PE15 FP KING EDWARD PARADE DEVONPORT BEACH
Transcript of PE15 FP KING EDWARD PARADE DEVONPORT BEACH
PE15PE15
PE14
IRV
WTM
LP
LP
DRP
PLAQUE
CONP
MH
CP
NAME BOARD
BENCH
BRK
CO
NB
FP
FP
RB
PWR
BEN
CH
BEN
CH
BEN
CH
WO
OD
EN B
RID
GE
CO
NC
RET
E
RAM
P
STEP
S
DRP
DRP
DRP
FP ASPHALT
FLG
FLG
WTR
CYCLE
LPSM
LP
FP
KING EDWARD PARADE
DEV
ON
POR
T BE
ACH
SW
SW
SW
SW
SW
SW
SW
SW
SWSW
SWSW
PE07PE09
PE01
PE10
PE11
PE08
PE13
PE14
PE02
PE02
PE06
PE02
PE02
PE02
PE03
PE04
PE05
PE02
PE06
PE02
PE08 PE08
PE10
PE12
▲ JOINS SHEET L411 ▲ ▲ JOINS SHEET L411 ▲
PE15
PE15
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:39:30 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L400.dwg L410
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
GENERAL ARRANGEMENTSHEET 01 OF 02
DRAFT FOR COMMENT
3-AL186.00 L410 A
C Hamilton / T Jones C Hamilton 30.11.2017
T Jones 1:100 A1 | 1:200 A3
Designed
mm1:100
0@ A1@ A31:200 2000 4000 6000 8000 10000
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
PE15
PE15PE15
PE14
MH
SGN
CP
CP
FP
LP
PWR
CHM
SM
FP
RCY
RB
BEN
CH
BEN
CH
WO
OD
EN B
RID
GE
DRP
DRP
KING EDWARD PARADE
FP
TK
DEV
ON
POR
T BE
ACH
▼ JOINS SHEET L410 ▼ ▼ JOINS SHEET L410 ▼
mm1:100
0@ A1@ A31:200 2000 4000 6000 8000 10000
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:39:34 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L400.dwg L411
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
GENERAL ARRANGEMENTSHEET 02 OF 02
DRAFT FOR COMMENT
3-AL186.00 L411 A
C Hamilton / T Jones C Hamilton 30.11.2017
T Jones 1:100 A1 | 1:200 A3
Designed
BEAN'S BEACON PLAY TOWER PE02 PE03
PE04 PE05 PE06
ROCK POOL HIDES GROUP SPINNER
BALANCE SPRINGERS STEPPING STONES SINGLE ROCKER
Refer to sheets L610, L611, L612, L613 for conceptual basis formanufacturers shop drawings.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Below ground cubby formed with circular manhole and detailedconcrete apron.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Oyster or similar 'Intertidal reef' themed group spinner in mutedoff-white colour. 'OmniSpinner' ex. Landscape Structures shown.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Cats Eye or similar 'Intertidal reef' themed balance springers.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Arrangements of Shellfish or similar 'Intertidal Reef' themed steppingstones.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
'Intertidal reef' themed single rockers in muted off-white / white washcolour.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
To be confirmed. To be confirmed. To be confirmed.
To be confirmed. To be confirmed. To be confirmed.
PE01
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:30 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L600
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
PLAY EQUIPMENT SCHEDULESITE WIDE PLAY EQUIPMENT - SHEET 01 OF 03
DRAFT FOR COMMENT
3-AL186.00 L600 A
T Jones C Hamilton 30.11.2017
T Jones As Shown
Designed
PE07 PE08 PE09
PE10 PE11 PE12
CRAWL TUNNEL BARNACLE CLIMBING HOLDS CARGO NET CRAWL
ROPE CLIMB WIDE EMBANKMENT SLIDE SAND PLAY STRUCTURE
To be confirmed. To be confirmed. To be confirmed.
To be confirmed. To be confirmed. To be confirmed.
Crawl tunnel diagonally angled through constructed mound form.Colour TBC.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Arrangement of resin climbing holds. Colour TBC.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Net structure formed into constructed landform with crawl tunnelunder. Rope to be muted off-white/jute colour.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Neptunes Necklace or similar 'Intertidal reef' themed ropes withclimbing holds for scaling embankment. Colour TBC.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
1.2 - 1.8m high group embankment slide in stainless steel ormuted off-white coloured plastic.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Sand play structure in linear, low form with timber materiality.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:33 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L601
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
PLAY EQUIPMENT SCHEDULESITE WIDE PLAY EQUIPMENT - SHEET 02 OF 03
DRAFT FOR COMMENT
3-AL186.00 L601 A
T Jones C Hamilton 30.11.2017
T Jones As Shown
Designed
PE13 PE14 PE15
PE15 PE15
THREE BAY SWING SERIOUS AIR SWING FLOTSAM JETSAM TRAIL
FLOTSAM JETSAM TRAIL FLOTSAM JETSAM TRAIL
To be confirmed. To be confirmed. To be confirmed.
To be confirmed. To be confirmed.
Three bay swing with 1x basket swing, 2x vandal resistant strapseats and 2x toddler seats with safety harnesses. Slim-line, round,shaved log timber frame and legs to match timber used for PE15 -Flotsam Jetsam Trail.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Senior serious air swing. Slim-line, round, shaved log timber frameand legs to match timber used for PE15 - Flotsam Jetsam Trail.
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Trail arrangement of rope courses, log stacks and steeping logs.Round slimline timber to form main structural component. Rope to bemuted off-white/jute colour
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Trail arrangement of rope courses, log stacks and steeping logs.Round slimline timber to form main structural component. Rope to bemuted off-white/jute colour
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
Trail arrangement of rope courses, log stacks and steeping logs.Round slimline timber to form main structural component. Rope to bemuted off-white/jute colour
Final appearance and placement to be agreed with LandscapeArchitect and Auckland Council nominated Play Specialist.
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:36 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L602
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
PLAY EQUIPMENT SCHEDULESITE WIDE PLAY EQUIPMENT - SHEET 03 OF 03
DRAFT FOR COMMENT
3-AL186.00 L602 A
T Jones C Hamilton 30.11.2017
T Jones As Shown
Designed
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:39 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L610
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
PLAY EQUIPMENT SCHEDULEBEAN'S BEACON CONCEPT - SHEET 01 OF 04
DRAFT FOR COMMENT
3-AL186.00 L610 A
T Jones C Hamilton 30.11.2017
T Jones As Shown
Designed
Timber 'board & batten' style siding. 60x40mm verticalbattens in randomised setout of 150,300,600,1200mmcentres as shown. Painted Resene 'Soapstone' colour.Timber board siding painted Resene 'Colonial White'.
Finish timber board siding 600mm above floor level toallow light spill into structure and further caregiver
visibility. Aperture covered by wire rope mesh with timberbattens continuing full height.
Safety railing over access aperture. Ensure form is acontinuation of cylindrical rope access tunnel with
emphasis on vertical structural components. Elements tobe painted Resene 'Soapstone'
Two open sided slides to edges as shown. Size and typeto be confirmed with Landscape Architect. Material to be
stainless steel with brushed finish or alternativelyapproved neutral coloured plastic.
Rope nets fixed to structure allow interaction with groundlevel and 'hammock' style play experience. Rope colourto be neutral to Landscape Architect approval.
Compliant access ladder to first storey. Powdercoat tomatch 'Resene Soapstone'
Wide cargo net style access up to firststorey. Rope colour to be neutral toLandscape Architect approval.
Tubular steel safety rail powdercoated Resene'Soapstone' colour with wire rope mesh infill panel. Flatsteel vertical supports in randomised setout of150,300,600,1200mm centres extending above safetyrail and below deck as shown.
Approx. 150x150mm universal columns set at anangle with central vertical column provide mainstructural support. Columns to be powdercoated tomatch Resene 'Colonial White'.
Clusters of stacked rock to reference BeanRock reef. Position to avoid critical fallheights from structure and play equipment.
Upper fenestration featuring red perspex and leadlightpattern referencing Bean Rock Lighthouse. Red colour toResene 'Bright Red'. Final colour and specification to beconfirmed by Landscape Architect.
Coloursteel or similar corrugate roofing to enclose secondstory. White colour to match Resene 'Soapstone'. Final colourand specification to be confirmed by Landscape Architect.
Fibre reinforced plastic or similar grating for first storeyflooring. Colour to be neutral to Landscape Architect
approval.
Scale: NTSEXPLODED AXONOMETRIC
Scale: NTSBEAN ROCK LIGHTHOUSE - DESIGN INSPIRATION
Resene Bright Red - RGB 146.42.49
Resene Colonial White - RGB 233.215.171
Resene Soapstone - RGB 236.229.218
Downpipe from guttering to be hidden. Run pipe withinstructure and within recess of Universal Columns to lowerstorey. Tie into nearest catchpit.
300mm wide x full height perspex windows to four sidesof top floor. Perspex in red colour to match upperfenestration.
Dressed and whitewashed hardwood timber decking tosecond storey flooring.
Two rope net tunnels to allow access to upper level. Ropecolour to be neutral to Lanscape Architect approval.
Approximately 350mm diameter cylindrical formedconcrete footing extended 1.2m above ground and
featuring 'spiral' off the form pattern from cardboard tube.
AL612
DL612
BL612
CL612
1:500
@ A1@ A31:100 1000 30002000 4000 5000 mm
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:40 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L611
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
PLAY EQUIPMENT SCHEDULEBEAN'S BEACON CONCEPT - SHEET 02 OF 04
DRAFT FOR COMMENT
3-AL186.00 L611 A
T Jones C Hamilton 30.11.2017
T Jones As Shown
Designed
Scale: 1:50 A1 | 1:100 A3PLAN VIEW
Scale: NTSPERSPECTIVE VIEW
5464
3464
6309
4000
650
2000
(ALL 6 EDGES)
3155
(ALL 6 EDGES)
GENERAL NOTES:
1. All dimensions in mm unless otherwise noted.2. Do not scale off drawings. Use dimensioned measurements only.3. To be read in conjunction with Landscape General Arrangement Drawings 3-AL186.00-L400-L411.4. These drawings are to form the basis for manufacturers shop drawings. Shop Drawings shall conform with the design intent
provided.5. Shop drawings to be submitted to Landscape Architect for approval prior to undertaking works.6. Nominated manufacturer to design and build structure.7. Manufacturer to ensure compliance with Playground Equipment and Surfacing Standards NZS 5828:2015.8. Final setout to be confirmed against issue for construction Landscape General Arrangement Drawings 3-AL186.00-L400-L411 to
approval of Landscape Architect.
1000(DECK WIDTH)
650
250
(ALL 8 EDGES)
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:42 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L612
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
PLAY EQUIPMENT SCHEDULEBEAN'S BEACON CONCEPT - SHEET 03 OF 04
DRAFT FOR COMMENT
3-AL186.00 L612 A
T Jones C Hamilton 30.11.2017
T Jones As Shown
Designed
Scale: 1:50 A1 | 1:100 A3ELEVATION D
L611Scale: 1:50 A1 | 1:100 A3ELEVATION C
L611
Scale: 1:50 A1 | 1:100 A3ELEVATION B
L611Scale: 1:50 A1 | 1:100 A3ELEVATION A
L611
1:500
@ A1@ A31:100 1000 30002000 4000 5000 mm
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
1800
2400
2600
850
7900
600
TBC
650
3464
5464
1200
GENERAL NOTES:
1. All dimensions in mm unless otherwise noted.2. Do not scale off drawings. Use dimensioned measurements only.3. To be read in conjunction with Landscape General Arrangement Drawings 3-AL186.00-L400-L411.4. These drawings are to form the basis for manufacturers shop drawings. Shop Drawings shall conform with the design intent
provided.5. Shop drawings to be submitted to Landscape Architect for approval prior to undertaking works.6. Nominated manufacturer to design and build structure.7. Manufacturer to ensure compliance with Playground Equipment and Surfacing Standards NZS 5828:2015.8. Final setout to be confirmed against issue for construction Landscape General Arrangement Drawings 3-AL186.00-L400-L411 to
approval of Landscape Architect.
1000
TBC
10001000
1800
2400
2600
850
7900
600
TBC
650
2000
6309
1000
TBC
10001000 4000
1200
Approved Revision DateRevision Amendment
A DRAFT - LOCAL BOARD CH 30.11.2017
200
100
5010
0mm
300
mm
Scales Project No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date 2017-12-01 at 8:54:46 a.m. Path O:\env\tla_north\auckland_council\proj\3-al186.00 windsor reserve playscape redevelopment\500 - Technical\510 - Cad\511 - Base Drawings\3-al186.00_L600.dwg L613
Drawn
Approved Approved Date
Auckland Environmental PO Box 5848Auckland 1141New Zealand
+64 9 355 9500
AUCKLAND COUNCIL - DEVONPORT-TAKAPUNA LOCAL BOARDWINDSOR RESERVE PLAYSPACE - SPECIFIC DESIGNLANDSCAPE DRAWING SET
PLAY EQUIPMENT SCHEDULEBEAN'S BEACON CONCEPT - SHEET 04 OF 04
DRAFT FOR COMMENT
3-AL186.00 L613 A
T Jones C Hamilton 30.11.2017
T Jones As Shown
Designed
PLAY OPPORTUNITIES - FIRST STOREY
PLAY OPPORTUNITIES - SECOND STOREY
PLAY OPPORTUNITIES - GROUND LEVEL