Pensacola Bay Bridge Replacement Design Build
Kerrie Harrell, P.E.
District 3 Consultant Project Management Engineer
PENSACOLA BAY BRIDGE REPLACEMENT
2
Project Location
03/02/16
2
PENSACOLA BAY BRIDGE REPLACEMENT
3
GENERAL PROJECT INFORMATION
Replacement of the structurally deficient existing bridge
Environmental Document approval - May 2015
Key Project Elements
Repair of the existing bridge
Complete new southbound bridge construction and take existing
bridge out of service - $15,000,000 bonus achievable (860 days)
Maximum contract duration – 1770 calendar days
Maintenance of traffic
Aesthetics
PENSACOLA BAY BRIDGE REPLACEMENT
4
NEPA – Approved Central West Alignment
03/02/16
3
PENSACOLA BAY BRIDGE REPLACEMENT
Project Requirements
Typical Sections – roadway and bridges
Dual Shared-Use Paths
5
PENSACOLA BAY BRIDGE REPLACEMENT
Roadway Project Requirements - Pensacola
6
03/02/16
4
PENSACOLA BAY BRIDGE REPLACEMENT
Roadway Project Requirements – Gulf Breeze
7
PENSACOLA BAY BRIDGE REPLACEMENT
8
Designated Section 4(f) Property
03/02/16
5
PENSACOLA BAY BRIDGE REPLACEMENT
9
Final Section 4(f) Impacts
PENSACOLA BAY BRIDGE REPLACEMENT
10
Improvements of Gulf Breeze Wayside Park
03/02/16
6
PENSACOLA BAY BRIDGE REPLACEMENT
Section 7 Gulf Sturgeon Consultation
11
PENSACOLA BAY BRIDGE REPLACEMENT
NEPA – Other Species of Concern
West Indian Manatee USFWS guidelines “Standard
Manatee Conditions for In-
Water Work”
Sea Turtles USFWS guidelines “Sea Turtle and
Smalltooth Sawfish Construction
Conditions”
12
03/02/16
7
PENSACOLA BAY BRIDGE REPLACEMENT
NEPA – Other Species of Concern
Smalltooth Sawfish USFWS guidelines “Sea Turtle and Smalltooth Sawfish
Construction Conditions”
Department will continue informal consultation with NMFS after
design information is provided in order to seek a determination of
“not likely to adversely affect” the sea turtle and smalltooth
sawfish.
13
PENSACOLA BAY BRIDGE REPLACEMENT
Maintenance of Traffic
Maintain all existing travel lanes and turn lanes
Temporary lane closure restrictions – 5:00AM to
8:00PM
Posted speed limits during construction – maintain
existing, but no lower than 10mph below
Road Ranger Service Patrols (RRSP)
Active Traffic Management
14
03/02/16
8
PENSACOLA BAY BRIDGE REPLACEMENT
Project Aesthetic Requirements
Department Aesthetic Requirements included in the
Request for Proposal (RFP) are minimum components
Design-Build Firms encouraged to be innovative
Mandatory Alternative Technical Concept (ATC)
Aesthetics Package submittal
Horizontal alignment – tangents with minimal curvature
Scenic overlooks
17
PENSACOLA BAY BRIDGE REPLACEMENT
Aesthetics – Bridge Shapes
18
03/02/16
9
PENSACOLA BAY BRIDGE REPLACEMENT
Aesthetics – Bridge Shapes
19
PENSACOLA BAY BRIDGE REPLACEMENT
Aesthetics – Bridge Lighting
20
03/02/16
10
PENSACOLA BAY BRIDGE REPLACEMENT
Aesthetics – Bridge Lighting
21
PENSACOLA BAY BRIDGE REPLACEMENT
Aesthetics – Bridge Railing
22
03/02/16
11
PENSACOLA BAY BRIDGE REPLACEMENT
Aesthetics – Retaining Wall Textures
23
PENSACOLA BAY BRIDGE REPLACEMENT
Design Build Procurement Process
Adjusted score design build – Phase I/Phase II process
10/12/15 Contract Advertisement - “cone of silence”
Letters of Interest (20pts achievable) – 5 out of 12 teams
chose to move forward to bid the project
12/09/15 - Shortlist – self-election process
Alternative Technical Concept Meetings – Aesthetics, etc…
16
03/02/16
12
PENSACOLA BAY BRIDGE REPLACEMENT
Design Build Procurement Process
January thru March 2016 – ATC Meetings /Aesthetic ATC & Non-Aesthetic ATC submittals
May & June 2016 - Technical Proposal Submittal and Evaluations – 80 points achievable Design – 25 points achievable
Construction – 25 points achievable
Value Added – 5 points achievable
Maintainable Aesthetics – 15 points achievable
Pedestrian Features – 10 points
DBE Availability / SBE Aspirational Goals – 10% and 3% respectively
July 2016 – Price Proposal Opening Bid Price Proposal / Technical Score = Adjusted Score
Contract time – 2 bonus points achievable
August 2016 – design build contract execution
5
PENSACOLA BAY BRIDGE REPLACEMENT
Other Pensacola Bay Bridge Contracts…
Construction Engineering & Inspection (CEI) Contract –
approx. $24M
Advertisement – April 2016
Shortlist Selection – May 2016
Oral Interviews & Final Selection – June/July 2016
Execution – August 2016
Prestressed Inspection Contract – approx. $5M
Advertisement – May 2016
Shortlist Selection – May 2016
Expanded Letters of Interest review & Final Selection –
June 2016
Execution – July 2016
6
03/02/16
13
PENSACOLA BAY BRIDGE REPLACEMENT
INFORMATIONAL LINKS FDOT District 3 Design Build website -http://www.dot.state.fl.us/contractsadministrationdistrict3/Design%20Build/DesignBuild.shtm
FDOT Design Build Selection Results website –
http://www2.dot.state.fl.us/procurement/ProfessionalServices/advertise/desreslt.shtml#dist3
25
PENSACOLA BAY BRIDGE REPLACEMENT
CONTACTS
CEI contract
Contact Ed Hudec, District 3 Construction Engineer -
(850) 330-1617 or at [email protected]
Prestressed Inspection contract
Contact Blair Martin, District 3 Materials Engineer –
(850) 330-1249 or at [email protected]
Additional questions regarding the project
Contact Kerrie Harrell at (850) 330-1513 or at
26