![Page 1: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/1.jpg)
CLIC status, plans and outlook
Philip Burrows
John Adams Institute
Oxford University
On behalf of the CLIC Collaborations
Thanks to all colleagues for materials
1
![Page 2: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/2.jpg)
Acceleratorcollaboration
Detectorcollaboration
Accelerator + Detector collaboration
31 Countries – over 50 Institutes31 Countries – over 70 Institutes
CLIC Collaborations
![Page 3: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/3.jpg)
Outline
3
• Brief context and introduction
• CLIC Review
• Rebaselining + project staging
• Strategic plans 2019 and beyond
Apologies for skipping many results + details
![Page 4: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/4.jpg)
CLIC physics context
4
Energy-frontier
capability for
electron-positron
collisions,
for precision
exploration
of potential
new physics
that may
emerge
from LHC
![Page 5: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/5.jpg)
CLIC physics context
5
Energy-frontier
capability for
electron-positron
collisions,
for precision
exploration
of potential
new physics
that may
emerge
from LHC
![Page 6: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/6.jpg)
CERN DG address 18/1/16
6
![Page 7: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/7.jpg)
CERN DG address 18/1/16
7
![Page 8: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/8.jpg)
CERN DG address 18/1/16
We are vigorously preparing input for European Strategy Update ~ 2019:
• Project Plan for CLIC as a credible post-LHC option for CERN
• Initial costs compatible with CERN budget
• Upgradeable in stages over 20-30 years
![Page 9: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/9.jpg)
CLIC Review (Spring 2016)
9
From Review Mandate – called by Frederick Bordry, director of accelerators and technology
Further to recent discussions held in the framework of the MTP, a review is called by the Director for Accelerators and Technology to assess the current status and in particular provide recommendations on the targets to be achieved that will be instrumental for the next European Strategy Update of 2019. The review will concentrate on the CLIC accelerator programme.
Ranking: High Priority, Some Priority, Low Priority, Terminate
Members of the Review Panel
• ATS Department Heads: P. Collier, JM. Jimenez, R. Losito;
• Oliver Brüning;, Roberto Saban, Rüdiger Schmidt, Florian Sonnemann;
• Maurizio Vretenar (Chair).
Indico link
![Page 10: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/10.jpg)
CLIC Review report
10
![Page 11: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/11.jpg)
Report: some key points
11
• Produce optimized, staged design: 380 GeV 3 TeV
• Optimise cost and power consumption
• Support efforts to develop high-efficiency klystrons
• Support 380 GeV klystron-only version as alternative
• Consolidate high-gradient structure test results
• Exploit Xboxes + nurture high-gradient test capabilities
• Develop plans for 2020-25 (‘preparation phase’) + structure
conditioning strategy
• Continuing and enhanced participation in KEK/ATF2
![Page 12: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/12.jpg)
‘Rebaselining’
12
Optimize machine design w.r.t. cost and power for a staged
approach to reach multi-TeV scales:
~ 380 GeV (optimised for Higgs + top physics)
~ 1500 GeV
~ 3000 GeV(working assumptions: exact choices of higher c.m. energies depend on LHC findings)
for various luminosities and safety factors
• Expect to make significant cost and power reductions for the initial
stages
• Choose new staged parameter sets, with a corresponding consistent
upgrade path, also considering the possibility of the initial-stage being
klystron-powered
![Page 13: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/13.jpg)
Rebaselining:
first stage energy ~ 380 GeV
13
![Page 14: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/14.jpg)
14
New CLIC layout 380 GeV
![Page 15: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/15.jpg)
15
1.5 TeV / beam
New CLIC layout 3 TeV
![Page 16: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/16.jpg)
16
![Page 17: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/17.jpg)
Current rebaselined parameters
17
![Page 18: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/18.jpg)
Current rebaselined parameters
18
![Page 19: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/19.jpg)
19
Preliminary cost estimate (380)
![Page 20: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/20.jpg)
20
Klystron version (380)
![Page 21: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/21.jpg)
21
Klystron version (380)
![Page 22: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/22.jpg)
22
Klystron version (380)
Cost savings
may be possible
(at the 5% level)
![Page 23: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/23.jpg)
Updated CLIC run model
23
![Page 24: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/24.jpg)
CLIC Higgs physics capabilities
24
Omnibus paper: about to be submitted for publication
![Page 25: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/25.jpg)
CLIC Higgs physics capabilities
25
Higgs couplings
to heavy
particles benefit
from higher c.m.
energies:
ttH ~ 4%
HH ~ 10%
![Page 26: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/26.jpg)
CLIC physics capabilities
26
Direct new-particle
search reach
up to 1.5 TeV
Indirect search
reach up to
O(100 TeV)
![Page 27: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/27.jpg)
Rebaselining document
27
‘yellow report’ in preparation
![Page 28: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/28.jpg)
Rebaselining: ongoing studies
28
Optimize drive beam accelerator klystron system
Eliminated electron pre-damping ring (better e- injector)
Systematic optimization of injector-complex linacs
Optimize / reduce power overhead estimates
Use of permanent or hybrid magnets for the drive beam
(order of 50,000 magnets)
… … …
![Page 29: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/29.jpg)
CTF3
29
![Page 30: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/30.jpg)
Main achievements of CTF3
30
Drive beam generation:
• Linac operation (4A) with full beam loading
• Phase-coding of beam with sub-harmonic buncher system
• Factor of ~8 current amplification by beam recombination
• Power extraction from drive beam at 2 x CLIC nominal
Two-beam test stand + TBL:
• 2-beam acceleration in CLIC structures up to 1.5 x nominal
• Drive-beam stable deceleration to 35% of initial energy
• 12 GHz RF power @ ~ 1 GW in string of 13 decelerators
![Page 31: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/31.jpg)
Drivebeam,1-3A,100-50MeV
Æ50mmcircularwaveguide
RF
TBL decelerationTwo Beam Module,Wake-field monitors…
Dogleg Beam loading experiment
Phase feed-forward experiment
Diagnostics R&D using CALIFES
CTF3: 2016 last year of operation
![Page 32: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/32.jpg)
CTF3 programme 2016
32
Power production:
stability + control of RF profile (beam loading comp.)
RF phase/amplitude drifts along TBL
PETS switching at full power
beam deceleration + dispersion-free steering in TBL
routine operation
Drive-beam phase feed-forward prototype system
Beam orbit stabilisation/control
…
![Page 33: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/33.jpg)
Lucie Linssen, March 5th 2015 33
Recently installed 2-beam acceleration module in CTF3(according to latest CLIC design)
drive beam
main beam
![Page 34: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/34.jpg)
34
Module mechanical characterisation test stand:
active alignment, fiducialisation + stabilisation (PACMAN)
![Page 35: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/35.jpg)
35
• X-band FEL collaboration (preparation for EU-proposal)
• Continuation of the CLIC high-gradient research
• Instrumentation tests (including WFMs)
• Discharge plasma wakefield experiments
CALIFES
• Impedance measurements
• Irradiation facility
• THz production
• General interest from AWAKE (including instrumentation)
![Page 36: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/36.jpg)
36
Workshop on exploitation of CALIFES as an e- beam
user facility: CERN 10-12 October 2016
CALIFES workshop
https://indico.cern.ch/event/533052/
![Page 37: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/37.jpg)
Walter Wuensch, CERNCLIC Project Review, 1 March 2016
CLIC accelerating structureOutside
Inside
6 mm diameter beam aperture
11.994 GHz X-band100 MV/mInput power ≈50 MWPulse length ≈200 nsRepetition rate 50 Hz
Micron–precision disk
25 cm
HOM dampingwaveguide
![Page 38: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/38.jpg)
Walter Wuensch, CERNCLIC Project Review, 1 March 2016
Performance summary at CLIC specifications
![Page 39: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/39.jpg)
X-band test stands (CERN)
CPI50MW1.5usklystronScandinovaModulatorRepRate50HzBeamtestcapabili es
Xbox-1
Previoustests:2013 TD24R05(CTF2)2013 TD26CC-N1(CTF2)2014-15 T24(Dogleg)
Ongoingtest:
Aug2015- TD26CC-N1(Dogleg)
OPERATIONAL
Xbox-2
CPI50MW1.5usklystronScandinovaModulatorRepRate50Hz
Previoustests:2014-15 CLICCrabCavity
Ongoingtest:
Sep2015- T24OPEN
OPERATIONAL
Xbox-3
4xToshiba6MW5usklystron4xScandinovaModulators
RepRate400Hz
Mediumpowertests(Xbox-3A):20153D-printedTiwaveguide2015X-bandRFvalve
COMMISSIONINGSpring2016
Majorincreaseintes ngcapacity!
Xboxes
![Page 40: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/40.jpg)
High-gradient structure tests
40
Maximal use of slots in structure test stands:
• Higher statistics on baseline structure design
• Tests of 380 GeV (and FEL) structures
• Simplified structure design (halves, brazing vs. bonding)
• Qualification of industry-produced structures
• 7 structures ready for test
• 6 structures in production
• 30 - 40 tested structures in next 3 years
![Page 41: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/41.jpg)
• X-band technology appears interesting for compact, relatively low cost FELs – new or extensions– Logical step after S-band and C-band– Example similar to SwissFEL: E=6 GeV, Ne=0.25 nC, sz=8mm
• Use of X-band in other projects will support industrialisation– They will be klystron-based, additional synergy with klystron-
based first energy stage
• Collaborating on use of X-band in FELs– Australian Light Source, Turkish Accelerator Centre, Elettra,
SINAP, Cockcroft Institute, TU Athens, U. Oslo, Uppsala University, CERN
• Share common work between partners – Cost model and optimisation– Beam dynamics, e.g. beam-based alignment– Accelerator systems, e.g. alignment, instrumentation…
• Define common standard solutions– Common RF component design, -> industry standard– High repetition rate klystrons (200->400 Hz now into test-
stands)
Important collaboration for X-band technology
Background (Shanghai Photon Science Center)
Compact XFEL SXFEL
580m
Possible X-band FELs
![Page 42: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/42.jpg)
• X-band technology appears interesting for compact, relatively low cost FELs – new or extensions– Logical step after S-band and C-band– Example similar to SwissFEL: E=6 GeV, Ne=0.25 nC, sz=8mm
• Use of X-band in other projects will support industrialisation– They will be klystron-based, additional synergy with klystron-
based first energy stage
• Collaborating on use of X-band in FELs– Australian Light Source, Turkish Accelerator Centre, Elettra,
SINAP, Cockcroft Institute, TU Athens, U. Oslo, Uppsala University, CERN
• Share common work between partners – Cost model and optimisation– Beam dynamics, e.g. beam-based alignment– Accelerator systems, e.g. alignment, instrumentation…
• Define common standard solutions– Common RF component design, -> industry standard– High repetition rate klystrons (200->400 Hz now into test-
stands)
Important collaboration for X-band technology
Background (Shanghai Photon Science Center)
Compact XFEL SXFEL
580m
Possible X-band FELs
![Page 43: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/43.jpg)
43
Aim to:
• Present CLIC as a credible post-LHC option for
CERN
• Provide optimized, staged approach starting at
380 GeV, with costs and power not excessive
compared with LHC, and leading to 3 TeV
• Upgrades in 2-3 stages over 20-30 year horizon
• Maintain flexibility and align with LHC physics
outcomes
Outlook European Strategy
![Page 44: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/44.jpg)
CLIC roadmap
![Page 45: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/45.jpg)
45
Key deliverables:
Project plan: physics, machine parameters, cost,
power, site, staging, construction schedule,
summary of main tech. issues, prep. phase (2019-
2025) summary, detector studies
Preparation-phase plan: critical parameters, status
and next steps - what is needed before project
construction, strategy, risks and how to address
them
Outlook European Strategy
![Page 46: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/46.jpg)
Backup
46
![Page 47: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/47.jpg)
CLIC energy staging (CDR)
47
Energy-staging exercise started for CDR
![Page 48: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/48.jpg)
48
CLIC energy staging (CDR)
![Page 49: Philip Burrows - INDICO-FNAL (Indico) · Philip Burrows John Adams Institute Oxford University On behalf of the CLIC Collaborations Thanks to all colleagues for materials 1. Accelerator](https://reader030.fdocuments.in/reader030/viewer/2022040615/5f0cd63b7e708231d4375ffa/html5/thumbnails/49.jpg)
AC power (1.5 TeV)
49