AUG-Wapakoneta Riverscape
PID 102167
The City of Wapakoneta proposes to undertake enhancements activities along the Auglaize
River, between Harrison Street and Blackhoof Street. The project is intended to enhance the
river corridor, including Belcher and Heritage Parks, for all users. The project will include the
following improvements:
The existing multi-use path within Belcher Park will be reconfigured and extended to
provide a connection between Harrison Street and Blackhoof Street.
A new multi-use trail will be constructed through Heritage Park, providing a connection
between Harrison Street and Blackhoof Street. Decorative hand railing will separate the
trail from the river wall.
Heritage Park will be expanded to offer additional greenspace and walking paths.
A shelter house with restrooms will be constructed within Heritage Park.
The existing picnic shelters will be refurbished for re-installation within Belcher Park.
Both parks will be enhanced with benches, bike racks, trash receptacles, landscaping, and
interpretive signage.
Heritage Drive will be upgraded by installing new curb & gutter, storm sewer, and
decorative lighting with banner arms.
A decorative archway will be provided at the Blackhoof Street entrance to Heritage
Drive.
The project is located along the Auglaize River, between the City’s downtown commercial
district and residential housing along Harrison and River Streets. Within the project area,
minorities represent 13% of the population and individuals in poverty represent 28% of the
population.
The majority of the project will be undertaken on lands owned and controlled by the City of
Wapakoneta. The project will require approximately 0.04-acre of permanent right-of-way and
0.04-acre of temporary right-of-way from private owners along the corridor.
The project is expected to require two years for construction, beginning in early 2019 and
concluding in the fall of 2020. The project will require the temporary detour of Heritage Drive.
Access to the parking areas south of Heritage Drive will be maintained through the staged
reconstruction of Heritage Drive.
As detailed above, the project will include enhancements to Belcher and Heritage Parks, which
are protected resources under Section 4(f) of the Department of Transportation Act of 1966.
Both parks will experience temporary disruption to allow for the proposed improvements.
Construction activities will be phased, to ensure portions of both parks are accessible to the
public throughout construction. The project will not alter the City’s underlying fee ownership or
management authority of the parks. Due to construction activities, the project is considered to
have a de minimis impact to these recreational resources.
There are no National Historic Landmarks within the project area. The project is located
adjacent to the Wapakoneta Commercial District, included on the National Register of Historic
Places. The project will not encroach on the historic district’s boundaries.
Ohio Historic Inventory forms have been completed for multiple properties adjacent to the
project limits (most within the historic district). The project is expected to require minor right-of-
way (0.018-acre temporary and 0.017-acre permanent) from the property at 48 E. Auglaize (OHI
AUG01333303), from a portion of the property located outside of the established boundary of
the historic district. The project will also include work on land previously occupied by the Boy
Scout’s log cabin (OHI AUG0169803); this building is no longer extant.
The project will include minor work below the ordinary high water mark to allow for the closure
of two stairwells in the river wall. The project will otherwise not require instream work. There
are no wetlands within the project construction limits. The project will require the removal of
approximately 15 trees, two of which may offer roost habitat for the Indiana bat and northern
long-eared bat. The project will include work within the designated special flood hazard area
and floodway associated with the Auglaize River; the project has been determined to result in no
net rise in the base flood elevation. .
The project will be constructed with federal (Transportation Enhancement) and local funding.
Environmental clearance is scheduled for 06/03/2017. The anticipated award date is 01/01/2019.
s
s
s
s s
s
s
s
s
s
s
s
0s
s s
s
s
s
s
0
s
s
s
s
s
s
0
s
.
s
0
.
s
s
s
s
s
.
s
0
s
0
s
s
s
s
s
s
s
s
r
r
r
r r
r
r
r
r
r
r
r
/r
r r
r
r
r
r
/
r
r
r
r
r
r
/
r
-
r
/
-
r
r
r
r
r
-
r
/
r
/
r
r
r
r
r
r
r
r
364
119
274
362363
66
119
364
219
364
29
703
33
116
6629
219
C-6
6
66
29
66
33
197
116
66
197
66
T-2
16
219
33
219
75
67
33
75
197
198
197
198
501
75
65
33
720
33
196
67
65
67
196
385
67
117
,
,
,
,
,
,
,
,
,
364
119
274
362363
66
119
364
219
364
29
703
33
116
6629
219
C-6
6
66
29
66
33
197
116
66
197
66
T-2
16
219
33
219
75
67
33
75
197
198
197
198
501
75
65
33
720
33
196
67
65
67
196
385
67
117
AUGLAIZE COUNTYUnincorporated Places
Airports
Interstate Routes
Proposed Interstate Routes
U S Routes
Proposed U S Routes
State Routes
Proposed State Routes
County Roads
County Sub Division Streets
Proposed County Roads
County Roads (Right of Way only)
Township Roads
Township Sub Division Streets
Proposed Township Roads
Township Roads (Right of Way only)
Municipal Streets
Railroads
County Boundary
City Boundary
Township Boundary
1
2
3
4
0 1 2 3 4 5
Miles
Revised: April - 2015
´ 0 1,000 2,000 3,000 4,000 5,000Feet
AUG-Wapak RiverscapePID 102167
Wapakoneta, Ohio Quadrangle
4f and 6f ResourcesAUG-Wapak Riverscape
AU
G-W
AP
AK
RIV
ER
SC
AP
E
CITY
OF WPA
KONE
TA
Riverscape Project A U G - W A P A K R I V E R S C A P E , P I D 1 0 2 1 6 7
What is the project?
The City of Wapakoneta has proposed a project to construct and beautify Herit-age Drive (the area behind downtown) and the north bank of the Auglaize River from Blackhoof St to Harrison St. This project includes but is not limited to the installation of new water lines, new sanitary lines, new pavement, new side-walks, curb and gutters, curb lawns, tree planting, light pole fixtures, pavement markings, shelter house (Gazebo) with restrooms, interpretive signage, river wall enhancement, and landscaping.
The project will provide improved pedestrian access along both banks of the Auglaize River within the downtown area. The project will also better define Heritage Drive and Heritage Park, for improved aesthetics. Interpretive signage and new park amenities will promote community pride and encourage tourism.
How is this project funded?
The estimate project cost is approximately $2.34-million. Of this, federal Trans-portation Enhancement funds will cover up to approximately $1.56-million. The remainder will be paid for through local funds.
What acquisition is required for the project?
The project will require minor temporary (approximately 0.4-acre) and permanent (approximately 0.4-acre)
acquisition from three private properties along Heritage Drive. Affected property owners will be contact-
ed at a later date to discuss the right-of-way needs, the acquisition process, and property owner rights un-
der the process.
Most of the project will occur on publicly-owned lands. In some areas, this land will need to be dedicated
as public right-of-way, there will be no change in the underlying land ownership.
How will the project affect parking?
The paved area north of Heritage Drive will be incorporated into Her-itage Park. However, this area is not currently designated for park-ing. New designated parking will be provided adjacent to Heritage Park, east of Heritage Drive.
Will the project include work in the Wapakoneta Commercial District, included on the Nation-al Register of Historic Places?
The project will not encroach on the recognized boundary of the Historic District. The project is not expected to adversely affect this important community resource.
How will the project affect Belcher and Heritage Parks?
The project will provide enhance-ments to both parks. Limited access to Belcher Park will be maintained during construction of the new trail. Heritage Park will be redeveloped in phases, so that park space remains open to the public throughout construction, including at least one shelter house at all times. The project is considered to meet the standard of “de minimis” impact to recreational resources.
What types of amenities will be provid-ed?
The centerpiece of the redevelopment is the new shelterhouse. The shelterhouse is cur-rently in design, but will offer restrooms and a fireplace.
An entryway archway off Blackhoof Street, similar to that at the Alley Parkway.
In addition to new walking trail and sidewalks throughout both parks, new benches and a water fountain will be installed at various loca-tions. The existing picnic tables, which are in good condition, will be reused. A variety of plantings (trees and bushes) will be provided throughout the project area.
The image to the right depicts the proposed light poles and railing.
Interpretive signage has not yet been devel-oped, but will be designed to complement the historic character of the neighborhood.
Preliminary Shelter House Design
Arch at Alley Parkway
City of Wapakoneta Engineering Department 102 Perry Street P.O. Box 269
Wapakoneta, Ohio 45895 Phone: (419) 738 - 5596 Fax: (419) 738 - 0540
www.wapakoneta.net
Questions or Comments?
Contact Us!
City of Wapakoneta:
Mary Ruck
Zoning & Engineering Superintendent
Phone: 419-738-5596
Email: [email protected]
City of Wapakoneta Engineer
102 Perry Street, PO Box 269
Wapakoneta, Ohio 45895
ODOT :
Tricia Bishop
District Environmental Coordinator
Phone: 937-497-6721
Email: [email protected]
ODOT District 7
1001 St. Marys Avenue
Sidney, Ohio 45365
What is the schedule for the project?
The project is currently in preliminary design. Final plans are expected to be completed in September 2018.
Based on the current sched-ule, the project will be awarded to a contractor for construction in January 2019.
The project is expected to begin in early 2019 and to be completed in the fall of 2010.
Will the project include river work?
Work within the Auglaize River will be limited to filling
of two existing stairwells within the river wall. Bank
improvements along the north bank of the river will
not extend below the ordinary high water mark. The
project has been designed to result in no net fill with-
in the floodway and will not increase the risk of flood-
ing.
The environmental review, consulta-tion and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated 12/11/2015, and executed by