Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs...

16
Washington State Department of Transportation PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation Committees Status Report Highways & Local Programs Division December 2013 Contact Information Kathleen Davis, H&LP Director, (360) 705-7871

Transcript of Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs...

Page 1: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

Washington State Department of Transportation

PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS

Legislative Transportation Committees Status Report

Highways & Local Programs Division

December 2013

Contact Information Kathleen Davis, H&LP Director, (360) 705-7871

Page 2: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY &

SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation Committee

Status Report

To meet the conditions outlined in ESSB 5024 Section 311(6), WSDOT hereby submits the attached status report for the Pedestrian & Bicycle Safety and Safe Routes to School programs.

WSDOT Highways & Local Programs, through a criteria based process, identifies cost-effective projects to improve the conditions for biking and walking. Highways & Local Programs provides technical assistance and oversight to ensure delivery of the projects.

Pedestrian & Bicycle Safety Program Since 2006, including projects awarded funding in the 2013-15 biennium, approximately $44 million in federal and state funding has been made available to 55 local agencies for 105 projects. To date, two projects were cancelled and 52 projects are complete and being utilized by the public.

The remaining 51 projects are in various stages of development from design to construction (status – underway). For recently selected projects, agencies are currently executing the agreements necessary to start the projects (status – approved). A brief description and status about each of these projects is detailed in Table 1.

Safe Routes to School Program Since 2006, including projects awarded funding in the 2013-15 biennium, over $49 million in federal and state funding has been made available to 88 local agencies for 136 projects. To date, one project was cancelled and 49 projects are complete and being utilized by the students and their families.

The remaining 87 projects are in various stages of development from design to construction (status – underway). For recently selected projects, agencies are currently executing the agreements necessary to start the projects (status – approved). A brief description and status about each of these projects is detailed in Table 2.

2

Page 3: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

3

Table 1 Active Pedestrian & Bicycle Safety Projects

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2011

Aberdeen

19

US Hwy 101 Pedestrian Crossing Safety Project

665,000

Underway

The project includes curb extensions, pedestrian lighting, crosswalks, improved routes to transit at four non-signalized intersections, brochures, local media coverage, signage and enforcement.

2011

Auburn

31

SR 164 Auburn Way South Corridor Improvement Plan

740,830

Underway

The project includes pedestrian lighting, relocating utility poles, landscaped median, mid-block crossing with flashing beacons, countdown pedestrian signal heads, pedestrian safety education campaign, and targeted enforcement.

2011

Bainbridge Island

23

Madison Avenue Non- motorized Safety Improvement Project

240,000

Underway

The project includes shoulder, sidewalk and sign improvements, ditch and storm drainage relocation, pavement repair, solar powered speed indicator signs, and education at bicycle safety fair.

2013

Bainbridge Island

23

Olympic Drive Non- Motorized Improvements

764,200

Approved

This project provides for pedestrian and bicycle improvements on Olympic Drive SE / SR305 from Winslow Way to Harborview Drive.

2009

Bellevue

41

124th Ave SE Connection to the I-90 Trail

605,000

Underway

Project includes a shared use path, a mid- block crossing, a pedestrian refuge island, improved drainage, signage, and a safety education program.

2011

Bellevue

48

Northup Way Pedestrian Crossing Safety Enhancements

355,000

Underway

The project includes crosswalks, curb ramps, signal poles, pedestrian lighting, accessible countdown pedestrian signals, curb extensions, and distribution of pedestrian safety information sheets.

2011

Bellingham

40

Indian Street Pedestrian and Bicycle Safety Project

193,000

Underway

The project includes curb extensions, curb ramps, pedestrian lighting at intersections, signage, parking removal, public awareness and education campaign, safe bicycling classes, enhanced traffic enforcement.

2011

Bellingham

40

Samish Way Pedestrian and Bicycle Safety Improvement Project

400,000

Underway

The project includes flashing beacons, pedestrian refuge islands, neighborhood public awareness and safety campaign, targeted speed and crosswalk enforcement.

2007

Bonney Lake

31

Sidewalk Extension and Safety Education Program

384,000

Underway

Project includes sidewalk and curb and gutter, targeting schools with walking and biking safety curriculum and photo enforcement.

2013

Bremerton

26

Washington Avenue/11th Street Sidewalk Connector

1,700,000

Approved

The project installs curb, gutter, sidewalks, pedestrian scale lighting, street trees, and bike lanes between 5th Street and the Manette Bridge.

2009

Buckley

31

State Route 410 and Mason Avenue Pedestrian Crossing Improvement

170,620

Underway

Project includes flashing beacons at the crosswalk, sidewalk, curb, gutter, pedestrian lighting, pavement markings, and a safety education program.

2012

Chewelah

7

Lincoln Ave Sidewalks

6,525

Underway

Project includes construction of new sidewalk from 3rd St to East of 7th St, including minor street lighting.

2012

Chewelah

7

Main St - Pedestrian and Bicycle Safety

51,555

Underway

Project includes reconstruction of roadway, new sidewalks and street lighting.

Page 4: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

4

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2013

Ellensburg

13

5th Ave Sidewalk

92,000

Underway

Construct sidewalk and ADA improvements along the north side of 5th Avenue between N Railroad Ave and N Wenas St.

2007

Everett

21

W Marine View Dr Shared Use Path

426,000

Underway

Project includes a shared use path, distribution of materials on safe pedestrian and bicycle travel and radar speed feedback signs.

2011

Everett

38

Evergreen Way (SR99) Airport Rd to 112th Street Pedestrian Safety

390,000

Underway

The project includes sidewalk reconstruction, curb ramps, speed feedback signs, bicycle detection, accessible pedestrian signals, brochures, events, additional police patrols and speed enforcement.

2011

Everett

38

North Everett Pedestrian and Bicycle Safety

410,000

Underway

The project includes curb ramps, radar speed feedback signs, bicycle detection, pedestrian accessible signals, sidewalk, educational materials, safety patrols and speed enforcement.

2013

Everett

38

Everett Downtown Streetscape Improvements - Phase II

554,520

Approved

The project constructs curb, gutter, wide sidewalk, ADA improvements, curb extensions, street trees, street furniture, pedestrian scale lighting, and bike lanes along Hoyt Avenue between Pacific Avenue and Wall Street.

2013

Fife

25

Pacific Highway E (SR 99) Pedestrian and Bicycle Safety Improvements

1,660,800

Approved

The project will construct curb, gutter, sidewalk with planter strip, and stripe a bike lane along the north side of Pacific Highway E (SR 99) between 54th Avenue E and 65th Avenue E.

2009

Jefferson County

24 Rick Tollefson Memorial Trail

441,514

Underway Project includes a shared use trail, two bridges, and a safety education program.

2013

Jefferson County

24

Quilcene Complete Streets Project

884,165

Approved

The project will construct enhanced pedestrian crossings, sidewalks on the east side, and bicycle lanes on both sides of US 101 from MP 294.5 to MP 295.0, including landscaping, pedestrian-scale lighting, design charrette-style workshops, and a video to document the project.

2011

Kent

47

Kent Kangley Pedestrian Safety Project

416,200

Underway

The project includes two pedestrian crossings, pedestrian refuge islands, flashing beacons, crosswalks, curb ramps, accessible signals, countdown pedestrian signals, pedestrian safety campaign and materials, and pedestrian enforcement patrols.

2013

King County Metro Transit

43

King County Bike Share Program Launch University District (Target Area B)

750,000

Approved

The project pays for capital costs of equipment associated with the installation of approximately 12-15 bike share stations in the University District of Seattle.

2011

Lacey

22

College Street and 22nd Avenue Traffic Calming Project

1,750,000

Underway

The project includes a roundabout, sidewalks, curb ramps, pedestrian lighting, landscaping, education program expansion, enforcement, pace car campaign.

2009

Leavenworth

12

Chumstick Highway Shared Use Trail

200,000

Underway

Project includes a shared use trail, landscaping, retaining walls, sidewalk, ADA curb ramps, striping, signs, crosswalk markings, speed feedback signs, and flashing beacons.

Page 5: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

5

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2011

Longview

19

15th Ave at Douglas and Hemlock Streets

200,000

Underway

The project includes curb extensions, curb ramps, countdown pedestrian signal heads with audible warnings, educational materials, and enhanced enforcement.

2013

Newport

7

SR 2 – 4th Street to 7th Street Non-Motorized Transportation Improvements

646,200

Underway

The project will construct curb, gutter, and sidewalk, mark crosswalks at intersections, and install bike lanes and lighting along the north side of SR 2 from 4th Street to 7th Street.

2011

Olympia

22

Cooper Point Road Pedestrian Crossing Improvement

199,520

Underway

The project includes crosswalks, pedestrian refuge island, signage, educational handouts.

2013

Omak

7

Main Street/SR 215 & SR 155 Complete Street Project

340,425

Approved

The project will construct curb extensions, install bicycle racks, construct curb, gutter, sidewalk, preserve or replace existing street trees, and install pedestrian scale lighting on SR 215 (Main Street) between 3rd Avenue W and Bartlett Avenue E,

2011

Redmond

48

SR 202 Rechannelization

400,000

Underway

The project makes channelization improvements from 4-lanes to 3-lanes with bike lanes, curb ramps, driveways and sidewalks to ADA standards, education, and targeted enforcement.

2013

Redmond

48

Redmond Central Connector Phase 2

500,000

Approved

The project constructs a paved shared-use path and modifies two railroad bridges along the former BNSF railroad corridor between the Sammamish River Trail and DigiPen Institute of Technology. The project includes ADA improvements, and installs wayfinding signs.

2006

Renton

11

SR 167/S 4th Pl to SR 900/SB Ramps to SR 405 Safety Improvements

200,000

Underway

Project improvements include the construction of sidewalks, improving the lighting for pedestrian, landscape medians, pedestrian refuge islands, planted buffer strips, benches, kiosks and transit shelters.

2007

Renton

11

Rainier Ave S/S 4th Pl Safety Improvements

230,000

Underway

Project includes pedestrian lights, signs, refuge islands, medians, replacing deficient sidewalk, informational mailer to alert area travelers and increased police patrols.

2011

Seattle

36, 37, 43, 46

2011 Pedestrian Safety Education Campaign

260,000

Underway

The project is a pedestrian safety education campaign rolled out during the holiday season, multiple media outlets, and crosswalk compliance operations.

2011

Seattle

46

Aurora Ave N and N 95 St New Signal

585,000

Underway

The project includes a traffic signal, pedestrian countdown signals, curb ramps, marked crosswalks, public awareness campaign, and crosswalk enforcement.

2011

Seattle

36, 37, 43, 46

2011 Accessible Pedestrian Signals

246,000

Underway

The project includes accessible signals and curb ramps at 14 locations, education and enforcement campaign.

2011

Seattle

37

Rainier Beach Pedestrian Improvements

275,000

Underway

The project includes rechannelization from 4-lanes to 3-lanes with bike lanes and parking, signal timing adjustments, education and enforcement campaign.

2011

Seattle

37

South Fisher Place at Rainier Ave S Sidewalk

509,000

Underway

The project includes sidewalk, pedestrian lighting, landscaping, group walks, and targeted speed enforcement.

Page 6: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

6

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2013

Seattle

34

Delridge Multimodal Path

337,000

Approved

The project will reduce the northbound lane of Delridge Way SW to provide for a shared- use path with new curb, gutter, ADA improvements, lighting, signage and crosswalks between SW Andover Street and the West Seattle Bridge Trail, and will raise the intersection of Delridge Way SW and 23rd Avenue SW to the level of the new shared-use path.

2013

Shoreline

32

Shoreline – Interurban Trail/Burke-Gilman Connectors

540,000

Underway

The project includes filling curb, gutter, and sidewalk gaps, ADA improvements, bike lanes, sharrows, wayfinding, and shared- use path connections citywide in residential and commercial areas.

2013

Snohomish

44

Centennial Trail and 2nd St Intersection Project

760,000

Underway

The project will reduce existing street pavement width, construct a shared-use path, curb, gutter and sidewalk, and install curb extensions, street lighting and a traffic signal to improve a crossing of the Centennial Trail across 2nd Street at Lincoln Avenue.

2013

Snoqualmie

5

Town Center Phase II: Pedestrian and Bicycle Improvements

1,885,000

Approved

The project will construct a shared-use path, sidewalk, pedestrian scale lighting, pedestrian crossings, and install shared lane markings and bicyclist wayfinding from SE Northern Street to SE Newton Street.

2011

Spokane

3, 6

North Division Street (US 2)

214,035

Underway

The project includes sidewalk, crosswalks, pedestrian refuge islands, public service safety segments, health benefits outreach, informational handouts, and traffic enforcement.

2011

Spokane

3

Browne St / Division St Couplet

410,000

Underway

This project includes curb extensions, pedestrian countdown signal heads, curb ramps, public service safety segments, health benefits outreach, and traffic enforcement.

2011

Spokane

3, 6

Comprehensive Education Project

116,450

Underway

The project includes a safety media campaign, materials, events, safety display, pedestrian and bicycle safety classes, mountable camera to study behavior, targeted enforcement.

2011

Spokane

3

Monroe Street

80,600

Underway

The project includes countdown pedestrian signals, public service safety segments, health benefits outreach, and traffic enforcement.

2011

Spokane

3

Nevada Street

100,460

Underway

The project includes school zone flashers, sidewalk, signage, crosswalk relocation, safety education, health benefits outreach, and traffic enforcement.

2009

Tacoma

29

Pedestrian and Bicycle Safety Crossing Signals

835,500

Underway

Project includes minor grading, conduit, new ADA curb ramps, traffic signal, pedestrian countdown timers, crosswalk markings, curb extensions, a safety education program.

2011

Vancouver

49

Mill Plain Blvd - Hybrid Pedestrian Beacons and Lead Pedestrian Intervals

499,000

Underway

The project includes two flashing signal beacons, timing adjustments, pedestrian and bicycle safety classes, public outreach, and speed enforcement.

Page 7: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

7

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2013

Wilkeson

31

Foothills Trail Extension

475,000

Approved

The project will construct a shared-use path and sidewalks, refurbish a rail trestle, stripe bike lanes, and install crossings with lighting and flashers from just south of Hill Street across Wilkeson Creek, through the Wilkeson Town Center, to Railroad Avenue/Ash Street.

2013

WSDOT Northwest Region

21

SR 104/Edmonds - Mid Block Pedestrian Crossing

465,000

Approved

The project will construct a midblock pedestrian crossing across SR 104 in the vicinity of Edmonds City Park between the intersection of Pine St and Dayton St by installing a hybrid pedestrian beacon (HAWK signal) with ADA improvements, a median traffic island with pedestrian pass- through, crosswalk striping, raised pavement markings, and signage.

TOTAL $25,560,119

Page 8: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

8

Table 2 Active Safe Routes to School Projects

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2011

Airway Heights

6

Sunset Elementary Safe Routes Grant 2010

223,692

Underway

The project includes sidewalk, flashing beacons, fence, crosswalk markings, bicycle and pedestrian safety classes, materials and events, speed feedback signs, and additional police patrols.

2011

Anacortes

40

Anacortes Safe Routes Bike and Pedestrian Safety, Education and Enforcement Improvements-Locations Vary

675,000

Underway

The project includes sidewalk, pavement markings, signage, curb extensions, bike racks, shared use path, pedestrian and bicycle safety classes, events and materials, additional police patrols.

2013

Anacortes

40

Anacortes Safe Routes to Schools - Covered Bike Parking and Mid-Block Crossing

221,000

Approved

The project includes mid-block crossing, pavement markings, flashing beacons, curb extensions, curb ramps, covered bike parking, drainage, street lighting, educational materials and events, and emphasis patrols.

2011

Auburn

47

Lea Hill Safe Walking/Cycling Route Improvements

398,500

Underway

The project includes sidewalk, bike lanes, bicycle racks, curb ramps, pedestrian countdown signal, crosswalk, public education materials, bicycle and pedestrian safety classes and events, crossing guards, increased police patrols, photo speed enforcement, and speed feedback signs.

2013

Battle Ground

18

School Zone Safety Improvements, City Wide Battle Ground

66,206

Underway

The project includes crosswalk pavement markings, rear flashing beacon strobe lights, flashing beacon, guided walk groups and crossing guards, student/parent education, and speed emphasis patrols.

2013

Bellevue

48

West Lake Sammamish Parkway Sidewalk Connection

260,000

Approved

The project includes sidewalk, curb, gutter, planter strip, educational materials and events, walking school bus, and emphasis patrols.

2007

Bellingham

42

Shuksan - Birchwood Safe Routes to School Program

780,600

Underway

Project includes a roundabout, crosswalks, pedestrian and bicycle safety education program, increased police patrols and radar speed feedback signs.

2013

Bellingham

40

Carl Cozier Safe Routes to School Program

237,300

Approved

The project includes sidewalk, curb, gutter, drainage, curb ramps, crosswalk markings and signage, curb extensions, flashing beacons, bicycle racks, educational materials and events, increased school zone crosswalk and speed emphasis patrols.

2007

Bonney Lake

31

Bonney Lake Shared use path & Sidewalk Extension

1,098,000

Underway

Project includes a shared use path, sidewalk, pedestrian bridge, safety promotion activities, distribution of educational materials, photo enforcement and increased police patrols.

2013

Brewster

12

Ferry Street Safety Improvements

282,700

Approved

The project includes sidewalk, curb, gutter, curb ramps, street lights, drainage, flashing beacons, and emphasis patrols.

2009

Carnation

5

Pedestrian Improvements on Tolt Avenue (State Route 203) at Elementary

148,000

Underway

Project includes flashing beacons, speed feedback sign, overhead “crosswalk” sign, pedestrian and bicycle safety education and events and increased police patrols.

Page 9: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

9

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2011

Castle Rock

20

Castle Rock's Safe Routes to School Improvements

322,000

Underway

The project includes sidewalk, path, crosswalk with signal, signage, shelter, pedestrian and bicycle safety classes, events and materials, crossing guards, photo speed enforcement, crosswalk enforcement and additional police patrols.

2011

Centralia

20

Centralia 2010 School Safety Enhancement Program

297,750

Underway

The project includes school zone signs, crosswalk in-ground flashing beacons, pedestrian and bicycle safety classes, maps, public service announcements, additional police patrols.

2011

Chelan

12

Bradley Street - Morgen Owings Elementary to Gibson Ave

423,413

Underway

The project includes shared use paths, on street parking, narrow/reduce travel lane width, planter strips, bike racks, crosswalks, curb extensions, flashing beacons, pedestrian and bicycle safety classes and materials, parent education, additional police patrols and crossing guards.

2013

Clark County

49

Sacajawea Elementary Pedestrian Safety

302,000

Underway

The project includes sidewalk, curb, gutter, crosswalk pavement markings, crossing guard safety equipment, walking school bus program, educational materials and events, speed feedback signs and emphasis patrols.

2013

Edmonds

32

Madrona Elementary Walkway Project

494,000

Approved

The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, educational materials and events, and emphasis patrols.

2013

Edmonds

32

15th St. SW from Edmonds Way (SR-104) to 8th Ave. S

374,000

Underway

The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, bicycle rack, educational materials and events, and emphasis patrols.

2013

Edmonds

32

238th St. SW from 100th Ave. W to 104th Ave. W

591,000

Underway

The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, bicycle rack, educational materials and events, and emphasis patrols.

2009

Everett

38

Horizon Elementary School Walk Route Safety

415,000

Underway

Project includes overhead school zone signs, speed feedback signs, pedestrian countdown signal heads, lighting, pedestrian and bicycle safety education, and increased police patrols.

2013

Everett

38

Hawthorne Elementary Safe Routes to School

256,000

Underway

The project includes sidewalk, curb, gutter, crosswalk markings, curb ramps, flashing beacon, educational materials and events, and speed emphasis patrols.

2011

Federal Way

30

Mark Twain Elementary - Safe Routes to School Program

386,057

Underway

The project includes walkway, school zone signs, crosswalk markings, flashing beacons, curb ramps, walk and bike to school day events and materials, crosswalk enforcement, and speed feedback signs.

2011

Federal Way

30

Lakota Middle School- Safe Routes to School Program

1,039,080

Underway

The project includes a traffic signal, pedestrian countdown signals, pavement markings, curb ramps, sidewalk, planter strip, bike lanes, lighting, bicycle and pedestrian safety classes, events and materials, and crosswalk enforcement.

Page 10: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

10

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2013

Federal Way

30

Lakota Middle School - 13th Avenue SW Sidewalk Connection

270,119

Approved

The project includes sidewalk, curb, gutter, curb ramps, school zone flashing beacons, website article, press release, assembly with in classroom follow up discussion, educational materials, pedestrian decoy operation, and school zone speed enforcement.

2013

Federal Way

30

Federal Way Pedestrian Connection

775,000

Underway

The project includes sidewalk, curb, gutter, curb ramps, planter strips, sharrow markings, street lights, roundabout, and flashing beacons.

2012

Jefferson County

24

SR 19 Pedestrian Crossing Improvement, Trail Connection, and Student Encouragement Project

438,669

Underway

The project includes multi-use path, flashing beacons, signage, bike racks, parent and student pedestrian and bicycle safety classes, events and materials, and crosswalk enforcement.

2009

Kirkland

45, 48

Making the Connection

498,000

Underway

Project includes sidewalk, pedestrian safety education and events, radar speed feedback trailer and increased police patrols.

2011

Kirkland

48

Peter Kirk Elementary

456,600

Underway

The project includes sidewalk, curb ramps, crosswalk, bike racks, maps, walk to school day events and materials, and increased police patrols.

2011

Kirkland

48

Lakeview Elementary

348,000

Underway

The project includes sidewalk, crosswalk, flashing beacons, curb ramps, bicycle racks, bicycle and pedestrian safety classes, and additional police patrols.

2013

Lake Forest Park

46

NE 178th Street Sidewalk Improvements

569,000

Approved

The project includes sidewalk, curb, gutter, curb ramps, removal of guardrail, curb extensions, crosswalk markings, flashing beacons, signage, bike lanes, bicycle racks, educational materials and events, and crossing guard equipment.

2011

Lakewood

29

Dower Elementary - Safe Routes to School Project

257,000

Underway

The project includes sidewalk, curb ramps, flashing beacons, walk to school day events and materials, maps, and additional police patrols.

2011

Leavenworth

12

Cascade School District Safe Routes Program

338,000

Underway

The project includes sidewalk, curb ramps, signage, pavement markings, intersection re-alignment, no parking zones, school zone flashing beacons, pedestrian and bicycle safety seminars, crossing guard training, flagger safety classes, bicycle safety education, walking school bus, radar speed feedback signs and additional police patrols.

2011

Longview

19

Washington Way at 28th Avenue

150,000

Underway

The project includes in-pavement flashing beacons, curb ramps, pedestrian crossing audible warning, educational materials, in- classroom pedestrian safety education, increased enforcement, and photo enforcement.

2013

Lynden

42

Jim Kaemingk Sr. Trail Extension

273,000

Underway

The project includes shared use path, sidewalk, curb, gutter, planter strip, speed feedback signs with flashing beacons, and educational materials and events.

2011

Lynnwood

32

Creating Walking and Cycling Paths in Lynnwood

250,000

Underway

The project includes sidewalk, curb ramps, bike lanes, crossing flags, lighting, flashing beacons, pedestrian and bicycle safety classes and events, extra police patrols and crosswalk enforcement, and speed feedback signs.

Page 11: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

11

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2011

Mount Vernon

10, 40

Mount Vernon Safe Routes to School 2010

308,100

Underway

The project includes sidewalk, speed zone signs, narrow/reduce travel lanes, bike lanes, on street parking, crosswalk, pedestrian safety education events and materials, bicycle safety instruction equipment, parent education, drivers safety education classes, public service announcements, extra police patrols, and crossing guards.

2013

Mount Vernon

10, 40

Bike Walk Mount Vernon 2013

389,500

Approved

The project includes bike lanes, a bike signal, a trail crossing improvement, a roundabout, and enforcement.

2011

Mountlake Terrace

1

54th Avenue West Sidewalk Improvement Project

330,304

Underway

The project includes sidewalk, curb ramps, bicycle safety classes, speed feedback signs, increased police patrols, and crossing guards.

2009

Oak Harbor

10

Safe Routes to Oak Harbor Schools

339,925

Underway

Project includes sidewalk, flashing crosswalk beacons, bicycle racks, bike route designation, signs, bicycle and pedestrian safety education, School Share, increased police patrols, and radar speed feedback trailer.

2009

Ocean Shores

24

Ocean Shores Safe Routes to School Program (State Route 115)

635,000

Underway

Project includes a sidewalk, crosswalks, school zone flashing beacons, pedestrian and driver safety education and neighborhood watch program.

2011

Olympia

22

Garfield Elementary School, Safe Walking Routes

58,700

Underway

The project includes school speed zone signs, flashing beacons, bicycle racks, bicycle education equipment, walk and bike to school day events and materials, maps, health education, public service announcements, neighborhood speed watch, and extra police patrols.

2013

Olympia

22

22nd Avenue Sidewalk Project

1,076,000

Approved

The project includes sidewalk, planter strip, education materials and events, walking school bus.

2013

Port Townsend

24

Sheridan Street Sidewalk and Crossing Improvements

497,913

Approved

The project includes sidewalk, curb, gutter, curb extensions, planter strips, crosswalk markings, signage, educational materials and events, and emphasis patrols.

2011

Poulsbo

23

North Kitsap Schools Poulsbo Campus Complex Safe Routes Program

298,000

Underway

The project includes sidewalk, curb ramps, bicycle lane, narrow/reduce travel lane width, flashing beacons, pedestrian railing, pavement markings, walk and bike to school day events and materials, maps, speed feedback signs, and additional police patrols.

2007

Puyallup

25

Wildwood Park Elementary School Safety Improvements

245,650

Underway

Project includes improving a pedestrian path, crosswalk, signs, walking school bus, bicycle safety program, school walk route map, outreach program, increased police patrols and citizen's patrol and traffic hotline.

2013

Puyallup

25

Meeker Elementary, Aylen Junior High and Stewart Elementary School Crosswalk Improvements

210,000

Underway

The project includes flashing beacons, street lights, curb ramps, educational materials and events, and speed emphasis patrols.

2013

Quincy

13

Quincy Valley K-7 Pathway

292,000

Underway

The project includes shared use path, bollards, enclose irrigation ditch, fencing, landscaping, bicycle racks, educational materials and events, walking school bus, adult crossing guard equipment, and emphasis patrols.

Page 12: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

12

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2007

Redmond

48

Traffic & Pedestrian Improvements

350,000

Underway

Project includes traffic signals, pavement markings, bike lanes, pedestrian safety campaigns, announcements, changes to the driver’s education program and increased police patrols.

2009

Seattle

11

2009 Focus School, Concord Elementary School

315,150

Underway

Project includes sidewalk, planter strips, pedestrian and bicycle safety education and event, increased police patrols, speed feedback signs, and evaluation.

2011

Seattle

37

Hawthorne Hike and Bike

132,000

Underway

The project includes chicanes, pedestrian crossing flags, bike racks, pedestrian and bicycle safety education and encouragement materials and events, maps, additional police patrols, and speed feedback sign.

2011

Seattle

34

Roxhill Elementary - Feet, Food and Fitness

564,000

Underway

The project includes sidewalk, curb ramps, curb extensions, parent and teacher education, bicycle and pedestrian safety classes, materials, and events, public service announcements, additional police patrols, and speed feedback sign.

2011

Seattle

37

Dearborn Park Elementary School Sidewalk

587,000

Underway

The project includes sidewalk, planter strip, curb ramps, walk and bike to school day events and materials, additional police patrols, and speed feedback sign.

2011

Seattle

46

Olympic Hills Elementary Sidewalk

424,500

Underway

The project includes sidewalk, planter strip, bicycle and pedestrian safety classes, walk to school day events and materials, parent and teacher safety education, additional police patrols, and radar speed gun spot speed study.

2013

Seattle

37

Beach Square Safe Routes to School

248,000

Approved

The project includes school speed zone signage, flashing beacons, crosswalk markings and stop bar, pedestrian refuge island, curb extensions, street lighting, pedestrian countdown signals, educational materials and events, and speed control campaign.

2013

Seattle

36

Greenwood Neighborhood Greenways Go to School

153,000

Approved

The project includes curb extensions, rectangular rapid flashing beacons, educational materials and events, speed enforcement, speed feedback signs, and a speed control campaign.

2013

Seattle

46

Wedgwood Elementary Children and Neighbors

439,000

Approved

The project includes sidewalk, curb, gutter, planter strip, drainage, educational materials and events, speed feedback signs, and emphasis patrols.

2013

Seattle

11

Beacon Hill Neighborhood Greenways Go to School

597,000

Approved

The project includes a shared use path, educational materials and events, and a speed control campaign.

2013

Sedro Woolley

39

SR9 Pedestrian/Bicycle Safety Improvements

300,000

Underway

The project includes sidewalk, curb, gutter, bike lane, stormwater improvements, educational materials and events, emphasis patrols.

2012

Sedro-Woolley

39

SR9 Pedestrian/Bicycle Safety Improvements Project

400,000

Underway

The project includes sidewalk, bike lanes pedestrian safety education for children in grades 1-4 and additional police patrols.

2013

Shelton

35

Evergreen Elementary Safe Routes to School Program

497,700

Approved

The project includes sidewalk, curb, gutter, curb ramps, curb extensions, signage, educational materials and events, walking school bus, speed feedback signs, crossing guard equipment and emphasis patrols.

Page 13: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

13

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2013

Shoreline

32

Einstein Safe Routes

435,000

Approved

The project includes sidewalks, curb, gutter, curb ramps, educational materials and events, and emphasis patrols.

2013

Spokane

6

Hamblen Elementary School

592,232

Underway

The project includes sidewalk, curb, gutter, planter strips, curb ramps, educational materials and events, and emphasis patrols.

2013

Spokane

6

Westview Elementary School

555,935

Underway

The project includes, curb, gutter, planter strip, curb ramps, educational materials and events, and increased traffic patrols

2011

Spokane County

7

Northwood Middle School and Farwell Elementary School Safety Project

373,794

Underway

The project includes a traffic signal, crosswalks, sidewalk, pedestrian and bicycle safety classes, events and materials, maps, public service announcements, additional police patrols and crosswalk enforcement.

2011

Spokane County

4

Pasadena Park Elementary School Pathway Project

451,992

Underway

The project includes sidewalk, crosswalk, flashing beacons, bike racks, pedestrian and bicycle safety classes, events and materials, parent education, additional police patrols, and crosswalk enforcement.

2012

Spokane County

6

Prairie View Elementary School Sidewalk Project

408,465

Underway

The project includes sidewalk with curb, sidewalk with seperation/planter strip, crosswalk markings, signage, parent education, pedestrian and bicycle safety classes, events and materials, maps, additional police patrols, crosswalk enforcement, and crossing guards.

2012

Spokane Valley

4

Wellesley Ave Sidewalk and Adams Road Sidewalk

635,000

Underway

The project includes sidewalk, curb extensions, curb ramps, pedestrian and bicycle safety classes, additional police patrols, crossing guards, and crosswalk enforcement.

2013

Stanwood

10

Cedarhome Elementary Safe Routes to School

171,750

Approved

The project includes sidewalk, curb, gutter, planter strip, parking lane, educational materials and events, speed feedback signs, and emphasis patrols.

2013

Swinomish Indian Tribal Community

10

Swinomish to La Conner Safe Routes Project

744,610

Approved

The project includes sidewalk, curb, gutter, bicycle lanes, signage, sharrow markings, crosswalk markings including stop bars, flashing beacons, bicycle and pedestrian safety education training, crossing guard training, speed feedback signs and emphasis patrols.

2011

Tacoma

27

Sheridan Elementary - Safe Routes to School Project

379,960

Underway

The project includes sidewalk, curb extensions, curb ramps, bike racks, educational materials, maps, walk and bike to school day events and materials, additional police patrols, speed feedback sign, and neighborhood speed watch.

2012

Tukwila

11

Cascade View Elementary Safe Routes Demonstration Program

427,588

Underway

The project includes multi-use path, assembly, walk to school event and walking school buses.

2013

Tukwila

11

Thorndyke Elementary Safe Routes to School Application

457,000

Underway

The project includes sidewalk, curb, gutter, drainage, widen road to 10 ft., walking school bus, educational materials, maps and events.

Page 14: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

14

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2009

University Place

28

40th Street Sidewalk Gap Project

697,000

Underway

Project includes sidewalk, lighting, bike lanes, speed feedback signs, school zone signs, pedestrian and bicycle education and events, and increased police patrols.

2009

University Place

28

Grandview Drive Improvement Project

782,000

Underway

Project includes bike lanes, sidewalk, speed feedback signs, flashing crosswalk mast arms signs, lighting, pedestrian and bicycle education and events, and increased police patrols.

2011

University Place

28

Beckonridge Drive Safe Routes to School Project

830,000

Underway

The project includes sidewalk, lighting, planter strip, curb ramps, flashing beacon, pavement markings, signage, maps, pedestrian and bicycle safety materials and events, increased police patrols and speed feedback signs.

2011

University Place

28

27th Street Safe Routes to Schools Project

910,000

Underway

The project includes sidewalk, pedestrian lighting, planter strip, curb ramps, signal, pavement markings, signage, maps, pedestrian and bicycle safety education events and materials, additional police patrols and speed feedback signs.

2013

University Place

28

56th Street Safe Routes to Schools Project

464,000

Approved

The project includes sidewalk, curb, gutter, street lights, curb ramps, crosswalk markings, signage, pedestrian refuge island, educational materials and events, speed feedback signs, and emphasis patrols.

2013

University Place

28

44th Street Safe Routes to Schools Project

820,000

Underway

The project includes sidewalk, curb, gutter, bike lane, street lights, curb ramps, signage, educational materials and events, speed feedback signs and emphasis patrols.

2013

University Place

28

Cirque Drive Safe Routes to Schools Project

1,040,000

Underway

The project includes sidewalk, curb, gutter, bike lane, planter strip, street lights, crosswalk markings, signalized crosswalks, curb ramps, educational materials and events, speed feedback signs and emphasis patrols.

2013

Vancouver

17

Endeavour Elementary Pathway and Safety Improvement Program

209,654

Underway

The project includes a shared use path, educational materials and events, speed feedback sign, and emphasis patrols.

2006

Vashon Island School District

34

Safer Walking & Bicycling Routes for Students, McMurray Middle & Chautauqua Elementary Schools

236,500

Underway

Project includes sidewalks, crosswalks, signage, lighting, bicycle racks, bicycle safety program, pedestrian/pedometers program, and speed feedback trailers.

2013

WA State Dept of Health

N/A

State Student Travel Survey

173,052

Approved

Project conducts a statewide student travel survey to support state, regional and local project development and performance measurement.

2013

WA State Office Superintendent of Public Instruction (OSPI)

N/A

Safe Routes to School Bicycle & Pedestrian Safety Education Program

500,000

Approved

The project includes a shared use path, educational materials and events, speed feedback sign, and emphasis patrols.

2011

Walla Walla County

16

Safe Routes to Prospect Point Elementary School

330,000

Underway

The project includes shared use path, sidewalk, bike lanes, curb extensions, curb ramps, speed tables, pavement markings, signage, retaining wall, pedestrian and bicycle safety classes, materials, and events, parent education, speed feedback signs, crossing guards, and crosswalk enforcement.

Page 15: Pedestrian and Bicycle Safety and Safe Routes to School ......WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation

15

Award Year

Location Leg

District

Project Title Award

Amount

Status

Project Description

2013

Washougal

18

Jemtegaard Trail Improvements

599,305

Approved

The project includes multi-use path, pedestrian bridge, sidewalk, curb, gutter, walking and biking mobility and safety trainings, staff and volunteer training, active transportation mentor/role model project, bicycle and pedestrian education materials, encouragement activity, incentives, bicycle parking, increased traffic patrols, and pedestrian decoy crosswalk operations.

2013

Wenatchee

12

Okanogan and Red Apple Road Sidewalk and Pedestrian Enhancements

354,420

Approved

The project includes sidewalk, curb, gutter, crosswalk signs, pavement markings, curb ramps, flashing beacons, speed feedback signs, walking school bus, crossing guard equipment, educational materials and events, and emphasis patrols.

2013

Woodland

20

South Woodland Safe Walking Route

306,473

Underway

The project includes sidewalk, curb, gutter, crossing improvements, crossing guards, and walking school bus program.

2013

Yakima

14

West Valley Middle School Vicinity Improvements

544,000

Approved

The project includes sidewalk, curb, gutter, drainage, traffic signal, pedestrian safety and crosswalk public service announcements, television, radio and print media efforts, and pedestrian crosswalk decoy operation.

TOTAL $ 38,032,858