Petroleum Development Oman L.L.C. Layout of Onshore Facilities Document ID SP-1127 Document Type Specification Security Restricted Discipline Technical Safety Owner Lucien Van Ham, MSE4 Issue Date 15/10/2018 Version 5.0 Keywords: This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part of this document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted in any form by any means (electronic, mechanical, reprographic recording or otherwise) without prior written consent of the owner.

Transcript of Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Page 1: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman L.L.C.

Layout of Onshore Facilities

Document ID SP-1127

Document Type Specification

Security Restricted

Discipline Technical Safety

Owner Lucien Van Ham, MSE4

Issue Date 15/10/2018

Version 5.0

Keywords: This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part of this document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted in any form by any means (electronic, mechanical, reprographic recording or otherwise) without prior written consent of the owner.

Page 2: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 2 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

This page was intentionally left blank

Page 3: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 3 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

i Document Authorisation

Authorised For Issue

Note to user:

Any deviations from this specification require approval, as detailed in the Managing Deviations from Technical Standards, PR-2066.

Page 4: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 4 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

ii Revision History

The following is a brief summary of the 3 most recent revisions to this document. Details of all revisions prior to these are held on file by the issuing department.

Version No.

Date Author Scope / Remarks

3.0 Oct-10 Ian Jewitt (MSE4)

Updated to bring in line with current industry practice i.e. GE GAP.2.5.2, UK HSE CD211, API RP 752 and API RP 753

4.0 Mar-16 Anoop Radhakrishnan (MSE41)

SP will only reflect amendment to DEP 80.00.10.11 - Layout of onshore facilities

5.0 Aug-18 Anoop Radhakrishnan (MSE41)

SP will reflect amendment to DEP 80.00.10.11 - Layout of onshore facilities.

iii Related Business Processes

Code Business Process (EPBM 4.0)

A.01.01.04 Design, Construct, Modify or Abandon Facilities

iv Related Corporate Management Frame Work (CMF) Documents

The related CMF Documents can be retrieved from the Corporate Business Control Documentation Register CMF.

Code Title

CP-122 HSE management system Code of Practice

CP-117 Project Delivery Code of Practice

SP-2062 Specification for HSE cases

SP-1190 Design for Sour Service Specification

SP-1258 Quantitative Risk Assessment

SP-1075 Fire and Explosion Risk Management

PR-1172 Permit to Work Procedure

SP-2199 Design Class Selection for Capital Projects

Page 5: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 5 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

TABLE OF CONTENTS

i Document Authorisation ......................................................................................................... 3

ii Revision History ...................................................................................................................... 4

iii Related Business Processes .................................................................................................. 4

iv Related Corporate Management Frame Work (CMF) Documents......................................... 4

1 Introduction ............................................................................................................................. 6

1.1 Purpose ............................................................................................................................. 6

1.2 Changes to the Specification ............................................................................................ 6

1.3 General Definitions ........................................................................................................... 6

2 Scope ...................................................................................................................................... 7

2.1 Review and Improvement ................................................................................................. 7

3 DEP amendments/supplements ............................................................................................. 8

4 Appendix A ............................................................................................................................ 11

4.1 Appendix 1, Glossary of Definitions, Terms and Abbreviations ..................................... 11

4.2 Appendix 2, Related Business Control Documents and References ............................. 12

Page 6: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 6 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

1 Introduction

1.1 Purpose

Process safety experience shows that fires or explosions in congested areas of oil and gas facilities can result in harm to people, extensive asset damage, damage to environment and loss of company reputation. Wherever flammable hazards exist, proper facility siting, layout and adequate spacing between process units and equipments are essential to loss prevention and control.

This specification is an amendment /supplements to the Shell DEP 80.00.10.11-Gen. February 2018, Layout of onshore facilities and specify requirements for layout of onshore facilities.

1.2 Changes to the Specification

Previous revisions of this specification was to bring in line with the industry practices and to avoid the multiple standards and use Shell DEP 80.00.10.11-Gen. as a main standard with amendements/ supplements. In this revision, repeated DEP statements are removed, offplot requirements and definitions are clarified.

1.3 General Definitions

The lower-case word shall indicates a requirement.

The capitalised term SHALL [PS] indicates a process safety requirement.

The word should indicates a recommendation.

Page 7: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 7 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

2 Scope

This specification on layout of onshore facilities is for the protection of people, asset and limit the escalation of incident between the process units, and is intended for modifications to existing and design of new oil and gas facilities.

2.1 Review and Improvement

This specification requires revision in every two years or if there is a significant change in the yearly udate of DEP 80.00.10.11-Gen.

Page 8: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 8 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

3 DEP amendments/supplements

The amendments/supplements to Shell DEP 80.00.10.11-Gen. February 2018, Layout of onshore facilities are listed below.

DEP Section 1.3.2 Specific definitions

Process unit / Process plant:- In PDO, independent process units with in a facility can be defined as a Gathering system, Separation system, Compression system, Treatment system, Storage system, Utility System, Chemical handling system, Fire water storage and pumping system, foam storage and making system, Export pumping system, metering system or a pig launcher/receiving system. Critical process systems shall be considered as independent process unit; eg: bulk separator, compressor train as shown below. Typically the process units will have respective ESD, PSD systems and each process unit may have one or more isolatable segments with isolation and blowdown facilities as required.

Separation distances are specified between process units for both green field and brownfield developments in PDO. “Process plant” to be read as “Process unit” for PDO application while using the DEP.

The above statement added to define and clarify the definition of a process unit and application in PDO perspective for the purpose of separation and escalation assessment to avoid rapid escalation of an event to adjacent process unit resulting in a major accident affecting people, environment, assets and company reputation in a significant way.

Page 9: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 9 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

Safety Critical Equipment(SCE):- In the context of this DEP, those SCE's that enable controlled process shutdown and/or potentially controls further incident escalation in the event of an incident are ESD system, Depressurisation system, Pipeline Isolation Valves, Process ESDV’s, HIPPS, Relief systems and Uninterrupted Power Supply(UPS).

DEP Section 3.2.1 General

This specification is based on the assumption that the requirements of SP- 2199, Design Class Selection for Capital Projects and SP-1075 Fire and Explosion Risk Management are implemented.

DEP section 3.2.2, point no 4, 7 and 8, Segregation inside the property boundary.

To confirm the separation distances between process units, physical effects modelling (PEM) shall be used as per the ALARP criteria below.

Release through a medium hole size, represented by a 22 mm diameter shall be used for estimating potential damage to adjacent process unit. Potential thermal radiation contours shall be estimated as per SP-1258, Specification for PEM and QRA as part of the Fire and Explosion Assessment.

Pressurised hydrocarbon process equipments of adjacent process units shall not be located within the 37.5 kW/m2 thermal radiation contours. PEM shall be based on initial release rate at maximum operating pressure at standard operating conditions.

The above statement added to clarify the consequence and risk assessment methodology and spacing criteria in the context of this specification. This criteria will ensure that the rapid escalation of a credible incident will not happen to the adjacent process unit.

Spacing within the same process unit shall be based on accessibility, operability, and maintenability requirements.

DEP section 3.2.3 Segregation outside the facility property boundary

The following requirements shall be applied for green field and brown field projects.

a. MOG regulations shall be followed.

b. Within the 10-5 risk contour, there shall be no third party (PDO appointed personnel or contractors for services and public) activities unless the activities are controlled and the Emergency Response is linked to the facility Emergency Response Plan. When this cannot be achieved the 10-5 contours should be within the facility fence.

c. Land use planning criteria mentioned in SP-1258 shall be followed.

DEP section 3.2.4, Toxics.

Separation distances shall meet the criteria set in SP-1190 series, Specification for Design for Sour Service, for plants, process units, equipment, camp and operations/buildings in toxic services.

DEP section 4.2 Minimum separation distances and siting requirements, point no 2

Separation distances between process units shall be confirmed using physical effects modelling (PEM) as per criteria mentioned above in this specification under DEP section 3.2.2 amendment.

Property boundary:- Green field and brown field development shall review the PDO security policy PL-10, Personnel and Asset Security Code of Practice CP-126 and ROP criteria in addition to the DEP distances and select the most stringent for defining the distance to Property boundary.

Page 10: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 10 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

Offplot requirements

For separation involving producing wells, the following criteria shall be used.

Well to Well : Maintain 95m to prevent any damage due to mast/hoist fall during rig movement.

Well to roads: All of the below criteria shall be met. Roads shall be located outside

the 1.58 kW/m2 fire radiation countor from a well blowout release ( Absolute Open Flow Potential). Consider conservative results of horizontal and vertical releases.

the 0.5 LFL from a well blowout release ( Absolute Open Flow Potential). Consider conservative results of horizontal and vertical releases.

the criteria mentioned in SP-1190 series for toxic service.

Emergency response requirements shall be addressed.

Sweet /Sour Well to Facility : Same criteria for spacing Well to Roads as above shall be followed.

MSV and MPFM shall follow constructibilility, accessibility, maintainability and operability criteria for separation.

DEP section 4.6 Flares and Vent stacks

Blowers and flare ignition panels shall be located outside sterile area.

The statement added in response to action generated from PDO specific flare incidents thematic review.

Page 11: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 11 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

4 Appendix A

4.1 Appendix 1, Glossary of Definitions, Terms and Abbreviations

ALARP As Low As Reasonably Practicable

AOFP Absolute Open Flow Potential

AFP Active Fire Protection

BDV Blow Down Valve

BOM Business Opportunity Manager

CCPS Center for Chemical Process Safety

CFDH Corporate Function Discipline Head

CMF Corporate Management Frame Work

DCAF Discipline Controls & Assurance Framework

DEP Design Engineering Practice

ESD Emergency Shutdown

FEA Fire and Explosion Assessment

kW/m2 Kilowatt per square meter

LFL Lower Flammability Limit

MOG Ministry of Oil and Gas

MPFM Multi Phase Flow Meter

MSV Multi Selector Valve

PEM Physical Effects Modelling

PDO Petroleum Development Oman LLC

PSD Process Shut Down

QRA Quantitative Risk Assessment

ROP Royal Oman Police

SCE Safety Critical Equipment

UPS Uninterrupted Power Supply

Page 12: Petroleum Development Oman L.L.C. - hsedocs.pdo.com.om

Petroleum Development Oman LLC

Revision:5.0 Effective: Oct-2018

Page 12 Specification Printed 08/11/188

The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.

4.2 Appendix 2, Related Business Control Documents and References

Standard Title

DEP 31.40.00.10 Pipeline engineering (amendments / supplements to ISO 13623)

DEP-34.17.10.30-Gen. Design of blast resistant onshore buildings, control rooms and field auxiliary rooms

DEP 34.17.10.33-Gen Portable blast-resistant modules

DEP-30.00.60.10-Gen. Human factors engineering in projects

DEP-30.00.60.13-Gen. Human factors engineering - valves

DEP-30.00.60.15-Gen. Human factors engineering - Control room design

DEP-30.00.60.16-Gen. Human factors engineering - Human machine interface design for situation awareness

DEP-30.00.60.18-Gen. Human factors engineering - Design and procurement of skid-packaged units

DEP-30.00.60.19-Gen. Human factors engineering - Design for human reliability

DEP-30.00.60.20-Gen. Human factors engineering - Workspace design

DEP-34.17.10.35-Gen. Siting of onshore occupied portable buildings

DEP-34.17.10.36-Gen. Inflatable blast resistant shelters

DEP-80.00.10.10-Gen. Area classification (amendments/supplements to IP 15)

DEP-80.45.10.12-Gen. Emergency depressuring and sectionalizing

DEP 80.45.10.10-Gen Design of pressure relief, flare and vent systems (amendments/supplements to API RP 520 Part II and API STD 521 Chapter 5)

SP-1211 Onshore pipeline engineering

SP-1258 HSE Specification - Quantitative Risk Assessment (QRA)

PR-2219 Procedure for Conducting Physical Effects Modelling (PEM), Quantitative Risk Assessment (QRA) and Related Studies

CCPS (Centre for Chemical Process Safety)

Guidelines for Facility Siting and Layout

GE GAP Guidelines Oil and Chemical Plant Layout and Spacing

UK HSE CD211 A consultative document on proposals for revised policies for HSE advice on development and control around large-scale petrol storage depots

API RP 753 Management of Hazards Associated With Location of Process Plant Portable Buildings

API RP 752 Management of Hazards Associated With Location of Process Plant Buildings