Getting Started with VMware Workstation - VMware Workstation 8
PGSR Workstation Presentation
Click here to load reader
-
Upload
glen-hutchinson -
Category
Business
-
view
1.340 -
download
0
Transcript of PGSR Workstation Presentation
![Page 1: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/1.jpg)
Clean
Dry
Warm
Environmentally ....friendly Safe working ....environment
• Clean air in Clean air out• Carbon ...exhaust filters• Compact
• 60kg total ...weight• Cost effective
![Page 2: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/2.jpg)
![Page 3: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/3.jpg)
Looking towards the exhaust filter wall
![Page 4: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/4.jpg)
Workstation prepared for rotor placement
![Page 5: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/5.jpg)
Rotor stands awaiting the steam turbine rotor
![Page 6: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/6.jpg)
Steam turbine ready for grit blasting
![Page 7: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/7.jpg)
Protective sheets installed for grit over spray
![Page 8: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/8.jpg)
Grit blasting being conducted on the steam turbine rotor
A noise survey showed 112dB inside and 99dB outside the workstation
![Page 9: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/9.jpg)
Current methods of “clean, warm and dry” environment for generator rotor
![Page 10: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/10.jpg)
With old methods if crane work is to be carried out, licensed scaffolders are required to modify the structure
![Page 11: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/11.jpg)
Workstation floor section for the generator rotor is 11m long and 3 m wide
![Page 12: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/12.jpg)
Workstation inflation is complete in approximately 5 minutes
![Page 13: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/13.jpg)
No licences are required for personnel to erect, modify or move the Workstation
![Page 14: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/14.jpg)
Clear sides allow adequate ambient lighting for safe work conditions
![Page 15: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/15.jpg)
Halogen lamps are used to increase the Workstation temperature
![Page 16: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/16.jpg)
A de-humidifier is used to control humidity for ideal generator rotor conditions
A temperature of 32o C and humidity of 40% has been maintained for over 2 weeks on the turbine deck
![Page 17: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/17.jpg)
Additional heating can be introduced when required
![Page 18: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/18.jpg)
Workstation fan unit and services penetration point
![Page 19: PGSR Workstation Presentation](https://reader038.fdocuments.in/reader038/viewer/2022102323/548aa3c8b47959674d8b483e/html5/thumbnails/19.jpg)
Hire RatesAre available on request
Custom sizes available
Low transport costs
No erection costs