Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94...

52
"Pecan Street Project Preliminary Study Results" Carnegie Mellon University http://www.atmtxphoto.com/ Roger Duncan Sept. 12, 2012

Transcript of Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94...

Page 1: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

"Pecan Street Project Preliminary Study Results" Carnegie Mellon University

http://www.atmtxphoto.com/

Roger Duncan Sept. 12, 2012

Page 2: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Pecan Street Inc.

Page 3: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Pecan Street Inc. • Incorporated in August 2009

• Non-profit, 501 (c)(3)

• Founding Partners fill board positions

• Grant and member funded

• 10 staff, headquartered at UT’s West Pickle Research Building

Page 4: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1
Page 5: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Where is the Smart Grid?

Pecan Street offices

Pecan Street‘s Smart Grid (Mueller Community)

Ctr. for Electromechanics

pecanstreet.org

Page 6: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

• 711 acre mixed use

• 3 miles from Texas Capitol

• all new green-built buildings

• world’s first LEED platinum hospital

• reclaimed water system

Austin’s Mueller Community

• native landscaping

• includes 25% affordable housing

• Mueller Megawatt program

• experience with rooftop solar leasing

Page 7: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

energy storage

dynamic pricing

smart appliances

green building

distributed solar

smart grid water

demand response

electric vehicles

built on Austin’s advanced smart grid platform

Smart Grid Demonstration at Mueller

Page 8: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Home Energy Management System

• Management of pricing models

• Integrate gas, electric, and water

• Integrate solar, storage, and electric vehicle charging

• Diagnostics

Page 9: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Plug In Hybrids & Electric Cars

• Highest concentration of EVs in US

• Chevy, Nissan, Mitsubishi

• Level 2 chargers

• Integrated with solar and storage

Page 10: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Residential Solar • 75% of participating homes with solar, west and south

• Integrate with storage, electric vehicles and energy management systems

• Test impact on grid

Page 11: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1
Page 12: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1
Page 13: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1
Page 14: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Overview

• West versus South PV Generation – 2011-12-21 to 2012-06-20 split array data

• Actual, all West, all South • Consumption and Impact on grid

– A hypothetical typical year and ongoing research

Page 15: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Granularity Comparison August 10, 2011: 1-hour Consumption Data (kW)

Page 16: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Granularity Comparison August 10, 2011: 15-minute Consumption Data (kW)

Page 17: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Granularity Comparison August 10, 2011: 1-minute Consumption Data (kW)

Page 18: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1
Page 19: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

19

August average Whole-home electricity usage (kW)

Consumption

Page 20: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

20

August average Whole-home electricity usage and generation (kW)

Consumption and PV

Page 21: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

21

August average Whole-home usage and modeled generation(kW)

Consumption, South PV, West PV

Page 22: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

22

August average Whole-home net electricity usage (kW)

No PV, South PV, West PV

Page 23: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

23

September average Whole-home net electricity usage (kW)

No PV, South PV, West PV

Page 24: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

24

October average Whole-home net electricity usage (kW)

No PV, South PV, West PV

Page 25: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

25

November average Whole-home net electricity usage (kW)

No PV, South PV, West PV

Page 26: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

26

December average Whole-home net electricity usage (kW)

No PV, South PV, West PV

Page 27: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Overview

• West versus South PV Generation – A sample house-day – 2012-12-21 to 2012-06-20 split array data

• Actual, all West, all South • Consumption and Impact on grid

– A hypothetical typical year and ongoing research

Page 28: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Overview

• West versus South PV Generation – A sample house-day – 2012-12-21 to 2012-06-20 split array data

• Actual, all West, all South • Consumption and Impact on grid

– A hypothetical typical year and ongoing research

Page 29: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1
Page 30: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

• Chris Holcomb • [email protected]

Page 31: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Impact of PVs and EVs on Distribution Transformers:

A first Look

Center for Electromechanics Pecan Street, Inc.

IEEE Photovoltaic Specialists Conference June 3 – 8, 2012 Austin, Texas Workshop Session Dr. Fabian Uriarte

Center for Electromechanics University of Texas at Austin

Page 32: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Electrical Distribution

Mueller Community, Austin, Texas

•735 homes (so far)

•94 transformers

•200 solar panels

•100 electric vehicles

Subtransmission 69 kV

Feeder

T130 MVA

Lateral

Phase APhase B

Phase C

12.47 kV 12.47 kVSubstation

T230 MVA

Mueller Community

Circuit 1 Circuit 2 Circuit 3

Circuit 4

Circuit 5

CapacitorBank

Page 33: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Each Transformer’s Load*

120/240V

7.2 kV

*One possible combination

Homes per transformer: Maximum: 11 Mode: 8 Minimum: 4

Page 34: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Case Study: 24 hrs in 1 min intervals

Center for Electromechanics

*EV charging randomizes 3 variables: oPlug-in time (>4 PM) oCharge rate (0.9, 1.4, 3.3 kW) oCharge duration

Page 35: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Pecan Street Data Pool

•>100 homes being measured (load and PV generation) •1 minute intervals •Measurements start on different dates

•24 hrs of data per CSV file •Everyday a new CSV file is created

(awaiting next data dump)

Page 36: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

PV Generation

Real Data

0.5 - 1 MW of distributed PV generation daily

Page 37: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

EV Penetration

Mix of 120 V and 240 V charging > 4 PM

Page 38: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Transformer Utilization

•High PV/Load ratio causes reverse flows •Can increase or decrease xfm. utilization

Page 39: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Change in Transformer Utilization

•*before: 25%, after: -5%, change = |after|-before = -20%. •Sign indicates direction of real power

No change

PVs produce 23% increase

PVs produce 20% decrease*

EVs produce 2% increase

0.45x previous usage

5.8x previous usage#

0.3x previous usage

# |after|/before = |-58%|/10% = 5.8x

Page 40: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Lateral Demand

0 4 8 12 16 20 240

5

10

15x 10

5

Powe

r

Hours

3-phase Power

0 4 8 12 16 20 240

0.2

0.4

0.6

0.8

1

1.2

Powe

r Fac

tor (

PF)

S (kVA)P (kW)Q (kVar)PF

•0.5 MW reduction in real power demand •Equal reactive power demand •Power factor drops

After PVs and EVs

0 4 8 12 16 20 240

5

10

15x 10

5

Powe

r

Hours

3-phase Power

0 4 8 12 16 20 240

0.2

0.4

0.6

0.8

1

1.2

Powe

r Fac

tor (

PF)

S (kVA)P (kW)Q (kVar)PF

Before PVs and EVs

From here

Vars

Watts

VA

PF

Vars

Watts

VA PF

Page 41: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Conclusions Center for Electromechanics

Simulation Model We have real data in 1-min. intervals

For house load For house PV generation

Can simulate entire smart grid (735 homes) Confidence in results Simulations highlight areas needing

attention Transformers

Some operating at 80% Avg. losses per transformer = 120 W Show enough capacity to meet EV load (at

Mueller only) Low diurnal power factor

Residential Solar Panels

Cause reverse transformer flows

Reduces lateral and transformer power factor

Provide voltage support

Homes require reactive power (cannot detach from grid)

Residences getting reactive power from utility; diurnal real power from PVs

Electric Vehicles (Chevy Volts)

Uncontrolled charging exacerbates peak demand

Electrical impact appears small due to transformer sizing

Page 42: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Community Energy Storage: A 7-day Forecast

Jul. 2012 - Austin, Texas

Dr. Fabian Uriarte Dr. Robert Hebner Center for Electromechanics

Page 43: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Electrical Distribution

Mueller Community, Austin, Texas

•735 homes

•94 transformers

•200 solar panels

•100 electric vehicles

Subtransmission 69 kV

Feeder

T130 MVA

Lateral

Phase APhase B

Phase C

12.47 kV 12.47 kVSubstation

T230 MVA

Mueller Community

Circuit 1 Circuit 2 Circuit 3

Circuit 4

Circuit 5

CapacitorBank

Community energy storage at 1 xfm.

Page 44: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Community Energy Storage (CES) Assumptions*

AC configuration

Data set: Jul 2011

No electric vehicles

Residential reactive power

assumed (not measured)

Battery provides real power

only

Generic battery model used

*Assumptions are for the initial simulation. So, they define the starting points but are not a constraint on the approach

Page 45: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Battery Control Strategies • Charge

a. When transformer load is low (< 30 kW) b. When sun is out (PV > 5 kW) c. When SOC reaches 10 % d. Charge logic: (a OR b) AND c

• Discharge a. When PV output fluctuates b. When transformer load is high (≥ 30 kW) c. When SOC reaches 90 % d. Discharge logic: (a OR b) AND c

Page 46: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Simulation Model

•Easy to experiment with different battery sizes and charge rates •Control schemes can be modified

Page 47: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Residential and PV Input Data Residential load does

not reach transformer capacity

More energy consumed than produced by PV

Reactive power is assumed

Fluctuations shown in 1-min intervals Real PV data recorded

from 5 kW PV (scaled to estimate 25 kW PV data)

Transformer Load

PV generation

Page 48: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Simulation Results (25 kWh) 30 kW is considered high demand here

Observations: •Battery typically charges between 3-9 PM (except Tuesday) •Battery not available some evenings (e.g., Sat, Sun) •Intermittent peak load interrupts (delays) battery charging

Sun ●12-5a: battery charges ●11a-5p battery supports PV + residential load ●5p-12a: battery charges (with interruptions)

Mon ●9-11a: battery supports PV ●11a-2p: battery charges ●2-6p: battery supports PV + residential load

Tue ●9a-2p: battery supports PV + load ●2-10p: battery charges ●10p-12a: battery supports residential load

Page 49: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Larger Battery, Same Control 100 kWh 25 kWh

•Battery available most evenings •Less frequent charging (2x week) •Batter available when needed •More charging power

•Battery not available most evenings •Prolonged PV support discharges battery fast and forces daytime recharging •Battery not available when needed

Page 50: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Conclusions Center for Electromechanics

50 kVA transformer oversized load leveling support not

needed PV

great for battery charging fluctuation support not

necessary 25 kWh battery

low availability daily charging small for 8 homes

100 kWh battery

less frequent charging larger charging power better load support

Additional uses Flicker and outage support Time-of-use support in

locations with rate structures

Page 51: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Questions

Dr. Fabian Uriarte

[email protected]

Dr. Robert Hebner [email protected]

Center for Electromechanics The University of Texas at Austin utexas.edu/research/cem

10100 Burnet Road, Austin, TX

Hours

Tran

sfor

mer

#

Transformer Load (%-VA) (w/PVs & EVs)

Circuit 1

Circuit 2

Circuit 3

Circuit 4

Circuit 5

0 4 8 12 16 20 24

10

20

30

40

50

60

70

80

90

-40%

-20%

0%

20%

40%

60%

80%

Center for Electromechanics

Hours

Tran

sfor

mer

#

Secondary Voltages (w/PVs & EVs)

Circuit 1

Circuit 2

Circuit 3

Circuit 4

Circuit 5

0 4 8 12 16 20 24

10

20

30

40

50

60

70

80

90

230V (95.8%)

235V (97.9%)

240V (100%)

245V (102.1%)

0 4 8 12 16 20 240

5

10

15x 10

5

Powe

r

Hours

3-phase Power

0 4 8 12 16 20 240

0.2

0.4

0.6

0.8

1

1.2

Powe

r Fac

tor (

PF)

S (kVA)P (kW)Q (kVar)PF

Page 52: Pecan Street Project Preliminary Study Results€¦ · Austin, Texas •735 homes •94 transformers •200 solar panels •100 electric vehicles . Subtransmission 69 kV Feeder T1

Questions?