    The Petronas Towers: MalaysiaThe Petronas Towers: Malaysia

    Mike Kleist

    Dan Witter

    Michael Mohr

    Michele Hartmann

    Ross Umentum

  • 8/8/2019 Pet Roans

    2/17

    Petronas Towers, MalaysiaPetronas Towers, Malaysia

    Stats:

    2nd and 3rd tallest, 1483, 88 stories

    Ownership: (essentially state owned)

    KLCCHPetronasPrime Minister

  • 8/8/2019 Pet Roans

    3/17

    Inside the Petronas TowersInside the Petronas Towers

    Symphony Hall 8 million square feet of shopping

    Petroleum Museum

    4500 stall parking garage

    Multimedia Conference CenterMosque

  • 8/8/2019 Pet Roans

    4/17

    Malaysias Silicon ValleyMalaysias Silicon Valley

    High Tech TenantsAvaya

    Computer Associates

    Alcatel

    EDS

    IBM

    Microsoft

  • 8/8/2019 Pet Roans

    5/17

    Cesar Pelli & AssociatesCesar Pelli & Associates

    Established in 1977 with offices in New YorkEstablished in 1977 with offices in New York

    City and New Haven, CtCity and New Haven, Ct

    Practice of 3 architects: Cesar Pelli, Fred Clarke &

    Rafael Pelli

    Cesar Pellis Awards

    American Institute of Architects Gold Medal

    Named one of the top 10 influential living

    American architects

  • 8/8/2019 Pet Roans

    6/17

    Architectural StyleArchitectural Style

    Postmodern style characteristicsPostmodern style characteristics

    Unusual Building ShapeUnusual Building Shape

    Tapered building outlineTapered building outline

    Unique floor plan designUnique floor plan design

    SkybridgeSkybridge

    Conservative imitation of classicalC

    onservative imitation of classicalarchitecturearchitecture

    Tapered shape imitates the pyramidsTapered shape imitates the pyramids

  • 8/8/2019 Pet Roans

    7/17

    Aesthetics/ArchitecturalAesthetics/Architectural

    MaterialsMaterials

    Floor plan forms an 8Floor plan forms an 8--pointed starpointed star

    Glass curtain and stainless steel

    cladding

    Stainless steel spires

    Skybridge joins the two towers

  • 8/8/2019 Pet Roans

    8/17

    Fire SafetyFire Safety

    Skybridge serves as an alternate escape routeSkybridge serves as an alternate escape route

    Pressurized central core protects the stairs andPressurized central core protects the stairs and

    elevatorselevators

    SpraySpray--applied fireproofing protects steelapplied fireproofing protects steelstructural membersstructural members

  • 8/8/2019 Pet Roans

    9/17

    Structural EngineersStructural Engineers

    ThorntonThornton TomasettiTomasetti

    Engineers from theEngineers from the

    United StatesUnited States

    Ranhill BerskutuRanhill Berskutu

    Engineering fromEngineering from

    MalaysiaMalaysia

  • 8/8/2019 Pet Roans

    10/17

    Main Construction Material: ConcreteMain Construction Material: Concrete

    Concrete was idealConcrete was ideal

    choice for Petronaschoice for Petronas

    TowersTowers

    Concrete mixtureConcrete mixture

    tested and revisedtested and revised

    multiple timesmultiple times

    Petronas is twice asPetronas is twice asheavy as if a steelheavy as if a steel

    design had been useddesign had been used

  • 8/8/2019 Pet Roans

    11/17

    Structure of Petronas TowersStructure of Petronas Towers

    Inner coreInner core

    Outer coreOuter core

    Connection of the twoConnection of the twocores at the 38cores at the 38thth floorfloor

    Structural steel floorStructural steel floor

    planplan

    Sky bridgeSky bridge

    FoundationFoundation

  • 8/8/2019 Pet Roans

    12/17

    MEP SystemsMEP Systems

    MEP Engineering FirmMEP Engineering Firm

    Flack + KurtzFlack + Kurtz

    Important MEP ConsiderationsImportant MEP Considerations

    HVAC facilitiesHVAC facilities

    Vertical TransportationVertical Transportation

    Electrical, Communication & Fire ControlElectrical, Communication & Fire Control

    SystemsSystems

  • 8/8/2019 Pet Roans

    13/17

    Mechanical SystemsMechanical Systems

    HVAC FacilitiesHVAC Facilities

    Gas District Cooling systemGas District Cooling system

    Vertical TransportationVertical Transportation--ElevatorsElevators

    HighHigh--Speed, DoubleSpeed, Double--Deck LiftsDeck Lifts

    Executive liftsExecutive lifts--service everyservice every

    floorfloor

  • 8/8/2019 Pet Roans

    14/17

    Intelligent SystemsIntelligent Systems

    Lighting and AirConditioningLighting and AirConditioning

    Control is given on a floor by floor basisControl is given on a floor by floor basis

    Fire Control SystemFire Control System

    Ability to override the building control system, ifAbility to override the building control system, if

    needed, for lifeneeded, for life--saving facilities (e.g. sprinklers, airsaving facilities (e.g. sprinklers, air

    to stairwellsto stairwells

    High Tech CommunicationHigh Tech Communication

    Fiber optic backboneFiber optic backbone

  • 8/8/2019 Pet Roans

    15/17

    Construction of theConstruction of the

    Petronas Towers (1993Petronas Towers (1993--1998)1998) Below ground level structure:Below ground level structure:

    Slurry wall method usedSlurry wall method used

    World record set for most concrete poured at one timeWorld record set for most concrete poured at one time

    ProblemsProblems

    High silt content of soilHigh silt content of soil machine cloggingmachine clogging Caverns in porous limestone bedrockCaverns in porous limestone bedrock excess settlement of pilesexcess settlement of piles

    after set in placeafter set in place

    Above ground level structure:Above ground level structure: PERI Automatic Climbing SystemPERI Automatic Climbing System

    Hydraulically operated selfHydraulically operated self--climbing formworkclimbing formwork Advantageous for tall buildingsAdvantageous for tall buildings faster and safer than crane liftedfaster and safer than crane lifted

    formworkformwork

    Also used on Trump World Tower (New York) and Park TowerAlso used on Trump World Tower (New York) and Park Tower(Chicago)(Chicago)

  • 8/8/2019 Pet Roans

    16/17

  • 8/8/2019 Pet Roans

    17/17

    Construction of theConstruction of the

    Petronas Towers (1993Petronas Towers (1993--1998)1998) Placement of concretePlacement of concrete

    Tower 1Tower 1 -- High speed hamper hoist lift to pumping stationsHigh speed hamper hoist lift to pumping stations

    Tower 2Tower 2 -- Pumps lifted to entire elevationPumps lifted to entire elevation -- set world record forset world record for

    highest continuous concrete pumphighest continuous concrete pump

    Sky bridgeSky bridge Mostly constructed on groundMostly constructed on ground

    Lifted into position using 16 hydraulic jacksLifted into position using 16 hydraulic jacks

    Lightning was problematicLightning was problematic lost power three timeslost power three times

    2 separate contracts2 separate contracts Natural competitionNatural competition

    Completed on timeCompleted on timehttp://www.architectureweek.com