    Aspal median Paving Atap (m2) Taman

    3-2 613.33 4087.84 6459.09 25836.37 0.89 36383.30 0.0364

    9-8 306.67 4055.09 1621.79 1250.00 10000.00 1250.00 0.77 18176.89 0.0182

    11-10 200.00 1524.98 1078.87 8631.00 1078.87 0.84 12313.72 0.0123

    13-12 150.00 1524.98 762.46 6099.70 762.46 0.84 9149.60 0.0091

    14-12 386.67 3764.67 888.79 7110.36 888.79 0.83 12652.61 0.012715-7 240.00 2083.75 4000 16000 0.89 22083.75 0.0221

    16-6 383.00 4500.90 6000 24000 0.89 34500.90 0.0345

    17-5 313.30 3306.20 3499.96 13999.85 0.88 20806.02 0.0208

    23-22 490.00 4167.50 6693.32 26773.28 0.89 37634.10 0.0376

    28-18 583.33 4087.84 2981.61 11926.44 583.25 0.86 19579.14 0.0196

    27-19 516.67 8887.94 3043.69 7934.66 31738.63 222.23 0.89 51827.14 0.0518

    26-20 260.00 4055.09 1621.79 6362.53 25450.1 0.90 37489.51 0.0375

    25-21 496.67 4167.50 7265.46 29061.86 550.05 0.88 41044.87 0.0410

    24-22 310.00 5216.45 2088.89 3400 13600 1133.4 0.78 25438.73 0.0254

    Aspal Median Paving Atap (m2) Rumput

    6-5 30.00 21121.03 1621.79 14980.13 66951.41 3980.13 0.85 108654.49 0.1087

    7-6 193.33 16620.13 1621.79 8980.13 42951.41 3980.13 0.83 74153.59 0.0742

    8-7 23.33 10869.71 1621.79 3980.13 31841.05 3980.13 0.81 52292.82 0.0523

    10-8 130.00 6814.62 2730.13 21841.05 2730.13 0.84 34115.93 0.0341

    12-10 26.67 5289.64 1651.26 13210.06 1651.26 0.83 21802.21 0.0218

    19-18 360.00 37194.48 7509.73 12476.59 148633.65 1905.68 0.87 207720.13 0.2077

    20-19 140.00 22139.87 4466.05 18625.83 98727.28 1683.45 0.86 145642.48 0.1456

    21-20 266.67 15084.78 2844.25 12263.30 73277.18 1683.45 0.86 105152.97 0.1052

    22-21 140.00 9383.95 2088.89 2018.66 32298.62 1133.40 0.85 46923.52 0.0469

    Saluran Tersier

    Saluran L (m) Luas

    C gab

    Saluran Sekunder

    Saluran L (m) Luas

    C gab

  • 8/10/2019 Perhitungan Drainase New-1

    2/30

    Aspal Median Paving Atap (m2) Rumput

    5-4 306.67 28516.68 1621.79 22873.26 98523.94 4380.13 0.86 155915.81 0.1559

    18-4 26.67 37777.81 7509.73 15458.20 160560.08 2488.93 0.87 223794.76 0.2238

    4-2 33.33 66294.49 9131.53 38331.46 259084.02 6869.06 0.86 379710.56 0.3797

    2-1 126.67 70382.33 9131.53 44790.56 284920.39 6869.06 0.87 416093.87 0.4161

    Total Luas Lahan = 0.416 km2

    = 416093.867 m2

    = 41.609 Ha

    Saluran Primer

    Saluran L (m) Luas

    C gab

  • 8/10/2019 Perhitungan Drainase New-1

    3/30

    Luas (m2) Luas (km

    2) Luas (m

    2) Luas (km

    2) Luas (m

    2) Luas (km

    2) Luas (m

    2) Lua

    13 - 12 150.00 6099.70 0.006100 762.46 0.000762 762.46 0.000762 1524.98 0.0

    11 - 10 200.00 8631.00 0.008631 1078.87 0.001079 1078.87 0.001079 1524.98 0.0

    9 - 8 306.67 10000.00 0.010000 2871.79 0.002872 1250.00 0.001250 4055.09 0.026 - 20 260.00 25450.10 0.025450 1621.79 0.001622 6362.53 0.006363 4055.09 0.0

    15 - 7 240.00 16000.00 0.016000 0.00 0.000000 4000.00 0.004000 2083.75 0.0

    14 - 12 386.67 7110.36 0.007110 888.79 0.000889 888.79 0.000889 3764.67 0.0

    16 - 6 383.00 24000.00 0.024000 0.00 0.000000 6000.00 0.006000 4500.90 0.0

    17 - 5 313.30 13999.85 0.014000 0.00 0.000000 3499.96 0.003500 3306.20 0.0

    25 - 21 496.67 29061.86 0.029062 550.05 0.000550 7265.46 0.007265 4167.50 0.0

    23 - 22 490.00 26773.28 0.026773 0.00 0.000000 6693.32 0.006693 4167.50 0.0

    24 - 22 310.00 13600.00 0.013600 3222.29 0.003222 3400.00 0.003400 5216.45 0.0

    27 - 19 516.67 31738.63 0.031739 3265.91 0.003266 7934.66 0.007935 8887.94 0.0

    28 - 18 583.33 11926.44 0.011926 583.25 0.000583 2981.61 0.002982 4087.84 0.0

    3 - 2 613.33 25836.37 0.025836 0.00 0.000000 6459.09 0.006459 4087.84 0.0

    Luas (m2) Luas (km

    2) Luas (m

    2) Luas (km

    2) Luas (m

    2) Luas (km

    2) Luas (m

    2) Lua

    12 - 10 26.67 13210.06 0.013210 1651.26 0.001651 1651.26 0.001651 5289.64 0.0

    10 - 8 130.00 21841.05 0.021841 2730.13 0.002730 2730.13 0.002730 6814.62 0.0

    8 - 7 23.33 31841.05 0.031841 5601.93 0.005602 3980.13 0.003980 10869.71 0.0

    7 - 6 193.33 42951.41 0.042951 5601.93 0.005602 8980.13 0.008980 16620.13 0.0

    6 - 5 30.00 66951.41 0.066951 5601.93 0.005602 14980.13 0.014980 21121.03 0.0

    20 - 19 140.00 98727.28 0.098727 6149.50 0.006149 18625.83 0.018626 22139.87 0.0

    19 - 18 360.00 148633.65 0.148634 9415.41 0.009415 12476.59 0.012477 37194.48 0.0

    22 - 21 140.00 32298.62 0.032299 3222.29 0.003222 2018.66 0.002019 9383.95 0.0

    21 - 20 266.67 73277.18 0.073277 4527.70 0.004528 12263.30 0.012263 15084.78 0.0

    Luas (m2

    ) Luas (km2

    ) Luas (m2

    ) Luas (km2

    ) Luas (m2

    ) Luas (km2

    ) Luas (m2

    ) Lua5 - 4 306.67 98523.94 0.098524 6001.93 0.006002 22873.26 0.022873 28516.68 0.0

    18 - 4 26.67 160560.08 0.160560 9998.66 0.009999 15458.20 0.015458 37777.81 0.0

    4 - 2 33.33 259084.02 0.259084 16000.59 0.016001 38331.46 0.038331 66294.49 0.0

    2 - 1 126.67 284920.39 0.284920 16000.59 0.016001 44790.56 0.044791 70382.33 0.0

    L saluran (m)Rumah

    Taman Berm JalanSaluran L saluran (m) Rumah

    B. SALURAN SEKUNDER

    Taman Berm Jalan

    Taman Berm Jalan

    C. SALURAN PRIMER

    Saluran

    LUAS LAHAN

    PERHITUNGAN DRAINASE PERUMAHAN

    A. SALURAN TERSIER

    Saluran L saluran (m)Rumah

  • 8/10/2019 Perhitungan Drainase New-1

    4/30

    Lo (m) S nd Lo (m) S nd Lo (m) S nd Lo (m)

    0.00 0.50 0.10 27.00 0.02 0.20 30.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 2.00

    0.00 0.50 0.10 7.00 0.02 0.20 10.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 3.00

    12 - 10 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    0.00 0.50 0.10 17.00 0.02 0.20 19.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 3.00

    10 - 8 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 3.00

    0.00 0.50 0.10 17.00 0.02 0.20 20.00 0.03 0.02 0.00

    0.00 0.50 0.10 2.00 0.02 0.20 1.00 0.03 0.02 5.00 8 - 7 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    30.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 3.00

    7 - 6 0.00 0.50 0.10 6.00 0.02 0.20 1.00 0.03 0.02 6.00

    30.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    0.00 0.50 0.10 2.00 0.02 0.20 1.00 0.03 0.02 3.00

    6 - 5 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    32.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 3.00

    Lo (m) S nd Lo (m) S nd Lo (m) S nd Lo (m)

    30.00 0.50 0.10 17.00 0.02 0.20 12.00 0.03 0.02 0.00 0.00 0.50 0.10 2.00 0.02 0.20 1.00 0.03 0.02 5.00

    25.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 2.50

    22 - 21 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    30.00 0.50 0.10 6.00 0.02 0.20 10.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 2.50

    30.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    0.00 0.50 0.10 2.00 0.02 0.20 1.00 0.03 0.02 5.00

    35.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    0.00 0.50 0.10 2.00 0.02 0.20 1.00 0.03 0.02 5.00

    20 - 19 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    30.00 0.50 0.10 4.00 0.02 0.20 9.00 0.03 0.02 0.00

    0.00 0.50 0.10 2.00 0.02 0.20 1.00 0.03 0.02 5.00

    43.00 0.50 0.10 5.00 0.02 0.20 9.00 0.03 0.02 0.00 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 4.00

    27.00 0.50 0.10 9.00 0.02 0.20 13.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 3.00

    Lo (m) S nd Lo (m) S nd Lo (m) S nd Lo (m)

    18 - 4 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    43.00 0.50 0.10 3.00 0.02 0.20 6.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 4.00

    4 - 2 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 3.00

    30.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 3.00

    2 - 1 1 0.00 0.50 0.10 0.00 0.02 0.20 1.00 0.03 0.02 0.00

    2 3 - 2

    5 - 4 4

    SaluranTitik

    Kontrol

    Rumah Taman Berm

    28 - 18

    19 - 1818

    26 - 20

    21 - 20

    21

    20

    25 - 21

    27 - 19 19

    24 - 22

    22

    23 - 22

    5

    8

    6

    715 - 7

    16 - 6

    Titik

    Kontrol

    10

    SaluranRumah

    Taman

    14 - 12

    12

    Taman

    13 - 12

    11 - 10

    9 - 8

    Titik

    Kontrol

    Rumah

    PERHITUNG

    17 - 5

    Berm

    BermSaluran

  • 8/10/2019 Perhitungan Drainase New-1

    5/30

    Ai . Ci Ai

    Luas (km2) C Luas (km

    2) C Luas (km

    2) C Luas (km

    2) C (km

    2) (km

    2)

    13 - 12 150.00 0.006100 0.70 0.000762 0.30 0.000762 0.65 0.001525 0.90 0.006367 0.00915

    11 - 10 200.00 0.008631 0.70 0.001079 0.30 0.001079 0.65 0.001525 0.90 0.008439 0.01231

    9 - 8 306.67 0.010000 0.70 0.002872 0.30 0.001250 0.65 0.004055 0.90 0.012324 0.01817

    26 - 20 260.00 0.025450 0.70 0.001622 0.30 0.006363 0.65 0.004055 0.90 0.026087 0.03749

    15 - 7 240.00 0.016000 0.70 0.000000 0.30 0.004000 0.65 0.002084 0.90 0.015675 0.02208

    14 - 12 386.67 0.007110 0.70 0.000889 0.30 0.000889 0.65 0.003765 0.90 0.009210 0.01265

    16 - 6 383.00 0.024000 0.70 0.000000 0.30 0.006000 0.65 0.004501 0.90 0.024751 0.03450

    17 - 5 313.30 0.014000 0.70 0.000000 0.30 0.003500 0.65 0.003306 0.90 0.015050 0.02080

    25 - 21 496.67 0.029062 0.70 0.000550 0.30 0.007265 0.65 0.004168 0.90 0.028982 0.04104

    23 - 22 490.00 0.026773 0.70 0.000000 0.30 0.006693 0.65 0.004168 0.90 0.026843 0.03763

    24 - 22 310.00 0.013600 0.70 0.003222 0.30 0.003400 0.65 0.005216 0.90 0.017391 0.02543

    27 - 19 516.67 0.031739 0.70 0.003266 0.30 0.007935 0.65 0.008888 0.90 0.036353 0.05182

    28 - 18 583.33 0.011926 0.70 0.000583 0.30 0.002982 0.65 0.004088 0.90 0.014141 0.01957

    3 - 2 613.33 0.025836 0.70 0.000000 0.30 0.006459 0.65 0.004088 0.90 0.025963 0.03638

    Ai . Ci Ai

    Luas (km2) C Luas (km

    2) C Luas (km

    2) C Luas (km

    2) C (km

    2) (km

    2)

    12 - 10 26.67 0.013210 0.70 0.001651 0.30 0.001651 0.65 0.005290 0.90 0.015576 0.02180

    10 - 8 130.00 0.021841 0.70 0.002730 0.30 0.002730 0.65 0.006815 0.90 0.024016 0.03411

    8 - 7 23.33 0.031841 0.70 0.005602 0.30 0.003980 0.65 0.010870 0.90 0.036339 0.05229

    7 - 6 193.33 0.042951 0.70 0.005602 0.30 0.008980 0.65 0.016620 0.90 0.052542 0.07415

    6 - 5 30.00 0.066951 0.70 0.005602 0.30 0.014980 0.65 0.021121 0.90 0.077293 0.10865

    20 - 19 140.00 0.098727 0.70 0.006149 0.30 0.018626 0.65 0.022140 0.90 0.102987 0.14564

    19 - 18 360.00 0.148634 0.70 0.009415 0.30 0.012477 0.65 0.037194 0.90 0.148453 0.20772

    22 - 21 140.00 0.032299 0.70 0.003222 0.30 0.002019 0.65 0.009384 0.90 0.033333 0.04692

    21 - 20 266.67 0.073277 0.70 0.004528 0.30 0.012263 0.65 0.015085 0.90 0.074200 0.10515

    Ai . Ci Ai

    Luas (km2) C Luas (km

    2) C Luas (km

    2) C Luas (km

    2) C (km

    2) (km

    2)

    5 - 4 306.67 0.098524 0.70 0.006002 0.30 0.022873 0.65 0.028517 0.90 0.1113 0.15591

    18 - 4 26.67 0.160560 0.70 0.009999 0.30 0.015458 0.65 0.037778 0.90 0.1594 0.22379

    4 - 2 33.33 0.259084 0.70 0.016001 0.30 0.038331 0.65 0.066294 0.90 0.2707 0.37971

    2 - 1 126.67 0.284920 0.70 0.016001 0.30 0.044791 0.65 0.070382 0.90 0.2967 0.41609

    C. SALURAN PRIMER

    Saluran L saluran (m)

    Rumah Taman Berm Jalan

    Rumah Taman Berm Jalan

    PERHITUNGAN LUAS LAHAN

    Saluran

    A. SALURAN TERSIER

    Saluran L saluran (m)Rumah Taman Berm Jalan

    B. SALURAN SEKUNDER

    L saluran (m)

  • 8/10/2019 Perhitungan Drainase New-1

    6/30

    13 - 12 0.70 0.009150 0.203

    14 - 12 0.73 0.012653 0.29312 - 10 0.71 0.021802 0.482

    11 - 10 0.69 0.012314 0.261

    10 - 8 0.70 0.034116 0.661

    9 - 8 0.68 0.018177 0.339

    8 - 7 0.69 0.052293 0.981

    15 - 7 0.71 0.022084 0.423

    7 - 6 0.71 0.074154 1.244

    16 - 6 0.72 0.034501 0.586

    6 - 5 0.71 0.108654 1.798

    17 - 5 0.72 0.020806 0.350

    24 - 22 0.68 0.025439 0.473

    23 - 22 0.71 0.037634 0.729

    22 - 21 0.71 0.046924 0.820

    25 - 21 0.71 0.041045 0.713

    21 - 20 0.71 0.105153 1.575

    26 - 20 0.70 0.037490 0.554

    20 - 19 0.71 0.145642 2.05227 - 19 0.70 0.051827 0.724

    19 - 18 0.71 0.207720 2.590

    28 - 18 0.72 0.019579 0.247

    18 - 4 0.71 0.223795 2.758

    5 - 4 0.71 0.155916 1.925

    4 - 2 0.71 0.379711 4.634

    3 - 2 0.71 0.036383 0.444

    2 - 1 1 57.640 0.961 59.272 0.71 0.416000 4.888

    0.273

    0.345

    0.358

    0.465

    0.482

    tc (jam)

    71.675

    62.756

    0.431

    0.579

    0.657

    0.857

    A (km2) Q hidrologi (m

    3/dt)

    21.195

    25.862

    34.751

    39.418

    C gabungan

    0.353

    88.487

    76.336

    15.463 114.43712

    SaluranTitik

    Kontroltc (menit) I (mm/jam)tc (jam)

    0.258

    7 21.463

    8 20.685

    10 16.352

    Saluran

    5 28.907

    6 27.907

    83.697

    tc (menit) I (mm/jam)

    85.183

    51.418

    61.570

    21

    22

    SaluranTitik

    Kontrol

    tc (menit) tc (jam)

    18

    19

    20

    97.744

    2

    4

    Titik

    KontrolQ hidrologi (m

    3/dt)

    0.872 62.22052.307

    53.418 0.890

    PERHITUNGAN DEBIT HIDROLOGI

    I (mm/jam) C gabungan A (km2)

    Q hidrologi (m3/dt)C gabungan A (km

    2)

    111.283

    98.942

    97.133

  • 8/10/2019 Perhitungan Drainase New-1

    7/30

    13 - 12 Tersier 150.00 0.0007 81.31 81.21

    14 - 12 Tersier 386.67 0.0007 81.48 81.21

    12 - 10 Sekunder 26.67 0.0007 81.21 81.19

    11 - 10 Tersier 200.00 0.0007 81.33 81.19

    10 - 8 Sekunder 130.00 0.0007 81.19 81.10

    9 - 8 Tersier 306.67 0.0007 81.31 81.10

    8 - 7 Sekunder 23.33 0.0007 81.10 81.08

    15 - 7 Tersier 240.00 0.0007 81.25 81.08

    7 - 6 Sekunder 193.33 0.0007 81.08 80.95

    16 - 6 Tersier 383.00 0.0007 81.22 80.95

    6 - 5 Sekunder 30.00 0.0007 80.95 80.93

    17 - 5 Tersier 313.30 0.0007 81.15 80.93

    24 - 22 Tersier 310.00 0.0007 81.58 81.37

    23 - 22 Tersier 490.00 0.0007 81.71 81.37

    22 - 21 Sekunder 140.00 0.0007 81.37 81.27

    25 - 21 Tersier 496.67 0.0007 81.62 81.27

    21 - 20 Sekunder 266.67 0.0007 81.27 81.08

    26 - 20 Tersier 260.00 0.0007 81.26 81.08

    20 - 19 Sekunder 140.00 0.0007 81.08 80.98

    27 - 19 Tersier 516.67 0.0007 81.34 80.98

    19 - 18 Sekunder 360.00 0.0007 80.98 80.73

    28 - 18 Tersier 583.33 0.0007 81.14 80.73

    18 - 4 Primer 26.67 0.0007 80.73 80.71

    5 - 4 Primer 306.67 0.0007 80.93 80.71

    4 - 2 Primer 33.33 0.0007 80.71 80.693 - 2 Tersier 613.33 0.0007 81.12 80.69

    2 - 1 Primer 1 126.67 0.0007 80.69 80.60

    Saluran

    19

    18

    5

    Titik

    Kontrol

    Saluran

    7

    12

    10

    L saluran (m) Elv Hulu

    S rencana Elv Hilir

    6

    2

    L saluran (m)

    4

    Titik

    Kontrol

    S rencana

    S rencana

    Elv Hilir

    22

    PERHITUNGAN KEMIRINGAN MEDAN

    Saluran

    8

    Titik

    KontrolElv Hulu

    21

    20

    Elv Hulu Elv Hilir

    L saluran (m)

  • 8/10/2019 Perhitungan Drainase New-1

    8/30

    13 - 12 Tersier 0.47 0.94 0.44 1.87 0.23 0.0007 0.020 0.502 0.220

    14 - 12 Tersier 0.54 1.07 0.58 2.15 0.27 0.0007 0.020 0.551 0.318

    12 - 10 Sekunder 0.65 1.30 0.84 2.59 0.32 0.0007 0.020 0.624 0.482 11 - 10 Tersier 0.52 1.03 0.53 2.06 0.26 0.0007 0.020 0.536 0.261

    10 - 8 Sekunder 0.71 1.41 1.00 2.83 0.35 0.0007 0.020 0.661 0.661

    9 - 8 Tersier 0.57 1.14 0.65 2.28 0.28 0.0007 0.020 0.572 0.339

    8 - 7 Sekunder 0.82 1.64 1.34 3.28 0.41 0.0007 0.020 0.730 0.981

    15 - 7 Tersier 0.62 1.24 0.76 2.47 0.31 0.0007 0.020 0.605 0.423

    7 - 6 Sekunder 0.90 1.79 1.61 3.58 0.45 0.0007 0.020 0.775 1.244

    16 - 6 Tersier 0.69 1.39 0.97 2.78 0.35 0.0007 0.020 0.654 0.586

    6 - 5 Sekunder 1.03 2.06 2.12 4.12 0.51 0.0007 0.020 0.849 1.798

    17 - 5 Tersier 0.57 1.14 0.65 2.29 0.29 0.0007 0.020 0.574 0.350

    24 - 22 Tersier 0.64 1.29 0.83 2.58 0.32 0.0007 0.020 0.622 0.473 23 - 22 Tersier 0.73 1.47 1.08 2.93 0.37 0.0007 0.020 0.678 0.729

    22 - 21 Sekunder 0.77 1.53 1.17 3.07 0.38 0.0007 0.020 0.698 0.820

    25 - 21 Tersier 0.73 1.46 1.06 2.91 0.36 0.0007 0.020 0.674 0.714

    21 - 20 Sekunder 0.98 1.96 1.92 3.92 0.49 0.0007 0.020 0.822 1.575

    26 - 20 Tersier 0.67 1.35 0.91 2.70 0.34 0.0007 0.020 0.641 0.554

    20 - 19 Sekunder 1.08 2.16 2.34 4.32 0.54 0.0007 0.020 0.878 2.052

    27 - 19 Tersier 0.74 1.48 1.10 2.96 0.37 0.0007 0.020 0.682 0.724

    19 - 18 Sekunder 1.17 2.34 2.75 4.69 0.59 0.0007 0.020 0.926 2.590

    28 - 18 Tersier 0.48 0.97 0.47 1.94 0.24 0.0007 0.020 0.514 0.242

    18 - 4 Primer 1.21 2.42 2.92 4.83 0.60 0.0007 0.020 0.945 2.758

    5 - 4 Primer 1.05 2.09 2.19 4.19 0.52 0.0007 0.020 0.859 1.925

    4 - 2 Primer 1.47 2.93 4.31 5.87 0.73 0.0007 0.020 1.076 4.634

    3 - 2 Tersier 0.60 1.21 0.73 2.41 0.30 0.0007 0.020 0.595 0.433

    2 - 1 Primer 1 1.50 2.99 4.48 5.99 0.75 0.0007 0.020 1.091 4.888

    4

    19

    Q hidrolika

    (m3/dt)

    V (m/dt)

    2

    n

    n V (m/dt)

    Titik

    Kontrolhn (m) b (m) A (m

    2) P (m)

    Q

    R (m) S

    P (m) R (m) S

    18

    21

    20

    22

    5

    Titik

    Kontrolhn (m) b (m) A (m

    2)

    7

    6

    10

    8

    12

    Titik

    Kontrolhn (m) b (m) A (m

    2) P (m)

    n V (m/dt)Q hidrolika

    (m3/dt)

    Q

    R (m) S

    PERHITUNGAN DEBIT HIDROLIKA - DIMENSI SALURAN

    Saluran

    Saluran

    Saluran

    Q hidrolika

    (m3/dt)

    Q

  • 8/10/2019 Perhitungan Drainase New-1

    9/30

    13 - 12 0.70 0.009150 0.220 0.47 0.005 0.19

    14 - 12 0.73 0.012653 0.318 0.54 0.010 0.2112 - 10 0.71 0.021802 0.524 0.65 0.028 0.26

    11 - 10 0.69 0.012314 0.284 0.52 0.008 0.20

    10 - 8 0.70 0.034116 0.722 0.71 0.053 0.29

    9 - 8 0.68 0.018177 0.371 0.57 0.014 0.22

    8 - 7 0.69 0.052293 1.072 0.82 0.117 0.35

    15 - 7 0.71 0.022084 0.462 0.62 0.022 0.24

    7 - 6 0.71 0.074154 1.342 0.90 0.183 0.39

    16 - 6 0.72 0.034501 0.632 0.69 0.041 0.28

    6 - 5 0.71 0.108654 1.933 1.03 0.381 0.45

    17 - 5 0.72 0.020806 0.376 0.57 0.014 0.22

    24 - 22 0.68 0.025439 0.516 0.64 0.027 0.25

    23 - 22 0.71 0.037634 0.797 0.73 0.065 0.30

    22 - 21 0.71 0.046924 0.889 0.77 0.081 0.32

    25 - 21 0.71 0.041045 0.773 0.73 0.061 0.30

    21 - 20 0.71 0.105153 1.658 0.98 0.280 0.42

    26 - 20 0.70 0.037490 0.583 0.67 0.035 0.27

    20 - 19 0.71 0.145642 2.120 1.08 0.458 0.46

    27 - 19 0.70 0.051827 0.748 0.74 0.057 0.30

    19 - 18 0.71 0.207720 2.543 1.17 0.659 0.49

    28 - 18 0.72 0.019579 0.242 0.48 0.006 0.19

    18 - 4 0.71 0.223795 2.697 1.21 0.742 0.50

    5 - 4 0.71 0.155916 1.883 1.05 0.361 0.44

    4 - 2 0.71 0.379711 4.511 1.47 2.074 0.62

    3 - 2 0.71 0.036383 0.433 0.60 0.019 0.24

    2 - 1 1 57.640 0.961 56.672 0.71 0.416000 4.673 1.50 2.226 0.63

    Hc (m)Q^2/g

    Q^2/g

    Hc (m)

    Hc (m)

    2 53.418 0.890 59.931

    Hn ( m )

    Hn ( m )

    Hn ( m )A (km2) Q hidrologi (m

    3/dt)

    4 52.307 0.872 60.852

    SaluranTitik

    Kontrol

    tc (menit) tc (jam) I (mm/jam) C gabungan

    19 39.418 0.657 74.052

    18 51.418 0.857 61.609

    21 25.862 0.431 95.940

    20 34.751 0.579 80.364

    A (km2) Q hidrologi (m

    3/dt)

    22 21.195 0.353 106.808

    SaluranTitik

    Kontrol

    tc (menit) tc (jam) I (mm/jam) C gabungan

    6 27.907 0.465 91.844

    5 28.907 0.482 89.966

    8 20.685 0.345 108.147

    7 21.463 0.358 106.119

    12 15.463 0.258 124.073

    10 16.352 0.273 121.039

    PERHITUNGAN Hn dan Hc

    SaluranTitik

    Kontroltc (menit) tc (jam) I (mm/jam) C gabungan A (km

    2) Q hidrologi (m

    3/dt) Q^2/g

  • 8/10/2019 Perhitungan Drainase New-1

    10/30

    1. Ruas 2 -1

    H hilir = 0.629 m Hn = 1.50 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    4.673413 0.629 2.994 1.882 4.251 0.443 2.483 0.314 0.943 0.007310 0.0007 -0.0066

    4.673413 0.700 2.994 2.096 4.394 0.477 2.230 0.253 0.953 -0.011 0.005337 0.0007 -0.0046 2.276

    4.673413 0.987 2.994 2.956 4.969 0.595 1.581 0.127 1.115 -0.161 0.001997 0.0007 -0.0013 124.394

    4.673413 1.000 2.994 2.994 4.994 0.600 1.561 0.124 1.124 -0.009 0.001928 0.0007 -0.0012 7.629

    Catatan : n saluran = 0.02 dan L = 126.670 m

    Kedalaman pada jarak 126.67 m dari hilirnya, h = 0.987 m

    2. Ruas 4 -2

    H hilir = 0.987 m Hn = 1.47 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    4.634105 0.987 2.935 2.898 4.910 0.590 1.599 0.130 1.118 0.002066 0.0007 -0.0014

    4.634105 1.000 2.935 2.935 4.935 0.595 1.579 0.127 1.127 -0.009 0.001994 0 .0007 -0.0013 7.181

    4.634105 1.043 2.935 3.061 5.021 0.610 1.514 0.117 1.160 -0.033 0.001774 0.0007 -0.0011 30.490

    4.634105 1.100 2.935 3.228 5.135 0.629 1.436 0.105 1.205 -0.045 0.001530 0 .0007 -0.0008 54.445

    Catatan : n saluran = 0.02 dan L = 33.33 m

    Kedalaman pada jarak 33.33 m dari hilirnya, h = 1.043 m

    3. Ruas 3 -2

    H hilir = 0.987 m Hn = 0.60 mQ (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.444394 0.987 1.206 1.191 3.181 0.374 0.373 0.007 0.995 0.000206 0.0007 0.0005

    0.444394 0.800 1.206 0.965 2.806 0.344 0.461 0.011 0.811 0.184 0.000352 0.0007 0.0003 528.430

    0.444394 0.772 1.206 0.931 2.750 0.339 0.477 0.012 0.784 0.027 0.000386 0.0007 0.0003 87.065

    0.444394 0.700 1.206 0.844 2.606 0.324 0.526 0.014 0.714 0.069 0.000498 0.0007 0.0002 343.777

    Catatan : n saluran = 0.02 dan L = 613.33 m

    Kedalaman pada jarak 613.33 m dari hilirnya, h = 0.772 m

    4. Ruas 18 -4

    H hilir = 1.043 m Hn = 1.21 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    2.757872 1.043 2.416 2.520 4.502 0.560 1.095 0.061 1.104 0.001039 0.0007 -0.0003

    2.757872 1.07 2.416 2.585 4.556 0.567 1.067 0.058 1.128 -0.024 0.000969 0.0007 -0.0003 88.930

    TABEL 8. PERHITUNGAN PROFIL MUKA AIR

  • 8/10/2019 Perhitungan Drainase New-1

    11/30

    2.757872 1.046 2.416 2.526 4.507 0.560 1.092 0.061 1.106 0.022 0.001032 0 .0007 -0.0003 -65.24

    2.757872 1.100 2.416 2.657 4.616 0.576 1.038 0.055 1.155 -0.049 0.000900 0.0007 -0.0002 243.13

    Catatan : n saluran = 0.02 dan L = 26.67 m

    Kedalaman pada jarak 26.67 m dari hilirnya, h = 1.046 m

    5. Ruas 28 -18

    H hilir = 1.046 m Hn = 0.48 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.246699 1.046 0.970 1.014 3.061 0.331 0.243 0.003 1.049 0.000103 0.0007 0.0006

    0.246699 0.800 0.970 0.776 2.570 0.302 0.318 0.005 0.805 0.243 0.000200 0.0007 0.0005 486.600.246699 0.750 0.970 0.728 2.470 0.295 0.339 0.006 0.756 0.049 0.000235 0.0007 0.0005 105.34

    0.246699 0.700 0.970 0.679 2.370 0.286 0.363 0.007 0.707 0.049 0.000280 0.0007 0.0004 117.53

    Catatan : n saluran = 0.02 dan L = 583.33 m

    Kedalaman pada jarak 583.33 m dari hilirnya, h = 0.750 m

    6. Ruas 5 -4

    H hilir = 1.043 m Hn = 1.05 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    1.925188 1.043 2.094 2.184 4.180 0.522 0.882 0.040 1.083 0.000739 0.0007 0.0000

    1.925188 1.044 2.094 2.186 4.182 0.523 0.881 0.040 1.084 -0.001 0.000737 0.0007 0.0000 24.463

    1.925188 1.045 2.094 2.187 4.183 0.523 0.880 0.040 1.084 -0.001 0.000736 0.0007 0.0000 13.931

    1.925188 1.050 2.094 2.198 4.194 0.524 0.876 0.039 1.089 -0.005 0.000726 0.0007 0.0000 196.07

    Catatan : n saluran = 0.02 dan L = 306.67 m

    Kedalaman pada jarak 306.67 m dari hilirnya, h = 1.045 m

    7. Ruas 17 -5

    H hilir = 1.045 m Hn = 0.57 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.35019 1.045 1.144 1.195 3.233 0.370 0.293 0.004 1.049 0.000129 0.0007 0.0006

    0.35019 1.000 1.144 1.144 3.144 0.364 0.306 0.005 1.005 0.044 0.000144 0 .0007 0.0006 79.374

    0.35019 0.889 1.144 1.017 2.922 0.348 0.344 0.006 0.895 0.110 0.000194 0 .0007 0.0005 217.38

    0.35019 0.800 1.144 0.916 2.744 0.334 0.383 0.007 0.807 0.087 0.000253 0.0007 0.0004 195.18

    Catatan : n saluran = 0.02 dan L = 313.30 m

    Kedalaman pada jarak 313.3 m dari hilirnya, h = 0.889 m

  • 8/10/2019 Perhitungan Drainase New-1

    12/30

    8. Ruas 6 -5

    H hilir = 1.045 m Hn = 1.03 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    1.798423 1.045 2.058 2.149 4.147 0.518 0.837 0.036 1.080 0.000673 0.0007 0.0000

    1.798423 1.040 2.058 2.140 4.138 0.517 0.840 0.036 1.076 0.004 0.000680 0 .0007 0.0000 213.71

    1.798423 1.044 2.058 2.149 4.146 0.518 0.837 0.036 1.080 -0.004 0.000673 0.0007 0.0000 -144.24

    1.798423 1.050 2.058 2.161 4.158 0.520 0.832 0.035 1.085 -0.005 0.000663 0.0007 0.0000 -147.81

    Catatan : n saluran = 0.02 dan L = 30.00 m

    Kedalaman pada jarak 30 m dari hilirnya, h = 1.044 m

    8. Ruas 16 -6

    H hilir = 1.044 m Hn = 0.69 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.586123 1.044 1.390 1.451 3.478 0.417 0.404 0.008 1.052 0.000209 0.0007 0.0005

    0.586123 1.000 1.390 1.390 3.390 0.410 0.422 0.009 1.009 0.043 0.000234 0.0007 0.0005 93.072

    0.586123 0.900 1.390 1.251 3.191 0.392 0.468 0.011 0.912 0.098 0.000306 0.0007 0.0004 247.32

    0.586123 0.850 1.390 1.181 3.090 0.382 0.496 0.013 0.863 0.049 0.000355 0.0007 0.0003 141.90

    Catatan : n saluran = 0.02 dan L = 383.00 m

    Kedalaman pada jarak 383 m dari hilirnya, h = 0.900 m

    9. Ruas 7 -6

    H hilir = 1.044 m Hn = 0.90 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    1.244238 1.044 1.792 1.872 3.881 0.482 0.665 0.023 1.067 0.000467 0.0007 0.0002

    1.244238 1.030 1.792 1.846 3.852 0.479 0.674 0.023 1.053 0.014 0.000485 0.0007 0.0002 62.839

    1.244238 1.011 1.792 1.812 3.815 0.475 0.687 0.024 1.035 0.018 0.000509 0 .0007 0.0002 94.308

    1.244238 1.000 1.792 1.792 3.792 0.473 0.694 0.025 1.025 0.011 0.000524 0.0007 0.0002 59.778

    Catatan : n saluran = 0.02 dan L = 193.33 m

    Kedalaman pada jarak 193.33 m dari hilirnya, h = 1.011 m

    10. Ruas 15 -7

    H hilir = 1.011 m Hn = 0.62 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

  • 8/10/2019 Perhitungan Drainase New-1

    13/30

    0.423283 1.011 1.237 1.250 3.259 0.384 0.339 0.006 1.017 0.000164 0.0007 0.0005

    0.423283 1.000 1.237 1.237 3.237 0.382 0.342 0.006 1.006 0.011 0.000169 0 .0007 0.0005 20.622

    0.423283 0.903 1.237 1.116 3.042 0.367 0.379 0.007 0.910 0.096 0.000219 0.0007 0.0005 199.41

    0.423283 0.900 1.237 1.113 3.037 0.367 0.380 0.007 0.907 0.003 0.000221 0 .0007 0.0005 5.543

    Catatan : n saluran = 0.02 dan L = 240.00 m

    Kedalaman pada jarak 240 m dari hilirnya, h = 0.903 m

    11. Ruas 8 -7

    H hilir = 1.011 m Hn = 0.82 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X0.981269 1.011 1.640 1.658 3.662 0.453 0.592 0.018 1.029 0.000403 0.0007 0.0003

    0.981269 1.010 1.640 1.656 3.660 0.453 0.593 0.018 1.028 0.001 0.000404 0.0007 0.0003 3.523

    0.981269 1.005 1.640 1.648 3.649 0.451 0.596 0.018 1.023 0.005 0.000410 0.0007 0.0003 16.938

    0.981269 1.000 1.640 1.640 3.640 0.450 0.598 0.018 1.018 0.005 0.000415 0.0007 0.0003 16.556

    Catatan : n saluran = 0.02 dan L = 23.33 m

    Kedalaman pada jarak 23.33 m dari hilirnya, h = 1.005 m

    12. Ruas 9 -8

    H hilir = 1.005 m Hn = 0.57 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.338973 1.005 1.138 1.144 3.148 0.363 0.296 0.004 1.009 0.000136 0.0007 0.0006

    0.338973 0.900 1.138 1.024 2.938 0.349 0.331 0.006 0.906 0.104 0.000179 0 .0007 0.0005 199.05

    0.338973 0.856 1.138 0.975 2.851 0.342 0.348 0.006 0.862 0.043 0.000202 0.0007 0.0005 86.626

    0.338973 0.800 1.138 0.910 2.738 0.333 0.372 0.007 0.807 0.055 0.000241 0.0007 0.0005 120.66

    Catatan : n saluran = 0.02 dan L = 306.67 m

    Kedalaman pada jarak 306.67 m dari hilirnya, h = 0.856 m

    13. Ruas 10 -8

    H hilir = 1.005 m Hn = 0.71 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.66057 1.005 1.414 1.420 3.423 0.415 0.465 0.011 1.016 0.000280 0.0007 0.0004

    0.66057 1.000 1.414 1.414 3.414 0.414 0.467 0.011 1.011 0.005 0.000283 0 .0007 0.0004 11.489

    0.66057 0.957 1.414 1.353 3.328 0.407 0.488 0.012 0.969 0.042 0.000317 0.0007 0.0004 109.41

    0.66057 0.900 1.414 1.272 3.214 0.396 0.519 0.014 0.914 0.055 0.000371 0.0007 0.0003 168.54

  • 8/10/2019 Perhitungan Drainase New-1

    14/30

    Catatan : n saluran = 0.02 dan L = 130.00 m

    Kedalaman pada jarak 130 m dari hilirnya, h = 0.957 m

    14. Ruas 11 -10

    H hilir = 0.957 m Hn = 0.52 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.261078 0.957 1.031 0.986 2.945 0.335 0.265 0.004 0.961 0.000121 0.0007 0.0006

    0.261078 0.900 1.031 0.927 2.831 0.328 0.281 0.004 0.904 0.057 0.000140 0.0007 0.0006 101.07

    0.261078 0.851 1.031 0.877 2.733 0.321 0.298 0.005 0.856 0.048 0.000161 0 .0007 0.0005 89.227

    0.261078 0.850 1.031 0.876 2.731 0.321 0.298 0.005 0.855 0.001 0.000162 0.0007 0.0005 2.655Catatan : n saluran = 0.02 dan L = 200.00 m

    Kedalaman pada jarak 200 m dari hilirnya, h = 0.851 m

    15. Ruas 12 -10

    H hilir = 0.957 m Hn = 0.65 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.481882 0.957 1.296 1.240 3.210 0.386 0.389 0.008 0.965 0.000215 0.0007 0.00050.481882 0.940 1.296 1.218 3.176 0.384 0.396 0.008 0.948 0.017 0.000225 0.0007 0.0005 35.245

    0.481882 0.945 1.296 1.225 3.187 0.384 0.393 0.008 0.953 -0.005 0.000221 0 .0007 0.0005 -10.82

    0.481882 0.950 1.296 1.231 3.196 0.385 0.391 0.008 0.958 -0.005 0.000219 0 .0007 0.0005 -9.661

    Catatan : n saluran = 0.02 dan L = 26.67 m

    Kedalaman pada jarak 26.67 m dari hilirnya, h = 0.945 m

    16. Ruas 13 -12

    H hilir = 0.945 m Hn = 0.47 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.202544 0.945 0.936 0.884 2.826 0.313 0.229 0.003 0.948 0.000099 0.0007 0.0006

    0.202544 0.900 0.936 0.842 2.736 0.308 0.241 0.003 0.903 0.045 0.000111 0 .0007 0.0006 76.438

    0.202544 0.860 0.936 0.805 2.656 0.303 0.252 0.003 0.864 0.039 0.000124 0 .0007 0.0006 68.413

    0.202544 0.850 0.936 0.795 2.636 0.302 0.255 0.003 0.853 0.010 0.000128 0.0007 0.0006 17.952

    Catatan : n saluran = 0.02 dan L = 150.00 m

    Kedalaman pada jarak 150 m dari hilirnya, h = 0.860 m

    17. Ruas 14 -12

  • 8/10/2019 Perhitungan Drainase New-1

    15/30

    H hilir = 0.945 m Hn = 0.54 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.292997 0.945 1.075 1.016 2.965 0.343 0.288 0.004 0.950 0.000139 0.0007 0.0006

    0.292997 0.850 1.075 0.913 2.775 0.329 0.321 0.005 0.855 0.094 0.000181 0.0007 0.0005 181.65

    0.292997 0.767 1.075 0.824 2.608 0.316 0.356 0.006 0.773 0.082 0.000235 0.0007 0.0005 176.79

    0.292997 0.750 1.075 0.806 2.575 0.313 0.364 0.007 0.757 0.016 0.000249 0 .0007 0.0005 36.189

    Catatan : n saluran = 0.02 dan L = 386.67 m

    Kedalaman pada jarak 386.67 m dari hilirnya, h = 0.767 m

    18. Ruas 19 -18

    H hilir = 1.046 m Hn = 1.17 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    2.589938 1.046 2.343 2.450 4.434 0.553 1.057 0.057 1.103 0.000986 0.0007 -0.0003

    2.589938 1.080 2.343 2.531 4.503 0.562 1.023 0.053 1.133 -0.031 0.000903 0.0007 -0.0002 151.58

    2.589938 1.104 2.343 2.586 4.551 0.568 1.001 0.051 1.155 -0.022 0.000852 0 .0007 -0.0002 141.79

    2.589938 1.110 2.343 2.601 4.563 0.570 0.996 0.051 1.161 -0.006 0.000839 0.0007 -0.0001 40.308

    Catatan : n saluran = 0.02 dan L = 360.00 mKedalaman pada jarak 360 m dari hilirnya, h = 1.104 m

    19. Ruas 20 -19

    H hilir = 1.104 m Hn = 1.08 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    2.052068 1.104 2.162 2.387 4.370 0.546 0.860 0.038 1.141 0.000662 0.0007 0.0000

    2.052068 1.100 2.162 2.379 4.362 0.545 0.863 0.038 1.138 0.004 0.000668 0.0007 0.0000 112.63

    2.052068 1.104 2.162 2.388 4.371 0.546 0.859 0.038 1.142 -0.004 0.000662 0.0007 0.0000 -101.41

    2.052068 1.110 2.162 2.400 4.382 0.548 0.855 0.037 1.147 -0.005 0.000653 0.0007 0.0000 -114.50

    Catatan : n saluran = 0.02 dan L = 140.00 m

    Kedalaman pada jarak 140 m dari hilirnya, h = 1.104 m

    20. Ruas 26 -20

    H hilir = 1.104 m Hn = 0.67 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.553597 1.104 1.349 1.489 3.557 0.419 0.372 0.007 1.111 0.000177 0.0007 0.0005

    0.553597 1.000 1.349 1.349 3.349 0.403 0.411 0.009 1.009 0.103 0.000227 0.0007 0.0005 216.81

  • 8/10/2019 Perhitungan Drainase New-1

    16/30

    0.553597 0.986 1.349 1.329 3.320 0.400 0.416 0.009 0.995 0.014 0.000235 0.0007 0.0005 30.019

    0.553597 0.950 1.349 1.281 3.249 0.394 0.432 0.010 0.960 0.035 0.000258 0 .0007 0.0004 79.497

    Catatan : n saluran = 0.02 dan L = 260.00 m

    Kedalaman pada jarak 260 m dari hilirnya, h = 0.986 m

    21. Ruas 21 -20

    H hilir = 1.104 m Hn = 0.98 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    1.574619 1.104 1.958 2.162 4.166 0.519 0.728 0.027 1.131 0.000509 0.0007 0.0002

    1.574619 1.100 1.958 2.154 4.158 0.518 0.731 0.027 1.127 0.004 0.000514 0 .0007 0.0002 21.289

    1.574619 1.070 1.958 2.095 4.098 0.511 0.752 0.029 1.099 0.029 0.000553 0.0007 0.0001 194.70

    1.574619 1.050 1.958 2.056 4.058 0.507 0.766 0.030 1.080 0.019 0.000581 0.0007 0.0001 157.05

    Catatan : n saluran = 0.02 dan L = 266.67 m

    Kedalaman pada jarak 266.67 m dari hilirnya, h = 1.070 m

    22. Ruas 25 -21

    H hilir = 1.070 m Hn = 0.73 mQ (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.712931 1.070 1.455 1.557 3.595 0.433 0.458 0.011 1.080 0.000256 0.0007 0.0004

    0.712931 0.950 1.455 1.383 3.355 0.412 0.516 0.014 0.964 0.117 0.000347 0 .0007 0.0004 331.20

    0.712931 0.910 1.455 1.325 3.276 0.404 0.538 0.015 0.925 0.038 0.000387 0.0007 0.0003 123.09

    0.712931 0.900 1.455 1.310 3.255 0.402 0.544 0.015 0.915 0.010 0.000399 0 .0007 0.0003 33.131

    Catatan : n saluran = 0.02 dan L = 496.67 m

    Kedalaman pada jarak 496.67 m dari hilirnya, h = 0.910 m

    23. Ruas 22 -21

    H hilir = 1.070 m Hn = 0.77 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.819983 1.070 1.533 1.640 3.673 0.447 0.500 0.013 1.083 0.000293 0.0007 0.0004

    0.819983 1.050 1.533 1.610 3.633 0.443 0.509 0.013 1.063 0.019 0.000307 0.0007 0.0004 49.205

    0.819983 1.019 1.533 1.562 3.571 0.437 0.525 0.014 1.033 0.030 0.000332 0.0007 0.0004 81.386

    0.819983 1.000 1.533 1.533 3.533 0.434 0.535 0.015 1.015 0.019 0.000348 0 .0007 0.0004 53.124

    Catatan : n saluran = 0.02 dan L = 140.00 m

    Kedalaman pada jarak 140 m dari hilirnya, h = 1.019 m

  • 8/10/2019 Perhitungan Drainase New-1

    17/30

    24. Ruas 23 -22

    H hilir = 1.019 m Hn = 0.73 mQ (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.729393 1.019 1.467 1.495 3.506 0.427 0.488 0.012 1.031 0.000296 0.0007 0.0004

    0.729393 0.900 1.467 1.320 3.267 0.404 0.552 0.016 0.916 0.116 0.000409 0.0007 0.0003 397.28

    0.729393 0.891 1.467 1.307 3.249 0.402 0.558 0.016 0.907 0.009 0.000420 0.0007 0.0003 31.603

    0.729393 0.880 1.467 1.291 3.227 0.400 0.565 0.016 0.896 0.010 0.000433 0.0007 0.0003 39.056

    Catatan : n saluran = 0.02 dan L = 490.00 m

    Kedalaman pada jarak 490 m dari hilirnya, h = 0.891 m

    25. Ruas 24 -22

    H hilir = 1.019 m Hn = 0.64 m

    Q (m3/dt) h (m) B (m) A (m2) P (m) R (m) V (m/dt) V^2/2g E E2-E1 Se So So-Se Del X

    0.472577 1.019 1.288 1.313 3.327 0.395 0.360 0.007 1.026 0.000179 0.0007 0.0005

    0.472577 0.900 1.288 1.159 3.088 0.375 0.408 0.008 0.908 0.117 0.000245 0.0007 0.0005 258.15

    0.472577 0.891 1.288 1.148 3.070 0.374 0.412 0.009 0.899 0.009 0.000252 0.0007 0.0004 20.1510.472577 0.880 1.288 1.134 3.048 0.372 0.417 0.009 0.889 0.011 0.000260 0 .0007 0.0004 24.046

    Catatan : n saluran = 0.02 dan L = 310.00 m

    Kedalaman pada jarak 310 m dari hilirnya, h = 0.891 m

  • 8/10/2019 Perhitungan Drainase New-1

    18/30

    : Tersier

    : 3-2

    Luas Catchment (km2) : 0.036

    : 613.330

    : 0.714

    - h : 0.603

    - b : 1.206

    - A : 0.727

    - P : 2.412

    - R : 0.302

    : 0.0007

    Elevasi Saluran

    - Hilir : 80.689

    - Hulu : 81.118

    S Saluran

    U 1000x1000x1200

    Jenis Saluran

    Nama Saluran

    L saluran (m)

    C gabungan

    Dimensi Saluran (m)

    Dimensi U Gutter :

  • 8/10/2019 Perhitungan Drainase New-1

    19/30

    A. ESTIMASI LUASAN KOLAM PENAMPUNG

    Volume limpasan awal = C*R*Atotal = =

    C Gabungan =

    Volume limpasan baru = C*R*Atotal = =

    Selisih volume = =

    Estimasi kolam tampung, bila kedalaman efektif 1.8 m : =

    B. PERHITUNGAN DEBIT SALURAN

    Kondisi setelah ada jaringan saluran :

    Debit didapat dari debit saluran akhir menuju kolam :

    Q = 4.888 m3/dt

    C. PERENCANAAN KOLAM PENAMPUNGAN

    Setelah ada jaringan saluran :

    Volume total = tc xQp = 16904.1841 m3

    ,

    Setelah ada jaringan saluran, luasan yang dibutuhkan berkurang =

    Ukuran kolam : Luas = 6761.7 1.939727

    H eff = 2.5H kolam = 3.0

    W = 0.5

    t Q in Sal. Vol in Sal Vol in Kum Q out Sal.Vol out

    Pompa

    (min) (m3/dt) (m3) (m3) (m3/dt) (m3)

    1 2 3 4 9 10

    0 0 0 0 0 0

    5.0 0.314 47.142 47.142 0 0

    10.0 0.629 141.425 188.567 0 0

    15.0 0.943 235.709 424.275 0 0

    20.0 1.257 329.992 754.267 0 0

    25.0 1.571 424.275 1178.543 0 0

    30.0 1.886 518.559 1697.101 0 0

    35.0 2.200 612.842 2309.943 0 0

    40.0 2.514 707.126 3017.069 0 0

    45.0 2.829 801.409 3818.478 0 0

    50.0 3.143 895.692 4714.170 0 0

    57.6 3.623 1550.749 6264.919 0 0

    62.6 3.143 1014.868 7279.787 0 067.6 2.829 895.692 8175.480 0 0

    72.6 2.514 801.409 8976.889 0 0

    77.6 2.200 707.126 9684.014 0 0

    82.6 1.886 612.842 10296.856 0 0

    87.6 1.571 518.559 10815.415 0 0

    92.6 1.257 424.275 11239.690 0 0

    97.6 0.943 329.992 11569.682 0 0

    102.6 0.629 235.709 11805.391 0 0

    Tabel 1 Kemampuan tampung kondis

    td = tc

    Tanpa pompa

  • 8/10/2019 Perhitungan Drainase New-1

    20/30

    107.6 0.314 141.425 11946.816 0 0

    112.6 0.000 47.142 11993.958 0 0

    t Q in Sal. Vol in Sal Vol in Kum Sal Q out Sal.Vol out

    Pompa

    (min) (m3/dt) (m3) (m3) (m3/dt) (m3)

    1 2 3 4 9 10

    0 0 0 0 0 0

    5.0 0.314 47.142 47.1 0 0.000

    10.0 0.629 141.425 188.6 0.6 90.000

    15.0 0.943 235.709 424.3 1.2 270.000

    20.0 1.257 329.992 754.3 1.2 360.000

    25.0 1.571 424.275 1178.5 1.2 360.00030.0 1.886 518.559 1697.1 1.2 360.000

    35.0 2.200 612.842 2309.9 1.2 360.000

    40.0 2.514 707.126 3017.1 1.2 360.000

    45.0 2.829 801.409 3818.5 1.2 360.000

    50.0 3.143 895.692 4714.2 1.2 360.000

    57.0 4.888 1686.432 6400.6 1.2 504.000

    62.0 4.888 1466.355 7867.0 1.2 360.000

    67.0 4.888 1466.355 9333.3 1.2 360.000

    72.0 4.888 1466.355 10799.7 1.2 360.000

    77.0 4.888 1466.355 12266.0 1.2 360.000

    82.0 4.888 1466.355 13732.4 1.2 360.000

    87.0 4.888 1466.355 15198.7 1.2 360.000

    92.0 4.888 1466.355 16665.1 1.2 360.000

    97.0 4.888 1466.355 18131.4 1.2 360.000

    102.0 4.888 1466.355 19597.8 1.2 360.000

    107.0 4.888 1466.355 21064.2 1.2 360.000

    112.0 4.888 1466.355 22530.5 1.2 360.000

    114.0 4.888 586.542 23117.0 1.2 144.000

    119.0 2.829 1157.453 24274.5 1.2 360.000

    124.0 2.514 801.409 25075.9 1.2 360.000

    129.0 2.200 707.126 25783.0 1.2 360.000

    134.0 1.886 612.842 26395.9 1.2 360.000

    139.0 1.571 518.559 26914.4 1.2 360.000144.0 1.257 424.275 27338.7 1.2 360.000

    149.0 0.943 329.992 27668.7 1.2 360.000

    154.0 0.629 235.709 27904.4 1.2 360.000

    159.0 0.314 141.425 28045.8 1.2 360.000

    164.0 0.000 47.142 28093.0 1.2 360.000

    Dengan pompa

    Pada kondisi 1 kedalaman kolam masih cukup menampung volume air yang ada, dika

    1.774 < 3.0 m

    Tabel 2 Kemampuan tampung kondis

    td = 2tc

  • 8/10/2019 Perhitungan Drainase New-1

    21/30

    DATA SPESIFIKASI POMPA :

    2400

    0.666666667

    up to 14 bar (200 psi)Gas turbine

    1475 HP

    Suction 20" (550 mm)

    16" (400 mm)

    Diesel, Kerosene,

    Gasoline, Bio fuels

    Catatan : Water volume delivery dapat dikontrol oleh operator dengan me

    D. PERENCANAAN LONG STORAGE

    Q = 4.888 m3/dt

    S = 0.0007 m/dt

    n = 0.02

    B = 2.99 m

    h = 1.497 m

    H = 1.5 m

    A = 4.482 m2

    P = 5.988 m

    R = 0.748 m

    V = 1.091 m/dt

    Q barat = 4.888 m3/dt

    Del Q = 0.000 m3/dt

    Dasar saluran barat dan timur ditempatkan 0.50 m dari dasar kolam

    Bila muka air maksimum di kolam yang direncanakan = 2.00 m

    Maka tinggi air di hilir saluran =2.00 - 0.50 = 1.50 m

    Saluran :

    S = 0.0007

    H = 1.5

    Lsal = 126.67

    Discharge

    FuelsFuels

    Engine type

    Horse powerHorse power

    Width

    Height

    Length

    Weight

    Portability

    Pada kondisi 2 kedalaman kolam masih cukup menampung volume air yang ada, dikar

    2.616 < 3.0 m

    Water Volume deliveryBuilt in Fue

    Capacity

    Pump head Starting sys

  • 8/10/2019 Perhitungan Drainase New-1

    22/30

    B = 3.0

    Lmaks = H/S = 2143 m > L saluran

    X = Lmaks-L = 3750-600 =

    hx =H*X/Lmaks =

    Vol. = 1/2*L*B*(H+h) = 1/2*600*1.6*(1.5+1.26) =

    Kolam =Total

    Pada R2 Volume hujan = 18*10000*100/1000*0.67 =

    Kekurangan :

    tQ in

    Saluran

    Vol in

    SaluranVol in Kumulatif saluran

    Vol in

    kum totalQ out Sal.

    (min) (m3/dt) (m3) (m3/dt) (m3) (m3)1 2 3 4 8 9

    0 0 0 0 0 0

    5.0 0.314 47.142 47.1 47.1 0.25

    10.0 0.629 141.425 188.6 188.6 0.25

    15.0 0.943 235.709 424.3 424.3 0.5

    20.0 1.257 329.992 754.3 754.3 0.5

    25.0 1.571 424.275 1178.5 1178.5 0.5

    30.0 1.886 518.559 1697.1 1697.1 0.5

    35.0 2.200 612.842 2309.9 2309.9 0.5

    40.0 2.514 707.126 3017.1 3017.1 0.5

    45.0 2.829 801.409 3818.5 3818.5 0.5

    50.0 3.143 895.692 4714.2 4714.2 0.5

    57.0 3.583 1412.365 6126.5 6126.5 0.5

    62.0 3.583 1074.831 7201.4 7201.4 0.5

    67.0 3.583 1074.831 8276.2 8276.2 0.5

    72.0 3.583 1074.831 9351.0 9351.0 0.5

    77.0 3.583 1074.831 10425.9 10425.9 0.5

    82.0 3.583 1074.831 11500.7 11500.7 0.5

    87.0 3.583 1074.831 12575.5 12575.5 0.5

    92.0 3.583 1074.831 13650.4 13650.4 0.5

    97.0 3.583 1074.831 14725.2 14725.2 0.5

    102.0 3.583 1074.831 15800.0 15800.0 0.5

    107.0 3.583 1074.831 16874.8 16874.8 0.5112.0 3.583 1074.831 17949.7 17949.7 0.5

    117.0 3.583 1074.831 19024.5 19024.5 0.5

    122.0 3.143 1008.832 20033.3 20033.3 0.5

    127.0 2.829 895.692 20929.0 20929.0 0.5

    132.0 2.514 801.409 21730.4 21730.4 0.5

    137.0 2.200 707.126 22437.6 22437.6 0.5

    142.0 1.886 612.842 23050.4 23050.4 0.5

    147.0 1.571 518.559 23569.0 23569.0 0.5

    Tanpa pompa

    td = 117 min

    Tabel 1 Kemampuan tampung kondisi 2,

  • 8/10/2019 Perhitungan Drainase New-1

    23/30

    152.0 1.257 424.275 23993.2 23993.2 0.6

    157.0 0.943 329.992 24323.2 24323.2 0.6

    162.0 0.629 235.709 24558.9 24558.9 0.6

    167.0 0.314 141.425 24700.4 24700.4 0.6

    172.0 0.000 47.142 24747.5 24747.5 0.6

    CATATAN : - TINGGI AIR DARI DASAR KOLAM < 3.0 M - BILA KEDALAMAN > 0.70 M, AIR MASUK KE SALURAN

    X = L MAX - L SAL

    Tabel 2. Perhitungan Kedalaman air di Kolam dengan Long-Storage

    Volume kolam pada kedalaman 0.70 m = 4733.172 m3

    H V. Kolam Lmax sal Lsal Barat XB hxB

    (m) (m3) (m) (m) (m) (m)

    1 2 3 4 6 8

    0 4733.2 0.0 126.67 0 0

    0.018 4853.8 25.5 126.67 0 0.000

    0.160 5812.6 228.1 126.67 101 0.0710.301 6768.6 430.0 126.67 303 0.212

    0.442 7724.7 632.0 126.67 505 0.354

    0.584 8680.7 834.0 126.67 707 0.495

    0.725 9636.7 1036.0 126.67 909 0.637

    0.831 10348.9 1186.5 126.67 1060 0.742

    1.008 11548.8 1440.0 126.67 1313 0.919

    1.149 12504.8 1641.9 126.67 1515 1.061

    1.291 13460.8 1843.9 126.67 1717 1.202

    1.432 14416.9 2045.9 126.67 1919 1.343

    1.574 15372.9 2247.9 126.67 2121 1.485

    1.715 16328.9 2449.9 126.67 2323 1.626

    1.846 17216.7 2637.5 126.67 2511 1.758

    1.960 17987.6 2800.3 126.67 2674 1.872

    2.060 18660.9 2942.6 126.67 2816 1.971

    2.145 19236.9 3064.3 126.67 2938 2.056

    2.216 19715.3 3165.3 126.67 3039 2.127

    2.272 20096.3 3245.8 126.67 3119 2.183

    2.312 20364.3 3302.5 126.67 3176 2.223

    2.335 20519.4 3335.2 126.67 3209 2.246

  • 8/10/2019 Perhitungan Drainase New-1

    24/30

    2.343 20577.0 3347.4 126.67 3221 2.255

    2.337 20537.1 3339.0 126.67 3212 2.249

    2.317 20399.7 3310.0 126.67 3183 2.228

    Digunakan lebar saluran (B) sebesar 2.9m . Dengan kedalaman kolam se

    perencanaan ini diperoleh keda

    Dari Tabel Perhitungan Long Storage, diperoleh kedalaman air kolam ter

    limpasan

  • 8/10/2019 Perhitungan Drainase New-1

    25/30

    29126.571 m3

    0.71

    41538.338 m3

    12411.767 m3

    6895.4261 m2

    6761.7 m2

    % dari estimasi luas kolam penampungan

    Vol out

    KumTamp akhir H dari dasar

    (m3) (m3) (m)

    11 12 13

    0 0 0

    0.000 47.142 0.007

    0.000 188.567 0.028

    0.000 424.275 0.063

    0.000 754.267 0.112

    0.000 1178.543 0.174

    0.000 1697.101 0.251

    0.000 2309.943 0.342

    0.000 3017.069 0.446

    0.000 3818.478 0.565

    0.000 4714.170 0.697

    0.000 6264.919 0.927

    0.000 7279.787 1.0770.000 8175.480 1.209

    0.000 8976.889 1.328

    0.000 9684.014 1.432

    0.000 10296.856 1.523

    0.000 10815.415 1.600

    0.000 11239.690 1.662

    0.000 11569.682 1.711

    0.000 11805.391 1.746

    i 1

  • 8/10/2019 Perhitungan Drainase New-1

    26/30

    0.000 11946.816 1.767

    0.000 11993.958 1.774

    MAX 1.774

    Vol out

    KumTamp akhir H dari dasar

    (m3) (m3) (m)

    11 12 13

    0 0 0

    0.000 47.1 0.007

    90.000 98.6 0.015

    360.000 64.3 0.010

    720.000 34.3 0.005

    1080.000 98.5 0.0151440.000 257.1 0.038

    1800.000 509.9 0.075

    2160.000 857.1 0.127

    2520.000 1298.5 0.192

    2880.000 1834.2 0.271

    3384.000 3016.6 0.446

    3744.000 4123.0 0.610

    4104.000 5229.3 0.773

    4464.000 6335.7 0.937

    4824.000 7442.0 1.101

    5184.000 8548.4 1.264

    5544.000 9654.7 1.428

    5904.000 10761.1 1.591

    6264.000 11867.4 1.755

    6624.000 12973.8 1.919

    6984.000 14080.2 2.082

    7344.000 15186.5 2.246

    7488.000 15629.0 2.311

    7848.000 16426.5 2.429

    8208.000 16867.9 2.495

    8568.000 17215.0 2.546

    8928.000 17467.9 2.583

    9288.000 17626.4 2.6079648.000 17690.7 2.616

    10008.000 17660.7 2.612

    10368.000 17536.4 2.594

    10728.000 17317.8 2.561

    11088.000 17005.0 2.515

    MAX 2.616

    enakan nilai maksimumyang didapat sebesar

    i 2

  • 8/10/2019 Perhitungan Drainase New-1

    27/30

    24 voltQuick removable

    2268 kg

    4.45 m

    2.53 m

    2,07 m

    yesuaikan kecepatan mesin

    enakan nilai maksimum yang didapat sebesar

    l Tank2 hours

    tem

  • 8/10/2019 Perhitungan Drainase New-1

    28/30

    barat

    2016 m

    1.41 m

    552.1 m3

    6761.7 m37313.7

    41538.338 m3

    34224.6 m3 --> pompa

    Vol out

    PompaVol out Kum Tamp akhir

    H dari

    dasar

    (m3) (m3) (m3) (m)10 11 12 13

    0 0 0 0

    37.500 37.500 9.6 0.001

    75.000 112.500 76.1 0.011

    112.500 225.000 199.3 0.029

    150.000 375.000 379.3 0.056

    150.000 525.000 653.5 0.097

    150.000 675.000 1022.1 0.151

    150.000 825.000 1484.9 0.220

    150.000 975.000 2042.1 0.302

    150.000 1125.000 2693.5 0.398

    150.000 1275.000 3439.2 0.509

    210.000 1485.000 4641.5 0.686

    150.000 1635.000 5566.4 0.823

    150.000 1785.000 6491.2 0.960

    150.000 1935.000 7416.0 1.097

    150.000 2085.000 8340.9 1.234

    150.000 2235.000 9265.7 1.370

    150.000 2385.000 10190.5 1.507

    150.000 2535.000 11115.4 1.644

    150.000 2685.000 12040.2 1.781

    150.000 2835.000 12965.0 1.917

    150.000 2985.000 13889.8 2.054150.000 3135.000 14814.7 2.191

    150.000 3285.000 15739.5 2.328

    150.000 3435.000 16598.3 2.455

    150.000 3585.000 17344.0 2.565

    150.000 3735.000 17995.4 2.661

    150.000 3885.000 18552.6 2.744

    150.000 4035.000 19015.4 2.812

    150.000 4185.000 19384.0 2.867

  • 8/10/2019 Perhitungan Drainase New-1

    29/30

    165.000 4350.000 19643.2 2.905

    180.000 4530.000 19793.2 2.927

    180.000 4710.000 19848.9 2.936

    180.000 4890.000 19810.4 2.930

    180.000 5070.000 19677.5 2.910

    Vol B Vol total Vol Hihrg Hdr dasar Q = Volt-Volhg

    (m3) (m3) (m3) (m)

    10 12 13 15

    0 4733.2 4733.2 0.220 0.0

    0.7 4854.5 4641.5 0.518 212.9

    8.8 5821.4 5566.4 0.660 255.019.5 6788.1 6491.2 0.801 296.9

    30.3 7754.9 7416.0 0.942 338.9

    41.0 8721.7 8340.9 1.084 380.8

    51.7 9688.5 9265.7 1.225 422.8

    295.6 10644.5 10190.5 1.331 454.0

    73.2 11622.0 11115.4 1.508 506.7

    84.0 12588.8 12040.2 1.649 548.6

    94.7 13555.6 12965.0 1.791 590.5

    105.5 14522.3 13889.8 1.932 632.5

    116.2 15489.1 14814.7 2.074 674.4

    127.0 16455.9 15739.5 2.215 716.4

    136.9 17353.7 16598.3 2.346 755.3

    145.6 18133.2 17344.0 2.460 789.1

    153.2 18814.1 17995.4 2.560 818.7

    159.7 19396.5 18552.6 2.645 843.9

    165.0 19880.3 19015.4 2.716 864.9

    169.3 20265.6 19384.0 2.772 881.7

    172.3 20536.7 19643.2 2.812 893.4

    174.1 20693.4 19793.2 2.835 900.2

  • 8/10/2019 Perhitungan Drainase New-1

    30/30

    174.7 20751.7 19848.9 2.843 902.7

    174.3 20711.4 19810.4 2.837 901.0

    172.7 20572.5 19677.5 2.817 895.0

    besar 3.0m, direncanakan kedalaman air di hilir saluran (H) sebesar 1,5m. Dari

    laman di hulu saluran sebesar 1,5m .

    inggi sebesar 2,843m. Hasil tersebut kurang dari 3m sehingga tidak lagi terjadi

    air akibat banjir