22
¤ Item 0 01 0 01.01 0 01.02 0 02 0 02.01 0 02.02 0 02.03 0 02.04 0 03 0 03.01 0 03.02 0 03.03 0 03.04 0 03.05 0 04 0 04.01

description

Metrados de pavimento

Transcript of Pavimento Flexible Sangani

PavimentacionUndN DE VECESMEDIDASPARCIALTOTALLargoAnchoAltoItemDescripcinUnd.001SEGURIDAD Y SALUD001.01EQUIPOS DE PROTECCION Y SALUDund001.02CAPACITACION EN SEGURIDAD Y SALUDmes002OBRAS PROVISIONALES002.01GUARDIANIA Y ALMACENmes002.02CARTEL DE IDENTIFICACION DE OBRA Y PROMOCION DE OBRAund002.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOund002.04FLETE TERRESTREGLB003TRABAJOS PRELIMINARES003.01TRAZO DE NIVELES Y REPLANTEO (OBRA EN GENERAL)DIA240.00240.00240.00003.02CARTEL DE SEALIZACION PARA DESVIACION DE TRANSITOund2.002.002.00003.03DEMOLICION PAVIMENTO FLEXIBLEm3968.00968.00968.00003.04DEMOLICION DE SARDINELm3352.00352.00352.00003.05DEMOLICION DE CUNETASm3434.00434.00434.00004MOVIMIENTO DE TIERRAS004.01CORTE DE MATERIAL SUELTO HASTA LA SUBRASANTEm3232,670.85Cedro - Rio177.4411.000.40780.74Jr. Caceres - Rio380.6412.000.401,827.07Micaela Bastidas - Rio677.8115.000.404,066.86Av. Los Apostadores685.9912.000.403,292.75Tupac amaru677.8112.000.403,253.49Los Fundadores652.9712.000.403,134.26Los Heroes712.3112.000.403,419.09Ingenieros773.2312.000.403,711.50Antonio Sucre - Rio280.0912.000.401,344.43Av. Circunvalacion787.8214.000.404,411.79Galaxia223.6612.000.401,073.57Av. Venus665.7214.000.403,728.03Pje Auroras325.7414.000.401,824.14Av. Satelite587.9610.000.402,351.84560.0617.000.403,808.41559.6616.000.403,581.82229.5812.000.401,101.98218.7912.000.401,050.19578.1915.000.403,469.14328.6013.000.401,708.72358.6918.000.402,582.57330.6918.000.402,380.97278.8416.000.401,784.58119.4012.000.40573.12114.2212.000.40548.26146.5312.000.40703.3455.7518.000.40401.4049.5415.000.40297.2449.2112.000.40236.2159.9312.000.40287.66126.0012.000.40604.8039.0412.000.40187.3975.5512.000.40362.64531.2612.000.402,550.05709.2512.000.403,404.40798.1712.000.403,831.22797.9712.000.403,830.26840.2112.000.404,033.01855.3814.000.404,790.13708.6314.000.403,968.33236.1512.000.401,133.52502.1812.000.402,410.46142.0812.000.40681.98232.9714.000.401,304.6393.0812.000.40446.78141.2114.000.40790.78139.8414.000.40783.10Rio367.4614.000.402,057.78Los Pinos202.2815.000.401,213.68Los Cedros163.8816.000.401,048.83Los Libertadores258.6412.000.401,241.47Av. Circunvalacion480.3715.000.402,882.22Pje Neptuno56.4810.000.40225.92Antonio Sucre485.7212.000.402,331.46384.9812.000.401,847.90Av Saturno786.8112.000.403,776.698 de Febrero869.4212.000.404,173.22Caceres92.2414.000.40516.54Calle Lima814.9012.000.403,911.52Los Triunfadores257.5612.000.401,236.29Alfonso Ugarte135.8812.000.40652.221,140.4612.000.405,474.21El Sol1,141.4612.000.405,479.01556.1812.000.402,669.66Las Estrellas110.4312.000.40530.06Huancayo112.9412.000.40542.11M Bastidas84.9612.000.40407.8139.8212.000.40191.14384.1812.000.401,844.06Marte228.8014.000.401,281.28Halley880.5214.000.404,930.91153.9314.000.40862.01169.6812.000.40814.46172.6712.000.40828.82297.1812.000.401,426.46701.2514.000.403,927.00734.6914.000.404,114.26Buenos Aires319.5814.000.401,789.65210.6414.000.401,179.581,234.3214.000.406,912.19235.4312.000.401,130.06197.3512.000.40947.28162.8912.000.40781.87144.5212.000.40693.70318.3612.000.401,528.13315.8412.000.401,516.03247.7112.000.401,189.01136.6712.000.40656.02213.6212.000.401,025.38182.6912.000.40876.91184.0512.000.40883.44182.0012.000.40873.60156.7412.000.40752.35133.5312.000.40640.94123.6312.000.40593.4272.3812.000.40347.42302.5114.000.401,694.06787.2314.000.404,408.49699.2414.000.403,915.74700.6214.000.403,923.47364.6914.000.402,042.2699.9612.000.40479.81116.9612.000.40561.41722.0514.000.404,043.48713.6312.000.403,425.42593.9012.000.402,850.72539.0412.000.402,587.39592.2912.000.402,842.99452.0912.000.402,170.03367.2312.000.401,762.7099.9612.000.40479.81116.9612.000.40561.4185.7712.000.40411.7079.3012.000.40380.64100.4912.000.40482.35144.3512.000.40692.88161.1312.000.40773.42105.3514.000.40589.96768.7514.000.404,305.0096.9414.000.40542.86366.6313.000.401,906.4848.2712.000.40231.70004.02RELLENO CON MATERIAL PROPIO A NIVEL DE SUB RASANTEm344,701.463.600.1016,092.5316,092.53004.03EXCAVACION MANUALm344,701.463.600.1524,138.7924,138.79004.04ACARREO MANUAL DE MATERIAL EXCEDENTEm31.20232,670.85279,205.02279,205.02004.05CARGUIO DE MATERIAL EXCEDENTEm31.20232,670.85279,205.02279,205.02004.06TRANSPORTE DE MATERIAL EXCEDENTEm31.20232,670.85279,205.02279,205.02005EXPLANACIONES005.01ESCARIF. PERFIL. Y COMPACT. DE SUB RASANTEm2387,900.44Cedro - Rio177.448.001,419.52Jr. Caceres - Rio380.649.003,425.76Micaela Bastidas - Rio677.8112.008,133.72Av. Los Apostadores685.999.006,173.91Tupac amaru677.819.006,100.29Los Fundadores652.979.005,876.73Los Heroes712.319.006,410.79Ingenieros773.239.006,959.07Antonio Sucre - Rio280.099.002,520.81Av. Circunvalacion787.8211.008,666.02Galaxia223.669.002,012.94Av. Venus665.7211.007,322.92Pje Auroras325.7411.003,583.14Av. Satelite587.967.004,115.720560.0614.007,840.840559.6613.007,275.580229.589.002,066.220218.799.001,969.110578.1912.006,938.280328.6010.003,286.000358.6915.005,380.350330.6915.004,960.350278.8413.003,624.920119.409.001,074.600114.229.001,027.980146.539.001,318.77055.7515.00836.25049.5412.00594.48049.219.00442.89059.939.00539.370126.009.001,134.00039.049.00351.36075.559.00679.950531.269.004,781.340709.259.006,383.250798.179.007,183.530797.979.007,181.730840.219.007,561.890855.3811.009,409.180708.6311.007,794.930236.159.002,125.350502.189.004,519.620142.089.001,278.720232.9711.002,562.67093.089.00837.720141.2111.001,553.310139.8411.001,538.24Rio367.4611.004,042.06Los Pinos202.2812.002,427.36Los Cedros163.8813.002,130.44Los Libertadores258.649.002,327.76Av. Circunvalacion480.3712.005,764.44Pje Neptuno56.487.00395.36Antonio Sucre485.729.004,371.480384.989.003,464.82Av Saturno786.819.007,081.298 de Febrero869.429.007,824.78Caceres92.2411.001,014.64Calle Lima814.909.007,334.10Los Triunfadores257.569.002,318.04Alfonso Ugarte135.889.001,222.9201,140.469.0010,264.14El Sol1,141.469.0010,273.140556.189.005,005.62Las Estrellas110.439.00993.87Huancayo112.949.001,016.46M Bastidas84.969.00764.64039.829.00358.380384.189.003,457.62Marte228.8011.002,516.80Halley880.5211.009,685.720153.9311.001,693.230169.689.001,527.120172.679.001,554.030297.189.002,674.620701.2511.007,713.750734.6911.008,081.59Buenos Aires319.5811.003,515.380210.6411.002,317.0401,234.3211.0013,577.520235.439.002,118.870197.359.001,776.150162.899.001,466.010144.529.001,300.680318.369.002,865.240315.849.002,842.560247.719.002,229.390136.679.001,230.030213.629.001,922.580182.699.001,644.210184.059.001,656.450182.009.001,638.000156.749.001,410.660133.539.001,201.770123.639.001,112.67072.389.00651.420302.5111.003,327.610787.2311.008,659.530699.2411.007,691.640700.6211.007,706.820364.6911.004,011.59099.969.00899.640116.969.001,052.64006SUB BASE GRANULAR006.01MATERIAL P/SUB BASE PUESTO EN OBRAm3387,900.440.2077,580.0977,580.09006.02EXTENDIDO RIEGO Y COMPACTACION SUB-BASE E=0.20m.m2387,900.44387,900.44387,900.44007BASE GRANULAR007.01MATERIAL PARA BASE PUESTO EN OBRAm3387,900.440.2077,580.0977,580.09007.02EXTENDIDO RIEGO COMPACT. BASE E=0.20 m.m2387,900.44387,900.44387,900.44008PAVIMENTO FLEXIBLE008.01IMPRIMACION ASFALTICAm2387,900.44387,900.44387,900.44008.02CARPETA ASFALTICA EN CALIENTE E = 2"m2387,900.44387,900.44387,900.44009REPOSICION DE PAVIMENTOS009.01IMPRIMACION ASFALTICA (PARCHADO)m2387,900.44387,900.44387,900.4421.38387,921.82009.02CARPETA ASFALTICA 2" (PARCHADO)m2387,900.44387,900.44387,900.4428.34387,928.78010BADEN DE CONCRETO010.01ENCOFRADO Y DESENCOFRADO EN BADENm25,745.005,745.005,745.001091.326,836.32010.02CONCRETO F'C=210 KG/CM2 EN BADENm31,856.001,856.001,856.00538.142,394.140.00010.03ACABADO EN BADENm29,676.009,676.009,676.002716.4312,392.43011SARDINEL EN BOCACALLE011.01ENCOFRADO Y DESENCOFRADO EN SARDINEL EN BOCACALLEm2N Usos2.0044,878.900.500.522,439.4522,439.45196.9322,636.38011.02CONCRETO F'C=175 KG/CM2 EN SARDINEL EN BOCACALLEm31.0088,344.470.150.56,625.846,625.8438.646,664.48011.03ACABADO EN SARDINEL EN BOCACALLEm21.002,686.002,686.002,686.00230.522,916.52012DRENAJE012.01ENCOFRADO Y DESENCOFRADO EN CUNETAm22.0044,878.900.500.14,487.894,487.897535.7612,023.65012.02CONCRETO F'C=210 KG/CM2 EN CUNETASm32.0044,878.900.1210,770.9410,770.941808.5612,579.50012.03ACABADO EN CUNETASm22.0044,878.900.1513,463.6713,463.6710549.9124,013.58013JUNTAS013.01RELLENO DE JUNTAS CON ASFALTOm14,960.000.152,244.002,244.005015.997,259.99014SEALIZACION HORIZONTAL014.01PINTURA LINEAL EN SARDINELm2.0044,878.9089,757.8089,757.8032357.83122,115.63014.02PINTURA ZONAL CRUCE PEATONALm2320.0018.005,760.005,760.004544.6510,304.65014.03PINTURA INTERM. DISCONT. - CENTRO DE VIAm1.0044,878.9044,878.9044,878.9031665.4476,544.34014.04PINTURA DE SIMBOLOS - FLECHASm21.009,765.009,765.009,765.00400.3210,165.32015SEALIZACION VERTICAL015.01SEALES INFORMATIVAS TIPO 01und865.00865.00865.003531,218.00015.02SEALES REGULADORASund498.00498.00498.00155653.00016PRUEBAS DE CALIDAD DEL SUELO016.01PROCTOR MODIFICADOund50.0050.0050.002070.00016.02DENSIDAD DE CAMPOund870.00870.00870.003601,230.00017PRUEBAS DE CALIDAD DEL CONCRETO017.01DISEO DE MEZCLASund1.001.001.0012.00017.02ROTURA A LA COMPRESION DE CONCRETOund360.00360.00360.0050410.00018PRUEBAS DE CALIDAD DEL ASFALTO018.01PRUEBAS DE CALIDAD DEL ASFALTOund890.00890.00890.0080970.00019REFORESTACION019.01EXCAVACION DE HOYOS PARA PLANTASund1,760.001,760.001,760.005802,340.00019.02PLANTADO DE ARBUSTOSund1,760.001,760.001,760.005802,340.00020VARIOS020.01RECONEXION DE PUNTOS DE DESAGUEpto5,780.005,780.005,780.00438610,166.00020.02LIMPIEZA FINAL DE OBRAm2581,677.12581,677.12581,677.1286999.47668,676.59020.03PLACA RECORDATORIAGLB1.001.001.001.00
veredasItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)001TRABAJOS PRELIMINARES42,030.10001.01DEMOLICION DE CONCRETO EXISTENTE.m3374.70112.1742,030.10002MOVIMIENTO DE TIERRAS442,437.54002.01EXCAVACION MANUALm37,152.0527.46196,395.29002.02ACARREO MANUAL DE MATERIAL DE CORTEm37,152.0518.30130,882.52002.03CARGUIO DE MATERIAL EXCEDENTEm37,526.784.3632,816.76002.04TRANSPORTE DE MATERIAL EXCEDENTEm37,526.7811.0783,321.45003SUB BASE GRANULAR214,697.68003.01MATERIAL P/SUB BASE PUESTO EN OBRAm34,547.4527.57125,373.20003.02EXTENDIDO RIEGO Y COMPACTACION SUB-BASE E=0.10m.m232,481.632.7589,324.48004SARDINEL CONFINAMIENTO DE ACERA1,042,601.46004.01ENCOFRADO Y DESENCOFRADO EN SARDINEL DE CONFINAMIENTOm29,502.5242.68405,567.55004.02CONCRETO F'C=175 KG/CM2 EN SARDINEL DE CONFINAMIENTOm31,425.36284.97406,184.84004.03ACABADO EN SARDINEL DE CONFINAMIENTOm211,383.0920.28230,849.07005BERMA CENTRAL123,566.15005.01ENCOFRADO Y DESENCOFRADO EN BERMA CENTRALm21,055.7842.6845,060.69005.02CONCRETO F'C=175 KG/CM2 EN BERMA CENTRALm3190.05284.1454,000.81005.03ACABADO EN BERMA CENTRALm21,055.7823.2124,504.65006ACERA PEATONAL2,413,920.63006.01ENCOFRADO Y DESENCOFRADO DE VEREDASm218,743.9042.06788,368.43006.02CONCRETO F'C=175 KG/CM2 EN VEREDASm33,306.61284.14939,540.17006.03ACABADO EN VEREDASm232,481.6321.12686,012.03007RAMPAS90,697.39007.01ENCOFRADO Y DESENCOFRADO EN RAMPASm2283.1442.0611,908.87007.02CONCRETO F'C=175 KG/CM2 EN RAMPASm3179.62284.1451,037.23007.03ACABADO EN RAMPASm21,283.0021.6327,751.29008SELLADO DE JUNTAS166,550.21008.01RELLENO DE JUNTAS CON ASFALTOm25,544.516.52166,550.21009TRATAMIENTO DE JARDINERAS52,337.47009.01REFINE Y PERFILADO DE SUSTRATO DE JARDINERIAm21,768.042.163,818.97009.02SEMBRADO DE GRASSm21,768.043.285,799.17009.03RIEGO Y MANTENIMIENTO DE GRASSm21,768.040.24424.33009.04PLANTADO DE ARBUSTOSund3,076.0013.7542,295.00010INSTALACION DE TACHOS PARA BASURA561,096.20010.01INSTALACION DE TACHOS PARA BASURAund1,205.00465.64561,096.20011PRUEBAS DE CALIDAD DEL SUELO11,250.00011.01PROCTOR MODIFICADOund15.00190.002,850.00011.02DENSIDAD DE CAMPOund240.0035.008,400.00012PRUEBAS DE CALIDAD DEL CONCRETO5,100.00012.01DISEO DE MEZCLASund2.00310.00620.00012.02ROTURA A LA COMPRESION DE CONCRETOund160.0028.004,480.00