PERMIT USE TAX RECONCILIATION ACTUAL METHOD Sales Tax ...
Transcript of PERMIT USE TAX RECONCILIATION ACTUAL METHOD Sales Tax ...
Page 1 of 2
PERMIT USE TAX RECONCILIATION – ACTUAL METHOD
A permit use tax reconciliation form must be submitted to the City’s Finance – Sales Tax Division for
projects with a valuation of $50, 000 or more within 90 days of project completion. Contractors have the
option of using the short or actual method. The short method is the quickest way to see if there might have
been an over or under payment on a permit. The actual method is more accurate but requires more
documentation and the process can take longer to complete. See instructions for information on
completing and submitting this form.
Please submit this form with the following documentation:
☐ Final AIA progress bill and/or documentation to support final price of the completed project
☐ Subcontractor affidavits and final job cost accounting records
☐ If you are claiming credit for City of Brighton tax paid to vendors on construction materials, submit
corresponding invoices.
☐ If you calculated an overpayment, submit a claim for refund form
General Contractor Name
Street Address
City, State, Zip
Project Street Address
Permit Number (s)
1. Original Contract Price
2. Total Change Orders
3. Total Contract Price (Line 1 + 2)
4. Actual Taxable construction cost (See instructions)
5. Use Tax Due (Line 4 x 3.75%)
6. Use tax pre-paid on permit
7. Sales tax paid to vendors on materials
8. Use tax due difference (Line 5 – 6 – 7)
CONTINUE TO PAGE 2 – FOR WILL NOT BE ACCEPTED WITHOUT PAGE 2
Page 2 of 2
If line 8 is less than zero – submit this form together with the claim for refund form and backup
If line 8 is greater than zero – additional use tax is due, submit this form together with your payment and
backup
I declare that I have examined this permit use tax reconciliation form and that it is true and correct to the best of
my knowledge and belief
(Signature) (Date)
(Print Name) (Title)
(E-mail) (Phone)
Page 1 of 3
PERMIT USE TAX RECONCILIATION – ACTUAL METHOD
SUBCONTRACTOR AFFIDAVIT
Date
Subcontractor Contact
Subcontractor Name
Sub-Contractor Address
City, State, ZIP
General Contractor (GC)
Permit Number(s)
Project Address
The following information is needed in order for the general contractor to complete the City’s
Construction Permit Project Cost Reconciliation using the actual method.
1. Did your company pull a building permit as a subcontractor for this project?
☐ No
☐ Yes – permit number(s)
2. What was the description of the work provided per your subcontract with the GC?
3. What was the total final contract price (including change orders) for the above project?
4. Was any part of your contract subcontracted to others?
☐ No
☐ Yes – please complete page 3 of this affidavit. Send your subcontractors a blank copy of this
affidavit and request that they complete and send back to you. Then forward these lower tier
subcontractor affidavits along with your affidavit to the GC or directly to the City of Brighton’s
Sales Tax Division.
5. Total price charged to the GC for all construction materials purchased from suppliers and used by
your company on the project. (Excluding any sales tax paid and any materials fabricated by your
company)
CONTINUE TO PAGE 2
Page 2 of 3
6. If your company fabricated any items (i.e. ducting, cabinetry, etc.) for the job what was the total
price charged to the GC for all fabricated materials / items (raw materials + fabrication labor)
used by your company for the project?
7. Amount of City of Brighton Sales Tax paid to vendors on the above materials. Please submit
copies of corresponding invoices.
I certify, under penalty of perjury, that the above amounts are accurate
(Signature) (Date)
(Print Name) (Title)
(E-mail) (Phone)
Please either submit this affidavit to the GC OR submit directly to the City of Brighton.
City of Brighton
Attention Sales Tax
500 S 4th Ave
Brighton, CO 80601
E-mail to [email protected]
Phone 303-655-2041
CONTINUE TO PAGE 3 IF YOUR COMPANY HIRED SUBCONTRACTORS
Page 3 of 3
Complete this page only if you answered yes to question 4 on page 1 of the subcontractor affidavit. List
all lower tier subcontractors that you hired for this project.
Subcontractor Name
Description of work
Final Contract Price
Primary Contact Name
Contact Email
Contact Phone Number
Subcontractor Name
Description of work
Final Contract Price
Primary Contact Name
Contact Email
Contact Phone Number
Subcontractor Name
Description of work
Final Contract Price
Primary Contact Name
Contact Email
Contact Phone Number
Subcontractor Name
Description of work
Final Contract Price
Primary Contact Name
Contact Email
Contact Phone Number
MAKE COPIES OF THIS PAGE AS NEEDED
Page 1 of 2
INSTRUCTIONS PERMIT USE TAX RECONCILIATION – ACTUAL METHOD
A permit use tax reconciliation form must be submitted to the City’s Finance – Sales Tax Division for
projects $50, 000 or more within 90 days of completion.
You have the option of using the short or actual method. The short method is the quickest and easiest way
to determine if there might have been an over or under payment on a permit. The actual method is more
accurate, but requires more documentation and the process can take longer to complete.
These instructions are for the actual method
Questions? E-mail [email protected] or call 303-655-2041
STEP 1 – GATHER NECESSARY DOCUMENTS
Assemble and make copies of the following to include with the reconciliation form
Final AIA progress bill and/or documentation to support final price of the completed project
Invoices showing City of Brighton tax paid on construction materials
Subcontractor affidavits and final job cost accounting records – subcontractor affidavits can be
submitted to the GC and all documentation can be submitted together, or subcontractors can
submit the affidavit directly to the City of Brighton.
STEP 2 – CALCULATE ACTUAL CONSTRUCTION USE TAX
Line 1 – Enter the original total project contract price.
Line 2 – Enter total project change orders.
Line 3 – Add line 1 and line 2.
Line 4 – Total actual taxable cost of construction – this is the total combined actual purchase price of all
materials used to complete the project. The amount is generally derived from the general contractor’s
final job cost records and/or purchase invoices. When subcontractors are used, their taxable construction
materials must be obtained through a signed affidavit. The total taxable construction amount on line 4
should include the following:
All cost of construction materials
Cost of fabrication labor that goes into fabricating a completed unit. Examples of completed nits
are stairs, cabinetry, and shelving, ducting, and specialty fixtures.
Cost of materials purchased by subcontractors. A signed affidavit is required.
Line 5 – Multiple line 4 by the City of Brighton’s tax rate of 3.75% to arrive at the total construction tax
due for the project
Line 6 – Enter the amount of all city taxes paid on the permit
Line 7 – Sales tax paid to vendors on construction materials
CONTINUE TO PAGE 2
Page 2 of 2
In the event that City of Brighton sales tax was charged by vendors on construction materials please
provide a copy of the invoice showing City of Brighton tax. Please note that credit cannot be claimed for
another jurisdiction’s tax paid on construction materials
Line 8 – Calculate Line 5 Minus lines 6 and 7 to arrive at the total tax difference
If line 8 is greater than zero – This is the total due. Please mail check with form and supporting
documentation.
If line 8 is less than zero – complete the claim for refund form and submit with this form and
supporting documents
STEP 3 – SUBMIT FORM WITH APPROPIRATE DOCUMENTATION
If you are making a payment
Makes Checks payable to City of Brighton
Mail form, payment and supporting documents to
City of Brighton
Sales Tax Division
500 S 4th Ave
Brighton CO 80601
If you are NOT making a payment
You have the option to submit all documentation via e-mail to [email protected]