PERFORM. TRANSFORM.

67
PERFORM. TRANSFORM. CORPORATE PRESENTATION

Transcript of PERFORM. TRANSFORM.

Page 1: PERFORM. TRANSFORM.

PERFORM. TRANSFORM.

CORPORATEPRESENTATION

Page 2: PERFORM. TRANSFORM.

WE DO IT ALL

Building

Highway / Expressway

Railway Infrastructure

Water Supply

Electrification

Optical Fibre

Page 3: PERFORM. TRANSFORM.

1989 2012

Started Operations asM/s Patel Enterprises

Renamed as DEE VEE Projects Limited

Timeline

Page 4: PERFORM. TRANSFORM.

Leadership Team

• Mr. Dinesh Kumar Patel (Promoter and Whole Time Director)

• Mr. Vikas Ranjan Mahto (Promoter and Whole Time Director)

• Mr. Navin Kumar Patel (Promoter and Whole Time Director)

• Mr. Vivek Ranjan Mahto (Promoter and Whole Time Director)

• Mr. Ashok Patel (Director)

• Mr. Deepak Patel (Director)

• Mr. Dheeraj Dubey (Director)

• Mr. Ritesh Bhawnani (Director)

• Mr. Sumit R Das (Director)

• Mr. Hitesh Luna (Director)

• Mr. Gaurav Gupta (Director)

• Mr. Amit Sharma (Independent Director)

• Mr. Prakash Lodha (Business Development Advisor)

• Mr. Deep Patel (President)

• Mr. Avinash Bansal (President)

• Mr. Anup Agarwal (President)

• Mr. Prashant Singh (Vice President)

• Mr. Pushpakant Sharma (Vice President)

• Mr. N V Subrahmanyam (Vice President - Projects)

• Mr. C S Tiwari (Vice President - Projects)

• Mr. Satish Kumar Sarawgi (CFO)

Page 5: PERFORM. TRANSFORM.

Directors

Business Management

& Administration Units

Operating Work Divisions

R&D

Core Management Group

Auditing Group

Roads and Highways Division

Building Division

Railway Division

Water Supply Division

Business Development Division

Procurement Division

Financing & Accounting Division

Human Resource Division

Electrification & OFC Division

Organization Structure

Page 6: PERFORM. TRANSFORM.

Human Resources

1%

32%

4%1%

62%

➢ Taxation

➢ Audit

➢ Recruitment➢ Salary Administration➢ Statutory Compliance

Page 7: PERFORM. TRANSFORM.

Financial Highlights

INR 129.79 Cr

INR 162.37 Cr

NET WORTH

2018-19

2019-20

Page 8: PERFORM. TRANSFORM.

Financial Highlights

CRORE732.85

660

670

680

690

700

710

720

730

740

750

760

2017 - 2018 2018 - 2019 2019 - 2020

INR Cr

Average Annual Turnover (2017~2020)

INR

Page 9: PERFORM. TRANSFORM.

No Loss Certificate

2019-20

Financial Highlights

Page 10: PERFORM. TRANSFORM.

*

Page 11: PERFORM. TRANSFORM.

Plant & Equipment

Page 12: PERFORM. TRANSFORM.

Equipment Description Qty

Batching Plant(30 &20 Cum / hr.)

Computerized and Fully Automatic Concrete Batching plant of 30Cum / hr. capacitywith Cement Silos and manual feeding hoper 2 (two) days capacity with directfeeding

14 Nos.

Batching Plant(60 & 70 Cum / hr.)

Computerized and Fully Automatic Concrete Batching plant of minimum 60Cum / 70Cum hr capacity with direct feeding

04 Nos. (2+2)

Batching Plant(110Cum / hr)

Computerized and Fully Automatic Concrete Batching plant of minimum 112 Cum / hr capacity with direct feeding.

02 Nos.

Concrete Pump Concrete Pump with MS concrete Piping system for pumping. 25 Set

Transit Mixer Capacity – 6 Cum 77 Nos.

Crusher MESTO (80,200,220) TPH 04 No.

Wet Mix Macadam Plant

WMM Plant ( 100 – 120 TPH) 02 Nos.

Weigh Bridge 100 MT Capacity 09 Nos.

Plant & Equipment (1/5)

Page 13: PERFORM. TRANSFORM.

Plant & Equipment (2/5)

Equipment Description Qty

Earthmovers and Excavators

Excavator (JCB/ Komatsu/ TATA Hitachi/ Hyundai/ Volvo/ CAT/ CASE) 33 Nos.

Backhoe Loader 33 Nos.

Grader (CASE/ VALVO/ CAT) 12 Nos.

ASPHALT PAVER FINISHER (Vogele/ Amman) 05 Nos.

Roller (CASE 770EXM) 02 Nos.

Soil Compactor (GREAVES/ VOVLO/ CASE/HAMM) 21 Nos.

BOBCAT 08 Nos.

ACE GRADER (AG176) 01 No.

Page 14: PERFORM. TRANSFORM.

Plant & Equipment (3/5)

Equipment Description Qty

Earthmovers and Excavators

Water Tanker 24 Nos.

HY. DUMP TRUCK 127 Nos.

GRADER (CAT / CASE 120 H) 09 Nos.

TRACKTOR GRADER (FARM TRACK-30 HERO) 02 Nos.

MANUAL PAVER (UNISTEEL) 01 Nos.

BABY TENDOM ROLLER 03 Nos.

CASE 50 DX MINI ROLLER 01 Nos.

Slip form Paver (Writgen SP-94/SP1200) 02 Nos.

Slip form Paver (GOMACO C-III) 02 Nos.

Page 15: PERFORM. TRANSFORM.

Plant & Equipment (4/5)

Equipment Description Qty

Crane and HydraTOWER CRANE (POTAIN/DEAVOO ) 08 Nos.

MOBILE TOWER CRANE ACE 02 Nos.

Tractor & Tanker WATER & EQUIPMENT SHIFTING PURPOSE 18 Nos.

Wheel Loader HEAVY MATERIAL SHIFTING (3T/5T) 18 Nos.

Hydra Hydra 20 Nos.

Boom Placer Boom Placer – Putzmeister 04 Nos.

DG Set Diesel Generator (250/200/62/35KVA) 47 Nos

HDD Machine Goodeng 06 Nos.

Page 16: PERFORM. TRANSFORM.

Plant & Equipment (5/5)

Equipment Description Qty

Hoist

BUILDING HOIST 8 Nos.

MONKEY HOIST SAFARI 45 Nos.

Tractor TRACTOR 11 Nos.

Site Vehicles SUV, MUV, INNOVA, VERNA,BOLERO, CAMPER Pick- up, RITZ, SCORPIO, ZEST 31 Nos.

Site Vehicle Bike ( Activa , Honda, TVS) 45 Nos.

Cement storage silo 100 & 150 MT with feeding system

Cement and fly ash silo 23 Nos.

Chilling plant 90 Tr Chilled water supply to RMC @10000 liters per hour 2 Nos.

Page 17: PERFORM. TRANSFORM.

Certificate

ISO 9001:2015

Construction Work for Turnkey & EPC Projects - Building,

Roads, Highways, Mechanical, Electrical, Structural, & Civil

Engineering Works.

Page 18: PERFORM. TRANSFORM.

Certificate

ISO 14001:2015

Environmental Management System for Construction

Work for Turnkey & EPC Projects -Building, Roads,

Highways, Mechanical, Electrical, Structural, & Civil

Engineering Works.

Page 19: PERFORM. TRANSFORM.

Certificate

ISO 45001:2018Occupational Health and Safety Management System for

Construction Work for Turnkey & EPC Projects - Building,

Roads, Highways, Mechanical, Electrical, Structural, & Civil

Engineering Works.

Page 20: PERFORM. TRANSFORM.

Our Esteemed Clientele

and the list is growing..

Page 21: PERFORM. TRANSFORM.

Indore, Bhopal, Shahdol, Singrauli

Dhanbad

Raipur, Korba, Bilaspur,

Ambikapur

Sambalpur, Sundergarh

Nagpur, Chandrapur,

Gondia, Amravati, Bhandara

Project Locations

Goa

Hyderabad

New Delhi

Page 22: PERFORM. TRANSFORM.

Office Locations

Offices : Head Office and Corporate Office

Registered Office 1st Floor Vikas Complex, P.H Road, Korba - 495678 (C.G.), India, Phone : (07759) 245108

Corporate Office Dee Vee House , Maulshree Vihar, Raipur - 492006 (C.G.), India, Phone : (0771) 2972580

Page 23: PERFORM. TRANSFORM.

Project Details

ElectrificationBuilding Works Roads and

Highways Works

Railway

Infrastructure

Water Supply

Page 24: PERFORM. TRANSFORM.

Synopsis of

MAJOR EXISTING PROJECTS

Page 25: PERFORM. TRANSFORM.

Synopsis of Major Existing Projects (1/3)

Project Location Client Value (INR Cr)

Medical College Building at Ambikapur, CG Ambikapur, CG CG-PWD 336.42

Construction of House and Development of Infrastructure for Identified SlumLocalities in Indore, M.P. under PMAY at Rau Near Silicon City, MP

Indore, MP Municipal Corporation, MP 316.53

Construction of Civil Aviation Research Organization (CARO) Complex atBegumpet Airport, Hyderabad – Phase-I

Hyderabad, TS Airport Authority of India 296

Development of Permanent Campus (Phase-I Works) of IIM Sambalpur, Odisha onDesign, Engineering, Procurement and Construction (EPC) basis.

Sambalpur NBCC 276.34

Rehabilitation and Upgradation of Four Laning with Paved Shoulders of Talibani toSambalpur Section (KM 493.300 to KM 521.825 & KM 545.176 to KM 567.400) ofNH-6 in the State of Odisha Under NHDP Phase IV on EPC Mode

Sambalpur, OR NHAI / Punj Lloyd 260.49

Design and Construction of 300 Bedded (Expandable up to 500 bed) Hospital Indore CPWD 255.95

Civil & associated Works of Road Works for 4 Lane with paved shoulderconfiguration of Bilaspur to Pathrapali (Km 00+000 To Km 23+015) Section Of NH111 (New NH-130) in the State Of Chhattisgarh, India

Bilaspur, CG ADANI Infra 215

Construction of All India Institute of Ayurveda (AIIA) at Village Dhargal in PernemTaluka, Goa

Goa NBCC 206.11

Construction of 118 Nos. Sr. HIG (Duplex), 38 Nos. HIG (Duplex), 54 Nos. Jr. HIG(Duplex), 123 Nos. Sr. MIG (Duplex), & 122 Nos. Jr. MIG (Duplex) at Sector-12,Naya Raipur i/c External Development Works at Sector-12, Naya Raipur (Phase-I),CG

Raipur, CG CGHB 149.82

Page 26: PERFORM. TRANSFORM.

Synopsis of Major Existing Projects(2/3)

Project Location Client Value (INR Cr)

Construction of 674 EWS, 436 MIG and 108 HIG Residential Tenements onland bearing survey No. 47, 57 and 58 at Mauja Akoli, Dist.-Amravati, MH

Amravati, MH AHAADB, Amravati, MH 139.83

Rehabilitation and Up-gradation Of NH-111 (New NH-130) from KM 163.400to KM 215.800 (Shivnagar to Ambikapur) to 2-Lane with Paved Shoulder(Value 223.89 Cr, DEE VEE 49% = 109.70 Cr & GAWAR 51% = 114.18 Cr)

Shivnagar-Ambikapur, CG National Highway Zone PWD, Raipur, CG 109.7

Construction of Houses and Development of Infrastructure under PMAY,Singrauli Municipal Corporation, MP

Singrauli, MP Municipal Corporation Singrauli, MP 97.16

Construction of Education Hub Phase-II i/c Development Work at BlockKatghora, CG

Korba, CG CGHB 63.53

Two Laning with hard shoulder of Tara-Premnagar- Ramanujnagar roadsection from existing chainage KM 0.000 To KM 50.312 (Design ChainageFrom Km 0.000 To Km 50.242) in the State of Chhattisgarh on EPC Mode.(GAWAR - Rs. 54.18 Cr & DEE VEE - Rs. 50.29 Cr)

Tara- Premnagar-Ramanujnagar, CG CGRDC 50.29

Construction of 50 HIG Duplex ,18 Sr. MIG Duplex, 31 Jr. MIG Duplex, 52LIG Duplex & 160 EWS (G+3) Flats i/c internal W/S, S/F, E/F & all relatedInfrastructure Development Work & External Development Work under AtalVihar Yojna at Jhagarha, Korba District, CG

Korba, CG CGHB 40.95

Face Lifting and Renovation of ‘F' Type Buildings (87 Buildings) in Colony atCSTPS, Chandrapur, MH

Chandrapur, MH MSPGCL, MH 37.32

Page 27: PERFORM. TRANSFORM.

Synopsis of Major Existing Projects (3/3)

Project Location Client Value (INR Cr)

Face Lifting and Renovation of ‘E' Type Buildings (116 Buildings) in Colony atCSTPS, Chandrapur, MH

Chandrapur, MH MSPGCL, MH 34.46

Construction of Dipka-Jawali-Chakabuda Road in KM 1/2 To KM 15/2 (100) =14.10 KM i/c Hume Pipe Culverts

Korba, CG CGPWD 33.31

Construction Of GAD Houses i/c Development Work for Govt. Officers andEmployees at All Block Head Quarters of District Koriya, CG

Koriya, CG CGHB 24.18

Beautification of Ranisagar and Bhuthsagar Lake at Rajnandgaon, CG Rajnandgaon, CG Municipal Corporation, Rajnandgaon, CG 17.04

Construction of Art & Cultural Centre and Conventional Hall at Korba, CG Korba, CG CGHB 14.97

Page 28: PERFORM. TRANSFORM.

Synopsis of

MAJOR COMPLETEDPROJECTS

Page 29: PERFORM. TRANSFORM.

Synopsis of Completed Projects (1/5)

Project Location Client Value (INR Cr)

Construction of New Medical College and up-gradation of Hospital at Shahdol, MP Shahdol, MP MPRDC 277.4

Construction of 34 No. HIG (Premium), 144 No. HIG (Duplex), 176 No. Sr. MIG,176 No. Jr. MIG, 320 No. EWS (G+3), 432 No. LIG (S+6), 144 No. HIG (S+6),Commercial Complex (G+4) & Club House, Water Supply i/c Electrification Workat Sector-29, Naya Raipur, CG (Group-A)

Naya Raipur, CG CGHB 209.19

Township Package for Darlipali Super Thermal Power Project, Stage- I (2X800MW) near Jharsuguda, Odisha

Darlipali, OR NTPC LTD 157.45

Construction of Commercial Office Campus i/c buildings and services on Plot No.C03 of Phase-1, CBD Complex, Sector 21 at Naya Raipur, CG

Naya Raipur, CG NRDA, CG 154.42

Construction of Commercial Retail (Formal & Informal) i/c Buildings and Serviceson Plot No. E04, E05, E09 & E10 of Phase-1, CBD Complex, Sector 21 at NayaRaipur, CG

Naya Raipur, CG NRDA, CG 128.2

Construction of 32 HIG (Duplex), 63 Sr. MIG (Duplex), 576 MIG (S+6), 144 HIG(S+6) & Commercial Complex under Composite Housing Scheme at Sector-29Naya Raipur, CG (Group-B)

Naya Raipur, CG CGHB 125.22

Construction of 52 No. HIG (Duplex), 152 No. Sr. MIG, 72 No. HIG (S+6), 256No. HIG (S+8) and Commercial Complex (G+2) and Community Hall i/c WaterSupply and Internal Electrification at Sector-29 Naya Raipur, CG (Group-C)

Naya Raipur, CG CGHB 124.8

Page 30: PERFORM. TRANSFORM.

Synopsis of Completed Projects (2/5)

Project Location Client Value (INR Cr)

Rehabilitation and up-gradation of NH-43 from KM 241.00 to KM 298.00 (Dahikondato Jagdalpur ) in the State of Chhattisgarh to Two-lanes with Paved Shoulders underNHDP-IV on EPC Basis. (Barbric-DEE VEE (JV) Total Amount 175.99 Cr. DEE VEE-60%=105.5 Cr & Barbric-40%=70.39 Cr)

Dahikonda to Jagdalpur, CG NHDP 105.62

Renovation Repair, Rehabilitation, Addition, Alteration and Aesthetic improvementand other misc. Civil & Electrical works at Hotel Janpath, Janpath Road, New Delhi.

New Delhi CPWD 74.33

Integrated Infrastructure Development work for Sector-24 (Part-A Phase-II) NayaRaipur, CG

Naya Raipur, CG NRDA, CG 72.69

Construction of Head Quarter Building, Western Region-II, NTPC Ltd. at Sector-24,Naya Raipur, CG

Naya Raipur, CG NRDA, CG 70.07

Construction of Cement Concrete road in KM 1 to 23/4 = 22.40 KM of Dipka to PaliRoad i/c Bridge and Culverts, CG

Dipka to Pali, CG PWD, Korba, CG 61.89

Construction of Paryavas Bhawan (Composite Building) of Sector-19 at Naya Raipur,CG

Naya Raipur, CG NRDA, CG 61.59

Construction of Civil Works i/c Earthwork in formation for Embankment and Cutting,Blanketing, Culverts, Major & Minor Bridges and other Ancillary Works from KM98.860 to KM 134.660 and Flyover Line from KM 128.000 to KM 135.200 (Pkg-I) inconnection with the construction of New BG Electrified Double Line in the State ofChhattisgarh over SECR East-West Corridor–Gevra Road-Pendra Road via Dipka,Kathghora, Sendurgarh and Pasan. (DEE VEE-GAWAR (JV)) (Value 197.54 Cr, DEEVEE: 70%=138.28 Cr & GAWAR: 30%=59.26 Cr)

Gevra Road-Pendra Road, CG IRCON 56.68

Airport Highway (V.I.P. Road) Widening Contract, Raipur, CG Raipur, CG UADD, CG 55.12

Page 31: PERFORM. TRANSFORM.

Synopsis of Completed Projects (3/5)

Project Location Client Value (INR Cr)

Rehabilitation and up-gradation of NH-43 from KM 81.50 to KM 130.00(Dhamtari to Kanker) in the State of Chhattisgarh to Two-lanes with PavedShoulders under NHDP-IV on EPC. (Barbric-DEE VEE (JV)) (Value 135.99Cr, DEE VEE: 40%=54.40 Cr & Barbric: 60%=81.59 Cr)

Dhamtari to Kanker, CG NHDP 54.39

Construction of Police Head Quarter at Naya Raipur, CG Naya Raipur, CG NRDA, CG 49.63

Construction of Degree Collage Shahdol to University Shahdol, DisttShahdol, MP i/c Water Supply, Sanitary Fitting and Electrification

Shahdol, MP MPPWD 40.89

Construction of 24 No. HIG -II, 131 No. Sr. MIG-II, 131 No. Jr. MIG-II, 90No. LIG-II & 432 No. EWS (G+3), Total 808 No. Houses i/c W/S, S/F,Electrification Works at Atal Vihar Urga, Korba, CG

Korba, CG CGHB 39.98

Construction of Forest Department building at North block, Sector-19 ofNaya Raipur, CG

Raipur, CG NRDA, CG 38.92

Construction of 688 EWS and 510 LIG houses dwelling unit with RCCFramed Structure under Atal Vihar Yojana at Parsada Kumhari, Disst. Durg,CG

Durg, CG CGHB 33.39

Construction of 12 HIG Type-II, 47 Sr. MIG Type-II, 57 Jr. MIG Type-II,150 LIG Type-II, & 272 EWS Type-I for Atal Vihar Yojna at Chilhati,Bilaspur, CG

Chilhati, CG CGHB 30.8

Construction of Institute of Technology Building at Korba i/c Water Supply,Sanitary fitting, Electrification with Approach Road, Korba, CG

Korba, CG PWD, Korba, CG 26.94

Page 32: PERFORM. TRANSFORM.

Synopsis of Completed Projects (4/5)

Project Location Client Value (INR Cr)

Construction of 35 HIG-I Delux Duplex, 20 HIG-II Delux Duplex, 64 HIG- II Std., 38 MIGDuplex, 7 MIG, 65 LIG (Total 229) House at Hasdev Vihar Janjgir i/c Water Supply, InternalElectrification& Balance Development Work, Korba, CG

Korba, CG CGHB 26.61

Construction of Naya Raipur Capital Complex-Lake (Rakhi) front development underConservation & Development of Water Bodies under the Head of 13th Finance Commission

Naya Raipur, CG NRDA, CG 26.02

Execution of all P. Way works (Excluding PF shelter & FOB), Supply of Ballast and misc. Civilworks i/c supply and transporting of P. Way material in ARN (Ex)-BLSN (in) section and ANMDyard of Sambalpur division of E.Co.R. in the State of Chhattisgarh, India, in connection withRaipur-Titlagarh Doubling Project.

Raipur, CG RVNL 25.1

Construction of Directorate Health Department Building at Sector 19, North Block, Naya Raipur Naya Raipur, CG NRDA, CG 23.37

Balance Civil Renovation Work for Mining Engineering, Central Library, Metallurgical & ChemicalEngineering, Civil Engineering, Electronics & Communication Engineering, MechanicalEngineering, Admin Block, Deshpande Auditorium, Electrical Substation, (Hostel 1-6), RainWater Harvesting System, Horticulture & Landscaping, Road, (Package-I) at B.I.T. Sindri,Dhanbad, Jharkhand

Dhanbad, JH Engineering Projects (I) LTD 23.04

Construction of Chhattisgarh State Judicial Academy Bhawan at High Court, Bodri, Bilaspur, CG Bilaspur, CG PWD, Bilaspur, CG 20.11

Renovation work for various building (Pkg-III) at B.I.T. Sindri, Dhanbad, Jharkhand Dhanbad, JH Engineering Projects (I) LTD 19.93

Page 33: PERFORM. TRANSFORM.

Synopsis of Completed Projects (5/5)

Project Location Client Value (INR Cr)

Construction of New Civil at Visveswaraya National Institute of Technology, Nagpur Nagpur, MH NBCC 19.81

Construction of Cement Concrete Road in KM 1 to KM 8 = 8.00 KM on Barbaspur toGodhi Road (Ring Road Korba) i/c Hume Pipe Culverts, CG

Korba, CG PWD, Korba, CG 19.31

Construction of 1 no. ROB and 5 no. RUB (full height and limited height) and alliedwork in connection with construction of New Rail Line between Mandirhasaud-Nayaraipur- Kendri, CG

Mandirhasaud- Naya Raipur-Kendri, CG SECR-Bilaspur 18.84

Supply and Stacking of balance quantity of Ballast between Titlagarh-LakhnaSection of Sambalpur Division of E.Co.R in Odisha, India, in connection with Raipur-Titlagarh Doubling.

Titlagarh-Lakhna Sec. of Sambalpur Div., OR RVNL 18.45

Construction of New Composite Building at Bilaspur, CG Bilaspur, CG PWD, Bilaspur, CG 14.82

C.G.H.B. 30 Acre Land Development Work at Urga, Dist-Korba, CG Korba, CG CGHB 12.01

Construction of Cement Concrete Road in KM 9/2 to 13/10 = 5.00 KM on Ring RoadKorba (Godhi To Risdhi), Korba, CG

Korba, CG PWD, Korba, CG 9.09

Construction of 168 (G+2) Deendayal Awas House and 84 EWS (G+2) at Kharmora,Korba, CG

Korba, CG CGHB 7.89

Construction of Girls Hostel for IIIT at Naya Raipur, CG Naya Raipur, CG NRDA, CG 7.25

Page 34: PERFORM. TRANSFORM.

Quality Policy

VISIONTo be the preferred source of quality construction services while building a most favorable and successful organization.

MISSION• To specialize in all segments of construction activities.• To provide quality project supervision and workmanship through recruitment, training and systems support.• To foster a corporate culture where our employees have a safe, respectful and rewarding work environment.• To deliver projects on schedule and on budget• To maximize the utilization of resources• To seek business opportunities that optimize our multi-disciplinary capabilities.

QUALITY STATEMENTWe are committed to providing quality work to our customers that meets the project standards and specifications for materials, workmanship,schedules while maintaining Profitability and competitiveness.We seek to achieve quality by instilling the principle of “Trust to Last” in the efforts of all levels of staff.We ensure continual improvement through quality processes which are directed by a strong management team.

Page 35: PERFORM. TRANSFORM.

HSE Policy

STATEMENT OF POLICY

It is the policy of our company to perform work in the safest possible manner consistent with the Health & Safety Act and Regulationsfor Construction Projects.

It is our belief that every employee in the construction industry is entitled to work in a safe and healthy construction environment.Every reasonable precaution shall be taken to provide such an environment.

Our goal is to eliminate or minimize the hazards that cause accidents and injuries. Any accident in this company shall be viewed as aserious matter and shall be thoroughly investigated.

POLICY COMMITMENTCopies of this policy must be posted, distributed and explained to all workers. Compliance with this policy will be reviewed regularlyat all employee levels. Violations will be recorded. Repeated disregard or willful violations of this policy by any subcontractor oremployee at any level may be considered cause for discipline in accordance with the Company Rules and existing laws.

Page 36: PERFORM. TRANSFORM.

PROJECTSGLIMPSES

If one needs to succeed in the construction industry,

one needs to be committed & pay attention to detail.

There is also a need to be resolute in one's work ethic.

Page 37: PERFORM. TRANSFORM.
Page 38: PERFORM. TRANSFORM.
Page 39: PERFORM. TRANSFORM.
Page 40: PERFORM. TRANSFORM.
Page 41: PERFORM. TRANSFORM.
Page 42: PERFORM. TRANSFORM.
Page 43: PERFORM. TRANSFORM.
Page 44: PERFORM. TRANSFORM.
Page 45: PERFORM. TRANSFORM.
Page 46: PERFORM. TRANSFORM.
Page 47: PERFORM. TRANSFORM.
Page 48: PERFORM. TRANSFORM.
Page 49: PERFORM. TRANSFORM.
Page 50: PERFORM. TRANSFORM.
Page 51: PERFORM. TRANSFORM.
Page 52: PERFORM. TRANSFORM.
Page 53: PERFORM. TRANSFORM.
Page 54: PERFORM. TRANSFORM.
Page 55: PERFORM. TRANSFORM.
Page 56: PERFORM. TRANSFORM.
Page 57: PERFORM. TRANSFORM.
Page 58: PERFORM. TRANSFORM.
Page 59: PERFORM. TRANSFORM.
Page 60: PERFORM. TRANSFORM.
Page 61: PERFORM. TRANSFORM.
Page 62: PERFORM. TRANSFORM.
Page 63: PERFORM. TRANSFORM.

APPRECIATIONCERTIFICATES

Page 64: PERFORM. TRANSFORM.
Page 65: PERFORM. TRANSFORM.
Page 66: PERFORM. TRANSFORM.
Page 67: PERFORM. TRANSFORM.

Constructing SuccessCommitted to Superior Quality, Safety and Timely Completion.

Visit us at www.dvplindia.in