Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
-
Upload
dwain-brown -
Category
Documents
-
view
214 -
download
0
Transcript of Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Personal strategy for ATF2 beam operation in 2009
Toshiyuki OKUGI2009 / 7 /22
ATF2 weekly meeting
1st week (10/19 – 10/23 )
Fast Kicker test
DR BPM test
2nd week ( 10/26 – 10/30)
Beam extraction with nominal extraction kicker
Stripline BPM improvement• upgrade of present BPM readout - put more ADC and the timing adjustment - calibration with high pass filter - take calibration data with and w/o kicker pulse• test of the prototype of new readout electronics
Cavity BPM improvement• take stability data of calibration constants (calibrate some BPMs every day)
Septum rotation check with beam
Background test for IP-BSM detctor
Establish the reference detector of IP-BSM background
10 2009
Su Mo Tu We Th Fr Sa
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
Concentrate the hardware work in October
1st week ( 11/09 – 11/13 )
Cavity BPM study• C-band BPM - calibration - stabilize 1 week C-band BPM position readout• S-band BPM calibration
IP-BSM study• vertical laser wire mode
Optics study• EXT dispersion and coupling correction• make 1-2micron beam size at IP-BSM
FONT
Laser wire
2nd week ( 11/16 – 11/20 )
Cavity BPM study• continuous study of the C-band BPM• calibration of S-band BPM
IP-BSM study• vertical laser wire mode• interference mode test, if possible
Optics study• EXT dispersion and coupling correction• establish 1-2micron beam size at IP-BSM• optics diagnostics, if BPMs are ready
FONT
Laser wire
0th week ( 11/02 – 11/06 )
Shielding of Septum Area
Realignment of Final doublet to Dump
11 2009
Su Mo Tu We Th Fr Sa
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
Beam tuning will be started from November
12 2009
Su Mo Tu We Th Fr Sa
30
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
Cavity BPM study• establish of C-band & S-band BPM
IP-BSM study• observation of the interference pattern and beam size evaluation by interferometer mode• beam size measurement for sub-micron beam
Optics study• establish the high beta optics tuning• make sub-micron beam size at IP-BSM• background test for various beta* optics
FONT
Laser wire
Target is the measurement of the sub-micron beam size
After the 2009 operation
• Decision of the beam optics for 2010 operation.
• Improvement of the IP-BSM DAQ to be used for beam operation
• Installation of the multi-OTR chambers.
• Installation of the new readout for all of the stripline BPMs, if necessary.
Target by the end of 2010 spring run
• Beam size measurement of < 100nm beam