PeriodicServe Pelayanan Periodic Service unit prima, dengan kompetensi mekanik handal Kategori imUT SOLUTION Nama Inovator SOLUTION / NRP : Jarwo Wahyudi (80107111) Cabang : Pekanbaru Project Owner : Muchsin R. Yahya/SDH

Transcript of PeriodicServe - jarwowahyudi.files.wordpress.com › 2011 › 03 › periodicserve-copy.pdfBW211D-40...

  • PeriodicServe

    Pelayanan Periodic Service unit prima, dengan kompetensi mekanik handal

    Kategori imUT SOLUTION Nama Inovator SOLUTION / NRP : Jarwo Wahyudi (80107111)

    Cabang : Pekanbaru

    Project Owner : Muchsin R. Yahya/SDH

  • Service-Branch Operation

    Meetings

    2

    P Rupat

    Kuala Cinaku Rangsang

    SITE KERINCI

    CONS/FOR

    UT-PEKANBARU

    CONS/FOR/AGRO/MHIM

    SITE CPI-MINAS

    MNG/CONS

    SITE CPI-DURI

    MNG/CONS

    Row Labels Sum of QTY

    KOMAT 1335 NISSAN 142

    GENSET 108 BOMAG 76 SCANIA 35

    FORKLIFT 38 VALMET 18

    TADANO 22 Grand Total 1774

    Coverage Area 2011

    COVERAGE UNIT TERSEBAR +/- 48 LOKASI

  • Cust. Distribution

    Keterangan

    PT. Chevron Pacific Indonesia

    PT. Multi Struckture

    PT. Putra Rimba Nusantara

    PT. Cipta Buana Samudra

    CV. Nala

    CV. Usaha Sawit Mandiri

    PT. Inti Kamparindo

    PT. Indah Kiat Pulp & Paper

    PT. Riau Andalan Pulp & Paper

    PT. Wilmar Group

    PT. Salim Group

    PT. Sarindo Group

    PT. Cahaya Indah Sumatra

    PT. Mitra Karya Sejati

    PT. Rimba Permata Mas

    PT. Citra Holindo

    PT. Rezeki Riau Makmur

    PT. Metta Calista Indonesia

    PT. AAL Group

    PT. Insan Muda Mandiri

    PT. Surya Dumai Group

    PT. Pec Tech Indonesia

    PT. Putri Dewi Riau Mandiri

    PT. Bintang Jaya Sejati

    PT. Inti Bara Nusa Lima

    ut Krc

    ut Dri

    79

    110

    80

    79

    79

    125

    383

    64

    RUJ Site

    90

    cirenti

    Bangkinan

    Kerinc

    98

    167

    157

    180135

    87

    130

    179

    Pulau

    Total populasi 200 unit 30 unit under warranty Lokasi RUJ S

    Total populasi 55 unit All unit under warranty Lokasi Serapung & Rangsang (RPM & SRD)

    S

    Total populasi 120 unit 21 unit under warranty Lokasi Pulau muda

    V

    Total populasi 150 unit 15 unit under warranty Lokasi Tembilahan

    V

    S : Mekanik Stay V : Mekanik routine Visit

    Ref : Raker SDH_PKB Overview 2011

    by Muchsin R. Yahya

  • 1. Latar Belakang LATARBELAKANG & MASALAH

    Tingkat penjualan unit khususnya PC Small di area UT Pekanbaru naik, secara

    langsung membawa dampak pada After Sales Service karena banyak

    muncul issue problem spesifik (PC200-8/High fuel consumption & PC130F-

    7/Hydraulic overheat).

    Actual competency mekanik yang ada sebenarnya sudah banyak yang sesuai

    (mekanik senior) dengan level pekerjaannya, akan tetapi man power

    tersebut banyak dialokasikan untuk pekerjaan di luar Periodic Service unit

    (Troubleshooting, Remove – Install) karena munculnya problem tsb.

    Sehingga terjadi kekurangan man power untuk melayani job PS/Periodical

    Service.

    Dengan alasan inilah, maka dibentuk Tim khusus (Sub cont) yang menangani

    Periodical Service unit-unit waranty, dengan tetap mengacu pada Kualitas &

    Kuantitas PS yang sama dengan mekanik UT.

    Agar kualitas PS yang dilakukan tetap baik, maka dibutuhkan development

    kompetensi man power-nya. Oleh karena itu, konsep Team PS Competency

    Development ini muncul.

  • Mechanic Compossition Population

    GRADE 2008 2009 2010 2011

    G 8 0 0 1 0

    G 7 0 0 1 2

    G 6 0 2 4 1

    G 5 10 12 8 7

    G 4 8 2 6 5

    G 3 4 10 9 16

    G 2 25 17 18 12

    G 1 9 7 1 6

    KANITRA 0 0 8 10

    TOTAL 56 50 56 59

    0

    2

    4

    6

    8

    10

    G1AG2A G2BG3A

    G3BG4A

    G4BG5A

    G5BG6A

    G7A

    G1A, 6

    G2A, 4

    G2B, 8

    G3A, 9

    G3B, 7

    G4A, 2

    G4B, 3

    G5A, 2

    G5B, 5

    G6A, 1 G7A, 2

    UNIT MODEL Total

    P380CB_6X4 10

    BW211D-40 7

    CWB45ALDN 4

    D68E-SS-12 4

    D85E-SS-2 5

    GD511A-1 6

    PC100F-6 2

    PC130F-7 97

    PC200-7 17

    PC200-8 62

    PC300SE-8 1

    VMT 890.3 1

    WA180-3 1

    Grand Total 217

    Underwarranty Only 2011

    MODEL UNIT 2008 2009 2010

    PC400-7/8 4 9 16

    PC300LC-7/8 65 90 115

    PC200-6/7/8 618 587 791

    PC130-7 0 0 97

    PC100F-6 51 86 87

    BW211-40 33 41 54

    GD511A-1 33 39 56

    NISSAN 28 96 96

    TOTAL 832 948 1312

    Ref : Raker SDH_PKB Overview 2011

    by Muchsin R. Yahya

  • 2. Inovasi & Ide Perbaikan

    Akar Masalah Utama

    Terjadinya prioritas kedua untuk job PS karena Mekanik banyak menangani troubleshooting

    Solusi yang dipilih Membentuk Tim khusus (sub cont) yang menangani

    Periodical Service unit-unit waranty, dengan tetap mengutamakan Kualitas & Kuantitas PS yang sama dengan mekanik UT.

    Rencana Penanggulangan Agar kualitas PS yang dilakukan tetap baik, maka dibutuhkan development kompetensi man powernya secara khusus. Oleh karena itu, konsep Team PS Competency Development ini muncul.

  • Product Support Strategy

    Product Performance Improvement

    PS Performance & Strategy :

    0

    200

    400

    600

    800

    1000

    1200

    1 2 3 4 5 6 7 8 9 10 11 12

    89 183

    233 326

    409 507

    593

    703

    820 890

    957 1040

    Plan

    Actual

    Actual/plan ( %

    )

    Achievement PS YTD 2010

    = 98 %

    No No No

    1 Product Knowledge Jarwo Wahyudi 7 Hidraulic System 1 13 PM GD Small Jarwo Wahyudi

    2 Tools Jarwo Wahyudi 8 Powertrain System 1 14 PM Bomag Jarwo Wahyudi3 Partbook Imam Munzaini 9 PM Bulldozer Small4 Basic Maintenance Imam Munzaini 10 PM WA Small5 Engine System 1 Jarwo Wahyudi 11 PM Valmet6 Electrical System 1 Imam Munzaini 12 PM PC Small10 - 13 Dec2010 Hery Cahyadi6 - 10 Jan 2011

    3-Dec-10 Jarwo Wahyudi

    6-Dec-10 Imam Munzaini

    8 - 9 Dec 2010 Imam Munzaini

    22 - 27 Dec 2010

    28 - 30 Dec 2010

    3 - 5 Jan 2011

    1-Dec-10 Jarwo Wahyudi 12 - 13 Jan 2011

    2-Dec-10 Jarwo Wahyudi 14 - 17 Jan 2011

    15 - 16 Dec 2010

    17 - 20 Dec 2010

    Materi Waktu Instruktur Materi Waktu Instruktur Materi Waktu Instruktur

    Strategy : “ Membentuk Team PS melalui Service Partner “

    Ref : Raker SDH_PKB Overview 2011

    by Muchsin R. Yahya

  • 2. Inovasi & Ide Perbaikan

    Plan Description PIC

    Recruitment Man Power

    • Menyeleksi calon karyawan/subcont untuk Team PS

    • Maintenance contract

    SDH/Muchsin Riza Yahya

    Man power competency development

    Melaksanakan up grading kompetensi man power dalam hal preventive maintenance

    Instructor/Jarwo W

    Supervisi job & reporting Field job guide & monitoring Field Supervisor/Sariyanto

    1

    • Populasi unit bertambah (PC Small)

    • Muncul problem spesifik

    2

    • Second priority job PS

    • Loss man power job PS

    • Tambah man power PS

    3

    •Recruitment man power

    • Development •Field guiden & monitoring

  • Product Support Strategy

    DATA PESERTA MEKANIK TEAM PS

    NO NAMA JURUSAN JENJANG

    1 AGUS TRIYONO TEKNIK MESIN D3

    2 CECEP ADIWIJAYA TEKNIK MESIN D3

    3 ISMARIANGGA TEKNIK MESIN D3

    4 SUBUR BUDIONO TEKNIK MESIN D3

    In class training W/Shop practice (Engine, Powertrain, Hidrolik, & Electric) Field practice PS & BMI Small Bulldozer (D85ESS-2)

    Field practice PS & BMI WA Small (WA180-3) Field practice PS & BMI PC Small (PC200-8) Field practice PS & BMI Bomag (BW211D-3)

    Ref : Raker SDH_PKB Overview 2011

    by Muchsin R. Yahya

  • 3. Implementasi Deskripsi Perbaikan

    Data & Photos

    Perbaikan yang dilakukan (Actual Development Process)

    •Sourcing participant

    DATA PESERTA MEKANIK TEAM PS

    NO NAMA TEMPAT, TGL LAHIR JURUSAN JENJANG

    1 AGUS TRIYONO KOTA BUMI, 7 AGUSTUS 1985 TEKNIK MESIN D3

    2 CECEP ADIWIJAYA PEKANBARU, 28 SEPTEMBER 1987 TEKNIK MESIN D3

    3 ISMARIANGGA CIREBON, 25 OKTOBER 1986 TEKNIK MESIN D3

    4 SUBUR BUDIONO BOTOLAMBAT RANDA TEKNIK MESIN D3

    •Training schedule

    SCHEDULE TRAINING TEAM PS (1 Des - 20 Jan 2010) NO START END MATERI DURASI (DAYS) PIC NOTE

    1 30-Nov-10 30-Nov-10 Pembukaan + Behaviour Training 1 JWY INSTRUCTOR NAME:

    2 1-Dec-10 1-Dec-10 Prod. Know & Tools 1 JWY JWY: Jarwo Wahyudi

    3 2-Dec-10 3-Dec-10 Partbook & Basic Maintenance 2 IMZ IMZ: Imam Munzaini

    4 6-Dec-10 6-Dec-10 Evaluasi PK, Tools, BM, PB 1 Team HCY: Hery Cahyadi

    5 8-Dec-10 9-Dec-10 Basic Engine 2 JWY

    6 10-Dec-10 13-Dec-10 Basic Elektrik 2 IMZ

    7 14-Dec-10 14-Dec-10 Evaluasi Engine, Elektrik 1 Team

    8 15-Dec-10 16-Dec-10 Basic Hidrolik 2 JWY

    9 17-Dec-10 20-Dec-10 Basic Powertrain 2 IMZ

    10 21-Dec-10 21-Dec-10 Evaluasi Hidrolik, Powertrain 1 Team

    11 22-Dec-10 27-Dec-10 PS BDS 3 JWY

    12 28-Dec-10 30-Dec-10 PS WAS 3 IMZ

    13 31-Dec-10 31-Dec-10 Evaluasi PS BDS, PS WAS 1 Team

    14 3-Jan-11 5-Jan-11 PS Valmet 3 IMZ

    15 6-Jan-10 10-Jan-11 PS PCS 3 HCY

    16 11-Jan-11 11-Jan-11 Evaluasi PS Valmet, PS PCS 1 Team

    17 12-Jan-11 14-Jan-11 PS GDS 3 JWY

    18 17-Jan-11 19-Jan-11 PS Bomag 3 HCY

    19 20-Jan-11 20-Jan-11 Evaluasi PS GDS, PS Bomag 1 Team

    20 21-Jan-11 31-May-11 OJT 130 Team

    TEAM

    Total 166

    prepared by,

    Jarwo W.

  • •Reporting

    LAPORAN PEMBELAJARAN

    Program Studi : Basic Competency 1 (BC 1) Semester/Program : 1/in class

    Periode : 1 Dec 2010 - 17 Jan 2011 Kelas : Mobile Service Mechanic

    MATERI PEMBELAJARAN

    No Materi Waktu Instruktur No Materi Waktu Instruktur No Materi Waktu Instruktur

    1

    Product Knowledge

    1-Dec-10 Jarwo Wahyudi 7 Hidraulic System 1 15 - 16 Dec 2010 Jarwo Wahyudi 13 PM GD Small

    12 - 13 Jan 2011 Jarwo Wahyudi

    2 Tools

    2-Dec-10 Jarwo Wahyudi 8 Powertrain System 1 17 - 20 Dec 2010 Jarwo Wahyudi 14 PM Bomag 14 - 17 Jan 2011 Jarwo Wahyudi

    3 Partbook

    3-Dec-10 Imam Munzaini 9 PM Bulldozer Small 22 - 27 Dec 2010 Jarwo Wahyudi

    4 Basic Maintenance

    6-Dec-10 Imam Munzaini 10 PM WA Small 28 - 30 Dec 2010 Imam Munzaini

    5 Engine System 1

    8 - 9 Dec 2010 Jarwo Wahyudi 11 PM Valmet 3 - 5 Jan 2011 Imam Munzaini

    6

    Elect

    rical System 1

    10 - 13 Dec2010 Imam Munzaini 12 PM PC Small 6 - 10 Jan 2011 Hery Cahyadi

    EVALUASI TEKNIS

    No Nama Cab/Cust

    Teori Praktek

    Keterangan

    PK TL PB BM ENG1 ELC1 HS1 PTR1 PMBDS PMWAS PMVLM PMPCS PMGDS PMBW Rata2 BM ENG1 ELC1 HS1 PTR1 PMBDS PMWAS PMVLM PMPCS PMGDS PMBW Rata2

    1 Agus Triono CV. Servitama Internusa 77 76 80 78 76 75 75 75 77 76 75 76 76 85 77 78 76 76 77 76 77 77 77 80 77

    2 Cecep Adiwijaya CV. Servitama Internusa 77 76 83 75 77 76 76 75 77 75 76 77 78 85 77 78 77 77 78 77 77 76 78 80 78

    3 Ismariangga CV. Servitama Internusa 86 77 85 75 78 81 81 75 78 80 78 88 79 83 80 79 78 80 79 77 79 79 80 79 79

    4 Subur Budiono CV. Servitama Internusa 81 84 85 84 78 76 77 81 79 76 78 86 79 80 80 79 79 77 78 80 79 77 79 79 79

    Rata-rata Kelas 79 Rata-rata Kelas 78

    EVALUASI BEHAVIOR

    No Nama NIS

    Inisiatif Disiplin Kerjasama Motivasi Proses belajar Keteranagan

    Ku Cu Ba Ku Cu Ba Ku Cu Ba Ku Cu Ba Ku Cu Ba Remarks 1 PK : Product knowledge

    1 Agus Triono CV. Servitama Internusa a a a a a 2 TL : Tools 2 Cecep Adiwijaya CV. Servitama Internusa a a a a a 3 PB : Parbook 3 Ismariangga CV. Servitama Internusa a a a a a 4 BM : Basic Maintenance

    4 Subur Budiono CV. Servitama Internusa a a a a a

    5

    ENG1 : Engine System 1

    6 ELC1 : Electrical System 1 7 HS1 : Hydraulic System 1

    Keteranagan: 8 PTR1 : Powertrain System 1

    Ku : Kurang Cu : Cukup Ba : Baik

    9

    PMBDS : Prev. Maint. Bulldozer Small

    10 PMWAS : Prev. Maint. WA Small

    11 PMVLM : Prev. Maint. Valmet

    12 PMPCS : Prev. Maint. PC Small

    13

    PMGDS : Prev. Maint Grader Small

    14 PMBW : Prev. Maint Bomag

    Pekanbaru,

    20 Januari 2011

    Mengetahui,

    ABDUL HASIM JARWO WAHYUDI

    TTA Head Penanggung Jawab

  • •Dokumentasi

    In class training W/Shop practice (Engine,

    Powertrain, Hidrolik, & Electric)

    Field practice PS & BMI

    Small Bulldozer (D85ESS-2)

  • •Dokumentasi

    Field practice PS & BMI WA

    Small (WA180-3)

    Field practice PS & BMI PC

    Small (PC200-8)

    Field practice PS & BMI

    Bomag (BW211D-3)

  • •Absensi Training

  • Project Assignment TC related branch support

    Managing People Strategy

    Nama Project Target Project Target Comp Devp Periode Indicator keberhasilannya

    Imam Munzaini Pocket Book PC 200-8 Membuat Pocket Book untuk

    mekanik customer dan

    mensosialisasikan ke customer

    Meningkatkan Kompetensi

    mekanik customer untuk

    PS dilapangan

    1 Jan - 31 Des 2011 Sesuai target

    Hery Cahyadi Improvement PC 130F-

    7

    Mengurangi Hydraulic Over Heat

    PC 130-7

    Machine Trouble Shooting

    PC 130-7

    1 Jan - 31 Des 2011 Sesuai target

    Jarwo Wahyudi Mechanic PS

    Development

    Mendevelop mekanik subcon baru,

    hingga mandiri melakukan

    pekerjaan PS

    Preventive Maintenance 1 Jan - 31 Des 2011 Sesuai target

    Agus Dianto Operator Komatsu

    Valmet Development for

    PTSI

    Mendevelop operator komatsu

    valmet harvester untuk Customer

    PTSI hingga mampu

    mengoperasikan sesuai standar

    OMM Harvester 378 1 Jan - 31 Des 2011 Sesuai target

    Fahrul Riza Speed up Kompetensi

    G1 Cabang PekanbaruMempercepat mekanik kompetensi

    G1 menjadi G2

    Planing & Organizing

    Project

    1 Jan - 31 Des 2011 Sesuai target

    Project Pocket Book PC200 -8 (Develop mekanik customer) :

    “ Buku panduan hydraulic excavator

    PC200-8 untuk mekanik costomer “

  • 4. Hasil & Manfaat Manfaat untuk Customer; Manfaat untuk UT Quality, Cost, Delivery, Safety, Morale (Culture), Productivity

    Manfaat untuk UT

    Manfaat untuk customer

    1. Respon terhadap pelaksanaan PS lebih cepat karena menerapkan sistem call center

    2. Pelaksanaan PS bisa selesai dengan cepat karena ditangani map power khusus

    3. Kualitas PS diharapkan tetap terjaga baik karena standar kompetensi man power

    sudah terpenuhi (dari program development)

    ASPEK SEBELUM SESUDAH

    QUALITY Baik (dengan jarang adanya complaint)

    Lebih baik (man power khusus)

    COST Tidak terukur/terbudgetkan Terbudgetkan (fixed cost PS/month)

    DELIVERY Sering lambat (menunggu call dari customer)

    Cepat (inisiatif call ke customer)

    PRODUCTIVITY Lead time lama & kuantitas sedikit Lead time cepat & kuantitas banyak (on target)

  • 4. Hasil & Manfaat Aspek-aspek SOLUTION

    ASPEK SEBELUM SESUDAH

    SERVE Lead time PS unit lama, kepuasan customer kurang

    Lea time PS cepat, tingkat kepuasan customer naik

    ORGANIZED Pengaturan man power kurang fokus

    Pengaturan manpower jelas & fokus

    TOTALITY Penanganan PS kurang fokus (2nd priority)

    Penanganan PS & T/S mendapat prioritas sama

    INNOVATE Belum ada problem solving Muncul ide, plan & implementasi untuk problem solving

    OPENMIND Man power baru belum kompeten untuk PS

    Man power baru punya avability & kompeten untuk PS

    NETWORKING Kerjasama tim untuk PS terkendala masalah man power

    Kerjasama tim lebih baik (manpower khusus)

  • Thank You !