PEMEX Exploracion y Produccion (PEP) Location: Cantarell ... Profiles/ProjectProfile... ·...

2
Contributed to Reaching PEMEX’s Total Maximum Peak Production Level of 2,295,000 bopd for the Cantarell Field. Client: PEMEX Exploracion y Produccion (PEP) Location: Bay of Campeche, Gulf of Mexico Scope: Engineering (Detailed Design). Procurement, Construction, Fabrication, Instal- lation, Commissioning, Hook-up, Installation Status: Completed 2003 Details: • The project encompasses the detail engineering design, procurement services, cosntruction, hook-up, and commissioning of the AKAL-B complex for PEP, located in the Bay of Campeche, Mexico. • This mega EPIC oil and gas project includes: Production platform Booster compression platform High-pressure compression platform Three bridge support platforms Two flare platforms Nine bridge platforms • Facilities include three major platforms; three minor platforms; two flare platforms; and nine bridges. • Includes over 140,000 HP of power-driven DLE (Dry Low Emission) gas turbines • Four generators with enough energy to supply power for 2,300 homes • Production capacity: 367,000 bopd and 664 mmscfd • Total weight: 30,000 tonnes • Topside weight: 22,216 tonnes • Tripods weight: 699 tonnes Continued on following page Cantarell EPC-22 Bay of Campeche, Gulf of Mexico

Transcript of PEMEX Exploracion y Produccion (PEP) Location: Cantarell ... Profiles/ProjectProfile... ·...

Contributed to Reaching PEMEX’s Total Maximum Peak Production Level of 2,295,000 bopd for the Cantarell Field.

Client: PEMEX Exploracion y Produccion (PEP)

Location: Bay of Campeche, Gulf of Mexico

Scope: Engineering (Detailed Design). Procurement, Construction, Fabrication, Instal-lation, Commissioning, Hook-up, Installation

Status: Completed 2003

Details:• The project encompasses the detail engineering design, procurement services,

cosntruction, hook-up, and commissioning of the AKAL-B complex for PEP, located in the Bay of Campeche, Mexico.

• This mega EPIC oil and gas project includes:

– Production platform

– Booster compression platform

– High-pressure compression platform

– Three bridge support platforms

– Two flare platforms

– Nine bridge platforms

• Facilities include three major platforms; three minor platforms; two flare platforms; and nine bridges.

• Includes over 140,000 HP of power-driven DLE (Dry Low Emission) gas turbines

• Four generators with enough energy to supply power for 2,300 homes

• Production capacity: 367,000 bopd and 664 mmscfd

• Total weight: 30,000 tonnes

• Topside weight: 22,216 tonnes

• Tripods weight: 699 tonnes

Continued on following page

Cantarell EPC-22

Bay of Campeche, Gulf of Mexico

Contributed to Reaching PEMEX’s Total Maximum Peak Production Level of 2,295,000 bopd for the Cantarell Field.

Client: PEMEX Exploracion y Produccion (PEP)

Location: Bay of Campeche, Gulf of Mexico

Scope: Engineering (Detailed Design). Procurement, Construction, Fabrication, Instal-lation, Commissioning, Hook-up, Installation

Status: Completed 2003

Details:• Flare stacks/deck weight: 455 tonnes

• Jacket weight: 7,508 tonnes

• Piling weight: 11,065 tonnes

• Pile length: 6.3 km (if laid end-to-end)

• Bridges weight: 2.978 tonnes

• Estimated length of welds required to assemble the steel: 724.2 km

Highlights:• An environmentally-sensitive program with implementation of a sour water stripper

and an oxygenation-cooling system for the produced water

• Peak Manpower 303

• 1,700,000 work-hours

Cantarell EPC-1

Bay of Campeche, Gulf of Mexico

Page 2