    Introduction

    ProjectTitle RAPIDSteamCrackerComplex(SCC)Project

    BusinessObjective Tomeetboth domesticandAsiasenergyandchemicalsdemand.

    ProjectOWNER PRPCRefineryandCrackerSdn. Bhd.

    CONTRACTOR Consortium of ToyoEngineeringCorporationandToyoEngineering&

    ConstructionSdn.Bhd.

    ProjectCoverage 1. SteamCrackerUnit

    2. PygasHydrogenation Unit

    3. ButadieneExtraction

    Unit

    4. BenzeneExtractionUnit

    5. IsobutyleneExtractionUnit

    6. Utilities

  • 7/24/2019 Petronas Overall SCC Project Briefing

    3/10

    RAPIDProjectOverview OverallScope

    RAPID Project

    Petronas Refinery & Petrochemical Corp. (PRPC)

    Refinery SCC Petchem Utilities

    Tank

    Farm

    Non-

    Process

    Offsite &

    Inter-

    connect

    Evonik

    (chem.)

    PDWT

    (marine)

    RGT2

    (regas)

    PCP

    (power)

    State

    Projects

    Other

    Projects

    External

    Facilities

    3rd Parties

    RAPID Toyosscope

  • 7/24/2019 Petronas Overall SCC Project Briefing

    4/10

    PETRONAS PROJECTLEADERSHIPTEAM(PLT)

    INTEGRATEDPROGRAMMANAGEMENTTEAM(IPMT)DIRECTORATE

    REFINERY

    PACKAGE1,2,3,4

    TANKAGE

    PACKAGE22A

    FLARE

    PACKAGE14

    INTERCONNE

    CTING

    PACKAGE

    14

    STEAMCRACKER

    PACKAGE5

    PETROCHEMICAL

    PACKAGE6A,6B,7,8,9,11,26*

    SOLIDHANDLING&

    WAREHOUSING

    PACKAGE12

    OFFSITES&UTILITIES

    PACKAGE14

    INDUSTRIALGASPRODUCTION

    PACKAGE15

    EFFLUENTPLANTTREATMENT

    PACKAGE

    16INCINERATOR

    PACKAGE17

    HVPOWERDISTRIBUTION

    PACKAGE13

    SITEPREPARATION

    WORKS

    PACKAGE18

    NONPROCESS

    BUILDING

    PACKAGE19

    CONSTRUCTION

    INFRA

    PACKAGE20

    RAWWATER

    TREATMENTPLANT

    PACKAGE20

    TECHNICAL

    CONTRACTS

    PACKAGE21

    PCP(PengerangCogenerationPlant)

    Evonik

    RegasTerminal2

    PDWT(PengarangDeepWaterTerminal)

    :Critical

    :Noncritical

    :

    Site,

    Infra,

    Building

    *6A:LLDPE, 6B:LDPE, 7:Polypropylene, 8:CPU,PPU,BPA,

    9:Elastomers, 11:EO/EG, 26:PolyCarbonate

    RAPIDProjectOverview OverallMatrix

  • 7/24/2019 Petronas Overall SCC Project Briefing

    5/10

    PKG No. Plants (Awarded at the same time) EPC ContractorPkg.1 Refinery 1 (RFCC, PRU, etc.) CTCI / Chiyoda

    Pkg.2 Refinery 2 (CDU, ARDS, HCDU) Sinopec

    Pkg.3 Refinery 3 (CCR, NHT, DHT, etc.) T-R

    Pkg.4 Refinery 4 (SRU, ARU, SWS, etc.) Petrofac

    Pkg.5 Steam Cracker Complex (SCC) TOYO

    Pkg.22A Storage Tank Yard Punj Lloyd

    PKG No. Other Facilities EPC Contractor

    PCP Pengerang Co-generation Plant (2000MW) Siemens, MMC

    PDWT Pengerang Deep Water Terminal (Tanks/Jetty) Dialog, Vopak,

    Johor Government

    RGT-2 Regasification Terminal 2 (2.0MMT/Y) Samsung C&T

    MOLF Material Offloading Facility Zelan Construction

    Pkg.14 Utility and Offsite Facilities for RAPID Technip-Fluor (EPCm)

    S/P Site Preparation Phase 1 & 2 Menta Construction

    Gadang Holdings

    RAPIDProjectOverview EPCCContractors

  • 7/24/2019 Petronas Overall SCC Project Briefing

    6/10

    Project Outline Location(Pengerang)

    Pengerang to Tanjung Pelepas : ~145kmPengerang to Pasir Gudang: ~75km

    PasirGudangand

    TanjungLangsat

    (PublicPort)

    RAPIDSITE

    MarineTerminal

    (PDWT)&Regas2 RamuniaYard

    and

    Jetty

    PelabuhanTanjung

    Pelepas

    (PublicPort)

  • 7/24/2019 Petronas Overall SCC Project Briefing

    7/10

    Raffinate 1 Methanol

    Ethylene

    Propylene

    ButadieneROG

    MTBE

    C3 Cut

    Raw C4 Raffinate 2Raffinate 1

    Full Range Naphtha

    isoButane Recycle

    Raffinate 2

    Raffinate 3HDT Naphtha

    Raw PyGas C6 Benzene

    H2C3/C4 LPG

    C5 Recycle C7-C8, C9+

    C6 Recycle

    Power & Utilities

    Effluent

    OSBL Facilitie

    ISBL Facil ities

    SCUUnit 2100

    (1,291 kTA)

    BDU

    Unit 2400(185 kTA)

    PGHUnit 2500(660 kTA)

    as feed

    BZUUnit 2600(175 kTA)

    MTBE

    Unit 3420(550 kTA)

    RFCC(PKG 1)

    SGP(PKG 3)

    CDU(PKG 2)

    NHT(PKG 3)

    C4 SpecialtyMEK

    Utility Center(PKG 13, 14 & 15)

    SCC CoolingTower

    Unit 4730(28 cells)

    SCC Tank FarmUnit 5210(41 units)

    SCC Flare StackUnit 6420(2 stacks)

    EffluentPlant(PKG 16A)

    Refinery

    Petchem Flare StackUnit 6430(2 stacks)

    Petchem Plants

    3.Project Outline BlockFlow

  • 7/24/2019 Petronas Overall SCC Project Briefing

    8/10

    EDC

    (=LOA)

    18Jul14

    CD

    (T0)15Aug14

    PA

    (M58)29May19

    RFSU

    (M52)30Nov18

    Engineering/Procurement/Construction

    Commissioning

    StartUp

    PTR

    51.5Months 6Months28Days

    TimeGuarantee:57.5Months (BDtoPA)

    MC

    (M49)

    31Aug

    18

    (48.5Months) (3Months)

    KOM

    (M1)

    25Aug

    14

    28Days

    1st Invoice

    SigningtheContract

    PerformanceBond

    InsuranceCertificate

    ParentCompanyGuarantee

    Tripartite

    Agreement

    w/LicensorConsortiumAgreement

    LegalOpinion

    Project Outline OverallTimeline

  • 7/24/2019 Petronas Overall SCC Project Briefing

    9/10

    M12(b) M16(e) M40(e) M52(e)M49(e)

    CD

    01 Jul 2015

    Handover of Site Area

    Haulage Road available

    30 Nov 2015

    MOLF available

    for offloading

    30 Nov 18

    Facility

    RFSU

    31 Aug 2018

    MechanicalCompletion

    30 Nov 2017

    Power & Steam

    available at BL

    01 Nov 2015

    Deep U/G work

    start

    01 Dec 2015

    Piling start

    01 Apr 2016

    Heavy lifting

    start

    01 Jun 2016

    Piping fabrication

    start

    01 Aug 2016

    Piping installation

    start

    01 Dec 2017

    Commissioning

    start

    01 Nov 2017

    Loop testing

    start

    31 Aug 2017

    Water & Air

    available at BL

    M37(e)

    M21(b)

    M12(b)

    M16(b) M17(b)

    M16(e)

    M23(b)

    M25(b) M41(b)

    M49(e)

    M40(b)

    M37(e) M40(e) M52(e)

    01 Aug 2017

    Loop testing

    start

    M37(b)

    Project Outline KeyMilestones

    T0

  • 7/24/2019 Petronas Overall SCC Project Briefing