Photo Album Template - Minuteman Trucks · 2017. 3. 29. · © 2005-2016 Fire & Safety Consulting,...
Transcript of Photo Album Template - Minuteman Trucks · 2017. 3. 29. · © 2005-2016 Fire & Safety Consulting,...
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956 © 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
Photo Album for
Duxbury, MA
Job 29578
June 10, 2016
This week the cab continued assembly while the
chassis began assembly and had the drivetrain
installed. The chassis cooling/pump plumbing structure
began fabrication while the body began the paint
process. Next week the cab is scheduled to be merged
with the chassis along with the pump. The body should
be nearing completion in paint.
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04364 DSC04365
DSC04366 DSC04367
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04368 DSC04028
DSC04029 DSC04030
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04031 DSC04032
DSC04033 DSC04034
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04035 DSC04036
DSC04037 DSC04038
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04039 DSC04040
DSC04041 DSC04042
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04043 DSC04044
DSC04045 DSC04046
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC04047 DSC04048
DSC04049 DSC07142
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC07143 DSC07144
DSC07145 DSC00319
© 2005-2016 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00320 DSC00321
DSC00322 DSC00323