Phase II
Transcript of Phase II
OG&C Procurement
0
Bechtel Oil, Gas & Chemicals
EIC Connect Oil & Gas 2012
Bechtel
Wednesday 28th November, 2012
OG&C Procurement
1
BECHTEL OG&C Procurement
Agenda
• Organization & History
• Prospects
• Projects
OG&C Procurement 2
In case of emergency please leave by the nearest exit and go to your
assembly point which is the rear car park
Emergency Exit
OG&C Procurement 3
Bechtel Corporation
Founded in 1898, Bechtel is one of
the oldest and largest family-led,
private corporations based in the
United States.
Bechtel Corporation can boast:
• 114 years of experience
• Over 23,000 Projects
• Worked in 140 nations on 7 continents
• Revenues of $32 billion in 2011
• Annual procurement of products and
services exceeding $20 billion
• 52,700 employees
OG&C Procurement 4
Bechtel Offices Worldwide
OG&C Procurement 5
Bechtel Oil, Gas & Chemicals - London
For over 60 years Bechtel has
been engaged in:
• Petroleum refineries
• Chemical and petrochemical
plants
• Gas and liquids pipelines
• Oil and gas production
• Plant manufacturing
OG&C Procurement 6
London Procurement Organization – OG&C
OG&C Procurement
7
Prospects Houston Based:
Africa
North America
Australia
Asia
Russia
London Based:
Oman
Qatar
UAE
Bahrain
Kazakhstan
Azerbaijan
Russia
India
Africa
Other business lines (London)
UK
Europe
OG&C Procurement 8
APPROVED VENDOR LIST APPROVED SUBCONTRACTOR
LIST
Pre-Qualification
OG&C Procurement 9
Review information received and maintained in
Bechtel Procurement Systems to determine if
acceptable
ES&H
Quality
Performance (Previous)
Technical
Financial
Pre-Qualification
OG&C Procurement 10
The Procurement and Contracts groups value suppliers and contractors that focus on safety, quality and performance.
Bechtel’s Expectations
OG&C Procurement
11
OG&C Projects
OG&C Procurement
12
West Nile Delta Onshore Gas Processing Facilities
Project Name West Nile Delta Onshore Gas Processing Facilities
Jobsite Location Egypt
Project Description Onshore facility to treat fluids from the offshore fields to
meet a pipeline export specification for gas and
condensate. Comprising two gas processing trains having
a design capacity of 525 MMscfd each, capable of
receiving and processing up to 20,000 barrels per day of
stabilized condensate. Additional facilities include an
MEG regeneration and reclamation facility a water
treatment facility and export pipeline.
Status/Opportunities Prequalification is mandatory.
Major Equipment Packages are still to be awarded.
Tagged equipment / items / E&I bulks / Piping bulks
enquiries to be issued during the second half of 2013.
OG&C Procurement
13
Reliance J3 O's & U's, Marine Facilities and CPP
Project Name Reliance J3 O's & U's, Marine Facilities and CPP
Jobsite Location Jamnagar, India
Commercial Operation or
Mechanical Completion Date
July 2015
Project Description Reliance is expanding the existing facilities at Jamnagar to
include various additional process units and associated off-
sites and utilities under the project name “Jamnagar J3
expansion program”. The Bechtel contract covers offsites and
utilities systems, facilities and infrastructure, new Jetty
Facilities and new Captive Power Plants (CPP).
The Bechtel scope includes project management and control,
basic and detailed engineering including process design,
procurement services, inspection coordination, expediting and
interface management.
Status/Opportunities All major equipment and bulk materials are being purchased
by Reliance.
Bechtel Procurement will assist in some pre award activities
with management of most items during the post award phase
until shipment.
OG&C Procurement
14
Borouge 3 Project
Project Name Borouge 3 Project
Jobsite Location Ruwais, Abu Dhabi, UAE
Project Description Third phase expansion of the Borouge polymers
complex.
Project scope also includes downstream product
handling facilities and utilities and offsite systems.
Services being provided through an integrated PMT
consisting of Borouge, Bechtel, and Borealis
personnel.
Status/Opportunities Project is in the construction phase.
OG&C Procurement
15
Gladstone LNG
Project Name Gladstone LNG (GLNG) Trains 1 & 2
Jobsite Location Gladstone, Queensland, Australia
Project Description A grassroots LNG complex including 2 x 3.9 mtpa
LNG liquefaction trains fed by coal seam gas, two
LNG storage tanks, a product loading jetty and a
material offloading facility to be located on Curtis
Island in Gladstone Harbor.
Status/Opportunities Home Office purchasing 85% complete.
Balance purchasing coordination being managed
from Australian Office.
OG&C Procurement
16
Queensland Curtis LNG
Project Name Queensland Curtis LNG Project (QCLNG)
Jobsite Location Gladstone, Queensland, Australia
Project Description Grassroots LNG complex including 2 x 4.2 (nominal)
mtpa LNG liquefaction trains fed by coal seam gas,
two 140,000 cubic meter full containment LNG
storage tanks, and a product loading jetty to be
located on Curtis Island in Gladstone Harbor.
Status/Opportunities Home Office Procurement Complete.
OG&C Procurement
17
Sabine Pass
Project Name Sabine Pass Liquefaction Project
(Trains 1 & 2)
Jobsite Location Sabine Pass, Louisiana
Project Description Conversion of the Sabine Pass LNG Import Terminal
into an import/export facility by adding four 4.5
mtpa LNG liquefaction trains to the existing facility
Status/Opportunities Mechanical – Purchasing Complete
Other: 50% Purchased
Additional trains being considered.
OG&C Procurement
18
Keystone XL Pipeline
Project Name Keystone XL Pipeline (KXL) Project
Jobsite Location Hardisty, Alberta to Steele City, Nebraska
Cushing, Oklahoma to the Texas Gulf Coast
Project Description A 700,000 barrel per day expansion of the Keystone
crude oil pipeline that will add a second line between
Hardisty, Alberta and Steele City, Nebraska and extend the
line southward from Cushing, Oklahoma to Port Arthur and
Houston, Texas. Project scope includes 1,704 miles of
36-inch pipeline; 30 Greenfield pump stations and three
pump station expansions in the U.S.; and 8 pump stations
and three oil storage tanks in Canada.
Status/Opportunities Limited most agreements already placed.
OG&C Procurement
19
Australia Pacific LNG Project
Project Name Australia Pacific LNG Project (APLNG)
Jobsite Location Gladstone, Queensland, Australia
Project Description Grassroots two-train 4.5 mtpa each LNG liquefaction plant fed
by coal seam gas, two LNG storage tanks, and a product
loading jetty to be located on Curtis Island in Gladstone
Harbor.
Status/Opportunities Home Office purchasing 85% complete.
Balance purchasing coordination being managed from
Australian Office.
OG&C Procurement
20
Wheatstone Project LNG
Project Name Wheatstone Project LNG Plant
Jobsite Location Onslow, Western Australia
Project Description A grassroots LNG plant including 2 x 5.0 mtpa LNG
liquefaction trains, two 150,000 cubic meter LNG
storage tanks, two 130,000 cubic meter
condensate tanks, domestic gas plant, LNG and
condensate product loading facility (PLF) with a 1.3
km jetty, marine offloading facility (MOF), 30 MM
cubic meters of dredging, utilities and
infrastructure facilities.
Status/Opportunities Prequalification is mandatory.
Procurement ongoing.
OG&C Procurement 21
Bechtel Civil (London) Projects
RAIL
BART Earthquake Safety Program
Crossrail & Reading Delivery Partner
Crossrail PDP
Dulles Corridor Metrorail
Rio Metro
Silicon Valley Rapid Transit
AVIATION
Gatwick Development Services
McCarran International Airport
Muscat International Airport
New Doha International Airport
INFRASTRUCTURE
Gabon Master Planning
Jubail
Kashagan Field Development
Khalifa Port & Industrial Zone
Kosovo Motorway
Riverside County Transportation
Romanian Motorway
OG&C Procurement 22
Working Together
Bidder Registration
Visit the Bechtel supplier and contractor portal at:
http://supplier.bechtel.com
http://contractor.bechtel.com
If you require assistance with the registration process/website, please send an email to [email protected] for assistance.
http://www.dnb.com/
https://iupdate.dnb.com/ iUpdate/companylookup.htm
OG&C Procurement 23
Summary
Bechtel Procurement acts on a global level
Close eye on changing market conditions
Process improvements – supplier performance
We are always looking for new high quality sources
Compliance focus on safety, quality, environment
Full, fair and reasonable conditions
Easy registration process
OG&C Procurement 24
Q & A