Picayune Strand Hydrologic Restoration · Picayune Strand Hydrologic Restoration ... 800 cfs U.S 41...

19
Picayune Strand Hydrologic Restoration formerly referred to as “Southern Golden Gate Estates” Picayune Strand Hydrologic Restoration formerly referred to as “Southern Golden Gate Estates” US Army Corps of Engineers Jacksonville District US Army Corps of Engineers Jacksonville District

Transcript of Picayune Strand Hydrologic Restoration · Picayune Strand Hydrologic Restoration ... 800 cfs U.S 41...

Picayune StrandHydrologic Restoration

formerly referred to as “Southern Golden Gate Estates”

Picayune StrandHydrologic Restoration

formerly referred to as “Southern Golden Gate Estates”

US Army Corps of EngineersJacksonville District

US Army Corps of EngineersJacksonville District

AuthorizationAuthorization

A component of the Comprehensive Everglades Restoration Plan which

requires congressional authorization for construction

A component of the Comprehensive Everglades Restoration Plan which

requires congressional authorization for construction

Picayune StrandPicayune Strand

Area MapArea Map

HydrologicRestorationStudy Area

HydrologicRestorationStudy Area

Project BackgroundProject Background

• 279 miles of roads and 48 miles of canals constructed by private developer in late ’60s

• Resulted in overdrainage of Southern Golden Gate Estates Area

Picayune StrandPicayune Strand

Project BackgroundProject Background

• Resulted in extreme flows to estuaries –affecting salinity and marine habitat

• Resulted in drier conditions inlandexpansion of invasive plant species such as Brazilian pepperloss of Cypress forestsas plant species changed, quality of animal habitat declined

Picayune StrandPicayune Strand

Major Flowway

Minor Flowway

I-75

US 41

Historic Flowways

Picayune StrandPicayune Strand

Alternatives Considered

• 20+ alternatives initially formulated • Three alternatives warranted further

evaluation

• “No Action” alternative also considered

Alternative #6Alternative #12Alternative #3D

Picayune StrandPicayune Strand

Decision Criteria1. Greater than 50%

restoration to historic conditions

2. No increased flooding to Northern Golden Gate Estates

3. No point source discharge to the estuary

Picayune StrandPicayune Strand

Picayune StrandPicayune Strand

No spreaders or pump stations

46 canal plugs

227 miles of road removed

Flood protection levees

Primary – all weather roads

Secondary – dry season at grade

Service – trails

$738 million

Alternative 6Elements

MILES

I-75

0 2

N

Management Road

MI LLER

CA

NA

L

FAK

A U

NIO

NC

AN

AL

ME

RR

ITT CA

NA

L

PR

AIR

IE C

AN

AL

U.S 41

Stewart

Everglades

De Soto

Merritt Blvd

Patterson

Patterson

Berson

Miller B

lvd

62 Ave SE

Merritt Blvd

Fails to meet Decision Criteria #2

Picayune StrandPicayune Strand

2 spreaders

3 pump stations

64 canal plugs

3 Obermeyers in Miller Canal

227 miles of road removed

Flood protection levees

Primary – all weather roads

$351 million

MILES

I-75

0 2

N

Management Road

800 cfs

U.S 41

Stewart

Everglades

De Soto

Merritt Blvd

Patterson

Patterson

Berson

Miller B

lvd

62 Ave SE

Merritt Blvd

2000 cfs100 cfs

Fails to meet Decision Criteria #2 & #3

Alternative 12Elements

MI LLER

CA

NA

L

FAK

A U

NIO

NC

AN

AL

ME

RR

ITT CA

NA

L

PR

AIR

IE C

AN

AL

Picayune StrandPicayune Strand

MILES

3 Spreaders

3 Pump Stations

83 Canal Plugs

227 miles of Road Removed

Primary All Weather Roads

Flood Protection Levees

$349 million

I-75

0 2

N

Management Roads

800 cfs

2680 cfs1250 cfs

U.S 41

6L levee

Private Lands Levee

POI N levee

POI SE leveePOI SW levee

Meets All Decision Criteria

Alternative 3DRecommended PlanElements

MI LLER

CA

NA

L

FAK

A U

NIO

NC

AN

AL

ME

RR

ITT CA

NA

L

PR

AIR

IE C

AN

AL

Alternative 3D The Recommended Plan

Summary of Project Benefits

• freshwater flows to estuaries• upland/wetland habitat in watershed• pre-drainage watershed flow pattern to a sheet

flow condition• habitat for endangered/threatened species

(panther, woodstork, etc.)• increase groundwater levels

Project will restore and enhance the following:Project will restore and enhance the following:

Picayune StrandPicayune Strand

restores restores ecologicalecologicalconnectivityconnectivitybetweenbetweenpubliclypubliclyowned landsowned lands

The “missing piece”of the puzzle…

The “missing piece”of the puzzle…

Collier Seminole

State Park Everglades

National Park

Big Cypress National Preserve

Urban Development

Southern Golden Gate

Estates

RookeryBay

National EstuarineResearch Preserve

Fakahatchee Strand State Preserve

Picayune Strand State

Forrest

Florida Panther National Wildlife Refuge

10,000 Islands National Wildlife Refuge

Picayune StrandPicayune Strand

Estimated Costs

Construction Costs $124,946,000

Preconstruction, Engineering, Design $11,369,000

Construction Management $12,633,000

Monitoring During Construction $7,431,000

Land Acquisition $193,043,000

Total Project Cost $349,422,000

Picayune StrandPicayune Strand

Comparison: Restudy and PIR Plan

Construction Costs $15,500,000 $124,946,000

(October 1999) (October 2004)

Land Acquisition $0 (main report) $193,043,000

$134,400,400 (appendix)

Acres Same for both plans: the land between I-75, US 41, Fakahatchee Strand, and Belle Meade. Approximately 64,000 acres in the PIR.

Picayune StrandPicayune Strand

Comparison: Restudy and PIR Plan

Roads removed 130 miles 227 miles

Canal plugs 83 83

Miller Station 200 cfs 1,250 cfs

Faka Union Station 500 cfs 2,630 cfs

Merritt Station 160 cfs 800 cfs

Flood protection none 5 levees

Siting criteria conceptual Land use, topo, connectivity

Picayune StrandPicayune Strand

ScheduleSchedule• Draft PIR distributed for public/agency review –

May 14, 2004 thru July 13, 2004

• Transmit Final PIR to South Atlantic Division for Division Engineer’s Notice - October 2004

• Second Public Comment Period - November 2004

• Chief of Engineer’s Report - December 2004

• Congressional Authorization

Picayune StrandPicayune Strand

Thank you

Questions?

Thank you

Questions?

Picayune StrandPicayune Strand