Periodic Inspection and Maintenance Checklist
for EOT Cranes or Hoists
REVA INDUSTRIES LIMITED
Periodic Inspection Chart
The frequency of inspection and maintenance depends on the class and duty of the crane or hoist
here is a general classification on the frequency
Periodic Maintenance
1) Walk Around Checklista) Mechanical Checksb) Electrical Checks
2) No Load Test3) Load Test
WALK AROUND CHECKLIST
CHECK LIST FOR HOIST / CRANES
SR NO. LOCATION MECHANICAL WORK YES/NO.REMARKS ACTION TO BE TAKEN
1ALL CRANE PARTS ALL CRANE DUST CLEANING
Check Visually
i)Clean thru air blow pressure Control Panel, Resistance Box, LT Mechanism, Hoisting Mechanism, CT Mechanism, Hook Block assy, Top Block assy, CT/lt rail track, All brakes
2GEARBOX MH,CT,LT GEAR OIL LEVEL CHECK
i) Check Oil level & remove scale layer made above the lubrication oil topii)Top-up the required oil to meet oil level requirement
3 WHEELS CT / LT GREASE TOP-UP CHECK
i)Please check whether grease is in semi-liquid form or in solid formii)If solidify please replace the grease with new oneiii)If semi-liquid top-up with required quantity manual or thru grease nipple
4 PULLEYSBOTTOM BLOCK SHEAVE LUBRICATION
i)Please check whether sheaves are rotating smooth manually by hand or notii)If smooth than it`s okiii)If not smooth than please open all sheaves & repeat all instructions given in sr. no. 3
5 WIRE ROPE WIRE ROPE LUBRICATIONi)Please remove dust thru air blow pressure or dieselii)Apply cadmium compound lubricant manually in full length of wire rope
6 BRAKES MH,CT AND LT BRAKE SETTING
i)Please make free all thruster motors manually by pulling up & downii)Please release manually all dc/ac disc brakes thru handle 3/4 times within a range of hook motion approx 1mtr.
SR NO. LOCATION ELECTRICAL WORK YES/NO. REMARKS ACTION TO BE TAKEN
1 BUSBAR (LT DSL)
Check busbar visually such as for any bent, damage or dismantle
Check Visually
please replace
Ensure that current collector is mounted properly If not please correct it
2POWER, CONTROL & CT DSL CABLES
Check for visual damage please replace/repair
Check the terminal point for the loose connections please tighten if required
3
CONTROL PANEL, TPN/ISOLATOR SWITCH, BREAKING RESISTANCE ETC.
Ensure panel is Dust free & moisture free if not remove dust & moisture
Check all termination & loose wire connections inside the panel after dust removing tighten if necessary
Earthing of control panel is not rusted or disconnected if yes please replace if necessary
4 MOTOR & BRAKESCheck the terminal point for the loose connections & lugs please tighten if required
Ensure there is no moisture/water inside terminal box if yes dryout it
5 PENDENT
Ensure pendent is dust free remove dust
Ensure water has not been entered into the pendant remove & start for dry out process
Ensure momentary push buttons are working properly. Also ensure after pressing it comes out to its original position if not replace & remove dust . Check connections
6 RADIO REMOTEEnsure dust free remove dust
Remote batteries are in good condition. These are not discharged replace / charge battery
7 LIMIT SWITCH Please check for the any physical damage for all motions If damaged replace it
NO LOAD TRAIL
S.NO Checking Points For No Load YES/ NO
1 MH Motion : NO LOAD (any abnormal sound) UP DOWN
2 CT Motion : NO LOAD (any abnormal sound) LEFT RIGHT
3 LT Motion : NO LOAD (any abnormal sound) FORWARD REVERSE
4 LIMIT SWITCH Functional Check MH CT LT
5 ALL BRAKE Functional Check
6 Check All Motions MOTOR CURRENTS compare with specified and note down in below obsevation sheet
MOTIONSpecified Current
(on motor name plate)Observed Current (No Load)
UP , LEFT , FORWARDObserved Current (No Load)
DOWN ,RIGHT, REVERSE
MAIN HOIST
CROSS TRAVEL
LONG TRAVEL
FULL LOAD TRAIL
S.NO Checking Points For FULL Load YES/ NO
1 MH Motion : SWL LOAD (any abnormal sound) UP DOWN
2 CT Motion : SWL LOAD (any abnormal sound) LEFT RIGHT
3 LT Motion : SWL LOAD (any abnormal sound) Forward Reverse
5 ALL BRAKE Functional Check - do settings of Brakes if required
6 Check All Motions MOTOR CURRENTS compare with specified and note down in below obsevation sheet
MOTION
Specified Current(on motor name
plate)Observed Current (SWL Load)
UP , LEFT , FORWARDObserved Current (SWL Load)
DOWN ,RIGHT, REVERSE
MAIN HOIST
CROSS TRAVEL
LONG TRAVEL
procedure for
full load test
During load test lift the rated load not higher than required to clear its supports and stop.Raise the load further about 1 mtr. above its support and stop.Lower the load about 300 mm and stop.Check drift/slippage of load during stopping.
REMARKS Crane Suitable for Operation Yes/No
SHROUDED BUSBAR
REVA INDUSTRIES LIMITED
● Check busbar visually such as for any bent, damage or dismantle
● Ensure that current collector is mounted properly
CABLES
REVA INDUSTRIES LIMITED
● Check for visual damage● Check the terminal point for the loose
connections
CONTROL PANEL
REVA INDUSTRIES LIMITED
● Ensure panel is Dust free & moisture free● Check all termination & loose wire connections
inside the panel after dust removing● Earthing of control panel is not rusted or
disconnected
MOTORS & BRAKES
REVA INDUSTRIES LIMITED
● Check the terminal point for the loose connections & lugs● Ensure there is no moisture/water inside terminal box
PENDANT
REVA INDUSTRIES LIMITED
MOMENTARY PUSH BUTTON
● Ensure pendent is dust free● Ensure water has not been entered into the pendant● Ensure momentary push buttons are working
properly. Also ensure after pressing it comes out to its original position
●
RADIO REMOTE
REVA INDUSTRIES LIMITED
Replace BATTERY if discharged
LIMIT SWITCH
REVA INDUSTRIES LIMITED
● Please check for the any physical damage● Check functionality
FOREIGN OBJECT ON RAIL
REVA INDUSTRIES LIMITED
GEAR BOX OIL LEVEL (MH/CT/LT/AH)
REVA INDUSTRIES LIMITED
OIL LEVEL INDICATOR
HOOK & BOTTOM BLOCK
REVA INDUSTRIES LIMITED
● Check if the Hook is Rotating Properly● Check if the Pulleys are Rotating Properly
Wire Rope
REVA INDUSTRIES LIMITED
● Check Wire Rope is Rusty● Bird caging● Excessive Wear
No Load Test
REVA INDUSTRIES LIMITED
● Check the NO LOAD Test● Measure Current● Check Functionality of Limit Switches● Check Functionality of Brakes
Load Test
REVA INDUSTRIES LIMITED
● Check the SWL LOAD Test● Measure Current on LOAD● Check Functionality of Brakes
Contact Us
REVA INDUSTRIES LIMITED