PBN Operational Approval Navigation Databases

Page 2: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

Requirement for Navigation Databases

• Most navigation specifications require a navigation database

• Exceptions are: • RNAV 10

• RNAV 5

• Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

• Suppliers of the navigation data should hold an LoA

2 ICAO PBN Operational Approval Course 2

RNAV 10 and RNAV 5 Navspecs support legacy navigation systems (INS) which do not use an

airborne nav database

Page 3: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

Communications Service Provider

Aerodrome Air Traffic Service Provider

Procedure & Airspace Designer

Aeronautical Information

Service

End Users

NOTAM AIP

Avionics Navigation Data

Provider

Flight Planning Navigation Data

Provider

End Users

Simulator Navigation Data

Provider

Navigation Data Tailoring Requirements

Navigation Data Provider

Other Government

Sources

Navigation Data Chain

3 ICAO PBN Operational Approval Course 3

Page 4: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

Navigation Data

• PBN is dependent on Nav Data

• Valid data is critical to flight safety

• Long chain from origin to aircraft • Opportunity for error/corruption at each stage

• Sound QA procedures need to be in place

• BUT operators responsible for managing their own safety • Procedures for checking, validating, managing data necessary

4 ICAO PBN Operational Approval Course 4

Nav Database suppliers should have a QA process. But QA cannot eliminate ALL errors! Operators must

have sound database management procedures

Page 5: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

Navigation Data Formats

5 ICAO PBN Operational Approval Course 5

Surveyor/ Designer

Civil Aviation Authority

Data House

Avionics Manufacturer/ Data Packer

Airborne RNAV System

AIP ARINC 424

Packed Data Various Formats

Paper

Electronic

Page 6: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

Delivery Schedule

6 ICAO PBN Operational Approval Course 6

7 Days Delivery to Operator

15 Days FMS Data Production

20 Days Cut Off

28 Days Latest Delivery Date

42 Days Normal Publication Date

56 Days Publication Date for Major Changes

Data is frozen for

28 days

Effective Date

Page 7: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

Actions on delivery

• Packed navigation databases delivered to operator at least one week prior to the AIRAC effective date.

• Operator should have procedures in place to ensure: • correct version of database is loaded on aircraft

• any database errors/omissions reported by the suppliers addressed expeditiously by flight crew briefing/removal of procedures etc.

• any database errors/omissions identified by the operator reported back to supplier

• version of the loaded navigation database checked for validity by the flight crew prior to departure

7 ICAO PBN Operational Approval Course 7

Page 8: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

Nav Database Management • Specific procedures required for RNP AR APCH

• Responsible database manager

• Documented process for accepting, verifying, and loading

• Documented process under configuration control

• Electronic nav database comparison required

• Initial

• 28 day cycle

• Similar database management procedures recommended for other operations

8 ICAO PBN Operational Approval Course 8

RNP AR APCH enables operations with reduced navigation tolerances and are more sensitive to nav data errors

BUT nav data errors can occur on ALL operations and the magnitude is not related to the type of operation

Page 9: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

Maintenance Program

• Part of standard maintenance requirements

• Usually documented in Maintenance Manual

• Includes navigation database management

9 ICAO PBN Operational Approval Course 9

Page 10: PBN Operational Approval Navigation Databases · • Procedures for maintaining currency, checking for errors and reporting errors to the navigation database supplier must be documented

ICAO PBN Operational Approval Course

QUESTIONS?

10 ICAO PBN Operational Approval Course 10