PeriodicServe - jarwowahyudi.files.wordpress.com › 2011 › 03 › periodicserve-copy.pdfBW211D-40...
Transcript of PeriodicServe - jarwowahyudi.files.wordpress.com › 2011 › 03 › periodicserve-copy.pdfBW211D-40...
-
PeriodicServe
Pelayanan Periodic Service unit prima, dengan kompetensi mekanik handal
Kategori imUT SOLUTION Nama Inovator SOLUTION / NRP : Jarwo Wahyudi (80107111)
Cabang : Pekanbaru
Project Owner : Muchsin R. Yahya/SDH
-
Service-Branch Operation
Meetings
2
P Rupat
Kuala Cinaku Rangsang
SITE KERINCI
CONS/FOR
UT-PEKANBARU
CONS/FOR/AGRO/MHIM
SITE CPI-MINAS
MNG/CONS
SITE CPI-DURI
MNG/CONS
Row Labels Sum of QTY
KOMAT 1335 NISSAN 142
GENSET 108 BOMAG 76 SCANIA 35
FORKLIFT 38 VALMET 18
TADANO 22 Grand Total 1774
Coverage Area 2011
COVERAGE UNIT TERSEBAR +/- 48 LOKASI
-
Cust. Distribution
Keterangan
PT. Chevron Pacific Indonesia
PT. Multi Struckture
PT. Putra Rimba Nusantara
PT. Cipta Buana Samudra
CV. Nala
CV. Usaha Sawit Mandiri
PT. Inti Kamparindo
PT. Indah Kiat Pulp & Paper
PT. Riau Andalan Pulp & Paper
PT. Wilmar Group
PT. Salim Group
PT. Sarindo Group
PT. Cahaya Indah Sumatra
PT. Mitra Karya Sejati
PT. Rimba Permata Mas
PT. Citra Holindo
PT. Rezeki Riau Makmur
PT. Metta Calista Indonesia
PT. AAL Group
PT. Insan Muda Mandiri
PT. Surya Dumai Group
PT. Pec Tech Indonesia
PT. Putri Dewi Riau Mandiri
PT. Bintang Jaya Sejati
PT. Inti Bara Nusa Lima
ut Krc
ut Dri
79
110
80
79
79
125
383
64
RUJ Site
90
cirenti
Bangkinan
Kerinc
98
167
157
180135
87
130
179
Pulau
Total populasi 200 unit 30 unit under warranty Lokasi RUJ S
Total populasi 55 unit All unit under warranty Lokasi Serapung & Rangsang (RPM & SRD)
S
Total populasi 120 unit 21 unit under warranty Lokasi Pulau muda
V
Total populasi 150 unit 15 unit under warranty Lokasi Tembilahan
V
S : Mekanik Stay V : Mekanik routine Visit
Ref : Raker SDH_PKB Overview 2011
by Muchsin R. Yahya
-
1. Latar Belakang LATARBELAKANG & MASALAH
Tingkat penjualan unit khususnya PC Small di area UT Pekanbaru naik, secara
langsung membawa dampak pada After Sales Service karena banyak
muncul issue problem spesifik (PC200-8/High fuel consumption & PC130F-
7/Hydraulic overheat).
Actual competency mekanik yang ada sebenarnya sudah banyak yang sesuai
(mekanik senior) dengan level pekerjaannya, akan tetapi man power
tersebut banyak dialokasikan untuk pekerjaan di luar Periodic Service unit
(Troubleshooting, Remove – Install) karena munculnya problem tsb.
Sehingga terjadi kekurangan man power untuk melayani job PS/Periodical
Service.
Dengan alasan inilah, maka dibentuk Tim khusus (Sub cont) yang menangani
Periodical Service unit-unit waranty, dengan tetap mengacu pada Kualitas &
Kuantitas PS yang sama dengan mekanik UT.
Agar kualitas PS yang dilakukan tetap baik, maka dibutuhkan development
kompetensi man power-nya. Oleh karena itu, konsep Team PS Competency
Development ini muncul.
-
Mechanic Compossition Population
GRADE 2008 2009 2010 2011
G 8 0 0 1 0
G 7 0 0 1 2
G 6 0 2 4 1
G 5 10 12 8 7
G 4 8 2 6 5
G 3 4 10 9 16
G 2 25 17 18 12
G 1 9 7 1 6
KANITRA 0 0 8 10
TOTAL 56 50 56 59
0
2
4
6
8
10
G1AG2A G2BG3A
G3BG4A
G4BG5A
G5BG6A
G7A
G1A, 6
G2A, 4
G2B, 8
G3A, 9
G3B, 7
G4A, 2
G4B, 3
G5A, 2
G5B, 5
G6A, 1 G7A, 2
UNIT MODEL Total
P380CB_6X4 10
BW211D-40 7
CWB45ALDN 4
D68E-SS-12 4
D85E-SS-2 5
GD511A-1 6
PC100F-6 2
PC130F-7 97
PC200-7 17
PC200-8 62
PC300SE-8 1
VMT 890.3 1
WA180-3 1
Grand Total 217
Underwarranty Only 2011
MODEL UNIT 2008 2009 2010
PC400-7/8 4 9 16
PC300LC-7/8 65 90 115
PC200-6/7/8 618 587 791
PC130-7 0 0 97
PC100F-6 51 86 87
BW211-40 33 41 54
GD511A-1 33 39 56
NISSAN 28 96 96
TOTAL 832 948 1312
Ref : Raker SDH_PKB Overview 2011
by Muchsin R. Yahya
-
2. Inovasi & Ide Perbaikan
Akar Masalah Utama
Terjadinya prioritas kedua untuk job PS karena Mekanik banyak menangani troubleshooting
Solusi yang dipilih Membentuk Tim khusus (sub cont) yang menangani
Periodical Service unit-unit waranty, dengan tetap mengutamakan Kualitas & Kuantitas PS yang sama dengan mekanik UT.
Rencana Penanggulangan Agar kualitas PS yang dilakukan tetap baik, maka dibutuhkan development kompetensi man powernya secara khusus. Oleh karena itu, konsep Team PS Competency Development ini muncul.
-
Product Support Strategy
Product Performance Improvement
PS Performance & Strategy :
0
200
400
600
800
1000
1200
1 2 3 4 5 6 7 8 9 10 11 12
89 183
233 326
409 507
593
703
820 890
957 1040
Plan
Actual
Actual/plan ( %
)
Achievement PS YTD 2010
= 98 %
No No No
1 Product Knowledge Jarwo Wahyudi 7 Hidraulic System 1 13 PM GD Small Jarwo Wahyudi
2 Tools Jarwo Wahyudi 8 Powertrain System 1 14 PM Bomag Jarwo Wahyudi3 Partbook Imam Munzaini 9 PM Bulldozer Small4 Basic Maintenance Imam Munzaini 10 PM WA Small5 Engine System 1 Jarwo Wahyudi 11 PM Valmet6 Electrical System 1 Imam Munzaini 12 PM PC Small10 - 13 Dec2010 Hery Cahyadi6 - 10 Jan 2011
3-Dec-10 Jarwo Wahyudi
6-Dec-10 Imam Munzaini
8 - 9 Dec 2010 Imam Munzaini
22 - 27 Dec 2010
28 - 30 Dec 2010
3 - 5 Jan 2011
1-Dec-10 Jarwo Wahyudi 12 - 13 Jan 2011
2-Dec-10 Jarwo Wahyudi 14 - 17 Jan 2011
15 - 16 Dec 2010
17 - 20 Dec 2010
Materi Waktu Instruktur Materi Waktu Instruktur Materi Waktu Instruktur
Strategy : “ Membentuk Team PS melalui Service Partner “
Ref : Raker SDH_PKB Overview 2011
by Muchsin R. Yahya
-
2. Inovasi & Ide Perbaikan
Plan Description PIC
Recruitment Man Power
• Menyeleksi calon karyawan/subcont untuk Team PS
• Maintenance contract
SDH/Muchsin Riza Yahya
Man power competency development
Melaksanakan up grading kompetensi man power dalam hal preventive maintenance
Instructor/Jarwo W
Supervisi job & reporting Field job guide & monitoring Field Supervisor/Sariyanto
1
• Populasi unit bertambah (PC Small)
• Muncul problem spesifik
2
• Second priority job PS
• Loss man power job PS
• Tambah man power PS
3
•Recruitment man power
• Development •Field guiden & monitoring
-
Product Support Strategy
DATA PESERTA MEKANIK TEAM PS
NO NAMA JURUSAN JENJANG
1 AGUS TRIYONO TEKNIK MESIN D3
2 CECEP ADIWIJAYA TEKNIK MESIN D3
3 ISMARIANGGA TEKNIK MESIN D3
4 SUBUR BUDIONO TEKNIK MESIN D3
In class training W/Shop practice (Engine, Powertrain, Hidrolik, & Electric) Field practice PS & BMI Small Bulldozer (D85ESS-2)
Field practice PS & BMI WA Small (WA180-3) Field practice PS & BMI PC Small (PC200-8) Field practice PS & BMI Bomag (BW211D-3)
Ref : Raker SDH_PKB Overview 2011
by Muchsin R. Yahya
-
3. Implementasi Deskripsi Perbaikan
Data & Photos
Perbaikan yang dilakukan (Actual Development Process)
•Sourcing participant
DATA PESERTA MEKANIK TEAM PS
NO NAMA TEMPAT, TGL LAHIR JURUSAN JENJANG
1 AGUS TRIYONO KOTA BUMI, 7 AGUSTUS 1985 TEKNIK MESIN D3
2 CECEP ADIWIJAYA PEKANBARU, 28 SEPTEMBER 1987 TEKNIK MESIN D3
3 ISMARIANGGA CIREBON, 25 OKTOBER 1986 TEKNIK MESIN D3
4 SUBUR BUDIONO BOTOLAMBAT RANDA TEKNIK MESIN D3
•Training schedule
SCHEDULE TRAINING TEAM PS (1 Des - 20 Jan 2010) NO START END MATERI DURASI (DAYS) PIC NOTE
1 30-Nov-10 30-Nov-10 Pembukaan + Behaviour Training 1 JWY INSTRUCTOR NAME:
2 1-Dec-10 1-Dec-10 Prod. Know & Tools 1 JWY JWY: Jarwo Wahyudi
3 2-Dec-10 3-Dec-10 Partbook & Basic Maintenance 2 IMZ IMZ: Imam Munzaini
4 6-Dec-10 6-Dec-10 Evaluasi PK, Tools, BM, PB 1 Team HCY: Hery Cahyadi
5 8-Dec-10 9-Dec-10 Basic Engine 2 JWY
6 10-Dec-10 13-Dec-10 Basic Elektrik 2 IMZ
7 14-Dec-10 14-Dec-10 Evaluasi Engine, Elektrik 1 Team
8 15-Dec-10 16-Dec-10 Basic Hidrolik 2 JWY
9 17-Dec-10 20-Dec-10 Basic Powertrain 2 IMZ
10 21-Dec-10 21-Dec-10 Evaluasi Hidrolik, Powertrain 1 Team
11 22-Dec-10 27-Dec-10 PS BDS 3 JWY
12 28-Dec-10 30-Dec-10 PS WAS 3 IMZ
13 31-Dec-10 31-Dec-10 Evaluasi PS BDS, PS WAS 1 Team
14 3-Jan-11 5-Jan-11 PS Valmet 3 IMZ
15 6-Jan-10 10-Jan-11 PS PCS 3 HCY
16 11-Jan-11 11-Jan-11 Evaluasi PS Valmet, PS PCS 1 Team
17 12-Jan-11 14-Jan-11 PS GDS 3 JWY
18 17-Jan-11 19-Jan-11 PS Bomag 3 HCY
19 20-Jan-11 20-Jan-11 Evaluasi PS GDS, PS Bomag 1 Team
20 21-Jan-11 31-May-11 OJT 130 Team
TEAM
Total 166
prepared by,
Jarwo W.
-
•Reporting
LAPORAN PEMBELAJARAN
Program Studi : Basic Competency 1 (BC 1) Semester/Program : 1/in class
Periode : 1 Dec 2010 - 17 Jan 2011 Kelas : Mobile Service Mechanic
MATERI PEMBELAJARAN
No Materi Waktu Instruktur No Materi Waktu Instruktur No Materi Waktu Instruktur
1
Product Knowledge
1-Dec-10 Jarwo Wahyudi 7 Hidraulic System 1 15 - 16 Dec 2010 Jarwo Wahyudi 13 PM GD Small
12 - 13 Jan 2011 Jarwo Wahyudi
2 Tools
2-Dec-10 Jarwo Wahyudi 8 Powertrain System 1 17 - 20 Dec 2010 Jarwo Wahyudi 14 PM Bomag 14 - 17 Jan 2011 Jarwo Wahyudi
3 Partbook
3-Dec-10 Imam Munzaini 9 PM Bulldozer Small 22 - 27 Dec 2010 Jarwo Wahyudi
4 Basic Maintenance
6-Dec-10 Imam Munzaini 10 PM WA Small 28 - 30 Dec 2010 Imam Munzaini
5 Engine System 1
8 - 9 Dec 2010 Jarwo Wahyudi 11 PM Valmet 3 - 5 Jan 2011 Imam Munzaini
6
Elect
rical System 1
10 - 13 Dec2010 Imam Munzaini 12 PM PC Small 6 - 10 Jan 2011 Hery Cahyadi
EVALUASI TEKNIS
No Nama Cab/Cust
Teori Praktek
Keterangan
PK TL PB BM ENG1 ELC1 HS1 PTR1 PMBDS PMWAS PMVLM PMPCS PMGDS PMBW Rata2 BM ENG1 ELC1 HS1 PTR1 PMBDS PMWAS PMVLM PMPCS PMGDS PMBW Rata2
1 Agus Triono CV. Servitama Internusa 77 76 80 78 76 75 75 75 77 76 75 76 76 85 77 78 76 76 77 76 77 77 77 80 77
2 Cecep Adiwijaya CV. Servitama Internusa 77 76 83 75 77 76 76 75 77 75 76 77 78 85 77 78 77 77 78 77 77 76 78 80 78
3 Ismariangga CV. Servitama Internusa 86 77 85 75 78 81 81 75 78 80 78 88 79 83 80 79 78 80 79 77 79 79 80 79 79
4 Subur Budiono CV. Servitama Internusa 81 84 85 84 78 76 77 81 79 76 78 86 79 80 80 79 79 77 78 80 79 77 79 79 79
Rata-rata Kelas 79 Rata-rata Kelas 78
EVALUASI BEHAVIOR
No Nama NIS
Inisiatif Disiplin Kerjasama Motivasi Proses belajar Keteranagan
Ku Cu Ba Ku Cu Ba Ku Cu Ba Ku Cu Ba Ku Cu Ba Remarks 1 PK : Product knowledge
1 Agus Triono CV. Servitama Internusa a a a a a 2 TL : Tools 2 Cecep Adiwijaya CV. Servitama Internusa a a a a a 3 PB : Parbook 3 Ismariangga CV. Servitama Internusa a a a a a 4 BM : Basic Maintenance
4 Subur Budiono CV. Servitama Internusa a a a a a
5
ENG1 : Engine System 1
6 ELC1 : Electrical System 1 7 HS1 : Hydraulic System 1
Keteranagan: 8 PTR1 : Powertrain System 1
Ku : Kurang Cu : Cukup Ba : Baik
9
PMBDS : Prev. Maint. Bulldozer Small
10 PMWAS : Prev. Maint. WA Small
11 PMVLM : Prev. Maint. Valmet
12 PMPCS : Prev. Maint. PC Small
13
PMGDS : Prev. Maint Grader Small
14 PMBW : Prev. Maint Bomag
Pekanbaru,
20 Januari 2011
Mengetahui,
ABDUL HASIM JARWO WAHYUDI
TTA Head Penanggung Jawab
-
•Dokumentasi
In class training W/Shop practice (Engine,
Powertrain, Hidrolik, & Electric)
Field practice PS & BMI
Small Bulldozer (D85ESS-2)
-
•Dokumentasi
Field practice PS & BMI WA
Small (WA180-3)
Field practice PS & BMI PC
Small (PC200-8)
Field practice PS & BMI
Bomag (BW211D-3)
-
•Absensi Training
-
Project Assignment TC related branch support
Managing People Strategy
Nama Project Target Project Target Comp Devp Periode Indicator keberhasilannya
Imam Munzaini Pocket Book PC 200-8 Membuat Pocket Book untuk
mekanik customer dan
mensosialisasikan ke customer
Meningkatkan Kompetensi
mekanik customer untuk
PS dilapangan
1 Jan - 31 Des 2011 Sesuai target
Hery Cahyadi Improvement PC 130F-
7
Mengurangi Hydraulic Over Heat
PC 130-7
Machine Trouble Shooting
PC 130-7
1 Jan - 31 Des 2011 Sesuai target
Jarwo Wahyudi Mechanic PS
Development
Mendevelop mekanik subcon baru,
hingga mandiri melakukan
pekerjaan PS
Preventive Maintenance 1 Jan - 31 Des 2011 Sesuai target
Agus Dianto Operator Komatsu
Valmet Development for
PTSI
Mendevelop operator komatsu
valmet harvester untuk Customer
PTSI hingga mampu
mengoperasikan sesuai standar
OMM Harvester 378 1 Jan - 31 Des 2011 Sesuai target
Fahrul Riza Speed up Kompetensi
G1 Cabang PekanbaruMempercepat mekanik kompetensi
G1 menjadi G2
Planing & Organizing
Project
1 Jan - 31 Des 2011 Sesuai target
Project Pocket Book PC200 -8 (Develop mekanik customer) :
“ Buku panduan hydraulic excavator
PC200-8 untuk mekanik costomer “
-
4. Hasil & Manfaat Manfaat untuk Customer; Manfaat untuk UT Quality, Cost, Delivery, Safety, Morale (Culture), Productivity
Manfaat untuk UT
Manfaat untuk customer
1. Respon terhadap pelaksanaan PS lebih cepat karena menerapkan sistem call center
2. Pelaksanaan PS bisa selesai dengan cepat karena ditangani map power khusus
3. Kualitas PS diharapkan tetap terjaga baik karena standar kompetensi man power
sudah terpenuhi (dari program development)
ASPEK SEBELUM SESUDAH
QUALITY Baik (dengan jarang adanya complaint)
Lebih baik (man power khusus)
COST Tidak terukur/terbudgetkan Terbudgetkan (fixed cost PS/month)
DELIVERY Sering lambat (menunggu call dari customer)
Cepat (inisiatif call ke customer)
PRODUCTIVITY Lead time lama & kuantitas sedikit Lead time cepat & kuantitas banyak (on target)
-
4. Hasil & Manfaat Aspek-aspek SOLUTION
ASPEK SEBELUM SESUDAH
SERVE Lead time PS unit lama, kepuasan customer kurang
Lea time PS cepat, tingkat kepuasan customer naik
ORGANIZED Pengaturan man power kurang fokus
Pengaturan manpower jelas & fokus
TOTALITY Penanganan PS kurang fokus (2nd priority)
Penanganan PS & T/S mendapat prioritas sama
INNOVATE Belum ada problem solving Muncul ide, plan & implementasi untuk problem solving
OPENMIND Man power baru belum kompeten untuk PS
Man power baru punya avability & kompeten untuk PS
NETWORKING Kerjasama tim untuk PS terkendala masalah man power
Kerjasama tim lebih baik (manpower khusus)
-
Thank You !