P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

44
1 P.C KINYANJUI TECHNICAL TRAINING INSTITUTE ATTACHMENT LOGBOOK DEPARTMENT: ……………………………. OUR MOTTO “EXCELLENCE IN TECHNOLOGY” P.O BOX 21280 - 00505 NAIROBI. TEL. 020 2042736/8 Cell: 0721 480 199 /0773 829 417 Email [email protected] [email protected] www.kinyanjuitechnical.ac.ke

Transcript of P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

Page 1: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

1

P.C KINYANJUI TECHNICAL TRAINING

INSTITUTE

ATTACHMENT LOGBOOK

DEPARTMENT: …………………………….

OUR MOTTO

“EXCELLENCE IN TECHNOLOGY”

P.O BOX 21280 - 00505

NAIROBI.

TEL. 020 2042736/8

Cell: 0721 480 199 /0773 829 417

Email – [email protected]

[email protected]

www.kinyanjuitechnical.ac.ke

Page 2: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

2

PREAMBLE

Prior to the introduction of the 8:4:4 system of education, placing attachés on industrial attachment was not a

challenge as all attachés entering the Technical Training system were required to have employer’s sponsorship.

However, with the advent of the 8:4:4 system, opportunities opened up for non – sponsored attachés to join

technical training institutions but there was no guarantee for self-sponsored attachés to secure opportunities for

industrial attachment.

The National Industrial Training Authority (NITA) is a state corporation that was established under the

Industrial Training (Amendment) Act of 2011 to assist all attachés in tertiary institutions and universities to

secure attachment places. It coordinates industrial attachment under its Industrial Attachment Programme. It

links industry and institutions for placement of attachés at the work place for acquisition of practical skills and

appropriate work-ethics.

The main purpose of the attachment is to expose the attachés to the application of the skills they have learned in

their trade in theory in real practice where others are earning their living from and also to the world of work

and the ethics associated thereof.

Industrial attachment is therefore an important part of technical training and is therefore a compulsory session

for each attaché. It is meant to give the attaché exposure in real-work situation. It also gives the attaché an

opportunity to interact with the industry and apply the knowledge and skills acquired at various levels of

training to real life experiences in a typical environment in the industry.

Some of the aims of industrial attachment include:

i. Exposure of attachés to latest technology in the industry

ii. For industry to assess relevance of skills the attaché has acquired and advises trainers.

iii. Gain insight into serious interpersonal and teamwork relationship that exists in industry.

iv. Attain a certificate of performance necessary for the award of respective Diplomas and Certificates at

the end of the course in line with Technical and Vocational Entrepreneurship Training (TVET) reforms.

Page 3: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

3

THE LOG BOOK

INTRODUCTION

This book aims to assist the attaché to keep a record of the day to day activities during the attachment period.

It will show the organization in which the attaché has worked on attachment and the period of time spent in

that organization.

ATTACHMENT PROGRAMME

The attaché must follow the set out attachment programme formulated by the department where he/she is

attached. This programme should be given to the attaché at the beginning of the activity. The department should

provide an atmosphere for learning desired competencies.

REPORT WRITING

The attaché is expected to write a daily report on the experiences acquired during the attachment. The supervisor

should give some information on the organization and contact address.

DAILY REPORT

The daily work carried out during the period of attachment is to be recorded clearly with sketches and

diagrams where applicable. This is a summary of work done in a week and should cover all the activities and

the level of accomplishment of each. Attachés are required to present the Logbook to the Supervisor/Trainer

(Technician) for assessment of content and progress at the end of each week.

Page 4: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

4

INDUSTRIAL ATTACHMENT TOOLS

a. Attaché’s letter of introduction – containing attaché details, list of areas of practice and familiarization

as well as any other important information. The letter is to be distributed to attachés by their respective

Departmental Attachment Officers (DAO’s) three months before the beginning of attachment period.

b. Logbook - to be distributed to attachés by the respective DAO two weeks before the end of the

term prior to attachment period. The log book is to be filled on a daily basis during the attachment

period.

c. Industrial Attachment Assessment Form - to be duly filled and then handed over in duplicate to

the Industrial Attachment Officer (ILO) on completion of attachment period. (pages 42 and 43)

Page 5: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

5

Attaché’s Particulars

Last Name:…………………………………………………………………………….

Other Names:……………………..…………………………………………………...

Identity Card No:………………………………………………………………….......

Admission No:………………………………………………………………………...

Date of Birth: Date……………......Month………….……..Year…………………….

Course…………………………Level………………..Year/Module………………….

Home Address……………………………Code…………..Town…………………….

.

Telephone……………………………………………………………………………….

Next of Kin

Name:………………………………….Relationship:………………………..……….

Postal Address:……………………..Postal Code:……………..Tel:………………….

Details of Attachment Place:

Name of Organization:………….……………………..……………………………….

Postal Address……………………………………..Code:…………………………….

Tel…………………………………Fax / E-mail ……………….……….……………

Name of Industry Based Supervisor:……………………………………………………

Position/ Designation:…………………………………………………………………..

Mobile Contact …………………………………………………………………………

Attachment duration period:

From: ……………………………………….………To: ………………………………

Page 6: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 6

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I –To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 7: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 7

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

.

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 8: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 8

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 9: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 9

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I –To be filled by the Attaché

Week…………………………

Date: From……………………….To: ………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 10: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 10

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

.

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 11: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 11

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 12: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 12

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I –To be filled by the Attaché

Week…………………………

Date: From……………………….To: ………………………………….

DAY/DATE DESCRIPTION OF

WORK/ACTIVITY DONE NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 13: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 13

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

.

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 14: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 14

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 15: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 15

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 16: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 16

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

.

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 17: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 17

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 18: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 18

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 19: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 19

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 20: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 20

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 21: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 21

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 22: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 22

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 23: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 23

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 24: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 24

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF

WORK/ACTIVITY DONE NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 25: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 25

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 26: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 26

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 27: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 27

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 28: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 28

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 29: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 29

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 30: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 30

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Remarks by the Attaché:

……………………………………………………………………………………………………………

Page 31: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 31

……………………………………………………………………………………………………………

Page 32: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 32

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 33: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 33

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 34: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 34

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 35: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 35

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 36: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 36

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 37: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 37

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF

WORK/ACTIVITY DONE NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 38: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 38

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 39: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 39

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 40: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 40

DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF WORK/ACTIVITY DONE

NEW SKILLS LEARNT

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Page 41: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 41

Remarks by the Attaché:

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..

.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………

…………………………………………………………………………………………………………….

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

Page 42: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 42

ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/

DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/

CALCULATIONS E.T. C

Page 43: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 43

Industrial Attachment Assessment Form (This form is to be filled by the Industry Based Supervisor in Duplicate)

Details of Attachment

Full Name of Attaché: ………………………………………………………………………………….

Admission No……………………..Attachment Contract No……………………………………………

Total length of Attachment in Months………………………………………………………….………..

Period: From: Date……………………Month……………….Year…………………………………….

To : Date……………………Month………………..Year……………………………………

Name of Training Institution:…………………………………………………………………………….

Name of Organization attached:………………………………………………………………………….

Please, give your assessment of this attaché’s performance during the period of attachment on the 5-

point scale below:

Assessment Areas Rating Scale

Excellent Good Average Fair Poor

5 4 3 2 1

1. Punctuality

2. Adhere to regulations

3. Workmanship and Work Output

4. Adaptability

5. Communication

6. Reliability

7. Teamwork

Total

/35

Overall assessment of the attaché as determined by the average score (please tick as appropriate)

Excellent Good Average Fair Poor

Supervised by: Name………………………………Position/Designation……………………………..

Signature:………………….. Date………….Official Stamp:.................................................................

Assessed by: Name:……………………………Signature:………………......Date:………………..

Assessor’s General Remarks:….………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Signed by Attaché…………………………………Date………………………………………………...

Page 44: P.C KINYANJUI TECHNICAL TRAINING INSTITUTE

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book 44

Industrial Attachment Assessment Form (This form is to be filled by the Industry Based Supervisor in Duplicate)

Details of Attachment

Full Name of Attaché: …………………………………..Female Male

Admission No……………………..Attachment Contract No……………………………………….

Total length of Attachment in Months……………………………………………………………….

Period: From: Date……………………Month……………….Year………………………………..

To: Date……………………Month………………..Year……………………………….

Name of Training Institution:………………………………………………………………………...

Name of Organization Attached:……………………………………………………………………...

Please, give your assessment of this attaché’s performance during the period of attachment

on the 5-point scale below: (to be filled in by Industry Based Supervisor)

Assessment Areas Rating Scale

Excellent Good Average Fair Poor

5 4 3 2 1

1. Punctuality

2. Adhere to regulations

3. Workmanship and Work Output

4. Adaptability

5. Communication

6. Reliability

7. Teamwork

Total

/35

Overall assessment of the attaché as determined by the average score (please tick as appropriate)

Excellent Good Average Fair Poor

Supervised by: Name………………………………Position/Designation……………………………..

Signature:………………….. Date………….Official Stamp:.................................................................

Assessed by: Name:………………………… Signature:………………......Date:………………..

Assessor’s General Remarks:….………………………………………………………………………

……………………………………………………………………………………………………………..

……………………………………………………………………………………………………………..

Signed by Attaché…………………………………Date………………………………………………...