Pic booklet screen view 2
-
Upload
amin-hadjaran -
Category
Documents
-
view
425 -
download
4
Transcript of Pic booklet screen view 2
Corporate Office & Works
42 Hope Valley Road
Naval Base
Western Australia 6165
Workshop 2
51 Hope Valley Road
Naval Base
Western Australia 6165
Postal Address
PO Box 263, Kwinana
Western Australia 6966
ABN
35 813 081 087
ACN
008 895 154
Website
www.pacind.com.au
Telephone
+61 8 9410 2566
Directors
Erasmo Mosole
Marco Mosole
Bankers
Commonwealth Bank of Australia
CORPORATE DIRECTORY
1. Corporate Directory
2. Introduction & Mission Statement
3. Vision and Corporate Values
4. Accreditation Credentials
4. Summary of Major Projects
INDEX
Company Profile
IntroductionPacific Industrial Company, Founded in 1969 by Erasmo Mosole and later joined by his sons, Marco and Sandro , is now established as one of Western Australia’s leading fabrication and construction organisations, presently combining main office and fabrication facilities at Naval Base, Western Australia.
Pacific Industrial Company is involved in all aspects of steel fabrication and construction from shop fabricated items through to major construction projects including: engineering, procurement, fabrication, installation, commissioning and related electrical, instrumentation and civil works.
Although the company’s main clientele are involved in the oil and gas, mining, resource and industrial sector, Pacific Industrial Company is actively involved in all forms of fabrication and construction for a broad customer base.
RESPECT
INTEGRITY
SAFETY TEAMWORK
PERSISTENCE
Vision & Values“Our vision is to develop a sustainable business by
being the best at what we do through the investment in our people, technology and innovation”
Accreditation Credentials
Quality Management System
ISO 9001:2008Certificate No: QEC0291
Occupational Health & Safety Management System
AS / NZS 4801:2001Certificate No: HSM40062
Occupational Health & Safety Management System
OHSAS 18001:2007Certificate No: HSM40062
Environmental Management System
ISO 140001:2004Certificate No: EMS40134
Pacific Industrial Company has a majority shareholding in Como Engineers. Through this agreement PIC is able to offer its mineral resource clients a more cost and time efficient execution model through an EPC contracting arrangement.
Como Engineers Pty Ltd was established in 1986. The core focus is to provide engineering services and specialist products to the Mining and Resource sector with a strong focus on process metallurgy, mechanical engineering and materials handling both in Australia and abroad.
Como Engineers employs a team of experienced metallurgists, engineers, construction supervisors and drafts-people which enables us to offer a complete process and engineering service. Como Engineers are able to supply services from metallurgical testing through to scoping and definitive feasibility studies as well as detailed engineering design to project construction and commissioning.
Como Engineers specialises in fit for purpose solutions utilising modular and transportable equipment in our plant designs. Where possible, Como Engineers likes to offer design and construct projects at a fixed duration, lump-sum price, thereby removing a large portion of the project risk from the client.
Como Engineers works closely with our Clients to understand and deliver the product and service that is required for each individual project.
Como Engineers operate worldwide offering localised support with offices in Perth, Melbourne and Jakarta.
Services include:
• Studies
• Design and Construction
• Plant and Infrastructure
• Relocations and Upgrades
• Maintenance and Refurbishments
• Modular Gold Stripping Plants
• Certified Dangerous Goods Assessments
Client:Completion:Value:
Tropicana Gold Mine
AngloGold Ashanti
2013
$120 MILLION
Works involved the total onsite construction of the Tankage, Structural, Mechanical and Piping works for the 5.5 million tonnes per annum gold process plant located 330klms North of Kalgoorlie W.A.
Client:Completion:Value:
Tropicana Gold Mine
Client:Completion:Value:
Karara Iron Ore
Karara Mining Limited
2012
$40 Million
Works involved the design, fabrication, Installation and surface treatment of the project tankage for the magnetite iron ore concentrator.Client:
Completion:Value:
Karara Iron Ore
Client:Completion:Value:
Client:Completion:Value:
Sino Iron Project
CITIC Pacific Mining
2012
$32 Million
Works involved the Installation of approx. 5000 tonnes of steelwork and mechanical items for the stockpile cover, conveying and recovery system for the Magnetite Iron Ore Concentrator. PIC subsidiary business COMO Engineers was also engaged under separate contracts for installation works for the Ball Mill and AG Mill equipment and other mechanical works.
Sino Iron Project
Client:Completion:Value:
Client:Completion:Value:
BHPBIO-Bucket Wheel Reclaimers
Thyssen Krupp
2012
$30 Million
Works involved the supply, fabrication and assembly of 3 x 15000 tonnes per hour capacity Bucket Wheel Reclaimers for BHP Billiton Iron Ore. One machine located at the Jimblebar Mine and 2 machines at the Port Hedland port facilities.
BHPBIO-Bucket Wheel Reclaimers
Client:Completion:Value:
Client:Completion:Value:
City Square – Brookfield Place
Brookfield Multiplex
2012
$52 Million
Works involved the supply, fabrication and delivery of 11,000 tonnes of steelwork, decking and column reinforcing for the 51 floor level steel frame building located in the Perth CBD.
City Square – Brookfield Place
Client:Completion:Value:
Client:Completion:Value:
DIN Project
Rio Tinto Iron Ore
2012
$15 Million
Works involved the supply, fabrication, surface treatment and load out and shipping to site of the 2 Surge Bins and associated steelwork for the Dampier Incremental Expansion Project located at Rio Tinto Iron Ore port facility at Parker Point W.A.
DIN Project
Client:Completion:Value:
Client:Completion:Value:
Gorgon LNG Subsea BIS
ALLSEAS
2011
$15 Million
Works involved the fabrication, testing and load out of 11 Buckle Initiator Structures weighing in excess of 120 tonnes each for the subsea gas pipelines delivering LNG to the Grogon LNG facility.
Gorgon LNG Subsea BIS
Client:Completion:Value:
Client:Completion:Value:
BHBIO – RGP 5Rail Bridges
BHP Billiton Iron Ore
2010
$40 Million
Works involved the fabrication, assembly, transportation and Installation of 125 Bridge Truss assemblies totalling 6500 tonnes for 11 river crossings for the Rail Bridge Duplication works between Newman and Port Hedland.
BHBIO – RGP 5Rail Bridges
Client:Completion:Value:
Client:Completion:Value:
FMG-Cloud Break Mine
FLSmisth - RAHCO
2010
$12 Million
Works involved the supply, fabrication, surface treatment and assembly of 2 mobile overburden removal systems for Fortescue Metal Group Cloud Break Mine
FMG-Cloud Break Mine
Client:Completion:Value:
Client:Completion:Value:
Pluto LNG Emission Chimneys
Woodside Petroleum
2010
$9 million
Works involved the fabrication, surface treatment, refractory lining and load out of the 3 Gas Turbine emission chimneys. Sections completed where up to 7 meters in diameter and weighing in excess of 200 tonnes each.
Pluto LNG Emission Chimneys
Client:Completion:Value:
Client:Completion:Value:
Bluewaters Power Station
ALSTOM
2009
$22 Million
Works involved the installation of steelwork, piping and the turbine and generating systems for both Units 1 and 2 for the Blue Waters Power Station.
Bluewaters Power Station
Client:Completion:Value:
Client:Completion:Value:
Rio Tinto – Ship Loader
Sandvik- Voest Alpine
2009
$20 million
Works involved the supply, fabrication, surface treatment and assembly and load out of 4 x 10,000 tonnes per hour capacity Ship Loaders for various Rio Tinto port operations.
Rio Tinto – Ship Loader
Client:Completion:Value:
Client:Completion:Value:
Pluto LNG Subsea BIS
ALLSEAS
2009
$14 Million
Works involved the fabrication, testing and load out of 21 Buckle Initiator Structures for the subsea gas pipeline delivering LNG to the Pluto LNG facility.
Pluto LNG Subsea BIS
Client:Completion:Value:
Client:Completion:Value:
NewGen Power Station
ALSTOM
2008
$12 Million
Works involved the installation of the Heat Recovery Steam Generator Boiler (HRSG) for the combined cycle 280MW gas turbine power station located in Kwinana W.A.
NewGen Power Station
Client:Completion:Value:
Client:Completion:Value:
Burrup LNG Train 4 & 5
Woodside Petroleum
2008
$11 Million
Works involved the fabrication, surface treatment, refractory lining and load out of the 7 Gas Turbine emission chimneys and Thermal Combustion Unit. Sections completed where up to 7 metres in diameter and weighing in excess of 200 tonnes each.
Burrup LNG Train 4 & 5
Client:Completion:Value:
Client:Completion:Value:
Ravensthorpe Nickel Mine
Outotec
2007
$35 Million
Works involved the supply, fabrication and installation of the 15 Thickeners – 6 x CCD thickeners, 4 x Precipitation thickeners, 5 x PAL, SAP and LIM deep cone thickeners and associated tanks totalling approx. 5000 tonnes of steelwork.
Ravensthorpe Nickel Mine
Client:Completion:Value:
Client:Completion:Value:
Telfer Gold Mine
Newcrest Mining
2005
$11 million
Works involved the fabrication and structural, mechanical and piping installation of the crushing, conveying, stockpiling and reclaim circuits for the gold – copper treatment plant located 400 klms south east of Port Hedland WA.
Telfer Gold Mine
Client:Completion:Value:
Client:Completion:Value:
Hlsmelt Project
Rio Tinto Iron Ore
2004
$20 million
Works involved the fabrication and structural, mechanical and piping installation of the coal drying and preparation facility. In addition PIC fabricated the massive Smelt Reduction Vessel and two Hot Blast Stoves for the HIsmelt plant located at Kwinana WA.
Hlsmelt Project
Client:Completion:Value:
Client:Completion:Value:
BHPBIO- Yandicoogina Rail Bridge
BHP Billiton Iron Ore
2003
$3.5 million
Works involved the fabrication, assembly and transportation of the 7 rail truss assemblies for the Yandicoogina Creek bridge located 150 kms north east of Newman WA. Individual girders fabricated where 3.2 metres deep and 45 meters long weighing 50 tonnes each and assembled into truss arrangements weighing 150 tonnes each for transportation and incremental launching.
BHPBIO- Yandicoogina Rail Bridge
Client:Completion:Value:
Client:Completion:Value:
AMC – Assembly Hall
Brookfield Multiplex
20003
$5.0 million
Works involved the fabrication and assembly of the mobile assembly hall located at the Australian Marine Complex in Henderson WA. The building dimension was 45 metres high, 90 meters long and spanned 90 meters. Included was also the fabrication and assembly of the 200 tonne capacity portal crane.
AMC – Assembly Hall
Client:Completion:Value:
Client:Completion:Value:
Cockburn Power Station
ALSTOM
2003
$6.0 million
Works involved the structural, mechanical, piping installation, hydrostatic testing and certification to ASME standard of the Heat Recovery Steam Generation (HRSG) unit for the 240MW combined cycle gas fired power station at Kwinana WA. Additional works included the fabrication and installation of the 60 meter high emission chimney.
Cockburn Power Station
Client:Completion:Value:
Client:Completion:Value:
Redbank Power Station
ALSTOM
2001
$12 million
Works involved the EPC contract for the materials handling plant for the 151MW coal fired power station located at Singleton NSW. Scope included the design, civil, structural, mechanical, piping, electrical, instrumentation and performance testing requirements using both coal and beneficiated dewatered tailings as fuels.
Redbank Power Station
Client:Completion:Value:
Client:Completion:Value:
Globex Grain Terminal
GrainCorp
2000
$10 million
Works involved the EPC contract for the grain silo construction at the Globex Grain Export Terminal located in Melbourne Victoria. Scope included the design and construction of 4 x 750 tonne, 14 x 1500 tonne capacity elevated silos and 2 x 12000 tonne capacity flat bottom steel silos for grain storage.
Globex Grain Terminal
Client:Completion:Value:
Client:Completion:Value:
Merlin Diamond Mine
Rio Tinto
2000
$11 million
Works involved the total construction including the earthworks, civil works, structural, mechanical, piping, electrical and instrumentation requirements for the Merlin Diamond Mine located 800 klms south east of Darwin NT.
Merlin Diamond Mine
Client:Completion:Value: