PERMIT SUBMITTAL - ci.rohnert-park.ca.us · duplex receptacle - split wired, switched duplex...
Transcript of PERMIT SUBMITTAL - ci.rohnert-park.ca.us · duplex receptacle - split wired, switched duplex...
This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.
Original Size
Title
Project
ClientDesignerDrawn
Scale
Plot Date: Filename:20 April 2017 - 3:33 PM G:\111\11121669 RP Performing Arts Center HVAC\06-CAD\Sheets\11121669 M-702.dwg
Arch E1
Date
Plotted By: Erik Omlid
Project No.
Sheet of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2017 GHD
DraftingCheck
0 1"
Bar is one inch onoriginal size sheet
DesignCheck
IssueNo. Drawn Approved Date
ProjectManager
PERMIT SUBMITTAL CITY OF ROHNERT PARKPERFORMING ARTS CENTER HVAC
2235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com
GHD Inc.M295626/30/17
No.Exp.
REG I
S TER
ED PRO FE S S I ON A L E NGI NEER
S TA T E O F C A L I F O R N I A
T E R R Y W O N G
M E C H A N I C A L
PLAN CHECK COMMENTS1 04/21/2017
ENERGY COMPLIANCE
M-702
E. OMLID T. WONG
B. THOM
AS SHOWN
This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.
Original Size
Title
Project
ClientDesignerDrawn
Scale
Plot Date: Filename:20 April 2017 - 3:33 PM G:\111\11121669 RP Performing Arts Center HVAC\06-CAD\Sheets\11121669 E-001.dwg
Arch E1
Date
Plotted By: Erik Omlid
Project No.
Sheet of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2017 GHD
DraftingCheck
0 1"
Bar is one inch onoriginal size sheet
DesignCheck
IssueNo. Drawn Approved Date
ProjectManager
PERMIT SUBMITTAL CITY OF ROHNERT PARKPERFORMING ARTS CENTER HVAC
2235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com
GHD Inc.E169296/30/17
No.Exp.
REG I
S TER
ED PRO FE S S I ON A L E NGI NEER
S TA T E O F C A L I F O R N I A
E R I C M . P E NN
E L E C T R I C A L
PLAN CHECK COMMENTS1 04/21/2017
ANNOTATION
SWITCHING
LIGHTING
CONDUIT
MAIN SWITCHBOARD
DISTRIBUTION PANEL BOARD
COMBINATION METER/MAIN SERVICE PANEL
BRANCH CIRCUIT PANEL BOARD, SURFACE OR FLUSHMOUNTED
LIGHTING CONTROL PANEL
SIGNAL TERMINAL CABINET OR CONTROL PANELSURFACE OR FLUSH MOUNTED
SIGNAL TERMINAL BACKBOARD
CONCRETE UNDERGROUND HAND HOLE(NUMBER DENOTES CHRISTY SIZE)
TRANSFORMER
EQUIPMENT
GENERAL ELECTRICAL NOTESELECTRICAL SYMBOLS LEGEND
KEYNOTE
DEMOLITION NOTE
RACEWAY, FEEDER OR CIRCUIT DESIGNATION (SEE SCHEDULE)
LIGHTING FIXTURE TYPE DESIGNATION(SEE SCHEDULE)
DETAIL INDICATOR SECTION INDICATOR
MECHANICAL EQUIPMENT DESIGNATION(SEE SCHEDULE)
CCTV CAMERA, CEILING MOUNT
INTERCOM CALL IN SWITCH - MOUNTING HEIGHT: +44" AFF, UON
TELEPHONE OUTLET FOR WALL MOUNTED TELEPHONEMOUNTING HEIGHT: +44" AFF UON
DATA OUTLET - MOUNTING HEIGHT: +18" AFF UON
TELEPHONE/DATA OUTLET, FLUSH TYPE UONMOUNTING HEIGHT: +18" AFF UON
SURFACE RACEWAY WITH POWER AND TELEPHONE/DATARECEPTACLES AS INDICATED
CATV OUTLET - MOUNTING HEIGHT: +96" AFF UON
AUDIO/VIDEO OUTLET - MOUNTING HEIGHT: +18" AFF UON
CLOCK WITH BUZZER - MOUNTING HEIGHT: SEE PLANS
BELL, STANDARD 6" - MOUNTING HEIGHT: SEE PLANS PA SYSTEM
SPEAKER - WALL MOUNTED
PA SYSTEM SPEAKER - CEILING MOUNTED
PA SYSTEM HORN - MOUNTING HEIGHT: SEE PLANS
DUPLEX RECEPTACLE, 15A 125V 2P 3W, GROUNDING TYPE,MOUNTING HEIGHT: +18" AFF UON
DUPLEX RECEPTACLE - SPLIT WIRED, SWITCHED
DUPLEX RECEPTACLE - EMERGENCY POWER
DUPLEX RECEPTACLE - CEILING MOUNTED
FLOOR RECEPTACLE, 15A 125V 2P 3W, GROUNDING TYPE,FLUSH TYPE UON
DOUBLE DUPLEX RECEPTACLE, 15A 125V 2P 3W, GROUNDING TYPE,MOUNTING HEIGHT: +18" AFF UON
SINGLE RECEPTACLE, 20A 125V 2P 3W, GROUNDING TYPE,MOUNTING HEIGHT: +18" AFF UON
SPECIAL PURPOSE RECEPTACLE AS DESIGNATEDSEE 'SPECIAL SYMBOLS' ON EACH SHEET
DUAL SERVICE RECESSED FLOOR BOX WITH DUPLEX AND DATARECEPTACLES
JUNCTION BOX, CODE SIZED UON
FLOOR JUNCTION BOX
DISCONNECT SWITCH - FUSED WHERE APPLICABLE
MOTOR STARTER, COMBINATION WITH DISCONNECT SWITCH
MOTOR STARTER OR CONTROLLER
MOTOR CONNECTION
CEILING EXHAUST FAN
WATER HEATER
POWER POLE: P=POWER, T=TELEPHONE,D=DATA, C=COMBINATION
TEST PORT
GROUND ROD
GUY WIRE AND ANCHOR
THERMOSTAT (SEE MECHANICAL DRAWINGS)COORDINATE MOUNTING HEIGHT
BYPASS TIMER OR TIME SWITCH
PUSHBUTTON
LIGHTING CONTACTOR
CONDUIT INSTALLED ABOVE GRADE
CONDUIT INSTALLED UNDERGROUND OR UNDER SLAB
CONDUIT STUB-OUT WITH CAP
FLEXIBLE CONDUIT WHIP TO LIGHT FIXTURE OR EQUIPMENT
FLUORESCENT FIXTURE, RECESSED
RECESSED DOWN LIGHT FIXTURE
RECESSED DIRECTIONAL FIXTURE (ARROW INDICATES AIMING)
FLUORESCENT FIXTURE, SURFACE MOUNTED
SURFACE, PENDANT OR OTHER FIXTURE
LARGE DIAMETER PENDANT, DEPICTING APPROXIMATE DIAMETER
FLUORESCENT FIXTURE, WALL MOUNTED
WALL-MOUNTED HID, INCANDESCENT, OR COMPACT FLUORESCENTFIXTURE
FLUORESCENT FIXTURE, PENDANT OR CABLE HUNG
LIGHT TRACK AND TRACK-MOUNTED FIXTURES
BATH FAN WITH INTEGRAL LIGHT
EXIT SIGN, SINGLE FACE WITH DIRECTIONAL ARROWS AS INDICATED
EXIT SIGN, DOUBLE FACE WITH DIRECTIONAL ARROWS AS INDICATED
EXIT SIGN, LOW LEVEL
COMBINATION EXIT/EMERGENCY LIGHT FIXTUREMOUNTING HEIGHT: +8'-0" AFF, UON
EMERGENCY FIXTUREMOUNTING HEIGHT: +8'-0" AFF, UON
DENOTES FIXTURE CONNECTED TO EMERGENCY CIRCUIT
ADJUSTABLE SPOT OR FLOOD (ARROW INDICATES AIMING)
OUTDOOR SITE LIGHT, POLE MOUNTED LUMINAIRE ARROWINDICATES AIMING DIRECTION, IF APPLICABLE
BOLLARD OR POST-TOP FIXTURE
LIGHT SWITCH, SPST - MOUNTING HEIGHT: +44" AFF, UON
LIGHT SWITCH, DPST - MOUNTING HEIGHT: +44" AFF, UON
LIGHT SWITCH, 3-WAY - MOUNTING HEIGHT: +44" AFF, UON
LOW VOLTAGE SWITCH, MOMENTARY CONTACT, 3-POS.,CENTER-OFF, MOUNTING HEIGHT: +44" AFF, UON
TIMER SWITCH - MOUNTING HEIGHT: +44" AFF, UON
CIRCUIT AND SWITCH DESIGNATION FOR LIGHTING FIXTURE
CIRCUIT AND RELAY DESIGNATION FOR LIGHTING FIXTURES(SEE CORRESPONDING LIGHTING CONTROL PANEL RELAYSCHEDULE)
DIMMER SWITCH - MOUNTING HEIGHT: +44" AFF, UON
OCCUPANCY SENSOR POWER PACK, 1-CIRCUIT, MOUNTED ABOVECEILING
OCCUPANCY SENSOR POWER PACK, 2-CIRCUITMOUNTED ABOVE CEILING
OCCUPANCY SENSOR, CEILING MOUNTED, LINE VOLTAGE
OCCUPANCY SENSOR, CEILING MOUNTED, LOW VOLTAGE
OCCUPANCY SENSOR, WALL MOUNTED, LINE VOLTAGE, 1-CIRCUITMOUNTING HEIGHT: +44" AFF, UON
OCCUPANCY SENSOR, WALL MOUNTED, LINE VOLTAGE, 2-CIRCUITMOUNTING HEIGHT: +44" AFF, UON
PHOTO CONTROL SWITCH - MOUNT ON BUILDING EXTERIOR
TIME CLOCK FOR LIGHTING CONTROL
COMMUNICATION
POWER
CONDUIT HOME RUN TO DESIGNATED PANEL, TERMINAL, ORCONTROL CABINETEXAMPLES:
NOTE FOR CONDUIT: THE TIC MARKS INDICATE THE QUANTITY OF#12 AWG WIRES OR, IF INDICATED, THE QUANTITY OF OTHER SIZEWIRE OR CABLES.
SEE THE SINGLE LINE DIAGRAM FOR FEEDER SIZES.EXAMPLES: = (3) #12 = (2) #10
= (1) TYPE F1 CABLE. SEE CABLE SCHEDULE.F1
T
OBJECT LINES
NEW OBJECTS(HEAVY CONTINUOUS LINES, UNDERGROUND CONDUITHEAVY DASHED LINES)
EXISTING OBJECTS TO REMAIN. MAY INCLUDE NEW CIRCUITING ETC.(FINE CONTINUOUS LINES, UNDERGROUND CONDUITFINE DASHED LINES)
EXISTING OBJECTS TO BE DEMOLISHED(EXTRA FINE DASHED LINES, SCREENED)
ABBREVIATIONS(D) DEMOLISH(E) EXISTING(F) FUTURE(N) NEW
A AMPERESAC ALTERNATING CURRENTAF AMP FRAMEAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAHU AIR HANDLING UNITAIC AMPS INTERRUPTING CAPACITYANN ANNUNCIATORATS AUTOMATIC TRANSFER SWITCHAWG AMERICAN WIRE GAUGE
BAT BATTERYBFG BELOW FINISH GRADE
CATV CABLE TELEVISIONC CONDUITCB CIRCUIT BREAKERCCTV CLOSED CIRCUIT TELEVISIONCO CONDUIT ONLYCPT CONTROL POWER TRANSFORMERCT CURRENT TRANSFORMERCU COPPER
DC DIRECT CURRENT
EF EXHAUST FANEGU ENGINE GENERATOR UNITEM EMERGENCYEMT ELECTRICAL METALLIC TUBINGENT ELECTRICAL NON-METALLIC TUBINGEP EXPLOSION PROOF
FA FIRE ALARMFACP FIRE ALARM CONTROL PANELFC FOOT CANDLEFU FUSE
GND GROUNDGFCI GROUND FAULT CIRCUIT INTERRUPTERGFI GROUND FAULT INTERRUPTERGFR GROUND FAULT RELAY
HID HIGH INTENSITY DISCHARGEHOA "HAND-OFF-AUTO" SWITCHHP HORSEPOWERHPS HIGH PRESSURE SODIUMHVAC HEATING, VENTILATION &
AIR-CONDITIONING
IG ISOLATED GROUND
JB JUNCTION BOX
KAIC KILO-AMPS INTERRUPTING CAPACITYKV KILOVOLTKVA KILOVOLT-AMPKW KILOWATTKWH KILOWATT-HOUR
LPS LOW PRESSURE SODIUMLV LOW VOLTAGE
MCB MAIN CIRCUIT BREAKERMCC MOTOR CONTROL CENTERMCP MOTOR CIRCUIT PROTECTORMFR MANUFACTURERMH METAL HALIDEMLO MAIN LUGS ONLYMV MEDIUM VOLTAGE
NIC NOT IN CONTRACTNL NIGHT LIGHTNTS NOT TO SCALE
OC ON CENTER
PA PUBLIC ADDRESSPT POTENTIAL TRANSFORMERPVC POLYVINYL CHLORIDEPB PULL BOX, ELECTRICAL
RECPT RECEPTACLE, OUTLETRGS RIGID GALVANIZED STEEL (CONDUIT)RVSS REDUCED VOLTAGE SOFT STARTRTU REMOTE TERMINAL UNIT
TV TELEVISION MONITOR (SET)TVSS TRANS. VOLT. SURGE SUPPRESSOR
UF UNDER FLOORUG UNDERGROUNDUON UNLESS OTHERWISE NOTEDUPS UNINTERRUPTIBLE POWER SUPPLY
V VOLTVA VOLT-AMPVFD VARIABLE FREQUENCY DRIVE
WP WEATHERPROOFWPI WEATHERPROOF IN USE
XFMR TRANSFORMER
ELECTRICAL LEGEND, NOTES, AND ABBREVIATIONS
E-001
E. OMLID E. PENN
B. THOM
AS SHOWN
1. UNLESS SPECIFICALLY INDICATED OTHERWISE, ALL EQUIPMENT INDICATED SHALL BECONSIDERED NEW AND PROVIDED BY THE CONTRACTOR COMPLETE, INSTALLED, TESTED AND FUNCTIONING.
2. ALL WORK SHALL CONFORM TO AND BE PERFORMED IN ACCORDANCE WITH CODES,STANDARDS, AND ORDINANCES AS SET FORTH BY THE AUTHORITIES HAVING JURISDICTIONAND THEIR LATEST ADOPTED EDITIONS OF THE FOLLOWING PUBLICATIONS:
(A) NATIONAL ELECTRICAL CODE
(B) NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
(C) AMERICANS WITH DISABILITIES ACT (ADA)
3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL EQUIPMENT IN A SAFE AND FUNCTIONALCONDITION. KEEP DEAD FRONT EQUIPMENT IN PLACE WHILE EQUIPMENT IS ENERGIZED.CONDUCT ALL CONSTRUCTION OPERATIONS IN A SAFE MANNER FOR EMPLOYEES AS WELL ASOTHER WORK PERSONS OR ANYONE VISITING THE JOB SITE. PROVIDE BARRIERS, FLAGS,TAPE, ETC. AS REQUIRED TO MAINTAIN SAFETY.
4. INFORMATION SHOWN AS EXISTING CONDITIONS WAS PRIMARILY GAINED FROM "AS BUILT"DRAWINGS AND LIMITED FIELD INVESTIGATION. BEFORE CONSTRUCTION, VISIT SITE TOVERIFY EXISTING CONDITIONS AND MAKE ALLOWANCE FOR VARIATIONS FROM THAT SHOWN.
5. DEMOLITION WORK SHOWN WAS PREPARED FOR THE CONVENIENCE OF THE CONTRACTOR.THE ENGINEER DOES NOT REPRESENT THAT ALL ITEMS WHICH MAY REQUIRE DEMOLITIONHAVE BEEN SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CAREFULLYEXAMINE THE SITE AND THE CONTRACT DOCUMENTS AND TO PERFORM ALL DEMOLITION ANDRECONSTRUCTION WHICH MAY BE REQUIRED FOR THE PROPER EXECUTION AND COMPLETIONOF THE WORK.
6. INTERCEPT, EXTEND, REROUTE, REPULL CONDUCTORS AND OTHERWISE MODIFY EXISTINGCONDUCTORS OF ALL SYSTEMS AS REQUIRED TO MAINTAIN AND/OR ESTABLISH PROPERFUNCTION AND SATISFY DESIGN INTENT. REMOVE ALL ABANDONED CONDUCTORS ANDCONDUIT.
7. PRIOR TO COMMENCING WORK, COORDINATE WITH FWS REPRESENTATIVE. WHEREDISCONNECTING, MODIFYING OR WORKING ON EXISTING EQUIPMENT OR SYSTEMS, PROVIDEA WRITTEN METHOD OF PROCEDURE OUTLINING DATES, TIMES, DURATION AND DESCRIPTIONOF PROPOSED WORK PRIOR TO COMMENCING WORK FOR APPROVAL.
8. DRAWINGS INDICATE THE REQUIRED EQUIPMENT, DEVICES, FIXTURES, ETC. AND THEIRRELATED CIRCUITING REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FORCOORDINATION OF THE DEVICE LOCATIONS WITH ALL DISCIPLINES. PRIOR TO COMMENCINGWORK, COORDINATE WITH OTHER TRADES TO PREVENT CONFLICTS.
9. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR SLAB AND BEAM NOTES FORTHE INSTALLATION OF ANCHORS, HANGERS, AND OTHER ELECTRICAL SUPPORTS.
10. ALL EQUIPMENT SHALL BE LISTED AND LABELED PER RECOGNIZED ELECTRICAL TESTINGLABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURERSINSTRUCTIONS.
11. ALL EQUIPMENT SHALL BE GROUNDED PER THE REQUIREMENTS OF NEC ARTICLE 250.EQUIPMENT GROUNDING CONDUCTORS SHALL BE INSTALLED IN ALL POWER SYSTEMRACEWAYS.
14. WIRING METHODS FOR THIS PROJECT SHALL BE AS DEFINED IN SPECIFICATION SECTION 26 0519 AND AS REQUIRED BY CODE, LOCAL ELECTRICAL UTILITY PROVIDER AND AUTHORITYHAVING JURISDICTION/
15. PULLROPES: ANY RACEWAY WITHOUT CABLE OR WIRE SHALL BE INSTALLED WITH MINIMUM200 POUND TEST PULL LINE.
16. MAINTAIN AS BUILT CONDITIONS OF THE INSTALLATION DURING CONSTRUCTION AND SUBMITTHE FINAL CONSTRUCTED CONDITIONS TO THE OWNER/ARCHITECT FOR THEIR RECORDS.
UP
AA
BB
CC
7 8 9 106
AC 1-3
AC 2-2
AC 2-3
2
2
2
UP
A
B
C
7 8 9 10
AC 4-1
AC 1-2
This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.
Original Size
Title
Project
ClientDesignerDrawn
Scale
Plot Date: Filename:20 April 2017 - 3:33 PM G:\111\11121669 RP Performing Arts Center HVAC\06-CAD\Sheets\11121669 ED101.dwg
Arch E1
Date
Plotted By: Erik Omlid
Project No.
Sheet of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2017 GHD
DraftingCheck
0 1"
Bar is one inch onoriginal size sheet
DesignCheck
IssueNo. Drawn Approved Date
ProjectManager
PERMIT SUBMITTAL CITY OF ROHNERT PARKPERFORMING ARTS CENTER HVAC
2235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com
GHD Inc.E169296/30/17
No.Exp.
REG I
S TER
ED PRO FE S S I ON A L E NGI NEER
S TA T E O F C A L I F O R N I A
E R I C M . P E NN
E L E C T R I C A L
PLAN CHECK COMMENTS1 04/21/2017
1 MEZZININE LEVEL 1SCALE: 1/8" = 1'- 0"
2 MEZZININE LEVEL 2SCALE
0 16'8'4' N
0 16'8'4' N
PANEL MDPA
AC 3-1
AC 2-1
AC 1-1
AC 5-1
2
2
2
2
1
2
2
SHEET GENERAL NOTES
1. EXISTING CONDUIT NOT SHOWN FOR CLARITY.
2. LOCK OUT AND TAG OUT POWER CIRCUITS TO (E) HVAC UNITS PRIOR TO DEMOLITION.
SHEET KEYNOTES
1. EXISTING PANEL MDPA TO REMAIN. REMOVE (E) CIRCUIT BREAKERS AND PROVIDE (N) ASSHOWN ON PANEL SCHEDULE.
2. EXISTING DISCONNECT SWITCH TO REMAIN. PROTECT INCOMING FEEDER FROM PANELMDPA AND RE-USE. REMOVE CONDUIT AND CABLE BETWEEN (E) DISCONNECT AND (E)HVAC EQUIPMENT.
ELECTRICAL DEMOLITION POWER PLANS
ED-101
E. OMLID E. PENN
B. THOM
AS SHOWN
UP
AA
BB
CC
7 8 9 106
AC 1-3
AC 2-2
AC 2-3
2
2
2
AC
2-3
AC1-3
AC2-2
CONTINUED ONLEVEL 2
1LB-33
UP
A
B
C
7 8 9 10
AC 4-1
AC 1-2
AC
1-2
AC
4-1
AC1-1
AC5-1
AC2-1
AC3-1 CONTINUED
ON LEVEL 1
This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.
Original Size
Title
Project
ClientDesignerDrawn
Scale
Plot Date: Filename:20 April 2017 - 3:34 PM G:\111\11121669 RP Performing Arts Center HVAC\06-CAD\Sheets\11121669 E-101.dwg
Arch E1
Date
Plotted By: Erik Omlid
Project No.
Sheet of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2017 GHD
DraftingCheck
0 1"
Bar is one inch onoriginal size sheet
DesignCheck
IssueNo. Drawn Approved Date
ProjectManager
PERMIT SUBMITTAL CITY OF ROHNERT PARKPERFORMING ARTS CENTER HVAC
2235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com
GHD Inc.E169296/30/17
No.Exp.
REG I
S TER
ED PRO FE S S I ON A L E NGI NEER
S TA T E O F C A L I F O R N I A
E R I C M . P E NN
E L E C T R I C A L
PLAN CHECK COMMENTS1 04/21/2017
1 MEZZININE LEVEL 1SCALE: 1/8" = 1'- 0"
2 MEZZININE LEVEL 2SCALE
0 16'8'4' N
0 16'8'4' N
PANEL MDPA
AC 3-1
AC 2-1
AC 1-1
AC 5-1
2
2
2
2
1
2
ELECTRICAL POWER PLANS
E-101
E. OMLID E. PENN
B. THOM
AS SHOWN
SHEET GENERAL NOTES
1. EXISTING CONDUIT TO BE RE-USED NOT SHOWN FOR CLARITY.
2. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF EACH HVAC UNIT. COORDINATEWITH VENDOR FOR FINAL POINT OF CONNECTION.
SHEET KEYNOTES
1. (E) PANEL MDPA. RE-USE (E) AND PROVIDE (N) CIRCUIT BREAKERS AS SHOWN ON PANELSCHEDULE. PROTECT FEEDER CABLES FOR RE-USE AND RECONNECT TO (N) OR (E)CIRCUIT BREAKERS.
2. PROVIDE (N) CONDUIT AND CABLE BETWEEN (E) DISCONNECT SWITCH AND (N) HVACUNIT. SIZE PER NEC REQUIREMENTS BASED ON SUPPLY IN CIRCUIT BREAKER IN PANELMDPA. RE-USE (E) FEEDER BETWEEN DISCONNECT AND PANEL.
3. EXTEND (E) RECEPTACLE CIRCUIT TO (N) LOCATIONS AS SHOWN. PROVIDE (N) CONDUITAND CABLE, OUTLET BOXES, AND WIRING DEVICES AS INDICATED.
33
3
(E)
3
1
1
1
This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.
Original Size
Title
Project
ClientDesignerDrawn
Scale
Plot Date: Filename:20 April 2017 - 3:34 PM G:\111\11121669 RP Performing Arts Center HVAC\06-CAD\Sheets\11121669 E-601.dwg
Arch E1
Date
Plotted By: Erik Omlid
Project No.
Sheet of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2017 GHD
DraftingCheck
0 1"
Bar is one inch onoriginal size sheet
DesignCheck
IssueNo. Drawn Approved Date
ProjectManager
PERMIT SUBMITTAL CITY OF ROHNERT PARKPERFORMING ARTS CENTER HVAC
2235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com
GHD Inc.E169296/30/17
No.Exp.
REG I
S TER
ED PRO FE S S I ON A L E NGI NEER
S TA T E O F C A L I F O R N I A
E R I C M . P E NN
E L E C T R I C A L
PLAN CHECK COMMENTS1 04/21/2017
ELECTRICAL SCHEDULES
E-601
E. OMLID E. PENN
B. THOM
AS SHOWN
PANEL SCHEDULEPANEL NAME: MDPA VOLTAGE: 480/277 NEMA RATING: 1 MOUNTING: SURFACE NOTES:
MAINS RATING: MLO A MCB PHASE: 3 AIC RATING: 10K LOCATION: MECHANICAL ROOM 224BUS RATING: 600 A WIRE: 4 DEMAND FACTOR: STD
CKT NO. USE DESCRIPTION BKRSIZE CKT KVA CKT AMPS WIRE SIZE
WIRELENGTH
(FT)
VOLTAGEDROP % PHASE VOLTAGE
DROP %WIRE
LENGTH(FT)
WIRE SIZE CKT AMPS CKT KVA BKRSIZE DESCRIPTION USE CKT NO.
1 HAC 5-1 15/3
3.13 11.30 12 25 0.18 A 0.19 25 10 20.00 5.5425/3 AC 4-1
H 23 H 3.13 11.30 12 25 0.18 B 0.19 25 10 20.00 5.54 H 45 H 3.13 11.30 12 25 0.18 C 0.19 25 10 20.00 5.54 H 67 H
AC 3-1 30/36.07 21.90 10 25 0.21 A 0.56 75 6 46.00 12.74
60/3 AC 2-3H 8
9 H 6.07 21.90 10 25 0.21 B 0.56 75 6 46.00 12.74 H 1011 H 6.07 21.90 10 25 0.21 C 0.56 75 6 46.00 12.74 H 1213 H
AC 2-2 60/312.74 46.00 6 65 0.49 A 0.29 25 6 46.00 12.74
60/3 AC 2-1H 14
15 H 12.74 46.00 6 65 0.49 B 0.19 25 6 46.00 12.74 H 1617 H 12.74 46.00 6 65 0.49 C 0.19 25 6 46.00 12.74 H 1819 H
AC 1-3 60/312.74 46.00 6 75 0.56 A 0.19 25 6 46.00 12.74
60/3 AC 1-2H 20
21 H 12.74 46.00 6 75 0.56 B 0.19 25 6 46.00 12.74 H 2223 H 12.74 46.00 6 75 0.56 C 0.19 25 6 46.00 12.74 H 2425 H
AC 1-1 60/312.74 46.00 6 215 1.61 A
60/3H 26
27 H 12.74 46.00 6 25 0.19 B H 2829 H 12.74 46.00 6 25 0.19 C H 3031 H
60/3A
60/3H 32
33 H B H 3435 H C H 3637 H
60/3A
60/3H 38
39 H B H 4041 H C H 42
CONNECTED KVA DEMAND KVA DEMAND AMPS USE LEGEND VOLTAGE DROP CALCULATIONPHASE A: 91.2 91.2 329.2 ID LOAD TYPE ASSUMED PF VOLTAGE DROP IS BASED ON THE IEEE RED BOOK AND 2011
NEC CHAPTER 9 TABLE 9 FORMULA:ASSUMPTIONS:
PHASE B: 91.2 91.2 329.2 H HVAC 0.85 POWER FACTOR VARIED BY LOAD TYEPHASE C: 91.2 91.2 329.2 L LIGHTING 0.80 VD = I * ( R * PF + X * SIN(ACOS(PF)) * L CONDUIT TYPE RGS
STD DEMAND LOAD BASED ON 125% OF THE LARGEST MOTOR AND 100% OFTHE REMAINING MOTORS, 125% OF CONTINUOUS LOADS, 100% OFNONCONTINUOUS LOADS, AND 50% OF RECEPTACLE LOADS BEYOND THEFIRST 10KVA
M MOTOR 0.85 WITH AN ADDITIONAL MULTIPLIER OF 2 FOR SINGLE PHASEAND 1.732 FOR 3-PHASE LOADS
WIRE MATERIAL CUR RECEPTACLE 0.80P PANEL 0.85 R AND X VALUES ARE TAKEN FROM 2011 NEC CHAPTER 9
TABLE 9. LENGTH IS IN 1000FT INCREMENTSO OTHER 0.85
PANEL SCHEDULEPANEL NAME: 1LB VOLTAGE: 208/120 NEMA RATING: 1 MOUNTING: RECESSED NOTES: EXISTING PANEL TO REMAIN - NO WORK REQUIRED
MAINS RATING: MLO PHASE: 3 AIC RATING: VERIFY LOCATION: WOMEN'S DRESSING ROOMBUS RATING: 100 A WIRE: 4 DEMAND FACTOR: STD
CKT NO. USE DESCRIPTION BKRSIZE CKT KVA CKT AMPS WIRE SIZE
WIRELENGTH
(FT)
VOLTAGEDROP % PHASE VOLTAGE
DROP %WIRE
LENGTH(FT)
WIRE SIZE CKT AMPS CKT KVA BKRSIZE DESCRIPTION USE CKT NO.
1 SPARE 20/1 A 20/1 SPARE 23 SPARE 20/1 B 6.00 0.72 20/1 WARDROBE 45 SPARE 20/1 C 12.50 1.50 20/1 WASHING MACHINE 67 MECH WELL T.C. AND RECEPT 20/1 0.50 4.17 A 3.00 0.36 20/1 DRESSING ROOM 89 DRESSING ROOM 20/1 0.36 3.00 B 3.00 0.36 20/1 DRESSING ROOM 1011 DRESSING ROOM 20/1 0.36 3.00 C 3.00 0.36 20/1 DRESSING ROOM 1213 DRESSING ROOM 20/1 0.36 3.00 A 3.00 0.36 20/1 DRESSING ROOM 1415 DRESSING ROOM 20/1 0.36 3.00 B 3.00 0.36 20/1 DRESSING ROOM 1617 DRESSING ROOM 20/1 0.36 3.00 C 3.00 0.36 20/1 DRESSING ROOM 1819 DRESSING ROOM 20/1 0.36 3.00 A 3.00 0.36 20/1 DRESSING ROOM 2021 DRESSING ROOM 20/1 0.36 3.00 B 3.00 0.36 20/1 DRESSING ROOM 2223 DRESSING ROOM 20/1 0.36 3.00 C 3.00 0.36 20/1 DRESSING ROOM 2425 DRESSING ROOM 20/1 0.36 3.00 A 3.00 0.36 20/1 DRESSING ROOM 2627 STARS DRESSING 20/1 0.18 1.50 B 15.00 1.80 20/1 VENDING MACHINES 2829 STARS DRESSING 20/1 0.18 1.50 C 15.00 1.80 20/1 VENDING MACHINES 3031 WATER COOLER 20/1 1.80 15.00 A 15.00 1.80 20/1 VENDING MACHINES 3233 WATER HEATER + MAINTENANCE 20/1 0.59 4.92 10 88 0.76 B 15.00 1.80 30/3 DRYER 3435 MECHANICAL 20/1 0.36 3.00 C 15.00 1.80 30/3 3637 EXHAUST FAN 20/1 1.13 9.42 A 15.00 1.80 30/3 3839 SPARE 20/1 B 20/1 SPACE 4041 SPARE 20/1 C 20/1 SPACE 42
CONNECTED KVA DEMAND KVA DEMAND AMPS USE LEGEND VOLTAGE DROP CALCULATIONPHASE A: 9.6 9.6 79.6 ID LOAD TYPE ASSUMED PF VOLTAGE DROP IS BASED ON THE IEEE RED BOOK AND 2011
NEC CHAPTER 9 TABLE 9 FORMULA:ASSUMPTIONS:
PHASE B: 7.3 7.3 60.4 H HVAC 0.85 POWER FACTOR VARIED BY LOAD TYEPHASE C: 7.8 7.8 65.0 L LIGHTING 0.80 VD = I * ( R * PF + X * SIN(ACOS(PF)) * L CONDUIT TYPE RGS
STD DEMAND LOAD BASED ON 125% OF THE LARGEST MOTOR AND 100% OFTHE REMAINING MOTORS, 125% OF CONTINUOUS LOADS, 100% OFNONCONTINUOUS LOADS, AND 50% OF RECEPTACLE LOADS BEYOND THEFIRST 10KVA
M MOTOR 0.85 WITH AN ADDITIONAL MULTIPLIER OF 2 FOR SINGLE PHASEAND 1.732 FOR 3-PHASE LOADS
WIRE MATERIAL CUR RECEPTACLE 0.80P PANEL 0.85 R AND X VALUES ARE TAKEN FROM 2011 NEC CHAPTER 9
TABLE 9. LENGTH IS IN 1000FT INCREMENTSO OTHER 0.85