PERSPECTIVE - Philippine National Police · 2017. 6. 20. · 3-wire, single phase 1- 6 thhnthwn cu....
Transcript of PERSPECTIVE - Philippine National Police · 2017. 6. 20. · 3-wire, single phase 1- 6 thhnthwn cu....
PERSPECTIVE1A 1
PERSPECTIVE
A 1
SUMMARY
LOCATIONVICINITY MAP2SITE DEVELOPMENT PLAN3
PLAN4ELEVATION5SECTION A-A6
FOUNDATION PLAN7F-C PLAN8
S
LOW GROUND FOOTING DETAIL9TIE BEAM DETAIL10
ELECTRICAL PLAN11E
WATCH TOWER PLANELEVATION12A
SIDE ELEVATION13PLAN14ROOF FRAMING PLAN15
SECTION16S
FOUNDATION PLAN17
ALTERNATE GATE ELEVATION18A
WELCOME ARCH DETAILS19SIDE ELEVATION20
AABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENTPOLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY:
PREPARED BY:
POLICE SENIOR INSPECTOR
DEP. CHIEF, RPMU 11
PHILIP LAWRENCE S ABAPO III
CHECKED BY:
MARIA DEOVINA G SEVILLANO
POLICE CHIEF INSPECTOR
ACTING CHIEF, RPMU 11
SUBMITTED BY:
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, ID, ES
PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
ABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
CHIEF OF STAFF, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY:
1
0
9
.8
3
m
ts
.
1
0
9
.
8
2
m
t
s
.
1
7
.
1
5
m
t
s
.
TOTAL AREA = 19,998 SQUARE METERS
TOTAL PROPOSED PERIMETER FENCE = 618.96 METERS
TOTAL 3 OF BAYS = 209 BAYS
1
2
3
.
8
7
m
t
s
.
1
7
.9
8
m
ts.
1
1
3
.
9
6
m
t
s
.
2
6
.0
2
m
ts
.
1
0
0
.
3
3
m
t
s
.
LOCATIONVICINITY MAP2B 1
SITE DEVELOPMENT PLAN3B 1 scale 1:2000 mts.
PREPARED BY:
POLICE SENIOR INSPECTOR
DEP. CHIEF, RPMU 11
PHILIP LAWRENCE S ABAPO III
CHECKED BY:
MARIA DEOVINA G SEVILLANO
POLICE CHIEF INSPECTOR
ACTING CHIEF, RPMU 11
SUBMITTED BY:
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, ID, ES
PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
BABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
CHIEF OF STAFF, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY:
3.00 mts. 3.00 mts. 3.00 mts.
1 Bay 1 Bay 1 Bay
Concrete Perimeter Fence
3.00 mts. 3.00 mts.
1.00 mts.
0.70 m
tr.
1.80 m
ts.
Top Beam
(see detail)
Bottom Beam
(see detail)
Tie Beam
(see detail)
4" CHB
6" CHB
1 Bay 1 Bay 1 Bay
NGL
Concertina Wires
Footing (see
details)
Enclosed Globe Post
Lamp every 3 - Bays
0.25 mtr. x 0.25 mtr.
Column
A
A
1.20 m
ts.
NGL
4 - 16 mm. dia. Rebars with
10 mm. dia. Ties spaced
2 @ 1", 2 @ 2", 2 @ 3",
2 @ 4", 2 @ 6", Rest @ 8"
Enclosed Globe Post Lamp
Spaced every 3 - Bays
Top & Bottom Beam
4 - 12 mm. dia. Rebars with
10 mm. dia. Stirrups
Tie Beam
5 - 12 mm. dia. Rebars with
10 mm. dia. Stirrups
2.50 m
ts.
1.20 m
tr.
0.40 m
tr.
0.70 m
tr.
1.80 m
ts.
0.20 m
tr.
0.25 mtr.
0.25 mtr.
0.25 m
tr.
PLAN4A 1
ELEVATION5A 2
SECTION A-A6A 3
scale 1:100 mts.
scale 1:100 mts.
scale 1:100 mts.
PREPARED BY:
POLICE SENIOR INSPECTOR
DEP. CHIEF, RPMU 11
PHILIP LAWRENCE S ABAPO III
CHECKED BY:
MARIA DEOVINA G SEVILLANO
POLICE CHIEF INSPECTOR
ACTING CHIEF, RPMU 11
SUBMITTED BY:
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, ID, ES
PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
CABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
CHIEF OF STAFF, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY:
0.40 m
tr.
1.20 m
tr.
0.75 mts. 0.75 mts. 0.75 mts. 0.75 mts.
AT L4 SPAN AT L4 SPAN AT L4 SPAN
3-12mm Ø TOP DEF. BARS 3-12mm Ø TOP DEF. BARS 3-12mm Ø TOP DEF. BARS
2-12mm Ø BOT. DEF. BARS 3-12mm Ø BOT. DEF. BARS 2-12mm Ø BOT. DEF. BARS
2-12mm Ø BOT. DEF. BARS 3-12mm Ø BOT. DEF. BARS 2-12mm Ø BOT. DEF. BARS
3.00 mts.3.00 mts. 3.00 mts. 3.00 mts. 3.00 mts.
PROPERTY LINE
Tie Beam
Perimeter Fence
FC FC FC FC FC
1.00 mtr.
1.00 m
tr.
PROPERTY LINE
0.25 mts.
0.25 m
ts.
0.50 m
ts.
INSIDE CAMP
OUTSIDE CAMP
9 - 12mm ∅ HOR. BARS BOTH WAY O.C.
5-12mm Ø HORIZONTAL BARS BOTHWAYS
VA
RIA
BL
E
COMPACTED FILLING MATERIALS
6" Ø PVC PIPE WEEP HOLES SPACED AT. 0.60m AT THE LOW GROUND PORTION
4 LAYERS BARBED WIRE ON 12mm Ø RSB SPACED @ 0.40m O.C.
10mm Ø LATERAL TIES
2.5
0 M
ET
ER
S +
V
AR
IA
BL
E =
T
OT
AL
H
EIG
HT
O
F T
HE
P
ER
IM
ET
ER
F
EN
CE
REINFORCED CONCRETE
4-16mm Ø STRAIGHT BARS
NATURAL GROUND LINE
SUPPORT
3-12mm dia
3-12mm dia
3-12mm dia
depth
TOP BARS
width
MARK
BEAM
BEAM CROSS
SECTION
250
200
200250
250
250
TOP
BOT
TIE
TOP, BOTTOM AND TIE BEAM
TOP BARS
MIDSPAN
BOTTOM BARSBOTTOM BARS
3-12mm dia
3-12mm dia
3-12mm dia
2-12mm dia
rest @0.2CL
rest @0.2CL
[email protected], [email protected]
[email protected], [email protected]
est @0.2CL
[email protected], [email protected]
2-12mm dia
2-12mm dia2-12mm dia
2-12mm dia2-12mm dia
STIRRUPS
TIE BEAM DETAIL10S 4 scale 1:50 mts.
FOUNDATION PLAN7S 1 scale 1:100 mts.
F-C PLAN8S 2 scale 1:50 mts.
LOW GROUND FOOTING DETAIL9S 3 scale 1:100 mts.
PREPARED BY:
POLICE SENIOR INSPECTOR
DEP. CHIEF, RPMU 11
PHILIP LAWRENCE S ABAPO III
CHECKED BY:
MARIA DEOVINA G SEVILLANO
POLICE CHIEF INSPECTOR
ACTING CHIEF, RPMU 11
SUBMITTED BY:
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, ID, ES
PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
DABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
CHIEF OF STAFF, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY:
43
5
SINGLE-LINE RISER DIAGRAM
6
60 AT MAIN C.B.
15 AT15 AT
30 AT30 AT
PERIMETER LIGHTING CIRCUIT 1
IN 65 MM DIA. RSC PIPE
3-WIRE, SINGLE PHASE
1- 6 THHNTHWN CU. WIRE (GROUNDING)
2- 4 THHNTHWN CU. WIRE &
M
2
SERVICE ENTRANCE
GUARD HOUSE CONVENIENCE CIRCUIT
GUARD HOUSE LIGHTING CIRCUIT
20 AT
EXISTING WIRING LAY-OUT AT MAIN GATE SPARE
SIZE OF WIRE & CONDUITS
MAIN GATE LIGHTINGCONVENIENCE OUTLET
PERIMETER LIGHTING OUTLET
LOAD DESCRIPTION
TOTAL
CKT. NO
2
3
1
NUMBER OF
60 AT MAIN CB,2P, 60 HERTZ, 240 V IN 6 BRANCHES PANEL BOARD, BOLT- ON TYPE
230 V
USE :
LIGHTING
CONVENIENCE
VOLTS
230 V
S3wS1 S2 S3
SWITCHES CIRCUIT BREAKER
30 A, 2P
30 A, 2P
21.304900
5.47
VOLT-AMP
800
4.351000
3.48
AMPERE
S C H E D U L E O F L O A D S
19 7 2
78
96
SPARE
1260
6 THHN WIRE25 MM DIA MOLDEX FLEXIBLE PIPE
20 A, 2P18408.0
2- 4 THHN COPPER WIRE + 1- 2.0 MM THHNTHW WIRE ( G ) IN 20 MM DIA RSC PIPE
PB-3
20 A, 2P
GENERAL NOTES & SPECIFICATION
3-WIRE, 240VOLTS AND 60HZ.
3. NATURE OF WORKS FOR SERVICE ENTRANCE AND MAIN
FEEDER LINE SHALL BE DONE IN RIGID STEEL CONDUIT (RSC),
AND FOR POWER AND LIGHTING LAYOUT SHALL BE DONE IN
POLYVINYL CHLORIDE (PVC) SCHED. 40 WITH PROPER BOXES
4. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE
NEW AND OF THE APPROVED TYPE BY THE PHIL. STANDARD
AGENCY FOR EVERY INTENDED LOCATION AND PURPOSES.
2. THE SUPPLY TO THE BUILDING SHALL BE SINGLE PHASE
STRICT CONFORMITY WITH THE LATEST APPROVED EDITION
REQUIREMENTS OF THE MANILA ELECTRIC COMPANY, THE
1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN
OF THE PHILIPPINE ELECTRICAL CODE (PEC), THE
RULES AND REGULATION OF ALL LOCAL AND NATIONAL
AUTHORITIES CONCERNED IN THE ENFORCEMENT OF
SUPPORTS AND FITTINGS.
ELECTRICAL LAWS.
LICENSED, REGISTERED ANDOR PROFESSIONAL ELECTRICAL ENGR.
PANEL BOARD - 1.50M.O.C. TO FIN. GRD. FLR. LN.
DUPLEX CONV. OUTLET - 0.30M.O.C. TO FIN. GRD. FLR. LN.
LIGHT SWITCHES - 1.40M ON CENTER TO FIN. GRD. FLR. LN.
8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
7. ALL WORKS HEREIN SHALL BE DONE IN WORKMAN-LIKE-MANNER
AND SHALL BE UNDER THE DIRECT SUPERVISION FROM A DULY
TYPE "THHN"" THW " OR APPROVED EQUAL.
STANDARD SIZE RESPECTIVELY.
WITH 600VOLTS HEAT RESISTANT THERMOPLASTIC WITH NYLON
6. WIRES AND CABLES TO BE USED SHALL BE PURE COPPER
NO. 6 AND 15 MMØ (1"Ø) ELECTRICAL
USED UNLESS SPECIFIED IN THE PLAN SHALL SHALL BE
PERIMETER LIGHTING OUTLET
WATCH TOWER LIGHTING
5
6
3
20
4
21
2
2
15 A, 2P 12 THHN WIRE15 MM DIA MOLDEX FLEXIBLE PIPE
12 THHN WIRE15 MM DIA MOLDEX FLEXIBLE PIPE
12 THHN WIRE15 MM DIA MOLDEX FLEXIBLE PIPE
6 THHN WIRE25 MM DIA MOLDEX FLEXIBLE PIPE
PERIMETER LIGHTING CIRCUIT
2- 12 THHN STRANDED COPPER WIRE
ON 15 mm Ø MOLDEX FLEXIBLE PIPE
2- 6 THHN STRANDED COPPER WIRE
ON 25 mm Ø MOLDEX FLEXIBLE PIPE
2- 6 THHN STRANDED COPPER WIRE
ON 25 mm Ø MOLDEX FLEXIBLE PIPE
2- 12 THHN STRANDED COPPER WIRE
ON 15 mm Ø MOLDEX FLEXIBLE PIPE
20 AT
ENCLOSED GLOBE POST LAMP
2- 6 THHN STR COPPER WIRE FOR PERIMETER LINE
WITH 25mm Ø MOLDEX FLEXIBLE CONDUIT PIPE
CONCRETE PERIMETER FENCE
4X4" JUNCTION BOX
FOR PERIMETER LIGHT LIGHTSINGLE-LINE RISER DIAGRAM
ELECTRICAL PLAN11E 1 scale 1:100 mts.
PREPARED BY:
POLICE SENIOR INSPECTOR
DEP. CHIEF, RPMU 11
PHILIP LAWRENCE S ABAPO III
CHECKED BY:
MARIA DEOVINA G SEVILLANO
POLICE CHIEF INSPECTOR
ACTING CHIEF, RPMU 11
SUBMITTED BY:
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, ID, ES
PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
EABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
CHIEF OF STAFF, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY:
1.20
2.50
0.52
1.50
2.00m
(m
in)
GALVAROOF ROOFING SCH. 40
4"THK CHB WALLING
2" Ø G.I PIPE SCH. 20 HANDRAIL
1.20
2.50
0.52
2.00m
(m
in)
PERIMETER FENCE
2 PCS - SPOT LIGHT
METAL HALIDE (150W)
12" G.I SCREEN (U.S)
0.10 m
ts.
CONCRETE PERIMETER FENCE
Concrete Bench
1.50
2.75
0.62 0.62
2.7
5
0.72
2X2" C-PURLINS SPACED 0.70m O.C.
A
A
WATCH TOWER PLANELEVATION12A 1 scale 1:100 mts.
SIDE ELEVATION13A 2 scale 1:100 mts.
PLAN14A 3 scale 1:100 mts.
ROOF FRAMING PLAN15A 3 scale 1:100 mts.
PREPARED BY:
POLICE SENIOR INSPECTOR
DEP. CHIEF, RPMU 11
PHILIP LAWRENCE S ABAPO III
CHECKED BY:
MARIA DEOVINA G SEVILLANO
POLICE CHIEF INSPECTOR
ACTING CHIEF, RPMU 11
SUBMITTED BY:
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, ID, ES
PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
FABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
CHIEF OF STAFF, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY:
1.5
0
1.5
0
4-12nn Ø VERT. BARS
10mm Ø LATERAL TIES SPACED AT 0.20M O.C.
0.25
0.60m
0.3
0
0.8
0
NGL
4 -12mm Ø HOR. BARS BOTH WAYS
1.2
0
2.5
00
.5
2
2.0
0m
(m
in
)
1-14"THK X1X1" ANGLE BAR FOR TOP
AND BOTTOM CHORD AND WEB MEMBERS
2-2X2" ANGLE BARS STRINGER
1X1" ANGLE BARS FRAME FOR STEPS
2" Ø SCH. 20 G.I PIPE HANDRAIL
2.5
0
CONCRETE BENCH
SPOT LIGHT
RC BASE SIZE 0.80X0.60X0.20M
SECTION16S 1 scale 1:100 mts.
FOUNDATION PLAN17S 2 scale 1:100 mts.
PREPARED BY:
POLICE SENIOR INSPECTOR
DEP. CHIEF, RPMU 11
PHILIP LAWRENCE S ABAPO III
CHECKED BY:
MARIA DEOVINA G SEVILLANO
POLICE CHIEF INSPECTOR
ACTING CHIEF, RPMU 11
SUBMITTED BY:
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, ID, ES
PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
GABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
CHIEF OF STAFF, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY:
0.85
WE L C
EMO
2" Ø G.I PIPE SCH. 40 DOOR FRAME
WITH 1
1
2
" G.I PIPE BRACING
12mm Ø PLAIN BARS TENTIONER WITH
G.I TURN-BUKLE
1X1" ANGLE BAR
WELCOME ARCH (see detail)
2.0
01
.0
01
.0
0
2" dia GI Pipe top and bot chord with
1
1
2
" dia GI Pipe web members welded
4" dia GI Pipe pedestal
embedded within Concrete Post
0.6
0
ARCH TRUSS (see detail)
CONCRETE COLUMN
3.20
2.0
01
.00
FRONT ELEVATION18A 1 scale 1:100 mts.
WELCOME ARCH DETAILS19A 2 scale 1:100 mts.
SIDE ELEVATION20A 3 scale 1:100 mts.
PREPARED BY:
POLICE SENIOR INSPECTOR
DEP. CHIEF, RPMU 11
PHILIP LAWRENCE S ABAPO III
CHECKED BY:
MARIA DEOVINA G SEVILLANO
POLICE CHIEF INSPECTOR
ACTING CHIEF, RPMU 11
SUBMITTED BY:
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, ID, ES
PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
Kidalapong, Malita, Davao Occidental
PROPOSED PERIMETER FENCE
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
H
ABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
POLICE SENIOR SUPERINTENDENTPOLICE CHIEF SUPERINTENDENT
ACTING DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
RECOMMEND APPROVAL:
SHEET NO.
APPROVED BY: