Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ......

15
1 Edmonton, Alberta, Canada February 14 th -16 th , 2017 Performance and Analysis of a New Pipeline Pig Design for the Removal of Deposits from Corrosion Pits Dan Fletcher, Ph.D., P.Eng. Vincent Foong, MIET, MCMI, FIDIAG.E Michael Hooper Fiberbuilt Manufacturing Inc.

Transcript of Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ......

Page 1: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

1 Edmonton, Alberta, Canada February 14th-16th, 2017

Performance and Analysis of a New Pipeline Pig Design for the Removal of Deposits from Corrosion Pits

Dan Fletcher, Ph.D., P.Eng.

Vincent Foong, MIET, MCMI, FIDIAG.E Michael Hooper

Fiberbuilt Manufacturing Inc.

Page 2: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

2 Edmonton, Alberta, Canada February 14th-16th, 2017

Introduction

• Internal Corrosion cause of 51% [1] of upstream multiphase pipeline failures

• Pitting is a major concern – Under Deposit Corrosion

– Microbe Induced Corrosion

• Need to disrupt deposits

• Improve pig effectiveness

• Improve pigging programs

• Improving pig performance can improve entire mitigation program effectiveness

[1] Alberta Energy Regulator (AER), “Report 2013-B: Pipeline Performance in Alberta, 1990-2012”, August 2013, Available December 2016 at: https://www.aer.ca/documents/reports/R2013-B.pdf

Page 3: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

3 Edmonton, Alberta, Canada February 14th-16th, 2017

Mitigating Pit Corrosion (UDC/MIC)

• Disrupt deposits

• Local pit environment

• Improve surfactant efficacy

• Remove Deposits from pit

• Clean to depths of pits

• Get inhibitors to pit bottom

Page 4: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

4 Edmonton, Alberta, Canada February 14th-16th, 2017

Background Study

• AITF – PICOM Joint Industry Project Phase 1 – Completed December 2014 – Evaluation of Pig Design for Deposit Removal from Corrosion Pits

• Test Method and Apparatus – 4 Inch Flow Loop (Water), simulated ‘sludge’ – Measure the depth and volume removed from pits

[2] W. Mosher et. al., “Method of Evaluating Cleaning Pig Design for the Removal of Deposits from Corrosion Pits”, NACE NAWC February 2015

[2] [2] [2]

Page 5: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

5 Edmonton, Alberta, Canada February 14th-16th, 2017

Results of Background Study [3]

• Evaluation of commercially available pigs

• Brushes are essential to effective pit cleaning

• Brushes did not reach to nominal size

• Effective cleaning to a depth equivalent to only to 25% of Pit Diameter

• Multiple passes provides only a very slight (not statistically significant) cleaning benefit

[3] W. Mosher, “Evaluation of Pig Design for Deposit Removal from Corrosion Pits – Phase 1: Crude Oil Systems and Water Systems”, Alberta Innovates – Technology Futures (InnoTech Alberta), December 2014

Page 6: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

6 Edmonton, Alberta, Canada February 14th-16th, 2017

Improved Pit Cleaning Pig and Method

• Significant room for improvement

• Clear need to improve pit cleaning brushes

– Improve effective reach into pits

– Make multiple runs more effective

• Improve pigs and pigging programs

– Increase pig performance

– Develop pig that allows for multiple runs

– Enable pigging in aggressive applications

Page 7: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

7 Edmonton, Alberta, Canada February 14th-16th, 2017

New Pit Cleaning Brush Design

• Improved brush geometry

• Combination of Radial and Raked Brushes

• Increase brush oversize

• Brush spacing resists debris buildup and pack-off

• Performance testing completed at the 4” AITF Flow Loop

Page 8: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

8 Edmonton, Alberta, Canada February 14th-16th, 2017

Cleaning Performance

Page 9: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

9 Edmonton, Alberta, Canada February 14th-16th, 2017

Depth as a % of Pit Diameter

Page 10: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

10 Edmonton, Alberta, Canada February 14th-16th, 2017

Depth as a % of Pit Diameter

50% - 70% Improvement

Best AITF JIP Results [3]

Page 11: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

11 Edmonton, Alberta, Canada February 14th-16th, 2017

Volume Removed from Test Coupons

Page 12: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

12 Edmonton, Alberta, Canada February 14th-16th, 2017

Clean 0.75 inch (19 mm) pit

• Concentric rings in false colour image show conical drill point

Page 13: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

13 Edmonton, Alberta, Canada February 14th-16th, 2017

New Pig Seal Design

• Composite Construction

• Brush/Diaphragm/Brush – Brushes = Support

– Diaphragm = Sealing

• Modular Design

• Reduced pressure differential – Pig more often

Page 14: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

14 Edmonton, Alberta, Canada February 14th-16th, 2017

Pigging with Reduced Differential Pressure

• New Seals reduce Differential Pressure (DP)

• Can select DP for requirements

• Alternative to Urethane

• Modular and easily adapted for aggressive environments – Aromatics, Bitumen, H2S, CO2,

H2, High Temperatures

Page 15: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion

15 Edmonton, Alberta, Canada February 14th-16th, 2017

Improved Pig for Pit Cleaning

New Pit Cleaning Brush

• Novel brush geometry

• Deep pit cleaning: effective to 37-40 % of pit diameter

• Volume cleaning: removes up to 100% of pit deposits

• Performance improves greatly with multiple passes

Multiple Pass Pigging

• Enables improved corrosion pit cleaning – multiple runs

• New seal concept

• Reduced drag and applied differential pressure

• Reduced pigging impact on well production