PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.
-
Upload
everett-robbins -
Category
Documents
-
view
214 -
download
0
Transcript of PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.
![Page 1: PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.](https://reader036.fdocuments.in/reader036/viewer/2022072116/56649f585503460f94c7ceb0/html5/thumbnails/1.jpg)
PHENIX STATUSStefan Bathe, Time Meeting, June 1, 2010
![Page 2: PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.](https://reader036.fdocuments.in/reader036/viewer/2022072116/56649f585503460f94c7ceb0/html5/thumbnails/2.jpg)
Stefan Bathe
2
7.7 GeV Close-Out
Time Meeting 06/01/2010
1.5 M minimum bias events
recorded @ 7.7 GeV
BBCLL1(>1 tubes)
![Page 3: PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.](https://reader036.fdocuments.in/reader036/viewer/2022072116/56649f585503460f94c7ceb0/html5/thumbnails/3.jpg)
Stefan Bathe
3
Minimum Bias Event Rate
Time Meeting 06/01/2010
run index (= store)
Average rate of 1.8 Hz in 2nd half of 7.7 GeV run
![Page 4: PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.](https://reader036.fdocuments.in/reader036/viewer/2022072116/56649f585503460f94c7ceb0/html5/thumbnails/4.jpg)
Stefan Bathe
4
Muon Trigger Commissioning
Time Meeting 06/01/2010
No collisions in PHENIX @ 11.5 GeV Commissioning new muon detectors with cosmic rays Crucial for next year’s W physics program
2-person watch shifts + experts
![Page 5: PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.](https://reader036.fdocuments.in/reader036/viewer/2022072116/56649f585503460f94c7ceb0/html5/thumbnails/5.jpg)
Stefan Bathe
5
Fire Alarm Last Night
Time Meeting 06/01/2010
At 1:00am last night smoke alarm shut off experiment Originated from rack WCB2 rack (holds MuID Blue Logic
electronics) WCB2 was shut off first by safety system Smoke apparently leaked out of rack enough to trigger
VESDA HSSD system, which shut off entire experiment Took access, no visible burning, but noticeable smoke odor Turned circuit breakers back on Re-established flammable gas flow Currently switching on racks (except for WCB2), front end
electronics Expect to be back up tomorrow morning Need 60-90 minute access to evaluate course of alarm