IZOLAREA LA CALD Executie Norma Petrom OMV L 3001 THERMAL INSULATION Construction Petrom OMV Group Standard L 3001 Elaborat/ Compiled: Ciobanu Daniela Verificat/ Checked: Decusara Felicia Rev: 1/10.04.2007 Eng: /10.04.2007 Aprobat/ Approved: Jeffrey Rinker Divizia Rafinare Petrom OMV isi rezerva toate drepturile asupra acestei documentatii si va da in judecata pe orice persoana neautorizata sa o utilizeze sau sa o transmita la terti Petrom OMV Refining Division reserves all its rights to these documents and will take legal action against anyone using them or passing them on without authorization. Aceasta norma a fost elaborata pentru rafinariile Petrom prin prelucrarea si adaptarea Normei de concern OMV L3001 revizie 1 Dec 2005 / This norm was elaborated for Petrom refineries by the processing and adapting of corporatenorm OMV L3001 revision 1 Dec 2005 Capitol Cuprins Nr Pagina 1.0 Generalitati 3 1.1 Domeniul de valabilitate 3 1.2 Norme si reglementari 3 1.3 Marcarea izolatiei la cald 3 1.4 Grosimi de izolatie 4 2.0 Materiale (Materiale de izolatii) 4 2.1 Materiale de izolatie / Conditii generale 4 2.2 Materii si materiale 5 2.3 Materiale pentru mantalele de protectie la intemperii si accesorii 6 3.0 Executie 8 3.1 Modalitati de executie 8 3.2 Documente de executie 8 4.0 Montaj 10 4.1 Instructiuni generale 10 4.2 Instructiuni de constructie 10 4.3 Izolatia rezervoarelor verticale 15 4.4 Izolatia aparatelor si rezervoarelor (cu si fara incalzire) 17 4.5 Izolatia conductelor 20 4.6 Mantaua de protectie la intemperii 22 4.7 Distantiere 23 4.8 Imbinari cu surub 24 4.9 mbinari glisante(pentru preluarea dilatatiei longitudinale a conductelor) 24 4.10 Imbinarea la segmentele de arc 24 4.11 Imbinari arcuite 24 4.12 Inchiderea in punctele terminale la intreruperi in izolatie 24 4.13 Inchiderile verticale in izolatie 25 4.14 Schimbatoare de caldura 25 4.15 Pompe 26 4.16 Turbine 26 4.17 Intrerupatoare de nivel 28 4.18 Traductoare de nivel 28 4.19 Indicatoare de nivel 28 Point Contents Page 1.0 General 3 1.1 Scope 3 1.2 Standards and regulations 3 1.3 Labelling of thermal insulation 3 1.4 Insulation thickness 4 2.0 Materials (Insulation) 4 2.1 Insulating materials / general 4 2.2 Materials 5 2.3 Materials for weatherproof jackets and accessories 6 3.0 Execution 8 3.1 Execution terms 8 3.2 Execution documents 8 4.0 Installation 10 4.1 General notes 10 4.2 Design engineering notes 10 4.3 Insulating vertical containers (tanks) 15 4.4 Tank and installation insulation (with and without tracing) 17 4.5 Piping insulation 20 4.6 Weatherproof jackets 22 4.7 Spacers 23 4.8 Screwed joints 24 4.9 Sliding seams 24 4.10 Joining bend segments 24 4.11 Tail joints 24 4.12 End pieces for insulation interruption 24 4.13 Vertical insulation ends 25 4.14 Heat exchangers 25 4.15 Pumps 26 4.16 Turbines 26 4.17 Level switches 28 4.18 Level transmitters 28 4.19 Level indicators 28

description

corporatenorm l3001

Transcript of Petrom OMV Corporatenorm L 3001 Rom Eng Rev.1 2007-04-10

  • IZOLAREA LA CALD Executie

    Norma Petrom OMV

    L 3001

    THERMAL INSULATION Construction

    Petrom OMV Group Standard

    L 3001

    Elaborat/ Compiled:

    Ciobanu Daniela

    Verificat/ Checked:

    Decusara Felicia

    Rev: 1/10.04.2007

    Eng: /10.04.2007

    Aprobat/ Approved:

    Jeffrey Rinker

    Divizia Rafinare Petrom OMV isi rezerva toate drepturile asupra acestei documentatii si va da in judecata pe orice persoana neautorizata sa o utilizeze sau sa o transmita la terti

    Petrom OMV Refining Division reserves all its rights to these documents and will take legal action against anyone using them or passing them on without authorization.

    Aceasta norma a fost elaborata pentru rafinariile Petrom prin prelucrarea si adaptarea Normei de concern OMV L3001 revizie 1 Dec 2005 / This norm was elaborated for Petrom refineries by the processing and adapting of corporatenorm OMV L3001 revision 1 Dec 2005 Capitol Cuprins Nr Pagina 1.0 Generalitati 3 1.1 Domeniul de valabilitate 3 1.2 Norme si reglementari 3 1.3 Marcarea izolatiei la cald 3 1.4 Grosimi de izolatie 4 2.0 Materiale (Materiale de izolatii) 4 2.1 Materiale de izolatie / Conditii generale 4 2.2 Materii si materiale 5 2.3 Materiale pentru mantalele de protectie

    la intemperii si accesorii 6 3.0 Executie 8 3.1 Modalitati de executie 8 3.2 Documente de executie 8 4.0 Montaj 10 4.1 Instructiuni generale 10 4.2 Instructiuni de constructie 10 4.3 Izolatia rezervoarelor verticale 15 4.4 Izolatia aparatelor si rezervoarelor

    (cu si fara incalzire) 17 4.5 Izolatia conductelor 20 4.6 Mantaua de protectie la intemperii 22 4.7 Distantiere 23 4.8 Imbinari cu surub 24 4.9 mbinari glisante(pentru preluarea dilatatiei longitudinale a conductelor) 24 4.10 Imbinarea la segmentele de arc 24 4.11 Imbinari arcuite 24 4.12 Inchiderea in punctele terminale la

    intreruperi in izolatie 24 4.13 Inchiderile verticale in izolatie 25 4.14 Schimbatoare de caldura 25 4.15 Pompe 26 4.16 Turbine 26 4.17 Intrerupatoare de nivel 28 4.18 Traductoare de nivel 28 4.19 Indicatoare de nivel 28

    Point Contents Page

    1.0 General 3 1.1 Scope 3 1.2 Standards and regulations 3 1.3 Labelling of thermal insulation 3 1.4 Insulation thickness 4 2.0 Materials (Insulation) 4 2.1 Insulating materials / general 4 2.2 Materials 5 2.3 Materials for weatherproof jackets and

    accessories 6 3.0 Execution 8 3.1 Execution terms 8 3.2 Execution documents 8 4.0 Installation 10 4.1 General notes 10 4.2 Design engineering notes 10 4.3 Insulating vertical containers (tanks) 15 4.4 Tank and installation insulation (with

    and without tracing) 17 4.5 Piping insulation 20 4.6 Weatherproof jackets 22 4.7 Spacers 23 4.8 Screwed joints 24 4.9 Sliding seams 24 4.10 Joining bend segments 24 4.11 Tail joints 24 4.12 End pieces for insulation interruption 24 4.13 Vertical insulation ends 25 4.14 Heat exchangers 25 4.15 Pumps 26 4.16 Turbines 26 4.17 Level switches 28 4.18 Level transmitters 28 4.19 Level indicators 28

  • Pag 2 / Page 2 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    4.20 Cutii de protectie instrumente 29 4.21 Protectia la atingere 29 4.22 Demontarea si montarea invelisului

    de tabla al izolatiei 29 5.0 Control si receptie 30 6.0 Garantie 30 Annex 1 - Standarde si reglementari ale

    Concernului OMV 31 Annex 2 - Specificatii si standarde ale Omv

    Deutschland GMBH 38 Annex 3 Prevederi stabilite anterior

    incredintarii contractelor 39 Annex 4 - Tabele cu grosimi de izolatii 40 Annex 5 - Detalii de executie (desene) 46

    4.20 Protective instrument boxes 29 4.21 Personnel protection 29 4.22 Removal and replacement

    of insulating plate 29 5.0 Testing and acceptance 30 6.0 Warranty 30 Annex 1 - OMV Group Standards and

    Guidelines 31 Annex 2 - OMV Deutschland GmbH

    Specifications and Standards 38 Annex 3 - List of Specifications to be Agreed

    Before Award of Contract 39 Annex 4 - Tables 40 Annex 5 - Installation Details (Drawings) 46

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 3 / Page 3

    1.0 GENERALITATI

    1.1 Domeniu de valabilitate Prezenta norma se aplica in companiile membre ale Concernului OMV inclusiv in OMV Petrom. Acest norma cuprinde cerintele impuse pentru executia, montajul si controlul unei izolatii la cald finalizate, la aparatele de presiune, aparate, coloane, schimbatoare de caldura, conducte, armaturi, rezervoare verticale (tancuri) ca si instructiunile privind izolatia de protectie la incendii. Norma mai cuprinde si instructiunile tehnice privind livrarea materialelor si a materialelor auxiliare de izolatie pentru executarea unei izolatii complete la caldura, ca si grosimile de izolatie necesare in conditii diverse de exploatare respectiv necesare pentru asigurarea rentabilitatii economice

    1.0 GENERAL

    1.1 Scope

    This OMV Group Standard is valid for OMV Group companies, including OMV Petrom. This Standard includes definitions for designing, installing and testing ready to use thermal insulation on pressure vessels, installations, columns, heat exchangers, piping, fittings and vertical containers (tanks) as well as notes for fire protection insulation. It also includes technical regulations for supplying insulation and auxiliary materials to provide complete thermal insulation and the required insulation thicknesses for various operating conditions and to ensure cost effectiveness.

    1.2 Norme si reglementari In coroborare cu prezentul standard se vor respecta toate dispozitiile legale, normele si directivele aflate in vigoare in Romania, mentionate in Anexa 1. Nu consideram ca enumerarea mentionata este completa, epuizeaza toate normele in vigoare.

    Daca intre diferitele directive si norme apar abateri si contradictii iar in prezentul standard nu exista referiri clare la aceste aspecte, se va aplica norma care contine cea mai restrictiva formulare.

    Acolo unde normele se exclud reciproc, se vor aplica prevederile legislatiei romane.

    Cade in sarcina executantului contractului sa verifice daca prezentul standard poate fi aplicat pentru scopul prevazut. Aplicarea standardului nu il exonereaza pe executant de responsabilitatile care ii revin in calitate de antreprenor expert si independent.

    1.2 Standards and instructions

    In conjunction with this Standard, the respective specifications, standards and directives legally applicable in Romania and stated in Annex 1 should be taken into account in their currently valid form. This list is not claimed to be complete.

    In the event of deviations or conflicts arising between the various standards and specifications and there is no firm definition in this standard, the strictest formulation shall be applied in each case.

    Where they are mutually exclusive, the statutory Romanian provisions shall apply.

    The contractor is responsible for checking the appropriateness of this standard for the intended purpose. Its application does not relieve the contractor of his responsibility as a competent, independent entrepreneur.

    Daca executantul are comentarii cu privire la anumite prevederi continute de standard, el va comunica imediat acest lucru beneficiarului contractului, in forma scrisa.

    Should the contractor have reservations concerning an agreed definition, he shall notify the client of this in writing without delay.

    1.3 Marcarea izolatiei la cald In general, marcarea izolatiei la cald se face in schema R&I (montare si demontare Removal & Installation) si in izometrii / planuri de amplasament poduri de conducte / liste de conducte conform codului de clasa de izolatie,

    1.3 Labelling of thermal insulation

    The thermal insulation shall generally be labelled in P&I diagrams (Removal & Installation), as well as in isometries, pipe bridge diagrams and piping lists using the insulation class abbreviations, as described in

  • Pag 4 / Page 4 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    asa cum este specificat in norma Petrom OMV L 1001, punctul 1.5

    Petrom OMV Group Standard L 1001, Sec. 1.5.

    1.4 Grosimi de izolatie Tabel 4.1 si 4.2 (Anexa) Tabel 4.3 (Anexa) Indica grosimile de izolatie necesare pentru conductele de proces / de abur si pentru sistemele de incalzire electrica.

    Pentru stabilirea grosimii de izolatie a conductelor cu incalzire cu abur este nevoie ca teava de incalzire sa fie prevazuta cu inca o izolatie de 30 mm grosime, chiar daca acest lucru conduce la aparitia unor abateri de la grosimea de izolatie raportata la temperatura, prevazuta de tabelele 4.1. si 4.2.

    Pentru evitarea decupajelor in mantaua de protectie la intemperii, grosimile de izolatie in zona ecliselor suportilor vor fi astfel concepute incat ele sa fie la nivelul grosimii mantalei de protectie, chiar daca acest lucru conduce la aparitia unor abateri de la grosimea de izolatie raportata la temperatura, prevazuta de tabelele 4.1. si 4.2.

    1.4 Insulation thickness

    Table 4.1 and 4.2 (Appendix)- Table 4.3 (Appendix) Indicate the required insulation thicknesses for the process/steam pipelines and electric heating.

    When determining the insulation thickness for pipes with steam tracing, it is essential for the insulation to be 30 mm thick above the tracer, even if this should result in deviations from the temperature-related thickness as indicated in Tables 4.1 and 4.2.

    To prevent cut-outs in the weatherproof jacket, the insulation thickness in the area of mounting brackets shall be selected to fit inside the weatherproof jacket, even if this should result in deviations from the temperature-related thickness as indicated in Tables 4.1 and 4.2.

    2.0 MATERIALE(MATERIALE DE IZOLATIE)

    Conditiile generale, limitele de aplicatie si coeficientii de conductivitate termica pot fi gasiti in norma Petrom OMV L 1001.

    Nu este permisa utilizarea de materiale fibroase din zgura de furnal.

    Alte materiale izolante vor fi stabilite de comun acord cu beneficiarul.

    2.0 MATERIALS (INSULATION)

    Refer to Petrom OMV Group Standard L 1001 for the general requirements, application limits and thermal conductivity properties.

    Fibre from blast furnace slag may not be used.

    Other insulating materials shall be specified in agreement with the customer.

    2.1 Materiale de izolatie/conditii generale 2.1.1 Marcarea

    Toate materialele livrate trebuie sa fie marcate complet si clar vizibil, cu:

    2.1 Insulating materials / general

    2.1.1 Labelling

    All materials supplied must be labelled adequately and clearly visibly:

    numele producatorului ; calitatea ; dimensiunile.

    2.1.2 Inflamabilitate Neinflamabilitate

    Materialele trebuie sa nu fie inflamabile. Materialele plastice trebuie sa fie greu inflamabile. La depozitarea pe santier, trebuie avut in vedere ca materialele de izolatie sa nu se impregneze cu lichide sau gaze inflamabile.

    with the name of the manufacturer, with the quality, with the dimensions.

    2.1.2 Flammability combustibility

    The materials must be non-combustible. Plastic materials must be flame resistant. When storing them on the building site, ensure that the insulating materials cannot become saturated with combustible liquids or gases.

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 5 / Page 5

    2.1.3 Compatibilitatea cu alte suprafete metalice

    Materialele feritice nu trebuie sa vina in contact cu suprafete metalice din oteluri austenitice.

    2.1.3 Compatibility with other metal surfaces

    Ferritic materials must not come into contact with metal surfaces made of austenitic steel.

    2.2 Materii si materiale 2.2.1 Saltele de vata minerala

    Conditii - vezi AGI Q 132.

    2.2.2 Piese fasonate (Placi, cofraje tubulare.)

    Pentru izolatia la cald la rezervoare, cu suprafete plane sau aproape plane, se pot folosi placi.

    La conducte se pot folosi cofraje tubulare (semicirculare).

    Segmentele (jumatatile) de cofraj tubular vor fi fixate de conducta cu sarma de legat, min. 6 infasurari pe metru. Piesele fasonate vor fi prevazute cu rosturi de etansare.

    Imbinarile longitudinale trebuie sa se intrepatrunda reciproc. Daca operatia de ajustare la piesele in T, la scarile de coborare etc nu a dat rezultatele dorite, rosturile formate vor fi astupate cu bucati de vata minerala.

    2.2.3 Bucati de vata minerala (vata pentru astupare)

    Bucatile de vata minerala cu fibra lunga, pentru izolatie prin astupare, pot fi folosite acolo unde, din motive tehnologice, nu este posibila izolatia cu saltele de vata minerala. La izolatia prin astupare trebuie sa se obtina o densitate de 80 100 kg/m3.

    Vata minerala va fi depozitata in ambalaje rezistente la ploaie.

    2.2.4 Sticla spongioasa

    Sticla spongioasa este adecvata pentru izolatiile la cald la care se impun conditii de rezistenta crescuta si pentru care exista riscul expunerii la umiditate ridicata (de ex.sub fundul rezervoarelor, izolatiile din culoare, batale etc).

    La izolarea tevilor cu elemente din sticla spongioasa trebuie avut in vedere ca este necesar ca teava sa fie prevazuta cu o protectie la uzura prin frecare, ca urmare a dilatarii conductei.

    2.2 Materials

    2.2.1 Mineral wool mats

    For requirements, see AGI Q 132.

    2.2.2 Shaped parts (boards, pipe shells, etc.)

    Boards may be used for thermal insulation on tanks with flat or virtually flat surfaces.

    Shells may be used for piping.

    The pipe shell halves shall be attached to the piping with binding wire using at least six per metre. The shaped parts must be laid with no space between joints.

    The long side joints should be staggered. Given that it is difficult to fit insulation round tees, outlets, etc., the joints must be stuffed with loose mineral wool.

    2.2.3 Loose mineral wool (wool stuffing)

    Loose, long-fibre mineral wool for thermal insulation by stuffing may only be used where mat insulation is not possible for access reasons. A density of 80 to 100 kg/m should be achieved by stuffing.

    The mineral wool must be stored in rainwater proof packaging.

    2.2.4 Foam glass

    Foam glass is suitable for thermal insulation where increased resistance is required and there is a risk of the insulation being exposed to greater moisture (e.g. underneath tanks, insulation of trenches, etc.).

    When insulating pipes with shaped foam glass parts, ensure that there is protection against metal-to-metal wear from pipe expansion on the pipe.

    Sticla spongioasa nu poate fi folosita pentru izolatii rezistente la trafic daca nu sunt

    Foam glass cannot be used for crushproof insulation without suitable supporting

  • Pag 6 / Page 6 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    asigurate constructiile de sustinere corespunzatoare.

    structures.

    2.3 Materiale pentru mantalele de protectie la intemperii si accesorii

    Materialul pentru mantaua de protectie la intemperii si executia izolatiei (de ex.tole trapezoidale, izolatie rezitenta la trafic etc) vor fi stabilite inainte de atribuirea contractului.

    2.3.1 Mantaua de protectie la intemperii

    2.3.1.1 Tabla Al-Zn(tabla de otel ameliorat)

    Tabla de otel ameliorat cu strat de acoperire 55 % Al, 1,6 % Si, restul Zn, denumire comerciala Galvalume, sub forma de benzi sau table plane, cu grosimea de 0,5 1,0 mm. Greutatea de sprijinire pe suport 185 g pentru ambele parti. Pentru imbinarile cu surub se vor folosi, de regula, suruburi din material 1.4301.

    2.3 Materials for weatherproof jackets and accessories

    The materials for the weatherproof jacket and type of insulation (e.g. trapezoidal sheet, crushproof insulation, etc.) shall be specified before the contract is awarded.

    2.3.1 Weatherproof jackets

    2.3.1.1 Aluminium-zinc plate (hot-dip galvanised steel sheet)

    Steel sheet coated with aluminium-zinc alloy made of 55% Al, 1.6% Si and the remainder Zn using a hot-dip process, trade name "Galvalume" as strips or flat sheets in thicknesses 0.5 to 1.0 mm. Coating weight 185 g for both sides. Bolts made of material 1.4301 must be used for connections.

    2.3.1.2 Tabla de aluminiu (pentru reparatii la tablaria existenta sau mici extinderi

    Se utilizeaza tabla de Al mata, calitate de izolatie semidura, puritate 99,5 % conform DIN EN 485 sau tole de Al in aliaj Al Mg 2 Mn 0,8 G 22 sau Al Mn 1 Mg 1 F 22 45/150 trapezoidale, ambele cu rezistenta la apa de mare, semidure, mate, sub forma de benzi de 1000 mm latime, grosime 0,6 2,0 mm

    La temperaturi de lucru mai mari (> 400C) si daca se preconizeaza dilatatii mai mari (de ex.rezervoare de stocare) pot fi folosite tole trapezoidale (45/150) sau tole striate din Al de calitatea specificata.

    2.3.1.3 Tabla de otel zincata (pentru reparatii la tablaria existenta sau mici extinderi)

    Materialul de baza este tabla subtire laminta la cald, calitatea I. Invelisul de Zn pe ambele parti, conform EN ISO 1461 si SR EN 50189, trebuie sa aiba in total min. 275 g/m3.

    2.3.1.2 Aluminium plate (for repairs and minor expansions)

    Matt aluminium plate, medium hard insulation quality, purity 99.5% to DIN EN 485 must be used or aluminium sheet in Al Mg 2 Mn 0.8 G 22 or Al Mn 1 Mg 1 F22 - 45/150 trapezoidal alloy, both seawater proof, medium hard matt as 1,000 mm wide strip in thicknesses of 0.6 2.0 mm.

    At higher working temperatures (>400C) and if greater expansion is to be expected (e.g. for storage tanks), trapezoidal sheet (45/150) or aluminium grooved plate of the stated quality may be used.

    2.3.1.3 Galvanised steel plate (for repairs and minor expansions)

    The base material is Grade I hot-rolled thin sheet. The zinc coating on both sides to EN ISO 1461 and SR EN 50189 shall be at least 275 g/m in total.

    2.3.1.4 Conducte de acid si lesie

    Pentru conductele de acid si lesie, mantaua de protectie la intemperii va fi fabricata din tabla de otel austenitic, material nr. 1.4571.

    2.3.1.5 Rezervoare verticale(Tancuri)

    Mantaua de protectie la intemperii este fabricata din tabla trapezoidala de Al (45/150) vezi punctul 2.3.1.2.

    2.3.1.4 Acid and alkali lines

    The weatherproof jacket for acid and alkali lines shall be made of austenitic steel plate, material No. 1.4571.

    2.3.1.5 Vertical containers (tanks)

    The weatherproof jackets shall be made of aluminium trapezoidal plate (45/150) see Sec. 2.3.1.2.

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 7 / Page 7

    2.3.1.6 Mici reparatii

    Micile reparatii executate la mantaua de protectie la intemperii vor fi adaptate la tablaria existenta. Tabla: Al-Zn, Al etc

    2.3.1.7 Suruburi / Suporti

    Suruburi de cupelatie pentru tabla conform SR EN ISO 1481-01sau suruburi cu cap cilindric pentru tabla, cu locas hexagonal si crestare longitudinala, conform SR EN 1479-03).

    Pentru izolatii la cald cu protectie speciala la umiditate (de ex.cu incalzire electrica) se vor folosi suruburi cu cap cilindric pentru tabla, cu saiba montata din plastic.

    Dimensiuni: vezi Fisa de lucru AGI

    Material: 1.4301

    2.3.2 Accesorii

    2.3.2.1 Imbinari cu nit

    Pentru imbinarile cu nit in zonele cu tabla se vor folosi nituri oarbe cu tija de otel (1.4301).

    2.3.1.6 Minor repairs

    Minor repairs to weatherproof jackets shall be carried out to suit the sheet metal used: aluminium-zinc, aluminium, etc.

    2.3.1.7 Screws / heads

    Cupellation screws for sheet to SR EN ISO 1481-01 or hexagon and slotted pan head tapping screws to SR EN 1479-03).

    Slotted pan head tapping screws with plastic disc attached shall be used for thermal insulation with special moisture protection (e.g. with electric tracing).

    Dimensions: see AGI Work Sheet Material: 1.4301

    2.3.2 Accessories

    2.3.2.1 Riveted joints

    Steel shank blind rivets (1.4301) must be used for riveted joints in the area of sheet metals.

    2.3.2.2 Benzi de strangere sau fixare

    Benzile de strangere sau fixare a mantalelor de tabla trebuie sa indeplineasca urmatoarele conditii de calitate si dimensiuni:

    Benzi, material nr. 1.4301 La o suprafata de strangere < 2000 mm: 16 x 0,5 mm La o suprafata de strangere > 2000 mm:

    20 x 0,8 mm

    2.3.2.3 Constructii portante de sprijin

    La constructiile cu distantiere zincate, pentru prevenirea coroziunii de contact, se va aplica suplimentar Coroplast pe inelul distantierului.

    Ca distantier pentru mantalele de tabla trebuie sa se foloseasca constructii zincate, usoare si performante sub aspectul termoizolatiei, din tabla sau otel lat. Trebuie asigurata rezistenta necesara.

    2.3.2.2 Fastening or tightening band

    Bands for fastening or tightening sheet metal jackets must be of the following quality and dimensions:

    Bands, material No.: 1.4301 For circumference 2,000 mm:

    20 x 0.8 mm

    2.3.2.3 Load-bearing and supporting structures

    If galvanised spacer structures are used, Coroplast must also be applied to the spacer ring to prevent contact corrosion. Light and good thermally insulating galvanised sheet and flat steel structures shall be used as spacers for sheet-metal jackets. Adequate strength must be ensured.

    Puntile de distantare trebuie sa fie separate de inelul distantierului printr-un strat intermediar izolant fara asbest, cu rezistenta suficienta la temperatura si cu o grosime minima de 3 mm.

    Pentru selectie vezi AGI Q 153 punct 2 Materiale

    The spacer webs shall be separated by means of an asbestos-free intermediate insulating layer of adequate temperature resistance and a minimum thickness of 3 mm from the spacer ring.

    For selection, see AGI Q 153, Sec. 2 materials

  • Pag 8 / Page 8 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    2.3.2.4 Inele de rezermare

    Vezi AGI Q 153 si Q 154 Constructii portante si de sprijin

    2.3.2.5 Inchizatoare cu parghie cotiata

    Pentru demontarea si remontarea mai usoara, la toate elementele de izolatie usor demontabile trebuie sa fie racordate inchizatoare cu parghie cotita.

    Aceste inchizatoare cu blocare automata trebuie sa fie fabricate din material nr. 1.4301.

    Prin elemente de izolatie usor demontabile se inteleg acele parti care trebuie sa fie demontate si remontate intr-un interval de min.6 luni.

    2.3.2.6 Folie de aliminiu

    Folie de Al in role, grosime 0,05 mm.

    2.3.2.7 Materiale de etansare pentru hidroizolatii

    Material de etansare, transparent (silicon) sau similar.

    2.3.2.8 Materiale izolante ceramice

    de ex.Superwool, KAO-Wool etc. Limita de aplicatie T = 1.250 C

    2.3.2.4 Supporting rings

    See AGI Q 153 and Q 154 load-bearing and supporting structures

    2.3.2.5 Toggle fasteners

    Toggle fasteners shall be attached to all easily removable insulation parts for easier detachment and replacement.

    These self-locking toggle fasteners shall be made of material No. 1.4301.

    Easily removable insulation parts mean components that have to be detached and replaced within a period of at least six months.

    2.3.2.6 Aluminium foil

    Aluminium foil, 0.05 mm thick, in rolls.

    2.3.2.7 Sealing material for seals

    Sealing material, transparent (silicon) or equivalent.

    2.3.2.8 Ceramic insulating materials

    e.g. Superwool, KAO-Wool, etc. application limit T = 1,250C.

    3.0 EXECUTIE

    3.1 Modalitati de executie Daca la incredintarea contractului nu s-a convenit altfel, firma care executa lucrarile de izolatie are in sarcina si urmatoarele:

    asigurarea personalului calificat si auxiliar de executie si a personalului calificat de control si supraveghere, pentru executarea unor lucrari de calitate ;

    livrarea tuturor materialelor, sculelor si utilajelor de prelucrare, franco santier ;

    materialele, in special cele de izolatie, vor fi depozitate in stare uscata, in baraci protejate la intemperii sau sub prelate adecvate. Pentru protectia la umezeala, materialele de izolatie nu vor fi pastrate direct pe sol

    3.0 EXECUTION

    3.1 Execution terms

    Unless agreed otherwise when the contract is awarded, the services to be provided by the insulation company shall include the following:

    provision of the necessary skilled and auxiliary staff as well as trained supervisors to ensure that the work is carried out properly.

    delivery of all materials, tools and sheet metal

    working machines free building site.

    the materials, especially the insulating materials, shall be stored in a dry place, e.g. inside weatherproof huts or under suitable tarpaulins. To protect against moisture, the insulating materials may not be stored directly on the ground.

    3.2 Documente de executie Documentele enumerate mai jos sunt considerate parti constitutive suplimentare ale prezentului standard: lista de conducte ;

    3.2 Execution documents

    The documents listed below shall also be deemed part of this Group Standard:

    piping list

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 9 / Page 9

    desene pentru rezervoare inclusiv pentru aparatele de masura si control ce vor fi izolate

    VDI 2055 Protectia la frig si la caldura ;

    DIN 4140 Izolatia instalatiilor tehnologice Izolatia la cald ;

    AGI Fise de lucru pentru izolatii.

    Pentru executarea lucrarilor de izolatie la cald, executantului ii vor fi puse la dispozitie urmatoarele documente:

    pentru conducte:

    lista de conducte, cu date referitoare la grosimea izolatiei, materialul din care este fabricata mantaua de ptrotectie la intemperii, tipul de incalzire, protectia la coroziune ;

    izometrii, planurile de amplasare a conductelor, cu datele amintite ;

    date suplimentare, daca pentru izolatie se impun conditii suplimentare, de ex.daca trebuie sa fie rezistenta la trafic.

    Pentru aparate si rezervoare:

    fisa de date cu specificarea grosimilor de izolatie, materiale de izolatie, materialul din care este fabricata mantaua de protectie la intemperii, constructii de sprijin, suporti etc ;

    date suplimentare, daca se impun si alte

    conditii de executie, de ex. izolatie demontabila.

    tank drawings, including the measuring and control equipment to be insulated

    VDI 2055: thermal insulation

    DIN 4140: insulation of industrial installations - thermal insulation

    AGI work sheets for insulation

    The following documents shall be made available to the contractor for executing the thermal insulation:

    For piping:

    piping list giving details of insulation thickness, weatherproof jacket material, type of tracing, corrosion protection

    isometries, pipe bridge diagrams with above details

    additional data when further demands are placed on the thermal insulation, e.g. crushproof type, etc.

    For tanks and installations:

    data sheet giving details of insulation thickness, insulating materials, weatherproof jacket material, supporting structure, fasteners, etc.

    additional details when further demands are placed on the material, e.g. removable insulation, etc.

  • Pag 10 / Page 10 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    4.0 MONTAJ

    4.0 INSTALLATION

    4.1 Instructiuni generale Conductele, aparatele si rezervoarele vor putea fi izolate numai daca probele de presiune / de stabilitate respectiv controalele de etanseitate s-au incheiat cu rezulate pozitive si daca dirigintele de santier OMV Petrom a avizat executia lucrarilor de izolatie la cald. Exceptiile vor fi decise de catre dirigintele de santier OMV Petrom.

    Izolatia la cald va fi facuta numai pe suprafete adecvate si uscate, care nu prezinta straturi groase de rugina sau arsura.

    4.1 General notes

    Piping, tanks and installations shall not be insulated until the required pressure and/or proof tests and leak tests have been successfully completed and the OMV Petrom site supervisors have approved them for thermal insulation. The OMV Petrom site supervisors may make exceptions in certain cases.

    The thermal insulation shall only be applied to clean, dry surfaces that do not display thick layers of rust or loose scaling.

    Daca, din cauza necesitatilor impuse de temperatura sau de mediul de transport, conductele trebuie sa aiba sub stratul de izolatie la cald o protectie la coroziune, aceasta va fi executata conform listei de conducte.

    4.1.1 Depozitarea si protectia materialelor de izolatie

    Inainte de montaj, materialul de izolatie va fi protejat de impuritati si umiditate. Zilnic se va executa un volum de operatii de izolatie egal cu volumul de operatii de acoperire cu tabla. Exceptii pot fi facute la rezervoarele verticale (coloane, tancuri, rezervoare sub presiune), prin prelate de protectie la intemperii.

    In special la depozitarea pe santier trebuie avut grija ca materialele de izolatie sa nu vina in contact cu lichide sau gaze inflamabile.

    Where the piping requires corrosion protection under the thermal insulation because of the temperature or medium, it shall be applied by the customer in accordance with the piping list.

    4.1.1 Storage and protection of insulating materials

    Before installation, the insulating material shall be protected against contamination and the effects of moisture. Only as much insulation should be installed every day as can be plated. Exceptions are possible for vertical containers (i.e. columns, tanks, pressure vessels) with weatherproof tarpaulins.

    Ensure that the insulating materials cannot become saturated with combustible liquids or gases, especially when they are stored on building sites.

    4.2 Instructiuni de constructie 4.2.1 Conducte, rezervoare, aparate

    Pentru obtinerea unei grosimi uniforme de izolatie si pentru evitarea deplasarii mantalei de protectie la intemperii, la izolatiile executate cu saltele, piese fasonate cu rezistenta mica la compresie sau cu bucati de vata minerala este necesar sa se foloseasca constructii de sprijin ca sistem portant pentru mantaua de protectie la intemperii.

    O constructie de sprijin va fi prevazuta pentru toate tevile mai mari de DN 50 si pentru grosimi de izolatie de la 90 mm in sus respectiv pentru tevi mai mari de DN 350 si grosimi de izolatie de 40 mm si mai mari. Constructiile de sprijin vor fi amplasate la intervale de 980 mm, prin fixare cu cleme.

    4.2 Design engineering notes

    4.2.1 Piping, tanks and installations

    When insulating with mats, shaped parts of low compressive strength and loose wool, the weatherproof jackets shall be attached to supporting structures to achieve a uniform insulation thickness and prevent the weatherproof jacket from becoming displaced.

    A supporting structure shall be installed for all pipes larger than DN 50, insulation thicknesses of 90 mm or more and larger than DN 350, and insulation thicknesses of 40 mm or more. The supporting structures shall be attached at intervals of 980 mm by clamping.

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 11 / Page 11

    La coturi, piese pasuite si piese incorporate in montaj se va amplasa cate o constructie de sprijin la inceputul si la sfarsitul componentei.

    La o temperatura de lucru de pana la 150C distantierele pot fi sudate cu inelul de rezemare.

    La peste 150C, intre distantier si inelul de rezemare se va monta un strat intermediar de izolatie, de grosimea corespunzatoare. Puntea de distantare si inelul de rezemare vor fi legate prin nituire.

    La temperaturi de lucru de peste 400C, intre puntea de distantare si inelul de rezemare se va monta un strat intermediar de izolatie, de grosimea corespunzatoare. Legatura dinspre punte catre inel se face printr-un colier din banda de otel inoxidabila de cca 1,0 mm grosime, iar banda va fi prinsa cu nituri atat de puntea distantierului cat si de inelul de rezemare

    Where bends, adapters and fittings are used, a supporting structure is required at the beginning and the end.

    The spacer webs may be welded to the supporting ring up to a working temperature of 150C.

    Over 150C an insulating inlay of suitable thickness must be inserted between the spacer web and supporting ring. The spacer web and supporting ring shall be connected with rivets.

    If the working temperature is over 400C, an insulating inlay of suitable thickness shall be inserted between the spacer web and supporting ring. The spacer web shall be connected to the supporting ring with a clip made of stainless steel strip, approx. 1.0 mm thick with the band attached using rivets to the supporting ring at one end and the spacer web at the other.

    Executantul va comunica si va obtine acordul beneficiarului privind insertia respectiv suportul izolant pe care il va utiliza.

    Daca executantul propune alte constructii si materiale, care indeplinesc conditiile impuse si care suporta dilatatiile termice ale elementelor ce urmeaza a fi izolate, aceste alternative vor fi indicate in comanda, separat.

    The contractor shall indicate the insulating inlay or overlay to be used and agree it with the customer.

    If the contractor suggests other structures and materials that meet the requirements and in particular absorb the thermal expansion of the system part to be insulated, such alternatives shall be listed separately in the tender.

    Numarul de punti de distantare per inel trebuie sa fie urmatorul:

    pana la DN 100 5 buc

    Peste DN 100 pana la DN 150 6 buc

    Peste DN 150 pana la DN 200 7 buc

    Peste DN 200 pana la DN 300 9 buc

    Peste DN 300 pana la DN 400 10 buc

    Peste DN 400 pana la DN 600 13 buc

    Peste DN 600 pana la DN 700 15 buc

    La diametre nominale de peste DN 700 sau la sectiuni ovale (nerotunde), distanta intre punti, masurata la inelul exterior, poate fi de max.250 mm.

    Constructiile de sprijin pot fi montate inainte sau dupa aplicarea materialelor de izolatie.

    Inele de rezemare din banda de otel vor fi inchise cu suruburi cu diametrul min.6 mm.

    The number of spacer webs per ring shall be at least:

    to DN 100 5 pcs

    over DN 100 to DN 150 6 pcs

    over DN 150 to DN 200 7 pcs

    over DN 200 to DN 300 9 pcs

    over DN 300 to DN 400 10 pcs

    over DN 40 to DN 600 13 pcs

    over DN 600 to DN 700 15 pcs

    If the nominal diameter is over DN 700 or the cross-section not circular, the distance between the webs, measured on the outer ring, shall be 250 mm maximum.

    The supporting structures may either be installed before or after the insulating materials are installed.

    The supporting rings made of steel strip shall be closed using bolts of at least 6 mm diameter.

  • Pag 12 / Page 12 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    Pentru evitarea formarii de punti termice, puntile de distantare care sunt sudate cu inelele de rezemare vor fi izolate cu un strat gros de material pe toata suprafata inelului.

    Pentru aparate si conducte, structura si fizarea constructiilor de sprijin vor fi la fel

    To prevent thermal bridges from forming, the supporting rings with welded on spacer webs must have a suitably thick layer of insulation over the entire circumference of the supporting ring.

    Design and attachment of supporting structures is the same for both piping and installations.

    4.2.2 Prevenirea coroziunii de contact

    Trebuie avut grija ca in nici un loc sa nu se asambleze metale care produc coroziune de contact. In aceste situatii trebuie sa fie prevazuta o insertie adecvata (de ex. panza din fibra de sticla).

    4.2.3 Interzicerea operatiilor de sudura provizorie (ajutatoare) pentru executarea izolatiei

    Pentru executarea izolatiei, pe santier nu sunt permise operatiile de sudura la rezervoare, conducte sau alte constructii.

    4.2.4 Aplatizarea executata din motive de spatiu

    In locurile unde, din motive de spatiu, trebuie redusa grosimea izolatiei, va fi prevazuta o apaltizare in invelisul metalic, executata profesionist. De semenea, in aceste locuri, invelisul de tabla va trebui sa fie complet inchis. La aplatizare se va tine cont de dilatatia longitudinala a tevii.

    4.2.5 Strapungerile

    Decupajele facute pentru strapungerile in mantaua de tabla trebuie sa fie adaptate cu precizie dupa forma elementului care strapunge tabla.

    4.2.2 Precautions to prevent contact corrosion

    Ensure that metals which could cause contact corrosion do not touch each other at any point. If there is a risk, a suitable intermediate layer should be inserted (e.g. glass mat).

    4.2.3 Ban on temporary welds for insulation

    Welding work on tanks, piping or other structures in order to install insulation is not permitted on the building site.

    4.2.4 Flattening in restricted spaces

    In places where the insulation thickness has to be reduced because space is restricted, the sheet metal covering may be flattened if carried out professionally. In addition, the sheet metal jacket must be completely closed in these places. Where the sheet metal is flattened, pipe expansion in a longitudinal direction shall be taken into consideration.

    4.2.5 Penetrations

    Cut-outs for sheet metal jackets penetrations must fit the shape of the penetrating part exactly.

    4.2.6 Grosimea saltelelor de izolatie

    Decupajele care nu sunt facute dupa forma trebuie sa fie prevazute cu rozete potrivite, care vor fi insurubate in mantaua de tabla cu ajutorul suruburilor pentru tabla.

    La grosimi de izolatie de peste 80 mm vor fi folosite mai multe straturi, a caror imbinare se va intrepatrunde atat pe lungime cat si pe latime.

    4.2.7 Montarea saltelelor de izolatie

    Saltelele vor fi prinse cu carlige zincate 2 x 125 mm. La tevi cu diametrul pana la DN 80 se poate folosi si sarma infasurata.

    Saltelele vor fi strans asezate una langa alta, incat la

    4.2.6 Insulating mat thickness

    If the cut-outs do not fit exactly, cover plates shall be used that are attached to the sheet metal jacket with tapping screws.

    When the insulation thickness is over 80 mm, several layers shall be used with the joints staggered both lengthwise and crosswise.

    4.2.7 Insulating mat installation

    The mats shall be attached with galvanised hooks measuring 2 x 125 mm. Where pipe diameters are below DN 80, binding wire may also be used.

    The mats shall be pushed up against each

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 13 / Page 13

    punctele de imbinare (de cusatura) sa se obtina o grosime uniforma

    4.2.8 Etanseitatea la apa/protectia la umezeala Invelisurile de tabla protejeaza izolatia la deteriorarile mecanice si la intemperii:

    suprapunerile si bordurile vor fi amplasate in

    asa fel incat sa impiedice patrunderea umezelii in izolatie ;

    de aceea, invelisurile metalice, mai ales cele din punctele terminale si la decupajele pentru strapungerile de orice fel, vor fi etansate la apa (apa de ploaie sau de curatat).

    Calotele din partea de sus, de ex.la armaturile montate vertical si orizontal:

    vor fi prevazute cu o inclinare de 5%, pentru a nu permite acumularea apei

    racordurile vor fi etansate cu material corespunzator

    Toate racordurile, strapungerile si racordurile zonelor cu decupaj:

    vor fi etansate suplimentar cu material adecvat ;

    other to ensure that the density is uniform throughout, even at the joints.

    4.2.8 Water tightness / protection against penetrating moisture

    Sheet metal covering protects insulating materials against physical damage and the effects of the weather:

    overlaps and beading shall be so located as not to allow any moisture to penetrate the insulation,

    sheet metal coverings, especially at the ends and cut-outs in all kinds of penetrations shall therefore be watertight (impervious to rain and cleaning water).

    Overhead bases, e.g. on vertically and horizontally installed fittings:

    shall all be at a gradient of 5% to prevent water from collecting,

    shall have connections sealed with suitable sealing material.

    All sockets, penetrations and plate connections:

    shall also be sealed with suitable material,

    inainte de aplicarea masei de etansare, tolele vor fi curatate si uscate pe suprafetele unde vor fi etansate, pentru o mai buna aderenta.

    in the areas to be sealed, the plates must be cleaned and dried before the sealing compound is applied to ensure good adhesion.

    4.2.9 Umplerea sectiunilor transversale

    La conducte, sectiunile transversale de izolat vor fi umplute complet cu saltelele de vata izolanta. Pentru aceasta se vor alege saltele cu lungime corespunzatoare pentru a obtine un strat de vata usor comprimat.

    4.2.9 Filling the insulation cross-sections

    The insulation cross-sections for piping must be filled over the whole area with insulating wool mats. When cutting the insulating wool, ensure that it is long enough to create a slightly compressed insulating wool layer.

  • Pag 14 / Page 14 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    4.2.10 Flanse si armaturi

    4.2.10.1 Generalitati

    Flansele si armaturile trebuie izolate cu calote de tabla detasabile (la protectie termica completa).

    Calotele vor fi executate conform AGI Q 01.

    Pentru o montare si demontare usoara, aceste elemente detasabile vor fi prevazute cu inchizatoare cu parghie cotita (vezi punctul 2.3.2.5).

    Daca armaturile sunt legate intre ele direct cu flanse, atunci fiecare armatura in parte va fi izolata. Imbinarea cu flansa ramasa libera va fi protejata impotriva patrunderii umezelii printr-un bandaj de tabla montat in jurul lamelelor flansei. Acest bandaj trebuie sa intre in decupajele calotei invecinate cu cca. 50 mm.

    4.2.10.2 Grosimea tablei pentru mantale si capacele calotelor

    Grosimea tablei pentru mantalele calotelor va fi aleasa conform tabelelor de la punctele 4.6.1, 4.6.2 si 4.6.3. In principiu, capacele calotelor trebuie realizate din tabla cu grosimea de 1 mm.

    4.2.10.3 Legarea mantalelor calotelor cu capacele calotelor

    Capacele calotelor vor fi legate cu mantalele acestora prin inclichetare. La calotele verticale sau orizontale, capacul respectiv mantaua de sus vor fi executate cu o inclinare de 5 % pentru scurgerea apei. Pentru rigidizare, mantaua care la imbinare intra dedesubt va fi prevazuta la cusatura cu o indoitura lata de 10 mm, in unghi drept. Mantaua care se suprapune la inclichetare trebuie sa fie prevazuta la cusatura cu o bordura de intarire, paralela cu marginea.

    4.2.10.4 Suprapunerea elementelor calotei

    Suprapunerea fiecarui element la cusatura trebuie sa fie de min.25 mm.

    4.2.10 Flanges and fittings

    4.2.10.1 General

    Flanges and fittings must be insulated with removable plate caps (for complete thermal insulation).

    Caps shall comply with AGI Q 01.

    Toggle fasteners must be attached to these removable insulation parts for easier detachment and replacement (see Sec. 2.3.2.5).

    If fittings are directly flanged to each other, each one shall be insulated individually. The remaining free flanged joint shall be protected against moisture and wetness penetrating by placing plate banding beaded on both sides round the flange faces. This plate banding must protrude approx. 50 mm into the cut-outs for the covers on the adjacent fitting.

    4.2.10.2 Plate thickness for cap jackets and cap

    covers

    The plate thicknesses for cap jackets shall be selected in accordance with the tables in Sec. 4.6.1, 4.6.2 and 4.6.3. The cap covers must generally be made of 1 mm thick sheet.

    4.2.10.3 Connecting cap jackets to cap covers

    The cap covers shall be connected to the cap jackets by snapping into place. If the caps are vertical or horizontal, the upper cover or jacket must drain off the water at a gradient of at least 5%. The cap jacket underneath must have a right-angled inwardly turned edge at least 10 mm wide for reinforcement at the seam. The cap jacket on top must be parallel to the edge with reinforcing beading at the seam.

    4.2.10.4 Overlapping cap parts

    The individual cap parts must overlap at least 25 mm at the seam.

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 15 / Page 15

    4.2.10.5 Lungimea calotei

    Lungimea calotei trebuie sa fie astfel gandita incat aceasta sa se suprapuna peste izolatia invecinata cu o distanta egala cu grosimea izolatiei tevii. Mantaua de tabla trebuie sa nu acopere presgarnitura sau alte elemente de intretinere, la nevoie chiar daca astfel se reduce din grosimea de izolatie.

    4.2.10.6 Bride pentru tabla

    Pe interiorul calotei vor fi prevazute bride de tabla, fixate de mantaua calotei prin nituri oarbe. Distanta intre bride, masurata pe circumferinta exetrioara a izolatiei, nu trebuie sa depaseasca 30 cm.

    4.2.10.7 Calote pentru stuturi

    Executie vezi Anexa 5, desene.

    4.2.10.8 Constructii de rezemare si suspendare a tevii

    Pentru ele se vor face decupaje cu precizie in mantaua de protectie la intemperii. Constructiile de suspendare care strapung mantaua de protectie la intemperii trebuie sa fie protejate la apa de ploaie prin obturatoare si material de etansare adecvat.

    4.2.10.9 Inchiderea izolatiei(in afara protectiei la atingere)

    Pentru prevenirea infiltrarii apei de ploaie in partea de sus, izolatiile la cald la conductele verticale nu trebuie sa fie pe verticala. De aceea, izolatia va fi continuata pana cand va ajunge sa se termine peste bolta din plan orizontal.

    4.2.10.5 Cap length

    The cap must be long enough to overlap the adjacent pipe insulation by one pipe insulation thickness. The sheet metal jacket must leave the stuffing box or other maintenance device free, if necessary at the cost of the insulation thickness.

    4.2.10.6 Plate holders

    Plate holders shall be provided for the inside of the cap that are attached to the cap jacket with blind rivets. The distance between the plate holders, measured on the outer circumference of the insulation, shall not exceed 30 cm.

    4.2.10.7 Socket caps

    For design, see Appendix 5: Drawings.

    4.2.10.8 Pipe supports and hangers

    Pipe supports and hangers shall be cut out of the weatherproof jacket exactly to fit their shape. The hanger structures penetrating the weatherproof jackets must generally be fitted with covers and sealed against rainwater with suitable sealing material.

    4.2.10.9 Insulation ends (except personnel protection)

    To prevent rainwater penetrating at the top, thermal insulation on vertical piping must not start in the vertical area. The insulation must therefore extend far enough over the bend so as to end in the horizontal plane.

    4.3 Izolatia rezervoarelor verticale 4.3.1 Generalitati

    La mantaua metalica a rezervoarelor verticale, pentru fixarea tablei trapezoidale la nivelul streasinei si la punctul de baza, este necesar un profil de cornier metalic (livrat de constructorul rezervorului).

    Profilul de la nivelul streasinii serveste totodata si la ancorarea tirantilor din izolatia acoperisului.

    Inchiderea tablei mantalei tabla fundului rezervorului va fi realizata in unghi si cu posibilitatea de scurgere a apei.

    La punctul de baza, constructia izolanta va fi cu 200 mm peste fundul rezervorului, cu o

    4.3 Insulating vertical containers (tanks)

    4.3.1 General

    An angled section (to be supplied by the tank manufacturer) is required round the steel jacket on vertical containers (tanks) for attaching the trapezoidal sheet at the top and the bottom.

    The angled section at the top also serves at the same time to anchor the tie rods required for roof insulation.

    The end of the jacket plates bottom plate shall be at an angle and provided with a suitable water drain.

    At the bottom, the insulation structure shall be provided with a joint cap on one side with

  • Pag 16 / Page 16 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    calota de imbinare care pe o latura este din tabla perforata.

    Toate celelalte substructii vor fi realizate de executant.

    perforated plate 200 mm above the tank floor.

    The contractor shall provide all the other auxiliary structures.

    Pentru intreaga constructie izolanta, cu elemente de fixare si substructii, se va prezenta un calcul de rezistenta / stabilitate, impreuna cu desenele de constructie si executie (reglementare pentru cazuri individuale).

    Stress analysis with design and working drawings shall be submitted (individual case studies) for the entire insulation structure, such as fastenings and auxiliary structures.

    4.3.2 Rezervoare verticale, standardizate (tancuri)

    Pentru rezervoarele izolate care sunt receptionate prin birouri de etalonare va fi prevazut un straif de izolatie demontabil cu o inaltime de 0,5 pana la 1 m, in zona cusaturii orizontale de sudura, la capatul superior al primei virole.

    Pentru a putea folosi acest starif izolant, saltelele de izolatie, tabla mantalei de protectie la intemperii si inelele de distantare trebuie sa fie elemente usor demontabile si sa se poata face o masuratoare a circumferintei rezervorului, cu o banda de masurare, in zona primei cusaturi circulare (cca. 100 mm deasupra sau dedesubtul acesteia).

    4.3.3 Suprafata mantalei - fixare

    Placile de izolatie rezistente la compresie vor fi fixate astfel: greutate volumetrica cca 100 kg/m3, imbinari segmentate, sustinute cu benzi de strangere din otel superior (1.4301) de 19 mm latime, la intervale de 500 mm pe orizontala si la cca 2000 mm pe verticala.

    Substructia de rezistenta, bandajele si celelalte vor fi fabricate din otel superior (1.4301).

    Elementele pentru accesul pe scari, guri de vizitare, placutele de fabricatie, conducte, benzile de impamantare si altele similare, ca si stuturile si calotele stuturilor care sunt insurubate de mantaua de tabla a izolatiei rezervorului, vor fi fabricate din tabla de Al de 1,2 mm neteda.

    4.3.4 Suprafata acoperisului

    Substructiile de rezistenta cum ar fi tirantii cu consolele de prindere si inelul de ancoraj (inclinat) pentru sustinerea si ancorarea tablariei vor fi fabricate din otel zincat la cald. Consolele pentru tiranti vor fi fixate de profilul de cornier metalic prin bolturi filetate, la distanta necesara.

    Placile de izolatie rezistente la compresie (greutate volumetrica cca 100 kg/m3) vor fi

    4.3.2 Calibrated, vertical containers (tanks)

    If insulated containers are to be certified by the weights and measures office, a removable insulating strip, 0.5 to 1 m high, shall be provided in the area of the horizontal weld seam at the upper end of the first section.

    For this insulating strip, the insulating mats, weatherproof plate and spacer rings must be easily removable and enable measurement of the tanks circumference with a tape measure in the area of the first seam (approx. 100 mm above or below it).

    4.3.3 Fixed jacket area

    Pressure-resistant insulation boards shall be fitted as follows: density approx. 100 kg/m3, joints staggered, held in place with 19 mm wide stainless steel tightening bands (1.4301) at horizontal intervals of 500 mm and vertical intervals of approx. 2,000 mm.

    Static auxiliary structures, banding and similar shall be made of stainless steel (1.4301).

    Inserts for steps, manholes, nameplates, piping, earthing strips and similar as well as sockets and socket caps that are permanently bolted to the tank insulations plate jacket shall be made of 1.2 mm smooth aluminium plate.

    4.3.4 Roof area

    Static auxiliary structures, such as tie rods with tensioning brackets and pole rings for holding and anchoring plating shall be made of hot-dip galvanised steel. The tensioning brackets for the tie rods shall be attached to the angled section with stud bolts at the required intervals.

    Pressure-resistant insulation boards (density approx. 100 kg/m3) shall be laid as follows:

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 17 / Page 17

    prinse astfel: imbinari segmentate, izolatie cu grosimea pana la max.50 mm, cu un strat, peste 50 mm grosime in varianta cu mai multe straturi.

    La acoperis, ca manta de protectie la intemperii se vor folosi numai benzi (rame) de tabla faltuite.

    joints staggered, single layer up to 50 mm insulation thickness maximum and multiple layer over 50 mm insulation thickness.

    Only lengths of crimped plating shall be used on the roof as the weatherproof jacket.

    Tolele segmentate pentru acoperis vor fi astfel executate:

    tabla de Al Mg 2 Mn 0,8 grosime 1,2 mm, latime 1000 mm, neteda, cu falt vertical, rame (sine) de acoperis corespunzatoare, fabricate dintr-o bucata, de la punctul de nivel streasina pana la calota stalpulu (consolei) .

    eclisele necesare de ancorare, tirantii cu falt

    vertical vor fi construite din otel superior (1.4301) .

    pentru insurubarea tolelor segmentate cu

    eclisele de ancorare si ramele de acoperire se vor folosi suruburi pentru masini din otel superior (1.4301).

    tabla de trecere de la acoperis la perete va fi

    tabla de Al, neteda, cu 1,2 mm grosime, rezistenta la tractiune Trebuie avuta in vedere aerisirea izolatiei peretelui .

    prestatia include si calota de stalp cu substructia si alte operatii de formare.

    4.3.5. Inscriptionarea rezervoarelor

    Dimensiunea tablei, asa cum s-a stabilit in contract.

    Montarea tablei inscriptionate este inclusa in volumul de lucrari de montaj

    Roof segmental plates shall be provided as follows:

    aluminium plate Al Mg 2 Mn 0.8, 1.2 mm thick, 1,000 mm wide, smooth, with standing seam and suitable cover strips, made from one piece from the top to the pole cap.

    the required anchoring, tie rods with standing seam, shall be made of stainless steel (1.4301).

    machine screws made of stainless

    steel (1.4301) shall be used for fastening the segmental plates to the anchoring and cover strips.

    the transition from roof to wall shall

    consist of smooth, 1.2 mm thick aluminium plate for high tensile strength. Ventilation of the wall insulation shall also be taken into consideration.

    the pole cap with substructure and all other shaping work is part of the scope of delivery.

    4.3.5 Tank labelling

    The plate size for the tank labelling shall be specified when the contract is awarded.

    Mounting the labelled plate is part of the scope of delivery.

    4.4 Izolatia aparatelor si rezervoarelor (cu si fara incalzire)

    Ca principiu, izolatia la cald a aparatelor nu difera de cea a conductelor.

    La aparatele verticale ca si la cele orizontale, la intervale de 980 mm se vor amplasa constructii de sustinere, a caror inaltime va fi egala cu cea a izolatiei. Saltelele din vata minerala de 1 m latime, adaptate la

    4.4 Tank and installation insulation (with and without tracing)

    There is no difference generally between thermal insulation for installations and for piping.

    Supporting structures of a height corresponding to the insulation thickness shall be mounted on vertical and horizontal installations at intervals of 980 mm. The 1 m wide mineral wool mats cut to fit the

  • Pag 18 / Page 18 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    circumferinta aparatului, vor fi asezate intre inelele de rezemare, cu rosturi etanse iar la imbinarile pe lungime vor fi cusute cu sarma sau stranse cu carlige din otel zincate.

    circumference of the installation shall be placed between the supporting rings with no space between joints and sewn with wire on the long side joints or held together with galvanised steel hooks.

    Izolatia va fi astfel aplicata la aparat incat, in timpul functionarii, aceasta sa nu se deplaseze sau sa se taseze.

    Gurile de vizitare vor fi izolate, cu conditia ca acest lucru sa nu fie interzis din motive tehnologice.

    Toate suporturile izolatiei, cum ar fi inele de rezemare, verigi etc sudate cu aparatul vor fi stabilite deja in comanda pentru achizitia aparatului si vor fi sudate de productaor

    The thermal insulation must be so attached to the installation that it cannot become displaced or give way during operation.

    Unless the process would indicate otherwise, manholes shall be thermally insulated.

    All insulation holders, such as supporting rings, eyes, etc., that are welded to the installation shall be specified before the installation is ordered and welded on by the manufacturer.

    4.4.1 Materiale de izolatie

    Pentru materialul de izolatie a rezervoarelor vezi cap. 2.2.1.

    Toate imbinarile vor fi intrepatrunse intre ele, in special la izolatia in mai multe straturi.

    Saltelele vor fi montate cu asigurare la alunecare.

    La tolele de protectie la intemperii, tola superioara se va suprapune peste tola inferioara.

    4.4.2 Placute de constructie

    Pentru placutele de constructie (producator, etc) se vor executa decupaje in izolatie.

    Suprafetele care trebuie sa ramana libere trebuie sa fie separate prin inserarea de gulere de tabla si rozete.

    4.4.3 Rezervoare cu diametru Da = 1.220 mm

    Sub aspectul constructiei si al grosimilor de izolatie, rezervoarele cu diametrul exterior pana la 1220 mm vor fi izolate ca si conductele, vezi tabelul 4.3. (Anexa).

    4.4.1 Insulating material

    Sec. 2.2.1 applies to insulating material for tanks.

    All butt joints shall be staggered, especially when multiple layer insulation is used.

    Mats shall be prevented from slipping.

    On the weatherproof plating, the top plate must overlap the bottom one.

    4.4.2 Nameplates

    There must be cut-outs in the insulation for tag holders (nameplates, etc.).

    Surfaces that remain free shall be finished off with inserts with plate collars and cover plates.

    4.4.3 Tanks up to OD = 1,220 mm

    Tanks up to an outside diameter of 1,220 mm shall be insulated like piping in terms of design and insulation thickness, see Table 4.3 (Appendix).

    4.4.4 Rezervoare cu diametru exterior Da > 1.220 mm

    Rezervoarele cu diametrul exterior > 1220 mm vor avea aceleasi grosimi de izolatie ca si la izolatia perete plan, vezi ultimul rand din tabelul 4.3. (Anexa).

    4.4.5 Fundul rezervoarelor si fundul boltit (tip Zepelin)

    Fundul rezervoarelor va fi izolat in functie de forma sa.

    4.4.4 Tanks of OD >1,220 mm

    Tanks with an outside diameter over 1,220 mm shall be provided with an insulation thickness as for a flat wall, see last line of Table 4.3 (Appendix).

    4.4.5 Tank bottoms, zeppelin floors

    Tank bottoms shall be insulated to suit the bottom shape.

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 19 / Page 19

    La rezervoarele cu diametrul mic si cu fund putin boltit (pana la cca 1000 mm), punctele terminale ale izolatiei aparatelor vor fi executate in forma de palnie, pentru scurgerea apei iar la diametre mari, in forma Zeppelin. Segmentele vor fi astfel croite incat sa nu permita infiltrarea apei.

    If the diameters are small and with little bottom arching (up to approx. 1,000 mm), the insulation ends on installations should be a flat rain-repelling funnel shape and zeppelin shape for large diameters. The segments shall be so designed as to prevent water from penetrating.

    4.4.6 Izolatia la o temperatura a rezervorului>250C

    La o temperatura a rezervorului > 250C izolatia si mantaua metalica de protectie la intemperii vor fi astfel executate incat sa poata prelua dilatatia termica in ambele axe.

    4.4.6 Insulation at tank temperatures >250C

    If the tank temperature is over 250C, the insulation and weatherproof jacket shall be so designed as to absorb thermal expansion in both axes.

    4.4.7 Suprapunerea mantalei metalice la intemperii

    Mantaua de protectie la intemperii trebuie sa se suprapuna cu 100 mm pe orizontala si 50 mm pe verticala.

    4.4.8. Insurubarea mantalei metalice de protectie la intemperii

    Toate cusaturile nerotunjite vor fi insurubate la distante de max.150 mm cu suruburi de cupelatie din material nr. 14301 SR EN 1481-01 sau SR EN 1479-03 min. 4,2 x 13 mm.

    4.4.7 Overlapping of the weatherproof jacket

    The weatherproof jacket must overlap 100 mm horizontally and 50 mm vertically.

    4.4.8 Attaching the weatherproof jacket

    All seams that are not rounded must be attached at intervals of 150 mm maximum with tapping screws made of material No. 1.4301 SR EN 1481-01 or SR EN 1479-03 at least 4.2 x 13 mm.

    4.4.9 Bordura proeminenta la margini.

    Marginile fiecarei tole va fi bordurata pentru rigidizare.

    4.4.10 Etansarea in zonele de intrerupere a izolatiei

    La izolatiile intrerupte de stuturi si alte elemente, imbinarile vor fi etansate cu masti sau cu material corespunzator si vor fi insurubate cu suruburi de cupelatie din otel superior. Se aplica in mod corespunzator punctul 4.6.1.

    4.4.11.Distantierele si reazemele

    La toate mantalele de rezervoare, distantierele vor fi prevazute la intervale de cca.980 mm. In orice caz, la liniile de tangenta cap/ manta va fi prevazut cate un inel de distantare. Constructiile de distantare vor fi, in principiu, zincate (calitate similara a materialului).

    La temperaturi prescrise de peste + 150C:

    Puntile distantiere vor fi separate de inelul distantier prin straturi intermediare de izolatie fara asbest. Asezarea puntilor la rezervor va fi punctiforma.

    Distantierele trebuie sa permita dilatatia

    4.4.9 Edge beading

    The edges of every plate shall be beaded for stiffening purposes.

    4.4.10 Sealing interruptions in the insulation

    The connections on insulation that is interrupted with connections and other parts shall be sealed with covers or suitable material and fastened with stainless steel tapping screws. Sec. 4.6.1 shall apply by analogy.

    4.4.11 Spacers and supports

    Spacers shall be provided at intervals of approx. 980 mm for all tank jackets. One spacer ring must be attached at the tangent lines between top and jacket in every case. Spacer structures shall generally be galvanised (material uniformity).

    At design temperatures over +150C:

    The spacer webs shall be separated from the spacer ring with asbestos-free intermediate insulating layers. The webs must touch the tank at various points.

    The spacers shall permit any radial expansion

  • Pag 20 / Page 20 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    radiala, fara a se deforma

    4.4.12. Suprapunerea cusaturilor verticale

    La rezervoarele verticale, cusaturile verticale vor fi astfel suprapuse incat deschiderea cusaturii sa fie orientata spre est.

    of the tank jacket occurring without becoming deformed.

    4.4.12 Overlapping vertical seams

    The vertical seams on upright containers shall overlap with the seam opening pointing to the east.

    4.4.13 Punctelele terminale la aparatele si coloanele verticale

    La aparatele la care izolatia incepe cu partea cilindrica (de ex. mantalele coloanelor la ramele verticale), inainte de prima virola, este necesara executarea unui punct terminal inclichetat, sub forma de tabla perforata, care inchide izolatia pe orizontala inspre manta.

    4.4.14 Zona ramelor verticale

    Aparatele si fundul coloanele cu incalzire vor fi prevazute cu o izolatie in rama verticala conform tabelelor 4.1 si 4.2 (Anexa).

    4.4.13 End pieces on vertical installations and columns

    Installations where the insulation starts with the cylindrical part (e.g. column jackets on upright frames) must be provided with a perforated plate end piece that finishes off the insulation horizontally to the jacket before the first jacket section is mounted.

    4.4.14 Upright frame area

    Heated installations and column bottoms shall be provided with insulation in the upright frame to Tables 4.1 and 4.2 (Appendix).

    Fundul fara incalzire la aparatele si coloanele cu rama nu vor fi izolate, in principiu.

    Fundul fara incalzire al aparatelor fara rama va fi izolat conform tabelelor 4.1 si 4.2 (Anexa).

    Non-heated bottoms of installations and columns with frames shall not generally be insulated.

    Non-heated bottoms of installations without frames shall be insulated as indicated in Tables 4.1 and 4.2 (Appendix).

    4.5 Izolatia conductelor Grosimea necesara a izolatiei se gaseste in tabelele 4.1, 4.2 si 4.3 (Anexa).

    4.5 Piping insulation

    Refer to Tables 4.1, 4.2 and 4.3 (Appendix) for the required insulation thickness.

    4.5.1 Conducte (cu si fara incalzire cu abur)

    La conductele orizontale, cusatura longitudinala a saltelelor va fi amplasata sub axa tevii.

    Elementele de conducta, cum ar fi coturile, piesele in T, fitinguri armate (Weldolet), piese de reductie, vor fi izolate cu bucati decupate de saltea. Rosturile vor fi umplute cu vata. Filtrele (sitele) de protectie incalzite vor fi izolate cu calote.

    Impletitura de sarma zincata va fi asezate intotdeauna pe exterior (la circumferinte mari).

    Pentru a preveni defectele de coroziune generata de contactul dintre metalele cu potential electric diferit, intre plasa de sarma si mantaua de protectie la intemperii se va introduce o panza izolanta (de ex.panza de

    4.5.1 Piping (with and without steam tracing)

    When piping runs horizontally, the longitudinal seam on the mats should be located under the pipe axis.

    The piping parts, such as elbows, tees, weldolets and reducers, shall be insulated with mat parts cut to shape, as described above. Where joints are required, they shall be stuffed with wool. Heated protective screens shall be insulated with caps. The galvanised wire netting should always be located on the outside (where the circumference is greater). To prevent corrosion damage from metals with different electric potential touching, an insulating mat (e.g. glass mat) shall be inserted between the wire netting and weatherproof jackets.

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 21 / Page 21

    fibra de sticla).

    In executarea izolatiei la cald nu se face nici o diferentiere intre teava cu incalzire si cea fara incalzire, sub aspectul materialului de izolatie si al mantalei de protectie la intemperii.

    Urmatoarele elemente de conducta nu vor fi izolate

    There is no difference in the thermal insulation required between pipes with or without tracing in terms of the insulating material and weatherproof jackets. The following piping parts shall not be insulated:

    4.5.1.1 Exceptia 1

    Rosturile de dilatatie, imbinarile mobile (rotitoare) si dispozitivele de evacuare a condensului cu exceptia dispozitivelor Armstrong in statiile de colectare condens.

    4.5.1.2 Exceptia 2

    Flansele de inalta presiune (> 56 bar abur) nu trebuie sa fie izolate, intrucat dilatatia bolturilor poate duce la scurgeri. Ele vor fi prevazute cu tabla perforata zincata, pentru protectie proprie, fara insertie izolanta. Decizia va fi luata de responsabilul de proiect OMV Petrom.

    4.5.1.3 Exceptia 3

    Armaturile si imbinarile cu flansa nu vor fi izolate daca se executa izolatie normala (OMV Germania).

    4.5.1.1 Exception 1

    Expansion and revolving joints as well as steam traps with the exception of Armstrong condensate coolers in the condensate collection systems.

    4.5.1.2 Exception 2

    High-pressure flanges (>56 bar - steam) must not be insulated, as bolt expansion may lead to leakage. They shall be provided with galvanised perforated plate as personnel protection without insulation inlay. Specifications available from the OMV Petrom project manager.

    4.5.1.3 Exception 3

    Fittings and flanged joints shall not be insulated for normal insulation (OMV Germany).

    4.5.1.4 Exceptia 4

    Tevi in conducte de protectie.

    4.5.1.4 Exception 4

    Pipes in conduits.

    4.5.2 Izolatia elementelor de instalatii (conducte, pompe etc) cu incalzire electrica asociata

    Conductele, rezervoarele etc cu incalzire electrica trebuie sa fie infasurate cu folie de Al inainte de aplicarea izolatiei. Capetele foliei vor fi lucrate la fel ca un falt vertical bordurat. In zonele boltite ca si la imbinarea foliei, aceasta va fi lipita cu benzi de etansare

    Pentru marcare vezi standardul aferent fiecarui sistem de incalzire.

    La toate punctele terminale trebuie montate discuri frontale cu protectie adecvata (de ex discuri PU), care impiedica deteriorarea sau sectionarea izolatiei de catre conductele de incalzire, la solicitari mecanice

    4.5.2 Insulation of system parts (piping, pumps, etc.) with electric tracing

    Electrically heated piping, tanks, etc. must be wrapped in aluminium foil before the insulation wool is installed. The foil ends shall be finished off similar to a beaded standing seam. In the area of the elbows and foil joints, the film shall be bonded with sealing strip.

    For labelling, see the applicable standard for electric tracing.

    Front discs with suitable protection (e.g. PU discs) must be fitted to all the ends to prevent the heat conductors from being damaged or cut off if the insulation is subject to loading.

    4.5.3 Izolatia la cald rezistenta la trafic

    Izolatiile la conductele care sunt pozate orizontal aproape de sol sau la podeste si poduri de conducte si pe care se circula

    4.5.3 Crushproof thermal insulation

    Insulation on piping that is laid horizontally near the ground or on platforms and pipe bridges and are sometimes walked on must

  • Pag 22 / Page 22 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    ocazional, trebuie sa fie executate ca izolatii rezistente la trafic.

    Constructia este urmatoare (vezi Anexa 5):

    a) Distantiere la intervale de 500 mm din metal, la incalzire electrica disc de rezemare PU cu latime de 50 mm ;

    b) Cofraj de vata minerala ;

    c) Semicofraj de repartizare a eforturilor de compresie din tabla de Al-Zn, 1 mm grosime ; d) Manta de protectie la intemperii.

    Beneficiarul este cel care stabileste daca la acoperisurile de la rezervoarele verticale (tancuri) va fi prevazuta izolatie la cald rezistenta la trafic si care este volumul de operatii si executia

    be crushproof.

    Structure as follows (see Appendix 5):

    a) Spacers every 500 mm made of metal; if electric tracing is used, PU supporting shells 50 mm wide

    b) Mineral wool shells

    c) Pressure distributing half shell made of aluminium-zinc plate 1 mm thick

    d) Weatherproof jacket.

    The customer shall specify whether there shall be crushproof thermal insulation on the roof of vertical containers (tanks) and what scope and design it shall be.

    4.5.4 Manunchiuri de tevi

    Manunchiurile de tevi (cu exceptia celor cu incalzire), care se afla intr-o manta metalica comuna, trebuie sa fie izolate in comun, cu saltele de grosimea specificata. Grosimea tablei se orienteaza dupa diametrul mic al manunchiului conform tabelelor de la punctele 4.6.1, 4.6.2 si 4.6.3

    Grosimea izolatiei trebuie sa fie cu min.10 mm mai mare decat cornierul metalic care fixeaza manunchiul. La manunchiuri verticale, cornierele metalice pot fi incluse in constructia de rezemare a izolatiei.

    4.5.4 Pipe bundles

    Pipe bundles (except traced pipes) that are located inside a common sheet metal jacket shall be insulated together with mats of the specified thickness. The plate thickness to be used depends on the small diameter of the bundle as indicated in the tables in Sec. 4.6.1, 4.6.2 and 4.6.3.

    The insulation thickness should be at least 10 mm larger than the angled sections that hold the bundle together. The angled sections may be used as a supporting structure for the insulation on vertical bundles.

    4.6 Mantaua de protectie la intemperii Imediat dupa aplicare, toate izolatiile vor fi protejate la intemperii. Daca, din motive specifice santierului, montarea mantalei de protectie la intemperii nu este posibila, izolatia va fi imediat infasurata cu folie de Al.

    Mantaua trebuie astfel conceputa incat sa impiedice patrunderea apei, chiar si la ploi torentiale. Acelasi lucru este valabil si pentru calote, capote, capace etc ( de ex. capacele / acoperirile pentru elementele care ies in afara mantalei de protectie).

    4.6 Weatherproof jackets

    Immediately after installation, all insulation must be protected against the effects of the weather. If the conditions at the specific building site do not allow a weatherproof jacket to be fitted, the insulation shall be wrapped in aluminium foil immediately.

    The weatherproof jacket must be so designed as to prevent water from penetrating, even in driving rain. This also applies to caps, hoods, triangular covers, etc. (e.g. cover for parts protruding out of the weatherproof jacket).

    4.6.1 Tabla de Al-Zn

    In functie de diametrul exterior al izolatiei, grosimea tablei va masura minimum:

    4.6.1 Aluminium-zinc plate

    The plate shall display the following minimum thickness in relation to the insulation outside diameter:

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 23 / Page 23

    Diametru exterior izolatie (mm

    Grosime tabla *) (mm)

    < 130 mm 0,6 mm 130 230 mm 0,6 mm 230 340 mm 0,7 mm 340 500 mm 0,8 mm > 500 mm 1,0 mm

    (* conform AGI Q 03 Tabel 7)

    Insulation outside diameter mm

    Plate thickness* mm

    < 130 mm 0.6 mm 130 230 mm 0.6 mm 230 340 mm 0.7 mm 340 500 mm 0.8 mm > 500 mm 1.0 mm

    (*to AGI Q 03 Table 7)

    4.6.2 Tabla de Al (Alu)

    In functie de circumferinta mantalei de protectie la intemperii, grosimea tablei va masura minimum:

    Circumferinta (mm Grosime tabla *) (mm)

    pana la 500 0,6 de la 500 pana la 1000

    0,8

    peste 1000 1,0 rezervor de depozitare 1,2

    (* conform AGI Q 03, Tabelle 7)

    4.6.2 Aluminium plate

    The plate shall display the following minimum thickness in relation to the weatherproof jacket circumference:

    Circumference mm

    Plate thickness* mm

    up to 500 0.6 from 500 to 1000

    0.8

    over 1000 1.0 storage tank 1.2

    (*to AGI Q 03, Table 7)

    4.6.3 Tabla de otel zincata

    In functie de circumferinta mantalei, grosimea tablei va masura minimum:

    Circumferinta (mm) Grosime tabla

    *) (mm) pana la 800 0,6 de la 800 pana la 1250

    0,7

    peste 1250 1,0 (* conform AGI Q 03, Tabel 7)

    Executie analog punctul 4.6.2. tabla de Al.

    .

    4.6.3 Galvanised steel plate

    The plate shall display the following minimum thickness in relation to the jacket circumference:

    Circumference mm

    Plate thickness* mm

    up to 800 0.6 from 800 to 1250

    0.7

    over 1250 1.0 (*to AGI Q 03, Table 7)

    Execution similar to Sec. 4.6.2 aluminium plate.

    4.7 Distantiere De regula, constructiile de distantare sunt zincate (material cu aceeasi calitate).

    Distantierele trebuie montate la toate conductele:

    peste DN 50 si grosimi de izolatie 80 mm si mai mari ;

    de la DN 400 si grosimi de izolatie 40 mm si mai mari. Distanta intre constructiile de sprijin trebuie sa nu depaseasca urmatoarele valori:

    4.7 Spacers

    Spacer structures shall generally be galvanised (material uniformity).

    Spacers must be installed for all piping that is

    over DN 50 and insulation thicknesses of

    80 mm and more; from DN 400 and insulation thicknesses of 40

    mm and more. The space between the supporting structures shall not exceed the following figures.

  • Pag 24 / Page 24 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    Izolatie normala: cca 1000 mm

    Izolatie rezistenta la trafic: cca 500 mm

    Normal pipe insulation: approx. 1000 mm

    Crushproof insulation: approx. 500 mm

    4.8 Imbinari cu surub Cusaturile longitudinale vor fi insurubate cu min.7 suruburi de cupelatie pe m de cusatura.

    4.8 Screwed joints

    The longitudinal seams shall be fastened with at least seven tapping screws per metre seam.

    4.9 Imbinari glisante Imbinarile glisante pentru preluarea dilatatiei (alungirii) tevilor trebuie sa fie realizate ca niste cusaturi circulare suprapuse. Cusaturile dintre acestea vor fi realizate ca bordura in borura. Suprapunerea trebuie sa fie de min.50 mm. La aceste cusaturi nu este permis ca in zona de suprapunere sa existe suruburi.

    Distanta dintre imbinarile glisante nu trebuie sa depaseasca urmatoarele valori:

    Temperatura

    tevii C Distanta maxima dintre

    cusaturi glisante (m) < 100 Nu este necesara 101 150 12 151 200 6 201 300 4 301 400 3 > 400 1

    Observatie:

    Elementele de schimbare a directiei la 90 si discurile frontale la intreruperile in izolatie prin flanse pot fi considerate imbinari glisante.

    Temperaturile de regim se gasesc in listele de conducte.

    4.9 Sliding seams

    Sliding seams for absorbing linear pipe expansion must be overlapped circumferential seams. Seams in between shall be beading in beading. The overlap must be at least 50 mm. Where these seams are used, there may not be any screws in the area of the overlap.

    The distance between the sliding seams must not exceed the following figures:

    Pipe temperature C

    Max. distance between the sliding seams in m

    < 100 None required 101 150 12 151 200 6 201 300 4 301 400 3 > 400 1 Note:

    90 turns and front discs on insulation interruptions before flanges, etc. may be regarded as sliding seams.

    Refer to the piping lists for operating temperatures.

    4.10 Imbinarile la segmentele de arc Toate cusaturile circulare pentru legarea segmentelor de arc trebuie lucrate bordura in bordura. Trebuie sa se aleaga un diametru al mantalei metalice care sa corespunda dimensiunii bordurii, pentru ca sa poata fi preluata in bordura tensiunea aparuta la dilatatia longitudinala.

    4.10 Joining bend segments

    All circumferential seams for joining bend segments shall be beading in beading. A suitable beading size shall be selected for the plate jacket diameter to ensure that the stress occurring during linear expansion can be absorbed in the beading.

    4.11 Imbinarile arcuite

    La imbinarile arcuite (de ex.stuturi pe teava), arcuirea trebuie sa fie de cca. 10-15 mm latime si precis adaptata la forma obiectului. Cusatura va fi insurubata la intervale de min. 10 cm.

    4.11 Tail joints

    If tail joints are used (e.g. socket on pipe), the tail must be approx. 10 15 mm wide and exactly fitted to the object. The tail seam shall be bolted at least every 10 cm.

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 25 / Page 25

    4.12 Inchiderea in punctele terminale la intreruperi in izolatie

    In zonele de intrerupere a izolatiei in fata imbinarilor cu flansa, a armaturilor etc punctul terminal va fi realizat in doua compartimente; vezi si punctul 4.5.2.

    Distanta dintre punctele terminale si latura exterioara a flansei trebuie sa fie: 1 x lungime bolt + inaltime piulita + 10 mm.

    Mantaua metalica trebuie sa fie prevazuta cu o bordura.

    De la DN 100 in sus, punctul terminal trebuie realizat din tabla de grosime 1 mm.

    La DN peste 250 si grosimi de izolatie peste 100 mm, aceste puncte vor fi executate ca niste calote de imbinare.

    4.12 End pieces for insulation interruption

    If the insulation is interrupted before flanged joints, fittings, etc. the ends shall be in two parts, see also Sec. 4.5.2.

    The distance between the end piece and flange outside must be 1 x bolt length + nut height and +10 mm.

    The sheet metal jacket must have beading for holding the end piece.

    If the diameter is DN 100 or over, the end piece shall be made of 1 mm thick plate.

    When the diameter is DN 250 or over and insulation thickness 100 mm or over, the ends shall consist of joint caps.

    4.13 Inchiderile verticale de izolatie La conductele verticale izolate care au flanse neizolate, izolatiile orientate in sus vor fi incheiate cu un con de tabla cu marginea bordurata..

    4.13 Vertical insulation ends

    The insulation facing upwards on vertical, insulated piping with uninsulated flanges must be finished off with a plate cone with beaded edge.

    4.14 Schimbatoare de caldura 4.14.1 Generalitati

    Schimbatoarele de caldura standard, cele cu tevi duble, refierbatoarele etc vor fi izolate comnform instructiunilor pentru rezervoare si conducte.

    4.14.2 Imbinarea cu flansa

    Imbinarile cu flansa nu vor fi izolate. Distanta dintre capatul boltului filetat si izolatie: 45 mm.

    4.14.3 Montarea izolatiei

    Izolatia la schimbatoarele standard va fi montata pe fata mantalei, prin insurubare.

    4.14.4 Calote si compartimente

    Calota din spate si camera de combustie la schimbatoarele standard vor fi izolate numai daca trebuie prevenite pierderile de caldura. Calotele de izolatie la schimbatoare (camerele de combustie, coronamentele mantalei) cu diametrul de pana la 1000 mm vor fi executate ca si constructii usor demontabile, cu inchizatori cu arc si cleme pentru vata de izolatie.

    4.14 Heat exchangers

    4.14.1 General

    Standard heat exchangers, double pipe heat exchangers, reboiler etc. shall be insulated in accordance with the relevant sections as for piping and tanks.

    4.14.2 Flanged joints

    Flanged joints shall not be insulated. Distance from the end of the stud bolt to the insulation: 45 mm.

    4.14.3 Insulation installation

    Insulation on standard heat exchangers shall be mounted on the jacket side with screws.

    4.14.4 Hoods and compartments

    The rear hood and front compartment of standard heat exchangers shall only be insulated if heat loss has to be prevented. Insulation caps on exchangers (compartments, jacket hoods) up to 1,000 mm insulation cap diameter should be easily removable with snap locks and holders for the insulation wool.

    4.14.5 Capul schimbatoarelor de caldura

    Calotele pentru capul schimbatoarelor trebuie astfel montate incat sa nu poata sa alunece.

    4.14.5 Heat exchanger heads

    Caps for heat exchanger heads shall be so mounted that they cannot slip. Suitable

  • Pag 26 / Page 26 Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001

    Prin elemente de sustinere adecvate se va evita inclinarea calotei.

    supports should be used to prevent the caps from being mounted at an angle.

    4.15 Pompe 4.15.1 Generalitati

    Pompele vor fi izolate numai dupa ce s-a obtinut acordul din partea responsabilului de proiect OMV Petrom. Acolo unde izolatia trebuie sa fie demontata in vederea executarii operatiilor de intretinere si control, vor fi prevazute mantale din tabla detasabile. O mare atentie se va acorda pieselor mobile.

    La pompele izolate, capacul sitei sorbului se va lasa liber.

    4.15 Pumps

    4.15.1 General

    Pumps shall only be insulated if so agreed with the OMV Petrom project manager. Where the insulation has to be dismantled for maintenance and inspection purposes, removable sheet metal jackets shall be used.

    Special care must be taken with moving parts. When pumps are insulated, intake filter covers shall be left free.

    4.16 Turbine

    De regula, pentru turbine se foloseste izolatia cu saltele.

    4.16 Turbines

    Mat insulation shall generally be used for turbines.

    4.16.1 Izolatia cu saltele

    Este necesara intocmirea unui plan de dispozitie a saltelelor, conform calculului dimensional. Dupa acest plan, saltelele vor fi confectionate astfel:

    Grosime de izolatie si plan de dispozitie a saltelelor conform specificatiilor producatorului turbinei.

    Planurile de dispozitie vor fi predate responsabilului de proiect OMV Petrom, pentru a se putea executa ulterior operatiile de revizie partiala, demontare si montare.

    4.16.1 Mat insulation

    A mat plan with allowances must be drawn up. The mats shall be produced as follows on the basis of this mat plan:

    Insulation thickness and mat plan to turbine manufacturers specifications.

    The position plans shall be made available to the OMV Petrom project manager to enable inspection work, removal and replacement to be carried out accordingly.

    4.16.2 Executie alternativa izolatie prin pulverizare

    In cazul unei izolatii prin pulverizare se va folosi un material fara asbest. Compozitia exacta va fi precizata in oferta.

    Dupa uscarea completa, izolatia va fi prevazuta cu o manta dura pe baza de ciment fara adaos de asbest, in care rosturile de dilatatie vor fi astfel amplasate incat sa se evite cat mai mult fisurile aparute sub influenta caldurii. Rosturile de dilatatie vor fi etansate cu un material corespunzator, pentru impiedicarea patrunderii uleiului.

    Izolatia partilor care necesita reparatii intense se va face cu saltele izolante din vata minerala (temperatura pana la + 450C). Aceste parti vor fi imbracate cu o manta de Al detasabila

    4.16.2 Alternative spray insulation

    If spray insulation is used, an asbestos-free material shall be selected. The exact composition shall be given in the tender.

    After it has dried completely, a hard jacket on cement basis without any asbestos added shall be applied to the spay insulation with expansion joints located to prevent cracks from occurring as far as possible when exposed to heat. The expansion joints shall be filled with suitable sealing material to prevent oil from penetrating.

    Parts subject to frequent repairs shall be insulated with mineral wool mats (temperatures up to +450C). These parts shall be encased in a removable aluminium

  • Norma Petrom OMV L 3001 / Petrom OMV Standard L 3001 Pag 27 / Page 27

    jacket.

    4.16.2.1 Substructia

    Substructia va fi astfel realizata incat sa corespunda cerintelor pentru izolatii prin pulverizare la turbinele de abur, aceasta insemnand in primul rand:

    Izolatia la toate partile turbinei trebuie sa fie foarte aderenta si sa nu se permita alunecarea sau tasarea acesteia.

    Pentru fixarea distantierelor se vor insuruba bandaje corespunzatoare pe carcasa turbinei.

    In nici un caz, distantierele nu vor fi sudate direct pe carcasa turbinei.

    Prin substructie nu trebuie sa se formeze punti termice.

    4.16.2.1 Substructure

    The substructure shall be so designed as to meet the requirements for spray insulation on steam turbines, e.g. in particular:

    The spray insulation must adhere strongly to all turbine parts and be prevented from slipping or settling.

    Suitable banding shall be fastened to the turbine casing for attaching the spacers.

    Under no circumstances may spacers be welded directly to the turbine casing.

    The substructures must not create any thermal bridges.

    4.16.3 Montarea izolatiei

    Fiecare parte de calota va fi izolata cu saltele izolante prinse pe impletitura de sarma zincata. Plasa de sarma va fi asezata in interior. Saltelele vor fi fixate de mantalele calotei cu ajutorul clemelor pentru tabla. Saltelele vor fi asezate in asa fel incat, dupa asamblarea calotei, sa se obtina un strat izolant inchis si cu grosime uniforma.

    .

    4.16.3 Insulation installation

    The individual cap parts must be covered with insulating mats sewn to galvanised wire netting. The wire netting must be on