Pedestrian, Bike & Trails
Federal Transit Administration Federal Transit Administration
Federal Transit
Administration Federal Transit Administration Federal Transit Administration
Federal Transit Administration Federal Transit Administration Federal
Transit Administration Federal
Transit Administration Federal Transit Administration Federal Transit Administration Federal Transit Administration Federal Transit Administration Federal Transit Administration
Federal Transit Administration Federal Transit Administration
Federal Transit Administration
Federal Transit Administration Federal Transit Administration Federal
Transit Administration Federal Transit Administration Federal Transit Administration Federal Transit Administration
Ped, Bike & Trails Ped, Bike & Trails Ped, Bike
& Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails
Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails
Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails
Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped,
Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped,
Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped,
Bike & Trails Ped, Bike & Trails Ped, Bike & Trails Ped, Bike & Trails
Ped,
g
-
F:\ITS\Projects\TIP\TIP11121314\Trails20.mxd ncsser
Consult the detailed project descriptions and funding summary for further information.
3
2
1
4
µ1 0 1 2 3 40.5
Miles
Lincoln Metropolitan Planning Organization Ped, Bike and TrailsTransportation Improvement Program FY 2021 - 2024NW
70th
NW 56
th
NW 40
th
McKelvie RdNW 27
th
NW 12
th
1st 14th 27th
40th
56th
70th 84th
98th
112th
Saltillo Rd
Rokeby Rd
Yankee Hill Rd
Pine Lake Rd
Old Cheney Rd
Pioneers Blvd
Van Dorn St
A St
O St
Holdrege St
Adams St
Havelock Av
Fletcher Av
Alvo Rd
HWY 2
I-80
HWY 34I-80
#1 Rosa Parks Way Trail#2 Beal Slough Trail Project#3 Fletcher Landmark Trail#4 Wilderness Hills Trail
Existing Parks
SW 70
th
SW 56
th
SW 40
th
SW 27
th
SW 12
th
SW 1s
t
S 14th
S 27th
S 40th
S 56th
S 70th
S 84th
S 98th
S 120t
h
Trail Projects
-
AGENCY:
DIVISION:
PROJ NO PROJECT
(Map) (Location & Distance)
(Improvement Description)
(Control Number) (Project Number) (Work Phase) FS 2020-21 FS 2021-22 FS 2022-23 FS 2023-24 FS
Lower Platte South Natural Resource District
1 Rosa Parks Way Trail PE 41.6 TA1
PE 10.4 NR
ROW 17.6 TA1
ROW 4.4 NR
Construction 609.6 TA1
Construction 152.4 NR
Construction 50.0 RT
Construction 5.0 GP
CE 97.6 TA1
CE 24.4 NR
C.N. 12945 ENH-55(164) TOTAL 52.0 961.0 0.0 0.0 0.0 0.0 1,013.0
City of Lincoln Parks & Recreation Department
2 Beal Slough Trail Project PE 76.2 TA2
PE 19.1 LN
ROW 8.0 TA2
ROW 2.0 LN
Construction 698.6 TA2
Construction 174.7 LN
CE 95.3 TA2
CE 23.8 LN
C.N. 13366 TAP-55(182) TOTAL 105.3 992.4 0.0 0.0 0.0 0.0 1,097.7
3 Fletcher Landmark Trail PE 125.5 TA2
PE 31.4 LN
ROW 20.5 TA2
ROW 5.1 LN
Util 22.6 TA2
Util 5.7 LN
Construction 545.7 TA2
Construction 136.4 LN
CE 81.5 TA2
CE 20.4 LN
TOTAL 156.9 0.0 25.6 812.3 0.0 0.0 994.8
4 Wilderness Hills Trail PE 87.5 OF
Continuing the Tierra Williamsburg trail from about 37th and Yankee Hill Rd PE 21.8 LN
South approximately .75 mile where it will branch off in two segments, one ROW 27.4
leading east to an underpass of S. 40th Street, the other southwest to an Utilities 36.5
underpass of Rokeby Road. Construction 767.5
CE 109.3
TOTAL 0.0 0.0 0.0 0.0 109.3 940.7 1,050.0
Pedestrian, Bike & Trails
PRIORITY PROJECTS
COST
BEYOND
PROGRAM
PRIOR
FISCAL
YEARS
TOTAL
PROJECT
COSTS
PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000's)
Planning Area Projects
2021-2024 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA
TRANSPORTATION IMPROVEMENT PROGRAM
27th Street.
Trail project to extend southeasterly along the Beal Slough Channel from 56th Street & London
Road to 70th Street & Yankee Hill Road. The trail will be on city owned property to Pine Lake
Railroad Undercrossing trail west of 1st and J Street,900 feet long and 10 wide concrete surface.
Trail project for concrete trail to follow primarily alongside Fletcher Street from N. 14th Street to N.
Road where it will connect with an underpass at Pine Lake Road (included with the street project).
trail will continue southeast parallel to the railroad and the Beal Slough Channel, connecting to 70th
Street. Ten foot concrete trail on 20 foot right-of-way. Total 2.22 miles.
3/25/2020 G-1 Lincoln Metropolitan Planning Organization
-
AGENCY:
DIVISION:
PROJ NO PROJECT
(Map) (Location & Distance)
(Improvement Description)
(Control Number) (Project Number) (Work Phase) FS 2020-21 FS 2021-22 FS 2022-23 FS 2023-24 FS
Pedestrian, Bike & Trails
PRIORITY PROJECTS
COST
BEYOND
PROGRAM
PRIOR
FISCAL
YEARS
TOTAL
PROJECT
COSTS
PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000's)
Planning Area Projects
2021-2024 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA
TRANSPORTATION IMPROVEMENT PROGRAM
FUNDING SUMMARY
FEDERAL FUNDSCMAQ (Congestion Mitigation and Air Quality) 0.0 0.0 0.0 0.0 0.0
RTP (Recreational Trails Program) 0.0 0.0 0.0 0.0 0.0
TE (STPB - Sub-Allocation, Transportation Enhancement) 0.0 0.0 0.0 0.0 0.0
TA1 (STP-TA - State Transportation Alternatives Program) 41.6 724.8 0.0 0.0 0.0
TA2 (STP-TA - Lincoln MPO Transportation Alternatives Program) 209.7 793.9 20.5 649.8 0.0
0.0 0.0 0.0 0.0 0.0
SR (SRTS - Safe Routes to School) 0.0 0.0 0.0 0.0 0.0
251.3 1,518.7 20.5 649.8 0.0 0.0 2,440.4
STATE FUNDSNE (State Revenue / Aids) 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOCAL FUNDSNR (Lower Platte South Natural Resource District Funds) 10.4 181.2 0.0 0.0 0.0
GP (Great Plains Trail Network Private Contributions) 0.0 5.0 0.0 0.0 0.0
RT (Railroad Transportation Safety District) 0.0 50.0 0.0 0.0 0.0
LN (City of Lincoln Funds) 52.5 198.5 5.1 162.5 21.8
HIC (City of Hickman Funds) 0.0 0.0 0.0 0.0 0.0
PR (Other Private Contributions) 0.0 0.0 0.0 0.0 0.0
OF (Other Funds) 0.0 0.0 0.0 0.0 87.5
62.9 434.7 5.1 162.5 109.3 0.0 774.4
TOTAL 314.2 1,953.4 25.6 812.3 109.3 940.7 4,155.5
SUB-TOTAL LOCAL FUNDING
SUB-TOTAL FEDERAL FUNDING
SUB-TOTAL STATE FUNDING
TAC (Advanced Construction for STP-TA-Transportation Alternatives Program Funding)
3/25/2020 G-2 Lincoln Metropolitan Planning Organization
-
AGENCY:
DIVISION:
PROJ NO PROJECT
(Map) (Location & Distance)
(Improvement Description)
(Control Number) (Project Number) (Work Phase) FS 2020-21 FS 2021-22 FS 2022-23 FS 2023-24 FS
Pedestrian, Bike & Trails
PRIORITY PROJECTS
COST
BEYOND
PROGRAM
PRIOR
FISCAL
YEARS
TOTAL
PROJECT
COSTS
PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000's)
Planning Area Projects
2021-2024 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA
TRANSPORTATION IMPROVEMENT PROGRAM
STATUS OF PREVIOUS YEARS PROJECTS
Projects Completed or Under Contract
City of Lincoln Parks and Recreation Department
Stonebridge TrailPE 72.0 TA2
PE 18.0 LN
ROW 107.0 TA2
ROW 26.7 LN
Construction 642.9 TA2
Construction 160.1 LN
CE 96.4 TA2
CE 24.1 LN
Wilderness Park BridgePE 20.0 LN
PE 10.0 GP
PE 12.4 OF
Const/CE 359.6 LN
Const/CE 7.5 GP
Const/CE 20.1 OF
Design and construction of a 10' wide, concrete bicycle, pedestrian trail, connecting the North 14th
Replace Salt Creek Bridge 1/2 mile north of Saltillo Road.
Street Trail with the Alvo Road Trail. This trail will begin at North 14th Street and Humphrey Avenue
and proceed through the Stonebridge neighborhood
3/25/2020 G-3 Lincoln Metropolitan Planning Organization