PDS Training jan2010.ppt
-
Upload
shaka-shalahuddin-shantika-putra -
Category
Documents
-
view
29 -
download
0
Transcript of PDS Training jan2010.ppt
-
PDS Training
Presentation title
-
ScheduleTrainee
Presentation title
-
PDS Software 3D Modeling
Presentation title
-
Konsep Desain 3DIntegrasi antar departemen dengan satu data base gabungan (unified data base)
Presentation title
-
3D Model3D Graphics:1. Equipment2. Piping3. Steel/ Structure4. Foundation5. Electrical Raceway6. InstrumentDesign Database:1. Piping Segment2. Piping Component3. Piping/ Tubing4. Instrument5. Pipe Support6. Equipment Group7. Equipment Nozzle
Presentation title
-
Log-On
Presentation title
-
PDS WORK PROCESSOVERVIEWEQUIPMENT MODELINGDRAWING SETUPPIPING MODELINGDRAWING ANNOTATIONDESIGN REVIEWINTERFERENCE DETECTIONISOMETRIC EXTRACTIONINTERNAL REVIEW/CHECKRE-RUN INTERFERENCESRE-RUN ISOMETRICCOMPLETE ANNOTATIONISSUE FOR FABRICATION AND/OR CONSTRUCTIONAPPROVE PIPING
Presentation title
-
Equipment Modeling Commands
Presentation title
-
Equipment Modeling Commands
Presentation title
-
Building EquipmentPrimitivesParametricsNozzle ManipulationDavit
Presentation title
-
Piping Model AnatomyComponent and SegmentComponent Graphics (Green Lines)MaterialComponent Category (shop, field)Reporting conditionPhysical DimensionWeight, etcSegment (Blue Lines)Line NumberDesign & Operation ConditionPaint requirementInsulation type
Presentation title
-
Piping Model AnatomyComponent Placement PointConnection Point 1 (CP1)Connection Point 2 (CP2)Component Center
Presentation title
-
Thank you
Presentation title