November 26 29 New Delhi fib Symposium on Segmental construction in concrete 1
Prestressed concrete bridges built
by the cantilever methodDesign and stability during erection
Philippe Vion - Emmanuel Bouchon
-
8/8/2019 pcbridges_cantilevermethod
2/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 2
Contents
1. Introduction2. General design
3. Longitudinal post-tensioning4. Temporary cantilevers stability
-
8/8/2019 pcbridges_cantilevermethod
3/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 3
Design begins with
knowledge of
successive stagesof construction
1. Introduction
-
8/8/2019 pcbridges_cantilevermethod
4/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 4
Cast in place segments
-
8/8/2019 pcbridges_cantilevermethod
5/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 5
Pre-cast segments
-
8/8/2019 pcbridges_cantilevermethod
6/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 6
-
8/8/2019 pcbridges_cantilevermethod
7/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 7
! Between 40 and 200 m, even 300 m
! French records: 205 m Rhin bridge (2002)
192 m Sioule viaduct (2005)
190 m Viaur viaduct (1999)
Range of spans
-
8/8/2019 pcbridges_cantilevermethod
8/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 8
Bridge over the Rhin river
-
8/8/2019 pcbridges_cantilevermethod
9/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 9
Viaduct over the Viaur river
-
8/8/2019 pcbridges_cantilevermethod
10/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 10
Viaduct over the Sioule river
-
8/8/2019 pcbridges_cantilevermethod
11/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 11
-
8/8/2019 pcbridges_cantilevermethod
12/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 12
-
8/8/2019 pcbridges_cantilevermethod
13/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 13
2. General design
LestCintre
With hinges at mid-span (in the old days)
Equal length spans, side spans 0.6L
-
8/8/2019 pcbridges_cantilevermethod
14/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 14
Variable length spans
L0,6 L 0,6 ll
( L + l ) / 2l
-
8/8/2019 pcbridges_cantilevermethod
15/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 15
Deck depth
h ch p
Parabolic depth variation
Linear depth variation
-
8/8/2019 pcbridges_cantilevermethod
16/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 16
Depth ratio
L/(19+(L/7))L/30 to L/35Mid-span hc
7.2 m7 m
L = 120 m
hp
3.3 m3.6 m
L = 120 m
hc
L/(14+(L/45))L/16 to L/18On Pier hp
Static studyCommon case
-
8/8/2019 pcbridges_cantilevermethod
17/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 17
One-sided cantilever technique
Bras de la plaine
-
8/8/2019 pcbridges_cantilevermethod
18/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 18
Cross section
One cell box
Two cells box
-
8/8/2019 pcbridges_cantilevermethod
19/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 19
Box-girder ribbed transversely
-
8/8/2019 pcbridges_cantilevermethod
20/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 20
Box-girder with braces
-
8/8/2019 pcbridges_cantilevermethod
21/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 21
Twin box-girder
-
8/8/2019 pcbridges_cantilevermethod
22/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 22
Boulonnais
Composite girder
-
8/8/2019 pcbridges_cantilevermethod
23/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 23
Simply supported
Bearing conditions
-
8/8/2019 pcbridges_cantilevermethod
24/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 24
Connected to
the pier
Twin walls
-
8/8/2019 pcbridges_cantilevermethod
25/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 25
Twin walls
-
8/8/2019 pcbridges_cantilevermethod
26/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 26
On pier segments
-
8/8/2019 pcbridges_cantilevermethod
27/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 27
-
8/8/2019 pcbridges_cantilevermethod
28/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 28
Traveller forms to cast
on pier segment
-
8/8/2019 pcbridges_cantilevermethod
29/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 29
Cantilever tendons
2. Post-tensioning
-
8/8/2019 pcbridges_cantilevermethod
30/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 30
2
1
3
7 89
5
10 12 14 16
4
111517 13
6 GV
ELEVATION
COUPE TRANSVERSALE
54321
1 2 3 4 5
-
8/8/2019 pcbridges_cantilevermethod
31/42
-
8/8/2019 pcbridges_cantilevermethod
32/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 32
Side-span
Internal continuity tendons
-
8/8/2019 pcbridges_cantilevermethod
33/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 33
Internal continuity tendons
-
8/8/2019 pcbridges_cantilevermethod
34/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 34
ancrage sur pile dviateur en traveAnchor on pier Deflection cross-beam
External continuity tendons
-
8/8/2019 pcbridges_cantilevermethod
35/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 35
External tendons: 3 spans
entretoises dviateurs
0,2 0,25 l
Diaphragms Cross-beam
-
8/8/2019 pcbridges_cantilevermethod
36/42
-
8/8/2019 pcbridges_cantilevermethod
37/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 37
0,150,35 0,40
Cbles extrieursExternal tendonsDeflection cross-beam
-
8/8/2019 pcbridges_cantilevermethod
38/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 38
3. Cantilevers stability
Temporary: Unbalanced cantilever during erection
Accidental: Fall of a traveller form or a precast segment
Poids de l'quipage
2 types of situation
St bilit d i
-
8/8/2019 pcbridges_cantilevermethod
39/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 39
Stability devices
Temporary ties
-
8/8/2019 pcbridges_cantilevermethod
40/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 40
Top flange anchorage
-
8/8/2019 pcbridges_cantilevermethod
41/42
November 26 29 New Delhi fib Symposium on Segmental construction in concrete 41
Temporary stays +
temporary ties
Vertical tendons
2 cbles
12 T 15 S
2 cbles
27 T 15 S
2 cbles
10 T 15 S
Temporary stays
-
8/8/2019 pcbridges_cantilevermethod