Page 1 of 27 CUSTOMER: PROJECT: SUBMITTED BY: PHARMA ENGINEERS PLOT NO. 113/A/1, LANE 8, PHASE II, IDA CHERLAPALLI, HYDERABAD- 500051. Tel No.91-40 27261113, 27261114 PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC SYSTEM OF AHU-01

Transcript of PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST...

Page 1: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Page 1 of 27

CUSTOMER:

PROJECT:

SUBMITTED BY:

PH AR M A EN G I N EER S

PLOT NO. 113/A/1 , LANE 8, PHASE II,

IDA CHERLAPALLI, HYDERABAD- 500051 .

Tel No.91-40 27261113 , 27261114

PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC SYSTEM OF

AHU-01

Page 2: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Page 2 of 27

PERFORMANCE QUALIFICATION PROTOCOL APPROVAL

This document is prepared by the documentation team of M/S. PHARMA ENGINEERS

for

AHU TAG Number : ___________________________

PLANT /PROJECT :

CLIENT :

Hence this document before being effective shall be approved by Client / Customer

M/s. PHARMA ENGINEERS:

Name Designation Signature Date

Prepared By

Reviewed By

CLIENT / CUSTOMER:

Name Designation Signature Date

Reviewed By

Approved By

Page 3: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 3 of 27

PERFORMANCE QUALIFICATION (PQ)

TABLE OF CONTENT

1. OBJECTIVE .............................................................................................................................. 4

2. FUNCTIONAL TEST FOR PERFORMANCE - AIRCHANGES .................................... 4

3. FUNCTIONAL TEST FOR PERFORMANCE – DIFFERENTAL PRESSURE ACROSS ROOM ..................................................................................................................... 9

4. FILTER INTEGRITY TEST ..................................................................................................12

5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING ..................16

6. PERFORMANCE TEST FOR - SYSTEM RECOVERY ....................................................19

7. FUNCTIONAL TEST FOR PERFORMANCE - AIR FLOW ...........................................22

8. FUNCTIONAL TEST FOR PERFORMANCE – TEMPARATURE & RH ACROSS THE ROOM .............................................................................................................................25

Page 4: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 4 of 27

PERFORMANCE QUALIFICATION (PQ)

1. OBJECTIVE

The objective of this document is to qualify and certify the performance of

HVAC system (TAG NO) with due considerations as specified in DQ of HVAC

System (TAG NO).

2. FUNCTIONAL TEST FOR PERFORMANCE - AIRCHANGES PURPOSE:

This test is to confirm that the air system is balanced and capable of delivering sufficient air volume to maintain minimum air changes per hour.

PRE-REQUISITES: 1. Anemometer (or) Air Capture Hood

2. Calibration Certificates of Instrument

PROCEEDURE / TEST METHOD:

1. This test to be performed after preliminary air balancing is completed.

2. Make sure that the fresh air, exhaust air has been adjusted to their

requirements.

3. Run the AHU and start measuring the velocity of air from each supply

grill/ filter.

4. Reading must be of minimum of five as per the size of grill/ filter.

1 2

5

3 4

Page 5: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 5 of 27

PERFORMANCE QUALIFICATION (PQ)

5. Enter the velocity readings in the test data sheet and evaluate the number

of air changes for every room.

6. In case of AIR CAPTURE HOOD, the same hood will give the total airflow

in CFM/CMH.

7. Test Results are enclosed here.

Page 6: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 6 of 27

PERFORMANCE QUALIFICATION (PQ)

TEST REPORT FOR AIR CHANES PER HOUR (Anemometer)

Purpose: To test air changes calculation

Client

AHU NO Class

Area of test Date of Test

INSTRUMENT USED

Name Make

Model Serial Number

Calibrated On Calibration Due

TEST RESULTS

Room Name Design ACPH

Filter Identity Number.

Filter Area

Velocity Readings Avg. Velocity

(V)

Air Flow CFM

Total Air

Flow CFM

Room Volume

CFT

Resultant ACPH

SFT V1 V2 V3 V4 V5

Page 7: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 7 of 27

PERFORMANCE QUALIFICATION (PQ)

TEST REPORT FOR AIR CHANES PER HOUR (Air Capture Hood)

Purpose: To test air changes calculation

Client Status At Rest

AHU NO Class

Area of test Date of Test

INSTRUMENT USED

Name Make

Model Serial Number

Calibrated On Calibration Due

TEST RESULTS

Room Name

Design ACPH

Filter Identity Number.

Air Flow CFM

Total Air

Flow CFM

Room Volume

CFT Resultant ACPH

Page 8: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 8 of 27

PERFORMANCE QUALIFICATION (PQ)

ACCEPTANCE CRITERIA:

AHU must deliver and maintain not less than 20 air changes per hour for ISO-8 However, the acceptance is up to the judgment of experts if any deviation in the readings. COMMENTS / DEVIATIONS (IF ANY): Test Conducted By Test Witnessed By

Page 9: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 9 of 27

PERFORMANCE QUALIFICATION (PQ)

3. FUNCTIONAL TEST FOR PERFORMANCE – DIFFERENTAL PRESSURE ACROSS ROOM PURPOSE:

To ensure that Air handling unit is designed to maintain sufficient pressure differentials across the room.

PRE-REQUISITES: 1. Pressure differentials drawing

2. Manometer for cross verification of gauges.

3. Calibration Certificates of Instruments

PROCEEDURE / TEST METHOD:

1. Before conducting test, make it sure all the Magnehelic gauges are duly calibrated.

2. The connections of the gauge are corrected for low and high pressure.

3. Make it sure that supply air adjustment is over /completed and required air changes

are being maintained.

4. Make sure that, all the doors are getting closed properly and door closures are fitted

5. Physically check and confirm the leakages from the door frame and shutter is

minimum, if required provide gasket to arrest.

6. Physically check and confirm the leakage from the door bottom is arrested with the

help of door seal.

7. Adjust the positive corridor prior to negative room.

8. Restrict the man entry while performing the test to avoid surge effect in the air.

9. Physically check and confirm for any wall cutouts where excess air may bleed. keep

the minimum opening required in case of conveyor transfer.

10. Gauge readings are not to be taken while the door is open or during traffic of man.

11. Differential Pressure readings shall be monitored for three consecutive days.

12. Test Results are enclosed here.

Page 10: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 10 of 27

PERFORMANCE QUALIFICATION (PQ)

TEST REPORT FOR PRESSURE DIFFERENTIALS ACROSS THE ROOM

Purpose: To test Pressure Differentials Across the rooms

Client Date of Test

Area of Test Test Frequency

TEST RESULTS

Gauge Details Fixed Across the Rooms Design

Reading Actual

Reading TIME Gauge Sr.

No Range

Calibrated on

Calibrated Due on

Make High Pressure Room Low Pressure Room

Page 11: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 11 of 27

PERFORMANCE QUALIFICATION (PQ)

ACCEPTANCE CRITERIA:

5 to 10 PA is acceptable between the same class of areas. 10 to 15 PA is acceptable between two different classes of rooms.

However, the acceptance is up to the judgment of experts if any deviation in the readings. COMMENTS / DEVIATIONS (IF ANY): Test Conducted By Test Witnessed By

Page 12: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 12 of 27

PERFORMANCE QUALIFICATION (PQ)

4. FILTER INTEGRITY TEST

PURPOSE: This test is to confirm that the terminal filter was installed with proper assembly and to

ensure that no leakage of air across the filter gasket and to ensure that terminal filter is

with stated rating.

PRE-REQUISITES: 1. Gas Generator (Leskin 6 nozzle)

2. Photometer (ATI-2I, ATI-2H & PH -5)

3. PAO (Poly-Alpha olefin) Oil.

4. Compressed air at a pressure of (20 PSI)

PROEEDURE / TEST METHOD:

1. Percentage of leakage between upstream and downstream is to be confirmed across

the filter.

2. Cold gas generator is to be selected to generate upstream concentration, for range 20 to

80 micro grams per liter which is equivalent to millions of particles.

3. Arrangements to be made to maintain consist quantity at the upstream side of the

filter.

4. Downstream concentration to be measured with the help of photometer

5. The operation of the instrument is to be followed strictly as per the recommendations

of the equipment.

6. Downstream concentration will be displayed in terms of the percentage of leakage,

compared to upstream concentration.

7. The allowed percentage of leakage must not be more than filter efficiency.

8. This test is to be conducted for every terminal filter and results to be mentioned in the

test data sheet.

Page 13: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 13 of 27

PERFORMANCE QUALIFICATION (PQ)

9. Care to be taken while conducting the test for selection of oil to generate smoke, which

must be non-cacogenic.

10. During the above test, it’s recommended to put off the control system of smoke

detection.

11. Test Results are enclosed here.

Page 14: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 14 of 27

PERFORMANCE QUALIFICATION (PQ)

TEST REPORT FOR SYSTEM FILTER INTEGRITY

Purpose: To find out the % Leak for Terminal Filters

Client

Area of Test AHU NO

Class Date of Test

Instrument Used

Name Make

Model Sr. No

Calibrated On

Calibration Due

TEST RESULTS

Room name Filter

Identity No

Upstream Concentration Acceptable

downstream (% leakage)

Obtained Result in downstream

Remarks

µg/Ltr % From Filter

Face From Side

Joint

Page 15: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 15 of 27

PERFORMANCE QUALIFICATION (PQ)

ACCEPTANCE CRITERIA:

Percentage of leakage must be less compared to filter efficiency.

However, the acceptance is up to the judgment of experts if any deviation in the readings.

COMMENTS / DEVIATIONS (IF ANY):

Test Conducted By Test Witnessed By

Page 16: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 16 of 27

PERFORMANCE QUALIFICATION (PQ)

5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE:

To check the correct functioning of the AHU with respect to filtration efficiency and area cleanliness, by measuring the particle concentration at 0.5 micron.

The result of particle count should comply with DESIGN QUALIFICATION.

PRE-REQUISITES: 1. Particle counter

2. Calibration certificate of particle counter

PROCEDURE / TEST METHOD:

1. Test to be conducted while the room is at rest condition i.e. no man power will be

allowed, and equipment’s are not in running condition.

2. Test to conduct by trained technical people.

3. Particle counter must be having valid calibration certificate.

4. Particle counter must have minimum of 1.7 Cfm capacity.

5. Number of locations and place of location to be decided before conducting the test.

6. Drawing shall be prepared showing the locations of the particle counting and same

drawing is to be attached along with the particle count report.

7. Particle counting must be verified at 0.5 micron and also at 5.0 micron with two

different WORKING DATA sheets.

8. Test is to repeat for three consecutive days for appropriate results.

9. Test Results are enclosed here.

Page 17: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 17 of 27

PERFORMANCE QUALIFICATION (PQ)

TEST REPORT FOR PARTICLE COUNT

Purpose: To determine actual particle count Level “at Rest”

Client Test Reference

Area of Test AHU NO

Class Date of Test

Instrument Used

Name Make

Model Sr. No

Flow Rate Sampling Time

Calibrated On

Calibration Due

TEST RESULTS

Room Name

Location ID

No. of Particles >0.5 µ /cu.mt No. of Particles >5.0 µ /cu.mt

S1 S2 S3 Avg S1 S2 S3 Avg

Mean Average Mean Average

Certification Results as per ISO14644-1 (2015)

ISO CLASS Maximum number of particles allowed per cubic meter of air

0.5 µ 5.0µ

ISO 8 3520000 29300

Page 18: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 18 of 27

PERFORMANCE QUALIFICATION (PQ)

ACCEPTANCE CRITERIA: Particle concentration should comply with ISO-14644-1(2015) standards. However, the acceptance is up to the judgment of experts if any deviation in the readings. . COMMENTS / DEVIATIONS (IF ANY):

Test Conducted By Test Witnessed By

Page 19: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 19 of 27

PERFORMANCE QUALIFICATION (PQ)

6. PERFORMANCE TEST FOR - SYSTEM RECOVERY

PURPOSE:

To check how much time is required to bring back to normal condition from a worst condition i.e., from peak concentration of particles to normal concentration of particles

PRE-REQUISITES:

1. Particle counter

2. Stop watch

PROCEDURE / TEST METHOD:

1. Manipulate the worst condition, i.e. increase the particle concentration in the room by

delivering the smoke in the room/ creating a nuisance.

2. Measure the peak concentration with the help of particle counter

3. Start the particle counter and run it continuously without time interval between the

two readings.

4. Observe the particle count on the display of the equipment and stop the counter when

the reading on the display gets stabilized to Acceptable condition.

5. Note down the time required to bring back to normal condition.

6. This time is dependent on how well the system is getting mixed and gives an estimate

of time required to bring back to normal condition in case of any mal operation.

7. This test to be conducted only in the critical rooms.

8. Test Results are enclosed here.

Page 20: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 20 of 27

PERFORMANCE QUALIFICATION (PQ)

TEST REPORT FOR SYSTEM RECOVERY TEST

Purpose: To determine actual time taken for “SYSTEM RECOVERY”

Client Test Reference

Area of Test AHU NO

Class Date of Test

INSTRUMENT USED

Name Make

Model Sr. No

Calibrated On Calibration Due

ISO14644-1 (2015) Airborne Particulate Cleanliness Level Classification

ISO Classification

Class Limits: Max Concentration limits (particles/m3 of air) for particles equal to or larger than the considered size

0.5 µ 5.0µ

IS0-8 3520000 29300

EU & GMP 3520000 29000

TEST RESULTS

Room name Start Time

Highest No. of Particles >0.5 µm/m3

Highest No. of

Particles >5 µm/m3

End Time

Lowest No. of Particles >0.5

µm/m3

Lowest No. of Particles >5

µm/m3

Page 21: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 21 of 27

PERFORMANCE QUALIFICATION (PQ)

ACCEPTANCE CRITERIA: The time required / system recovery time must be less than 15 minutes.

However, the acceptance is up to the judgment of experts if any deviation in the readings.

COMMENTS / DEVIATIONS (IF ANY):

Test Conducted By Test Witnessed By

Page 22: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 22 of 27

PERFORMANCE QUALIFICATION (PQ)

7. FUNCTIONAL TEST FOR PERFORMANCE - AIR FLOW PURPOSE:

To ensure that the movement of air in the clean room is not stagnant and flow is moderately conventional air flow.

PRE-REQUISITES:

1. Smoke Generator

2. Video camera

PROCEDURE / TEST METHOD:

1. This test is to be performed after completion of perfect air balancing.

2. Flow visualization must be checked by generating smoke near the supply grill.

3. Smoke movement to be recorded by video camera and the movement of smoke must

be towards return grill, ensuring maximum sweep of the room.

4. This test also, confirms the pressure differentials across the room.

5. Attach the airflow visualization CD as Annexure.

Instrument Used

Name Make

Model Chemical

Camera Make

Page 23: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 23 of 27

PERFORMANCE QUALIFICATION (PQ)

TEST REPORT FOR AIR FLOW DIRECTION

Purpose: To determine actual time taken for “SYSTEM RECOVERY”

Client Plant

Area of Test AHU NO

Class Date of Test

Instrument Used

Name Make

Model Chemical

Camera Make

TEST RESULTS

Room name Filer Identification

Number Airflow Direction Remarks

Page 24: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 24 of 27

PERFORMANCE QUALIFICATION (PQ)

ACCEPTANCE CRITERIA:

The flow must be towards return air grill, ensuring maximum sweep of the room.

COMMENTS / DEVIATIONS (IF ANY):

Test Conducted By Test Witnessed By

Page 25: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 25 of 27

PERFORMANCE QUALIFICATION (PQ)

8. FUNCTIONAL TEST FOR PERFORMANCE – TEMPARATURE & RH ACROSS THE ROOM PURPOSE: To check the correct functioning of the AHU capacity with respect to cooling coil/ heating coil and time required to bring down the temperature from ambient condition: PRE-REQUITIES: 1. Digital Thermometer/ Analog Thermometer / Data Loggers

PROCEDURE / TEST METHOD:

1. Test to be conducted while the room is at rest condition i.e. no man power will be

allowed, and equipment’s are not in running condition.

2. Make sure that the chilled water and hot water is working as per the rated parameters.

3. Chilled water must be available at 7 to 8 deg. centigrade and hot water at not less than

50 deg. centigrade near the AHU.

4. Allow the chilled water and hot water to flow and start monitoring the temp and RH

inside the room.

5. Observe the temperature and RH & monitor the time required to obtain a stabilized

reading.

6. The stabilized reading must be within the range of design parameters.

7. Enter the temperature and RH readings on the working sheet at specified location.

8. Enter the ambient condition of the air for reference.

9. Test to be repeated for three consecutive days to obtain consistent readings.

10. Test Results are enclosed here.

Page 26: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 26 of 27

PERFORMANCE QUALIFICATION (PQ)

TEST REPORT FOR TEMPERATURE & RH

Purpose: To test “Temperature & RH Conditions” across the room

Client AHU NO.

Area of test Date of Test

Instrument Used Make

Ambient Temperature & RH: Temp & RH Limit

TEST RESULTS

Instrument Details Location Time Observed

Temperature Observed

RH

Serial Number Calibrated

on Calibrated due

Page 27: PERFORMANCE QUALIFICATION PROTOCOL FOR HVAC …...PERFORMANCE QUALIFICATION (PQ) 5. FUNCTIONAL TEST FOR PERFORMANCE – PARTICLE COUNTING PURPOSE: To check the correct functioning

Client: Supplier/ Manufacturer: PHARMA ENGINEERS, HYDERABAD

Equipment: HVAC SYSTEM FOR AHU-01

Page 27 of 27

PERFORMANCE QUALIFICATION (PQ)

ACCEPTANCE CRITERIA: Uniform temperature and RH is to be maintained across all the rooms, as per the designed

parameters. However, the acceptance is up to the judgment of experts if any deviation in

the readings.

COMMENTS / DEVIATIONS (IF ANY):

Test Conducted By Test Witnessed By