double Storey Houses
![Page 196: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/196.jpg)
Distresses on Structures
![Page 197: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/197.jpg)
Void
![Page 198: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/198.jpg)
0 40000 80000 120000 160000 200000Coordinate-X (mm)
20
30
40
50
60
70R
educ
ed L
evel
(m)
Profile with SPT 'N'>50
Filled groundOriginal GroundHard StratumBoreholePile ToePile Toe of AdditionalPiles
OriginalGround Profile
BuildingPlatformOffset 13.1m
Offset 13.1m
N=25
N=40
N=34
Profile with SPT 'N'≅30
Offset 13.1m
N=29
N=30
N=5
Offset 36.2m
???
?? ?
??
?
?
?
?
Piling Contractor A
![Page 199: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/199.jpg)
0 40000 80000 120000 160000 200000Coordinate-X (mm)
30
40
50
60
70
80R
educ
ed L
evel
(m)
Filled groundOriginal GroundHard StratumBoreholePile ToePile Toe of Additional PilesProfile with SPT 'N'>50
Building Platform
Original Ground ProfileN=30
N=34
N=28N=41
N=5
N=29
Profile with SPT 'N'≅30
Offset 9.1mOffset 9.1m
?
??
? ?
PilingContractor A Piling Contractor B
![Page 200: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/200.jpg)
![Page 201: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/201.jpg)
Prevention MeasuresPrevention Measures
Design:– Consider downdrag in foundation design– Alternative strip systemConstruction: – Proper QA/QC – Supervision
![Page 202: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/202.jpg)
CASE HISTORY 2CASE HISTORY 2
Filled ground: platform settlementDesign problem: non-suspended floor with semi-suspended detailingBad earthwork & layout designShort piling problem
Distresses on 12 Double Storey Houses & 42 Townhouses
![Page 203: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/203.jpg)
Diagonal cracks due to differential
settlement between columns
Larger column settlement
![Page 204: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/204.jpg)
Sagging Ground
Floor Slab
![Page 205: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/205.jpg)
SAGGING PROFILE OF NON-SUSPENDED GROUND FLOOR SLAB
NON-SUSPENDED GROUND FLOOR SLAB BEFORE SETTLEMENT
BUILDING PLATFORM PROFILE AFTER SETTLEMENT
PILE PILECAP
Ve > Vc Vc < VeVcρs
ρs ACTUAL FILLED PLATFORM SETTLEMENT
![Page 206: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/206.jpg)
Distorted Car Porch Roof
![Page 207: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/207.jpg)
BLOCK 2
BLOCK 1
Silt trap
Temporary earth drain
Poor Earthwork Layout
![Page 208: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/208.jpg)
Prevention MeasuresPrevention Measures
Planning: – Proper building layout planning to suit terrain
(eg. uniform fill thickness)– Sufficient SI
Design: – Consider filled platform settlement– Earthwork layout
Construction: – Supervision on earthwork & piling
![Page 209: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/209.jpg)
SUMMARYSUMMARY
Importance of Preliminary Study
Understanding the Site Geology
Carry out Proper Subsurface Investigation that Suits the Terrain & Subsoil
Selection of Suitable Pile
Pile Design Concepts
![Page 210: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/210.jpg)
SUMMARYSUMMARY
Importance of Piling Supervision
Typical Piling Problems Encountered
Present Some Case Histories
![Page 211: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/211.jpg)
![Page 212: Piled Foundation Design and ConstructionPILED FOUNDATION DESIGN & CONSTRUCTION By Ir. Dr. Gue See Sew . Contents zOverview zPreliminary Study ... · 2008-5-21](https://reader033.fdocuments.in/reader033/viewer/2022051718/5a7232c07f8b9aa2538d6d16/html5/thumbnails/212.jpg)
FERRARI ‘S PITSTOP WAS COMPLETED BY 15 MECHANICS (FUEL AND TYRES) IN 6.0 SECONDS FLAT.
54 PEOPLE TOOK PART IN THIS CONCERTED ACROBATIC JUMP.