Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge...

13
03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer PENSACOLA BAY BRIDGE REPLACEMENT 2 Project Location

Transcript of Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge...

Page 1: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

1

Pensacola Bay Bridge Replacement Design Build

Kerrie Harrell, P.E.

District 3 Consultant Project Management Engineer

PENSACOLA BAY BRIDGE REPLACEMENT

2

Project Location

Page 2: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

2

PENSACOLA BAY BRIDGE REPLACEMENT

3

GENERAL PROJECT INFORMATION

Replacement of the structurally deficient existing bridge

Environmental Document approval - May 2015

Key Project Elements

Repair of the existing bridge

Complete new southbound bridge construction and take existing

bridge out of service - $15,000,000 bonus achievable (860 days)

Maximum contract duration – 1770 calendar days

Maintenance of traffic

Aesthetics

PENSACOLA BAY BRIDGE REPLACEMENT

4

NEPA – Approved Central West Alignment

Page 3: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

3

PENSACOLA BAY BRIDGE REPLACEMENT

Project Requirements

Typical Sections – roadway and bridges

Dual Shared-Use Paths

5

PENSACOLA BAY BRIDGE REPLACEMENT

Roadway Project Requirements - Pensacola

6

Page 4: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

4

PENSACOLA BAY BRIDGE REPLACEMENT

Roadway Project Requirements – Gulf Breeze

7

PENSACOLA BAY BRIDGE REPLACEMENT

8

Designated Section 4(f) Property

Page 5: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

5

PENSACOLA BAY BRIDGE REPLACEMENT

9

Final Section 4(f) Impacts

PENSACOLA BAY BRIDGE REPLACEMENT

10

Improvements of Gulf Breeze Wayside Park

Page 6: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

6

PENSACOLA BAY BRIDGE REPLACEMENT

Section 7 Gulf Sturgeon Consultation

11

PENSACOLA BAY BRIDGE REPLACEMENT

NEPA – Other Species of Concern

West Indian Manatee USFWS guidelines “Standard

Manatee Conditions for In-

Water Work”

Sea Turtles USFWS guidelines “Sea Turtle and

Smalltooth Sawfish Construction

Conditions”

12

Page 7: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

7

PENSACOLA BAY BRIDGE REPLACEMENT

NEPA – Other Species of Concern

Smalltooth Sawfish USFWS guidelines “Sea Turtle and Smalltooth Sawfish

Construction Conditions”

Department will continue informal consultation with NMFS after

design information is provided in order to seek a determination of

“not likely to adversely affect” the sea turtle and smalltooth

sawfish.

13

PENSACOLA BAY BRIDGE REPLACEMENT

Maintenance of Traffic

Maintain all existing travel lanes and turn lanes

Temporary lane closure restrictions – 5:00AM to

8:00PM

Posted speed limits during construction – maintain

existing, but no lower than 10mph below

Road Ranger Service Patrols (RRSP)

Active Traffic Management

14

Page 8: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

8

PENSACOLA BAY BRIDGE REPLACEMENT

Project Aesthetic Requirements

Department Aesthetic Requirements included in the

Request for Proposal (RFP) are minimum components

Design-Build Firms encouraged to be innovative

Mandatory Alternative Technical Concept (ATC)

Aesthetics Package submittal

Horizontal alignment – tangents with minimal curvature

Scenic overlooks

17

PENSACOLA BAY BRIDGE REPLACEMENT

Aesthetics – Bridge Shapes

18

Page 9: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

9

PENSACOLA BAY BRIDGE REPLACEMENT

Aesthetics – Bridge Shapes

19

PENSACOLA BAY BRIDGE REPLACEMENT

Aesthetics – Bridge Lighting

20

Page 10: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

10

PENSACOLA BAY BRIDGE REPLACEMENT

Aesthetics – Bridge Lighting

21

PENSACOLA BAY BRIDGE REPLACEMENT

Aesthetics – Bridge Railing

22

Page 11: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

11

PENSACOLA BAY BRIDGE REPLACEMENT

Aesthetics – Retaining Wall Textures

23

PENSACOLA BAY BRIDGE REPLACEMENT

Design Build Procurement Process

Adjusted score design build – Phase I/Phase II process

10/12/15 Contract Advertisement - “cone of silence”

Letters of Interest (20pts achievable) – 5 out of 12 teams

chose to move forward to bid the project

12/09/15 - Shortlist – self-election process

Alternative Technical Concept Meetings – Aesthetics, etc…

16

Page 12: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

12

PENSACOLA BAY BRIDGE REPLACEMENT

Design Build Procurement Process

January thru March 2016 – ATC Meetings /Aesthetic ATC & Non-Aesthetic ATC submittals

May & June 2016 - Technical Proposal Submittal and Evaluations – 80 points achievable Design – 25 points achievable

Construction – 25 points achievable

Value Added – 5 points achievable

Maintainable Aesthetics – 15 points achievable

Pedestrian Features – 10 points

DBE Availability / SBE Aspirational Goals – 10% and 3% respectively

July 2016 – Price Proposal Opening Bid Price Proposal / Technical Score = Adjusted Score

Contract time – 2 bonus points achievable

August 2016 – design build contract execution

5

PENSACOLA BAY BRIDGE REPLACEMENT

Other Pensacola Bay Bridge Contracts…

Construction Engineering & Inspection (CEI) Contract –

approx. $24M

Advertisement – April 2016

Shortlist Selection – May 2016

Oral Interviews & Final Selection – June/July 2016

Execution – August 2016

Prestressed Inspection Contract – approx. $5M

Advertisement – May 2016

Shortlist Selection – May 2016

Expanded Letters of Interest review & Final Selection –

June 2016

Execution – July 2016

6

Page 13: Pensacola Bay Bridge Replacement Design Build - DMS · PDF file03/02/16 1 Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management

03/02/16

13

PENSACOLA BAY BRIDGE REPLACEMENT

INFORMATIONAL LINKS FDOT District 3 Design Build website -http://www.dot.state.fl.us/contractsadministrationdistrict3/Design%20Build/DesignBuild.shtm

FDOT Design Build Selection Results website –

http://www2.dot.state.fl.us/procurement/ProfessionalServices/advertise/desreslt.shtml#dist3

25

PENSACOLA BAY BRIDGE REPLACEMENT

CONTACTS

CEI contract

Contact Ed Hudec, District 3 Construction Engineer -

(850) 330-1617 or at [email protected]

Prestressed Inspection contract

Contact Blair Martin, District 3 Materials Engineer –

(850) 330-1249 or at [email protected]

Additional questions regarding the project

Contact Kerrie Harrell at (850) 330-1513 or at

[email protected]