Photos Sept. 14, 2019 Front walk replaced with exposed aggregate to match the other new concrete work.

Transcript of Photos Sept. 14, 2019 Front walk replaced with exposed ...€¦ · Photos Sept. 14, 2019 Front walk...

Page 1: Photos Sept. 14, 2019 Front walk replaced with exposed ...€¦ · Photos Sept. 14, 2019 Front walk replaced with exposed aggregate to match the other new concrete work. Excavation,

Photos

Sept. 14, 2019

Front walk replaced with exposed aggregate

to match the other new concrete work.

Page 2: Photos Sept. 14, 2019 Front walk replaced with exposed ...€¦ · Photos Sept. 14, 2019 Front walk replaced with exposed aggregate to match the other new concrete work. Excavation,

Excavation, rebar installation, and concrete prep

for new entrance from parking lot.

Page 3: Photos Sept. 14, 2019 Front walk replaced with exposed ...€¦ · Photos Sept. 14, 2019 Front walk replaced with exposed aggregate to match the other new concrete work. Excavation,

Christian Education Building

• Floor coverings

Carpet for the classrooms and the vinyl for the hallways, restrooms and vestibules.

• New doors for all rooms.

• The classrooms will have new counter spaces and cabinetry.

Vinyl flooring for the hallways, restrooms and vestibules

Carpet for the classrooms