Performing Arts/ Carlsen Center Renovation€¦ · • Infrastructure cost - funded out of reserves...
Transcript of Performing Arts/ Carlsen Center Renovation€¦ · • Infrastructure cost - funded out of reserves...
Number of Events
2010-11 2011-12 2012-13 2013-14 2014-15
Total number of Events
178 143 159 199 208
Performing Arts Series
45(25%)
50(35%)
51(32%)
68(34%)
63 (30%)
JCCC Depts.including Theatre/Music
95(54%)
57(40%)
63(40%)
95(48%)
106 (51%)
Rentals 38(21%)
36(25%)
45(28%)
36(18%)
40 (19%)
In addition to the Series, other events are facilitatedin the Carlsen Center.
} Avg. 69%
Performing Arts/ Carlsen CenterRenovation
In addition to the Series, other events are facilitatedin the Carlsen Center.
Performing Arts/ Carlsen CenterRenovation
Academic events in the Carlsen Center include:
• Music - Concert Band, Choirs, Johnson County Chorus (through Continuing Education)
• Theatre - Academic Theatre productions• Annual Fashion Show - Fashion Merchandising• Graduations/Pinning Ceremonies - Nursing (RN)/Practical Nursing (LPN),
Respiratory Therapy, Dental Hygiene, Police Academy (5 per year)• Student Talent Show - Student Life• Job Olympics • Athletics - Annual Awards, Dance Team Rehearsals
During the Performing Arts Series 2014-15 season, 1,692 tickets were sold to students at $5, or 9% of total sales.
Competition with other professional arts venues and organizations throughout Greater Kansas City.
The Midland by AMC
Kauffman Center for the Performing Arts
Starlight Theatre
All these venues/organizations have undergone renovations or opened for business in the past 15 years.
Performing Arts/ Carlsen Center
Performing Arts/ Carlsen CenterRenovation
• This Season (2015-2016) is Carlsen Center’s 25th Anniversary.• Facility renovation is needed to remain competitive.• Acoustic Enhancements to Polsky Theatre to be completed
August 2015. (Donor Supported)• Maintenance to a 25-year-old space that has hosted over
Two Million visitors.
Investments for the Future
Performing Arts/ Carlsen Center
Performing Arts/ Carlsen CenterRenovation
Yardley Hall - $908,065 + Architectural Fees for bid documentsDemolition $ 7,921Carpet, Paint, Fabric Wall Covers, Baseboards refinished, etc $231,678Reupholstered Seats $198,720 (New: $465,000)Lighting and electrical $180,145Curtains, stage and acoustic, throughout house $ 35,500Fees – General Conditions, Escalation, Design Contingency, Contractor $254,102
Renovation Estimate
Polsky Theatre - $339,541 and Green Room/Dressing Rooms - $44,277 + Architectural Fees for bid documents = TOTAL $383,818Polsky - Demolition $ 6,303Polsky - Carpet, Paint, Fabric Wall Covers, Baseboards refinished, etc $184,960Polsky - Lighting and electrical $ 53,265Green Room/Dressing Rooms $ 44,277
Renovation Estimate
Lobby • Upgrades to digital signage throughout; replace carpet; paint soffits; replace fabric on benches• Ensure messaging for Performing Arts and also for student activities, student life, recruitment.
Renovation Estimate
• Infrastructure cost - funded out of reserves
• Programming and Operations support - funded by 25th Anniversary community campaign, with fundraising conducted by JCCC Foundation with Carlsen Center staff
• Infrastructure project completion deadline: September 1, 2016
Fundraising Ideas
• Review Prospect List and start asking for contributions. • Name-A-Seat campaign• Corporate Sponsor for Green Room• Other Naming Opportunities
Proposal